Sie sind auf Seite 1von 49

purposes only

Forr training

Hydraulic Cylinder Unit


Unit, HCU
HCU.

MAN Diesel & Turbo Author Current topic 00.00.2012 < 1 >
purposes only
Forr training

H d
Hydraulic
li Cylinder
C li d Unit.
U it

1)) Distribution Block

2) Components:
FIVA
Accumulators
Cylinder Lubricator

3) Highpressure Pipes

MAN Diesel & Turbo Author Current topic 00.00.2012 < 2 >
purposes only
Forr training

H d
Hydraulic
li Cylinder
C li d Unit,
U it HCU.
HCU
Accumulator
Exhaust Valve
Actuator

Fuel Oil
Pressure
booster

FIVA valve
Ball Valve
Distribution Block
Cylinder Lubricator
MAN Diesel & Turbo Author Current topic 00.00.2012 < 3 >
purposes only
Forr training Hydraulic Cylinder Unit,
HCU Di
Distribution
t ib ti Block.
Bl k

Seen from Man. Side Seen from Exhaust Side

MAN Diesel & Turbo Author Current topic 00.00.2012 < 4 >
purposes only
Forr training
Hydraulic Cylinder Unit, HCU
L70ME

Distribution block

Double wall pipe


Double wall pipe

MAN Diesel & Turbo Author Current topic 00.00.2012 < 5 >
purposes only
Forr training
Hydraulic Cylinder Unit,
HCU Hydraulic Diagram.

Inlet Valves Drain Valves


MAN Diesel & Turbo Author Current topic 00.00.2012 < 6 >
purposes only
Forr training
Hydraulic Cylinder Unit,
HCU Valve
Val e Operation.
Operation

405 : Drain valve for FIVA valve


406 : Drain valve for FIVA valve
420 : Main supply valve of high pressure
oilil tto FIVA valve
l
421 : Drain valve for distribution block
430 : Valve for double wall pipe leakage
detection
431 : Drain valve for outer pipe oil
560 455 : Mini-mess
Mini mess coupling for measurement
406 of the oil pressure (high pressure side)
421 455 560 : Supply valve of high pressure oil to
405 ME llubricator
bi t
420
430 431
Valve position during normal operation
405 406 420 421 430 431 560
Closed Closed Open Closed Open Closed Open

MAN Diesel & Turbo Author Current topic 00.00.2012 < 7 >
purposes only
Forr training
Hydraulic Cylinder Unit,
Hydraulic Diagram 300 bar
bar.

MAN Diesel & Turbo Author Current topic 00.00.2012 < 8 >
purposes only
Forr training
Hydraulic Cylinder Unit,
HCU Valves.
Valves

I t ti
Instructions

Valve No.

MAN Diesel & Turbo Author Current topic 00.00.2012 < 9 >
purposes only
Forr training
Hydraulic Cylinder Unit,
HCU Cautions

CAUTION CAUTION
HCU OVERHAULING LUBRICATION OVERHAULING
0. CHECK GAUGE WORKS! 0. CHECK GAUGE WORKS!
1. CLOSE VALVE NO. 420, 531 1. CLOSE VALVE NO. 560
2. OPEN VALVE NO. 421, 405, 406 2. CHECK PRESSURE AT MEASURING
3.CHECK PRESSURE AT MEASURING POINT 565
POINT 455.
455 3 IF PRESSURE IS PRESENT,
3. PRESENT PRESS
WARNING NEVER OPEN VALVE THE PRE-LUB BOTTON AT THE HMI
420 WHEN SYSTEM PRESSURE IS PANEL.
ON

MAN Diesel & Turbo Author Current topic 00.00.2012 < 10 >
purposes only
Forr training

FIVA Valves

MAN Diesel & Turbo Author Current topic 2007-01-03


00.00.2012 < 11 >
purposes only
Forr training
FIVA
Fuel Injection Valve Actuation
FIVA

Degree Crank angle

-20 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360

Injection start (0)

Injection End (20)

Exhaust valve open (110)

Exhaust valve Close (270)

Approximate timing of events to be carried out by the FIVA valve


On an ME- engine
g the timing
g of injection
j is variable and this is jjust an example.
p

MAN Diesel & Turbo Author Current topic 00.00.2012 < 12 >
purposes only
Forr training

MAN Diesel FIVA.

Pilot Valve

Feed Back Sensor

Control
Piston

Main Spool

MAN Diesel & Turbo Author Current topic 00.00.2012 < 13 >
purposes only
Forr training

FIVA Spool Positions.


Positions

Main Spool Position


Feedback from
LVDT Sensor

MAN Diesel & Turbo Author Current topic 00.00.2012 < 14 >
purposes only
Forr training
Accumulator
Diaphrame Working Principle.
Diaphrame, Principle

MAN Diesel & Turbo Author Current topic 00.00.2012 < 15 >
purposes only
Forr training
Accumulator
Nit
Nitrogen Ch
Check,
k SL06
SL06-469.
469

The accumulator
Th l t charge
h pressure should
h ld bbe
checked within the first week of service.
Next check should be made around 4
months
th llater,
t ffollowed
ll db
by checking
h ki every 6
months.
A minor leakage from the accumulators is
unavoidable and service experience shows
unavoidable,
that a pressure drop in the range of 2-5
bar/month is to be expected.
The charge pressure is dependent on
working servo oil pressure as well as the
accumulator temperature.
For the 200 bar HPS accumulator charging
pressures are:
95 bar +0/-5 @ 20C
105 bar +0/-5 @ 50C

MAN Diesel & Turbo Author Current topic 00.00.2012 < 16 >
purposes only
Forr training

Cylinder Lubrication System.


