CLEANLINESS AND CONTROL ON CHEMICAL ANALYSIS OF ER310 FILLERWIRE

1. The fillerwire shall be stored in the manufacturers container and drawn out only before use.
2. The fillerwire shall be duly cleaned using a swab soaked in Acetone to make it free from any
impurities.
3. Similarly, the base metal weld zone shall be cleaned using Acetone soaked swab to make it free
from impurities.
4. DPT shall be carried out before the beginning of the welding.
5. The welding shall be carried out in a specially allocated zone for SS310 welding to avoid any type
of contamination.
6. The welders are qualified in 3G Uphill position for groove welding and in all positions for fillet
welding. All the welders that are to be employed on the project have almost 10+ years of
relevant experience in welding using GTAW.
7. The fillerwire make that will be used is ADOR Make TIGINOX ER310 Brand and only one Batch of
the fillerwire will be used on the job to ensure control on the chemical analysis. PMI testing of
the weld will be carried out after the completion of the weld.
8. The tools and tackles employed on the SS310 material fabrication and welding will be limited to
their use on SS310 only to avoid contamination.