Certificates Sheet
(2011 Specifaction)
Workers carrying out firing of Provide safety harms to the works and
wooden planks on an unprotected ensure good supervision Immediate
edge at the second floor of the
building without any safety Provision of guard rails and toe boards at
precaution increased risk of people the unprotected edge. A suitable safety net 01 week
falling from height causing serious also to be positoined to prevent falls from
injury or death. height.
INTERNATIONAL GENERAL Candidates Observation
CERTIFICATE sheet
(2011 specification)
IGC3-THE HEALTH AND
SEFETY PRACTICAL APPLICATION sheet number _03 of _17_
Conveyor belt operator was sitting Frequent breaks and job rotation to reduce
on hand seat : fully exposed to total the effects of vibration . 01 day
vibration of the machine. Possible Seat is to be modified to a more
risk of serious nerve or joint damage comfortable seat preferably with cushion 01 weak
and muscle weakening due to long to minimize the exposure of vibration.
them exposing to vibration.
One window in the work site office All the obstructed materials ore to be
was blocked by card board boxes rumored and properly cleaned thoroughly. 01 day
and stationeries, in the office Empty card boards and concern packing
increased. risk of fatigue and materials are to be stored in separate 01 week
drowsiness due to thermal stress & location.
lack of oxygen supply to the brain.
INTERNATIONAL GENERAL Candidates observation
CERTIFICATE sheet
(2011 specification)
Empty and foul gas cylinders are Empty and failed gas cylinder isto be
kept in one place. separatedand to be chained upright. 01 day
the place is not marked increased A friends and open area storage place to
risk of fire hazard. be designated with suitable gate with lock 01 week
this to be marked and signed appropriately.
INTRODUCTION :-
This is a precise report on risk assessments carried out in a building construction site of
The inspection was made on 03 march 2014 to assess the risk and hazards arising daring various
construction activities and the adequacy of the control measures taken in the construction site.
Around 150 workers and 40 contractors were working towards building a three storied commercial
shopping complex of 8713 sq.ft on the banks of the busy state highway.
There I had meet with M.Nouman the site engineer who provided a had full of help to complete this
assessment.
EXECUTIVE SUMMARY :-
The inspection focuses mainly on health and safety hazards associated with
variousconstructionsactivates at the work associated with various construction activities at the work
site.
The main topics outlined below and a detailed description is placed in the main body of this report.
Few points related to lack of emergency procedures which required attention were also mentioned
INTERNATIONAL GENERAL Candidate report template
CERTIFICATE
(2011 specification)
Risk of people and objects bulling from height due to working with improper work
Platforms and badly maintained access equipments were clearly visible during the
Inspection.
Musculoskeletal hazards of excessive manual handling due to improper lifting techniques and
continuous stopping and twisting motions were also assessed.
Risk of continuous and long team exposure to hazardous clearly noticeable in the work
Site provision and usage of appropriate clothing and PPEs are found essential to minimize the ill-health
effects to workers.
INTERNATIONAL GENERAL
Candidate report template
CERTIFICATE
(2011 specification)
Increasing the risk to maximum tolerable extend. These are to be controlled by designating suitable
stowage area and necessary precautionary measures.
to vehicle road traffic should be avoided to possible extend if unavoidable , adequate safety measures
are to be adopted .
Risk of electrocution and electrical fire due to sparks from defective or poorly maintained
Anumber of breaches of legislation rules related to variable to various issues also noticed and mentioned in the
man body the good practices mentioned in the observation are to be acknowledged and appreciated.
The inspection highlighted many issues relating to health and safety hazards associated with
various construction activities at the worksite. They are persuaded below in details
INTERNATIONAL GENERAL
Candidate report template
CERTIFICATE
(2011 specification)
Working at height . Working at height always involves potential risk of serious injury or fatality to the workers.
Many of the working platforms and access equipments in the work site were prone to this highly
Alerted risk due to either improper design or poor maintenance. Some of the elevated work platforms are in badly
maintainedcondition. But still in use and not provided with guard rails and toe boards these represent
infringement of Rule 5(2) of Regulation of Employment and condition and workers Act 1996 by Republic of Indian
Immediate attention required on following points:
Replacing of poorly designed and badly maintained scaffolds and elevated platforms
Provision of suitable guard rails and toe boards to the unprotected edger and work platforms.
