Company Presentation
Dr. Marc Schier
Vancouver, September 2014
Introduction
Company Profile
The Linde Group
Linde Engineering
Product Line Natural Gas Plants
Woodfibre LNG Plant
Technoloy Selection Process and Linde's design features
Safety & Environmental control philosophies
First impressions
Discussion
2
The Linde Group
- Linde was founded in 1879 by Dr. Carl von Linde who was a pioneer in the development of
cryogenic systems, inventing for example the first air separation plant for production of
oxygen
- Today we are the leading gases and engineering company with 63 500 people working in
more than 100 countries worldwide. The company is committed to technologies and
products that unite customer value and sustainable development.
3
The Linde Group
Organisational structure
Engineering Division
Gases Division Other Activities
(EPC Contractor)
27 LE Entities
worldwide Gist
EMEA
of which 4 Execution
hubs are located in:
Asia/Pacific Germany
India
USA
China
Americas
5
5
Gases Division
Activity areas
Tonnage Healthcare
Global #2 Global #2
24%
24% 11%
11%
15-year take-or-pay contracts Hospital care & Homecare
(incl. base facility fees) Bulk & cylinder gases
Add. growth in JVs & Embedded Structural growth
Finance Lease projects 2011
Sales
24%
24% 41%
41%
6
6
Synergies
Between Gases and Engineering
Production of plants for Linde Gas and Providing chemistry and energy related solutions
3rd party customers to 3rd party customers
Adsorption plants
Air separation units
Hydrogen and synthesis gas plants
Gas processing plants
Natural gas plants
Yukon Territory Petrochemical plants
Northwest Territories
Newfoundland
British Alberta
Columbia Quebec
Manitoba
Ontario Nova
Saskatchewan Scotia
9 9
Linde Engineering
Engineering offices and research facilities (LEHQ)
13
Product Line Natural Gas
Typical examples of LNG distribution chains
14 14
Presence Along the Complete LNG Value Chains
A case study in Scandinavia
15
LNG Plant, Stavanger, Norway
Challenging Norwegian permitting
~ 240 m
~ 90 m ferry terminal ~200m
residential area
industrial park ~1.000m
~500m
16
Small to mid-scale LNG plants
Customer:
Customer:
Huineng Coal
Tongkai
Capacity: 0.28 MTPA
Capacity: 0.32 MTPA
Location:
Location:
Customer: Huagang Gas (PetroChina) Beiniuchuan,
Bazhong, Sichuan
Feedgas: Capacity: 0.45 MTPA Inner Mongolia
Location: Jincheng, Shanxi Feedgas: SNG
Trunk line
Feedgas: Coal Bed Methane Commission:
Commission:
Award: 2013 2013
20014
18
World's largest Re-liquefaction plant, Bintulu, Malyasia
Customer:
MLNG
Liquefaction capacity:
0.8 mtpa
Liquefaction process:
Linde's LIMUM process
with CWHE
Location:
Bintulu, Malaysia
Scope of work:
EPC turnkey
Start-Up:
Q1 2015
19
World Scale LNG Plant in Hammerfest, Norway (Snhvit)
20 20
Location of Snhvit LNG Plant next to Hammerfest
Distance from
LNG plant to
residential area
of Hammerfest is
approx. 1 km
21
Snhvit LNG Plant
A unique series of challenges and firsts
1st world scale all electric drive system of refrigerant cycle compressor
applying direct sea water cooling
1st CO2 capture from natural gas, clean-up, liquefaction and sequestration
World scale LNG plant on smallest plot space ever
Full modularization and use of largest process module ever
Near island mode power plant with highly efficient aero derivative GTs and
heat integration, resulting in minimal CO2 emission
Strong focus by Norwegian government on use of best available
environmental friendly technologies
22 22
Snhvit LNG Plant
Project execution approach
Heerema Fabricom
MEG-Modules: Cold Box: 3 100 tons
4 800 tons
Dragados
Heerema Process plant 35 000
SC-Modules: tons
9 300 tons
Tanko Italia Fabricom
MEG-Tanks: PAUs+PARs:
1 300 tons 10 600 tons
23
9/11/2014/A.Behrendt/ENPP1 Modularization - Project References 23
Snhvit LNG Plant
Cold box transport
24 24
Snhvit LNG Plant
Process barge transport
25 25
Snhvit LNG Plant
26 26
Product Line Natural Gas Plants
27
Manufacturer of Cryogenic Key Equipment
Supplied along the LNG value chain
28
28
Manufacturer of Cryogenic Key Equipment
Selected References for Coil Wound Heat Exchangers
29
Product Line Natural Gas Plants
30
Worldwide EPC Track Record
Lost Time Injuries per 1.000.000 man hours (LTI Rate)
1,20 2008
2009
2010
2011
2012
0,79 2013
0,63
0,44
0,37
0,37
Engineering Division (incl. Construction Contractors)
Status 31.12.2013
31
Recently Completed Major Projects
Selected major projects (in total around 4000 plants)
32
Recently Completed Major Projects
World largest Ethane Cracker (1.5 MTPA) in Abu Dhabi
Customer:
Borouge
Capacity:
1.50 Mio t/a Ethylene
0.06 Mio t/a Propylene
Scope of work:
EPC (Consortium with CCC)
Order:
12/2006
Completion:
07/2010
33
World largest Ethane Cracker (1.5 MTPA) in Abu Dhabi
HSE Record
HSE Statistics:
Awards:
34
Recently Completed Major Projects
8 Air Separation Units for the Pearl GTL Project
Customer:
Shell
Capacity:
8 x 3,600 MTPD Oxygen
Scope of work:
EPC
Order:
08/2006
Production Started:
01/2011
35
35
Thank you
for your attention.