Sie sind auf Seite 1von 4

AMJAD AHMED

mobile: +918237316777
Email: amjadtlq@yahoo.com

Objective

With an experience of over two decades, I seek a challenging job to control operations of large and fast track
multimillion projects and aim to achieve higher position in the construction industry.

Key Skills

Improving construction process, infrastructure and internal management information system to


achieve project requirements
Controlling and supervising subcontractor activities with regards to time and quality
Providing technical solutions to complex engineering issues
Monitoring daily productivity
Understanding and acting upon clients requirements
Monitoring and implementing strict HSE standards on site
Analyzing and improving the work process from initial stages
Familiar with MS Office, Auto Cad and construction ERP software

Education

Civil Engineering, Bangalore Board, 1993. INDIA


Associate member of The Institute of Engineers
(India)
ISO 9001:2000 Quality Management Systems
-Requirement

Work Experience 20.09 years (10 years in Gulf)

Sun Engineering & Contracting LLC, Dubai. 2.09


years
Construction Manager - July 2013 to April 2016
Project: Sparkle Tower, Dubai.
The twin tower building is of 3B+G+ 14 & 29storey at marina, Dubai. Monitored and executed
structure, post structural finishes in coordination with MEP services.
Client: Tebyan Real Estate Development Company, Consultant: MIMAR and ADC.

Project: Executive Bay, Dubai.


The mixed use twin tower building is of 3B +1 stG +2ndP+3rdP+4th (Health Club) +15&17, overall built up
area 58000m2. Monitored and completed post structural finishes in coordination with MEP services,
hard and soft landscape.
Client: DAMAC STAR PROPERTIES LLC, Consultant: Engineering Consortium consulting engineers (ECCE).

Al Futtaim Carillion LLC, Dubai. 5.05 years


Site manager - Jan 2007 to June 2012
Project: Al Jalila Children's Specialty Hospital, Dubai.
The 200 bed hospital building having 2B+G+3storey plus a technical level, overall built up area of 85000m2.
Monitored and executed structure.
Client: Dubai Health Authority (DHA), Consultant: Studio Altieri International,
Architect: Eng. Adnan Saffarini

Project: Al Muneera Development, Al Raha beach, Abu Dhabi.


Distinctively designed multi storey apartment buildings, magnificent villas with waterfront and canal views,
underground diverted traffic. An office tower with a unique covered walkway and a "Bridge Link" to the island
connecting to cafs, restaurants and retail outlets. Eleven sea-facing, five-bedroom villas on the promenade
spreaded over two levels. Monitored and completed internal fit outs and external facades of a 12 storey mainland
residential tower in coordination with MEP services, handing over of units to client satisfaction.
Client: ALDAR Properties PJSC, Consultant: DSA International

Project: Yas Island Marina hotel, Abu Dhabi.


The project comprised of two elliptical towers, 8 and 6 floors on land and other in a marina linked bridge with
glass bottom hotel towers, one floor providing underneath view of the racetrack having two levels of
underground parking, podium, Ballroom and various restaurant outlets. Both buildings are covered by a unique
Architectural shell cloak structure which incorporates specialist lighting effects. Monitored and completed
structure, post structural finishes in coordination with MEP services, management and supervision of fit out
activities for SPA and restaurants.
Client: ALDAR Properties PJSC, Consultant: Asymptotes, Architect: Tilke & Partners

Project: Burj Dubai Development plots 58 & 59, Dubai.


The project comprises of three levels of Underground Car parks, ground floor, and 5 levels of podium - Tower 58
of 25 levels and tower 59 of 26 levels, overall built up Area of 78000 m2. Monitored and executed internal
finishes, completed single bed apartment mockup to client satisfaction.
Client: EMAAR PROPERTIES. Dubai, Consultant: Arif and Bintouk

Project: Burj Dubai - Old Town residential Phase 2A, Dubai.