Routinely inspection and periodic maintenance of scaffolds work platforms and access
equipments
Provision of sufficient number of safety harness and other Protective equipments and proper
supervision to ensure corrector usage of PPES.
2,70,000inr
(a) Musculoskeletal hazards :- The tasks involving carrying load manually to longer distance and
repetitive stooping 01 twisting motion are prone to various musculoskeletal disorders like back
injury , tendon and ligament injurious wruldetc These risks are to be eliminated or minimized by
proper planning of posting for unloading construction materials and ways of appropriate
handling and following actions are strongly recommended
Proper planning and supervision to ensure the material or unloaded at the possible nearest
Point where the items are actually required
Provision of adequate and suitable handling aids for conveying goods.
Estimated cost for above remedial action would be 50,000 inr
(b) Falling of objects from height Is a common hazards in any construction site. Also, deliberately
throwing debris and rubbles from heighted floors to ground might increase the risk to the
INTERNATIONAL GENERAL
Candidate report template
CERTIFICATE
(2011 specification)
STUDENT NUMBER00224185
Training sessions for creating awareness among workers on ill health effects of various
hazardous substances
Estimated cost for these control measures would be 40,000 inr
3 FIRE SAFTY:
The inspection reveals some of the fire hazards and risks arising from improper storage
of gas cylinders inflammable fuels etc. and accumulation of paper wastage due for poor housekeeping
Non-availability of designated storage place for storing the gas and inflammablefuel containers are they
key issues which required immediate attention . Lack of effective supervision on housekeeping activities
also ignites the fire risk. Under mentioned prevention measures accorded priority to reduce occurrence
and spread if fire in the work site.
Arrangement of safe, suitable and dedicated storage aria with proper fencing and lockable gate
Keeping gas slanders this area to be marked with proper sign and warning boards. Empty and
Filled cylinders are to be stored separately and to be chained upright an inspection scheduleof this
storage area by competent personnel also to be promulgated and ensured.
Another safe stowage area for keeping the liquid fuel containers also to be earmarked.
Procurement of new first aid fire extinguishers.
Ensure good supervision on housekeeping routines for timely clearance of dustbins and other
waste materials.
Estimated cost for these control measures would be 1, 00,000 inr.
3 MACHINE / VECHICLE SAFTY :-
During the assessments, some points related to machine and vehicle safety did also
Come in light usage of rotating machineries without proper guards and protective covers
Was observed. This could lead to serious injurious fractures due to entanglement,
(a) All motors, cog wheel chairs and friction gearing, fly
Wheels, shafting, dangerous and moving parts of machinery (whether or not driven by
Mechanical power) and steam pipes are securely fenced or lagged: (b) the fencing of
Dangerous ports of machinery is not removed while such machinery is in close proximately to the
vehicular traffic was not addressed at all and it indicates clear breach of Rule 48 of Indian Building and
construction Workers central rules 1998 which says whenever a building or construction work is being
carried on or is located in close proximity to a road or any other place where any vehicular traffic may
cause danger to building workers the employer shall ensure that such building or other construction
work is barricaded and suitable warning signs and lights displaced or erected to prevent such danger and
if necessary he may make a request in writing to the concerned authorities to control such traffic.
Ensure availability of guards and protective covers while running any rotating machinery
Barricading , signage boards and hi-vis jackets white working in close proximity to road or any
vehicular traffic
Information , instruction , training and proper supervision while working with rotating machines
Estimated cost for these preventive measures is 30,000 inr
4 Electrical Safety :_-
Poor maintenance and unsafe working practice with electrical in the work site.
Over loading of power sockets and using of electrocution and fire to be heavy sparked the following
corrector are to be implemented to eliminate / reduce these risks:
INTERNATIONAL GENERAL
Candidate report template
CERTIFICATE
(2011 specification)
STUDENT NUMBER00224185