Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )

Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

WEEKLY REPORT. PLTU 3 BABEL ( 2 X 30 MW )Period May 09 May 18 ,


2011.
SUMMARY

INSPECTED PADDING SURVEY WATER INJECTION


PUMP AND CONDENSER TURBINE NO # 1
CONDENSER TURBINE NO # 1 AND CONDENSER
NO # 2 AND CONDENSER TURBINE NO # 2

SITE PROBLEM REMIDIAL TARGET


ACTION.
1. Centerline
and 1. Position 1. Condenser # 1 1. Condenser #
Dimensional Condenser In and 1,
Of Port Not Condenser Condenser #
Condenser. Centre Line. # 2 2
For T/G # 1 Between Position And Pump
& T/G # 2 Condenser Still Level Perfected.
# 1 and in Center Condition.
Condenser Line.
# 2.

Mechanical Weekly Report


Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

Condenser 2. Line thru Lube


2. Alignment #2. Must Oil Tank. Ok.
Of Water be Same. 2. Installation
Injection 3. Manual From
Pumps. Operation and Turbine
T/G # 1 Maintenance Generator #
2. Oil Lube Tank Equipment 1 and
must be Had been Turbine
welded Done. Generator #
Connect to 2 Thru Main
Flange and Master
3. The Leak Off Test. Steam valve
elevation of and Oil Lube
Top Padding 3. Gate Valves Tank .Ok
Plate of must be Ok. 3. Leak Of test.
Cond. To Test Run Pipe Line,
Pumps. for Open and Condenser
Closed Valves. and Lube Oil
Tank and
Pumps.
Will be Test.
4. Last Ok.
Drawing
Approval. 4. Operator
Professional
and
Experience
Must Be
Prefect.
5. Certificated
Equipment 5. Calibrated
Had been Had been
Down. done.

INSPECTED OF TURBINE GENERATOR NO. # 1 #


( TO ENCLOSED UPPER CASING TURBINE GENERATOR
#1).
DESCRIPTION SITE PROBLEM REMEDIAL TARGET
ACTION 1. Closed

Mechanical Weekly Report


Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

1. Padding Inspected Of Unit 1. Already Cover


Survey. Front Gland Checked Turbine
Clearance. The perfected.
2. Centerline Inspected.
Survey. Grade 1 : Ok. 2. Tightening
Bolts.
3. Pre 0 to 270 Degree : 2. Compared
Alignment = 0.50 ( a and b). Last 3. Installed
Generator Drawing Pipe Line
#1. Grade 2 : and Actual from TG 1
Inspected. Thru Lube
4. Pre 0 Degree : OK. Tank,
Alignment = 0.45 ( a and b). Condenser 1
Turbine # 1. 3. All and Master
90 -270 Degree : Equipment Steam
5. Last = 0.50 ( a and b). Cleaned Valves.
Drawing Out.
Approval. Grade 3 : Ok. 4. Installed AC
Aciter and
6. Certificate 0 Degree : 4. Closed Pipe Lines.
Had been = 0.50 ( a and b). Cover
done. Turbine. 5. Flushing
90 180 Degree : Ok. Pipe Lines.
7. Calibration = 0.60 ( a and b).
Equipments 6. Air Test
and Tools. 270 Degree : Line.
Had been = 0.50 ( a and b).
done. 7. Water Test
Grade 4 : Line.
8. Manual
Instruction 0 Degree : 8. Test Welded
from = 0.60 ( a and b). In Pipe
Fabricator. Lines.
Had been 90-180 Degree.
done. = 0.45 ( a and b). 9. Individual
Test.
9. SOP. 270 Degree.
= 0.55 ( a and b). 10.Manual
10.Safety Operation
Manual Had been
Procedure. Grade 5 : done.

11.Final 0 Degree :
Inspected = 0.50 ( a and b).
Before 11.Operator
assembled 90-180 Degree : Experience
and = 0.45 ( a and b). and
enclosed Excellent..
upper 270 Degree :
casing. = 0.55 ( a and b).

Grade 6 :

0 Degree :
= 0.57 ( a and b).
Mechanical Weekly Report
Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

Name : Marsaid.Arsyad / KSO - Mechanical Engineering.

Mechanical Weekly Report