Mined Tunnels SCL/NATM/SEM

Content

Latest Developments on mined tunneling supporting


method
Controlling soft ground

2
Mined Tunnels SCL/NATM/SEM

Terminology

SCL Sprayed Concrete Lining


NATM New Austrian Tunneling Method
SEM Sequential Excavation Method
Observational Approach

Shotcrete Sprayed Concrete

3
Example: Mined Station; Seattle

SoundTransit
Beacon Hill Station

4
Example: Mined Station; London

LUL Jubilee Line Extension


Contract 102 Waterloo Station

5
Example: DTSS Advance Tunnel; Singapore

North East Line


Contract C705

6
Example: Overrun Tunnels; Singapore Orchard Road

Circle Line 1 Overrun Tunnels


Contract C825 Dhoby Ghaut Station

7
Example: NS3 Cable Tunnel; Singapore

Tunnels for TBM operation and cable


enlargements

8
Example: EW1 Cable Tunnel; Singapore

Mined tunnel

9
Mined Tunnels

Key Issues
Are not rocket science
Understand the general sequence of tunneling and
the staging of excavation & support application
Pay attention to deformation control and ground
confinement
Recognize the importance of design adjustments
during construction
Maintain stability of the excavation face at all times
Understand why people call it high risk

10
Mined Tunnels

Characteristics of Work Processes

Linear development of the work zone with limited


space and accessibility
Repetition of working steps (work cycles)
Transient intermediate stages (sections with
incomplete liner)

11
Mined Tunnel - Construction

Sequencing of Excavation & Support

Constitutes major part of the design

12
Mined Tunnel - Construction

Sequencing/staging DETAILING
Staged Excavation
Lattice girder, full round in soft ground
Shotcrete & wire mesh

13
Mined Tunnel - Construction

Typical sequencing/staging

Top Heading

Bench

Invert Bench
14
Mined Tunnel - Construction

15
Typical sequencing/staging

16
Typical sequencing/staging

17
Steel Rib / Arch

Not embedded in shotcrete

Function
Load distribution
Support of green shotcrete
Profile control
Support for forepoling

Traditional Types
H-beams
Channels with sliding connection
Lattice girder
18
Channel with sliding connection

19
Lattice girder For embedment in shotcrete

Layout Options:

Standard

Optional

20
Face Stability

Advance support of excavation face


Forepoling / pipe umbrella / spiling

21
Ground Support

Forepoling DETAILING

Advance support ahead of excavation face


Provide support for exposed round
Needs support (soil and lattice girder)
22
Special Equipment Tunnel Excavator

23
Special Equipment Tunnel Excavator

24
Advance Support Ahead of Excavation Face

Pipe Umbrella / Pipe Roof


Same concept as forepoling
but stronger & heavier & longer

25
Advance Support Ahead of Excavation Face

Pipe Umbrella / Pipe Roof

26
Pipe Roof

27
Pipe Roof

Casagrande Rig
28
Pipe Roof

Jumbo

29
Pipe Roof

30
Advance Support Ahead of Excavation Face

Forepoling Soft ground

Support soil in front of the next face


Reduce soil loading for the soil wedge defining face
stability
Spacing typically 150-300mm c/c
T25 rebars, mostly grouted
Length > advance length (typically 1.5 x)
Tied into lattice girder of previous round

31
Face Stability

Effects of Advance Support

Wedge 1 & Wedge 2

32
Face Stability Design of Advance Support

Wedge 1 situation

Support of free
advance length

33
Face Stability Design of Advance Support

Wedge 2 situation

Supporting load
on top of wedge

34
Advance Support Ahead of Excavation Face

Spiling Rock

Same concept as forepoling but in rock


Rock bolting inclined forwards in order to avoid
overbreak in the next blasting round
Spacing typically >500mm c/c
Length advance length
Does not need a lattice girder

35
Spiling to reduce overbreaks

36
EXAMPLE: Face stability in Praxis

37
38
EXAMPLE: Face stability in Praxis

Loose Gravel

Silt Stone
Dense Gravel

Tunnel

Dense Gravel

39
Face stability in Praxis

Subdivide excavation face


Increase immediate support by reduction of
excavation area

Start where it is worst, use the better area for


support

FACE
SUPPORTING
BODY

40
Example Face
Recover, smallStability
faces

41
Recover, small faces

42
Recover, small faces

43
Drainage

Forepoling

Face bolts

Face
Dumpling
44
Application to Complicated Problems

Change of shallow cover pipe pile box


tunnel to a mined tunnel with shotcrete
Ground Level 109.43 (approx.)