Successfully completed the stone package for 13 residential buildings of low and medium rise up to 10 floors
Comprising 520 apartments and handing over of apartments.
Client: EMAAR PROPERTIES. Dubai, Consultant: DSA International

Al Jaber Grinaker - LTA (ALEC), Dubai. 0.04 years


General Foreman - Jan 2006 to April 2006
Project: Al Manzil and Qamardeen hotels, old town village, Dubai (Hotel A & B).
The project comprises of 197 and 184 bedroom four star resort hotels, with bars, restaurants, retail outlets, and
basement parking for 200 vehicles, overall built up area of 46000 m 2. Monitored and executed external facade.
Client: EMAAR PROPERTIES. Dubai, Consultant: Mirage mille Leisure & Development Inc.

BU HALEEBA Contracting LLC, Dubai. 2.07 years


General Foreman - March 2003 to October 2005
Project: Burj Dubai Business Park Phase-1.
The project comprises of 2B+G+P+5&7 floor Commercial Building. Monitored and executed structure.
Client: EMAAR PROPERTIES. Dubai, Consultant: Design and Architectural Bureau (DAR)

Project: Madinat Jumeirah resort phase-3.


Heritage themed retail souq comprising of 85 shops and multiple restaurants, a health club, a banquet hall /
multipurpose venue of 35000m2, 7 luxury villas, canal waterways and parking for 1000 vehicles. Built up area of
88000 m2. Monitored and completed structure, post structural finishes in coordination with MEP services and DLP.
Client: H.H. Sheikh Mohammed Bin Rashid Al Maktoum, Consultant: Mirage Mille Leisure & Development Inc.

R. N. A. Builders. Mumbai, India. 3.07 years


Quantity Surveyor - August 1999 to March 2003
A 17 storey Residential tower in Andheri, Bombay, India. Completed structure, post structural Finishes including of
all MEP services installation.
Architects: Hafeez Contractor, R.C.C. Consultant: Satish Dhupelia

New Banas Construction Co. Mumbai, India. 3.11 years


Site Engineer - August 1995 to July 1999
A 5 storey School building at wadala, Bombay, India.
Construction of R.C.C retaining wall over pile foundation at wadala. Bombay, India.
Construction of U. C. R masonry compound wall. Bombay, India. Monitored and completed structure, post
structural Finishes and MEP.
Client: Bombay Port Trust.

B. H. Construction Co. Mumbai, India. 2.02 years


Junior Engineer - May 1993 to July 1995
Construction of a Factory building for Amarnani Textile Industries Ltd, Bombay, India. Monitored and executed
structure.
Client: HARRY Collection premium suiting and shirting, Mumbai, Consultant: Gherzi Eastern Pvt. Ltd.

Roles and Responsibilities:

Managing day-to-day operational aspects of the project & supervising construction activities
Coordinating with client, consultants, sub-contractors and in house staff
Responsible for approvals, pre qualifications and monitoring the execution as per final approvals
Serving as main point of contact to client, in- house staff, suppliers, subcontractors and management
Supporting junior staff to improve quality of work
Monitoring and implementing strict HSE standards as per UAE regulations
Liaising with local statutory authorities for necessary submissions and approvals
Inspecting & controlling activities such as Earthworks, structural, MEP, External services,
Landscaping works, finishing works & different types of waterproofing systems
Identifying snags at early stages to improve the standard of quality
Implementing latest construction technology
Directing the team of engineers and staff below

Achievement

Carillion Values Award

Personal Details

WhatsApp: +971554538171
Permanent Address - Flat No: 16, 3rd.Floor, Vakola Village Road, Santa Cruz (East), Mumbai - 400 055.
Passport No L 3878895
Nationality - Indian
Religion - Muslim, Islam
Date of Birth - 13-02-1973
Marital Status - Married
Driving License - Valid U.A.E & Indian LMV License
Languages Known - English, Hindi, Marathi and Urdu.

Das könnte Ihnen auch gefallen