103.03m Existing 1.2m Water Pipe

101.48 Supporting Steel Frame

PIPE
800mmx11mm thk SUBWAY STRUCTURE

~ 94.00m
45
Pipe Roof Cross Section Pipe Pile Box

46
Application to Complicated Problems

One tunnel too shallow

Existing 1.2m Water Pipe

SUBWAY STRUCTURE

47
SCL Cross Section - Sequencing

48
SCL Cross Section - Sequencing

49
SCL Cross Section - Sequencing

Half of permanent
structure

Temp. props

50
SCL Cross Section - Sequencing

51
SCL Cross Section - Sequencing

52
SCL Cross Section - Sequencing

53
Longitudinal Section & Ground Condition

FILL & Peaty clay

Silty Clay

Cemented silty sand

Water Pipe

Pipe Roof Sections


54
Sequential Excavation with Pipe Roof

Install Pipe roof


Sections overlap more pipe layers

Top heading

Temporary invert

55
Construction

Pipe Roof

56
Ground Treatment

Details of face grouting arrangement

Design of drilling / grouting pattern

57
2D Analysis
Fill concrete

Mined Tunnel 2 (Staged Top Heading &


Connection DETAIL
Bench/Invert excavation)

Face & pipe roof grouting

Permanent Structure

Tunnel 2
Horizontal face grouting + Pipe Roof
installation and grouting
Temporary Prop
Staged excavation of Top Heading &
Bench/Invert (short ring closure)
Casting of second half permanent
58
structure
3D Analysis

59
Pipe Roof Drilling

60
Excavation

61
Construction

SECTION 1
double pipe roof

SECTION 2
double pipe roof

62
Excavation Top Heading

63
Construction

Pipe roof pipe

64
Excavation Top Heading

Face grouting
pipes
65
Face Support Top Heading

66
Face Grouting Top Heading

67
Drilling of Face Grouting 1st Drift

68
Construction Issue

Weak support resistance of


Lattice girder and temporary invert

69
Excavation 2nd Drift

70
2nd Drift Completed

71
Application to much Larger Schemes

72
Singapore Jurong Caverns

73
Storage Schematics and Terminology
Access tunnel

Water Curtain
Tunnel & dill holes

Water Curtain
Tunnel &
drill holes

Access
tunnel Storage cavern
20 x 30 x 650m

Inlet shaft
Pump Shaft
74
Storage Schematics and Terminology

75
Water Curtain System

Permanent pressure gradient towards the cavern


Oil floats on top of a water cushion
Thickness of water cushion is regulated by water
pumps in pump shaft

76
Storage of Crude Oil

Water pump

Oil pump

Crude Oil

Water cushion

Hot oil pipe

77
Storage Principle

Hot oil pipe

78
Engineering

Engineering during construction

Geological Mapping

Geotechnical Documentation

Rock Support Classification

Rock support application

Geological prediction during construction

79
Implementation During Construction

Geological
Mapping sheet

80
Distribution of rock quality Padur/A

81
Data Management

Geological documentation

82
Construction Sequencing

Gallery Pilot and Slashings

Side Slashing - LEFT Pilot Gallery Side Slashing - RIGHT


83
Construction Sequencing

Bench 1

Side Slashing
Bench 2
Pilot Bench

84
Construction Sequencing

3 Benches

Gallery
Bench 1

Bench 2

Bench 3

85
Excavation Stages

Gallery

Bench 1

Bench 2

Bench 3

86
Excavation Stages

Pilot
Side slashing

87
Excavation Stages

Bench 1 Pilot
Side slashing

88
Excavation Stages

Bench 2 Pilot
Side slashing

89
Excavation Stages

Bench 3

90
Excavation Stages

30m

21m

12m
Pump sump

91
Construction

Cavern

92
Construction

93 Access tunnel portal


Access tunnel junction

94
Pump Shaft

Inlet Shaft

95
96
Vishakapatnam Construction

Inlet shaft

97
Inlet shaft

98
Pump shaft

99
Pump shaft

100
Major Wedge Failure

101
Major Wedge Failure

102
Major Wedge Failure

Sigma 1
MPa
0.00
1.80
0

3.60
5.40
7.20
9.00
-10

10.80
12.60
14.40
16.20
18.00
-20

Shear
Tension
Both

Shear
-30

Tension
-40
-50
-60

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80

103
Major Wedge Failure

104
Major Wedge Failure

105
Thank You