System

MAN Diesel & Turbo Author Current topic 00.00.2012 < 17 >
purposes only
Forr training

Cylinder Liners.
Liners

Injection nozzle

Injection nozzle
with non-return Cylinder liner
valve

MAN Diesel & Turbo 3331050/20031212 (CBO/4100) Author Current topic 00.00.2012 < 18 >
purposes only
Forr training

ME Cylinder Lubricator.
Lubricator
Cylinder lub. Inductive proximity sensor
oil inlet for feed-back signal to
control of piston movement
Signal for
lubrication from
controller
Level sensor for
cylinder oil in lubricator

Outlets for
cylinder liner Injection plunger
lub oil
lub.
injectors

Spacer for
basic setting of
pump
stroke
Drain 200 bar system oil supply
Non-return valve Stroke oil
adjusting outlet Actuator
screw piston
Sealingring

MAN Diesel & Turbo 3331377/20041021 (2200/OZS) Author Current topic 00.00.2012 < 19 >
purposes only
Forr training

Cylinder Lubricator
Lubricator.

Distribution Block

Cylinder Lubricator

MAN Diesel & Turbo Author Current topic 00.00.2012 < 20 >
purposes only
Forr training

Cylinder Lubrication Demands.


Demands

The purposes of cylinder lubrication are as follows:

1
1. To create a hydrodynamic oil film separating the piston rings from the liner
The optimum is kept safely down to a feedrate of 0.60 g/kWh.

2. To clean the piston rings, lands and ring grooves

All approved cylinder oils fullfils the requirements, even at a feed rate as low as 0.60 g/kWh.

3. To control corrosion, i.e. control the neutralisation af sulphuric acid


According to latest Service Letter (SL2013-571) Feedrate Factor and Minimum Feedrate have to be
adjusted to 0.20
0 20 0.34
0 34 g/kWhxS% x S% and 0.60
0 60 g/kWh

MAN Diesel & Turbo Author Current topic 00.00.2012 < 21 >
oses only
Forr training
Optimising the Cylinder Condition.
Lubrication versus Maintenance
Maintenance.
purpo

Liner wear rate as a function of lube oil dosage


1

ooilstarvation
0,9

brication)
0,8

(boundarylub
Highweardueto
0,7

m/1000h)
0,6

Lin er Wear (mm


0,5

0,4

0,3

0.10 mm/1000h
0,2
0 05 mm/1000h
0.05

0,1 0.02 mm/1000h

0
03
0,3 04
0,4 05
0,5 06
0,6 07
0,7 08
0,8 09
0,9 1 11
1,1 12
1,2 13
1,3 14
1,4 15
1,5 16
1,6

Lube Oil Dosage (g/kWh)

MAN Diesel & Turbo Author Current topic 00.00.2012 < 22 >
purposes only
Forr training

H
How tto d
determine
t i ACC ffactor.
t

Prerequisite for correct determination of


ACC factor = Feed Rate factor

MAN Diesel & Turbo Author Current topic 00.00.2012 < 23 >
purposes only
Forr training
Sulphur % in relation to BN number.
SL2013 571
SL2013-571

Fuel type
yp BN
Distillate and LNG <= 40
Low Sulphur residual fuel 40 - 60
High Sulphur residual fuel Mk 6 - 8 55 - 100
High Sulphur residual fuel Mk 9 or newer 70 - 100

MAN Diesel & Turbo Author Current topic 00.00.2012 < 24 >
purposes only
Forr training

Scaling the ACC factor


factor.

3 % S
S. BN 70 3
3%S
S. BN 40

A A
A A
A
A
A
A
A
A A
A A A
A A A
A
0.6
0 6 g/kWh A A A
0.6 g/kWh

F = 70/40 =1.75

MAN Diesel & Turbo Author Current topic 00.00.2012 < 25 >
purposes only
Forr training
ACC Dosages calculated from different Feedrate
Factors (SL2013-571,
(SL2013 571 Min Feedrate =0
=0.6
6 g/kWh)

MAN Diesel & Turbo Author Current topic 00.00.2012 < 26 >
purposes only
Forr training

Lubricator part load break point


point.

MAN Diesel & Turbo Author Current topic 00.00.2012 < 27 >
purposes only
Forr training

Two ways to ACC factor


factor.

1: ACC familiarsation.
Adjust according to piston ring and liner wear.
wear
Use oil analysis to evaluate.
.

2: Adjust according to Feed Rate sweep.


Adj
Adjust according
di to oilil analysis.
l i

MAN Diesel & Turbo Author Current topic 00.00.2012 < 28 >
purposes only
Forr training

Piston ring and liner wear


wear.

CPR-POP Liner wear

CPR-CL
CPR CL
MAN Diesel & Turbo Author Current topic 00.00.2012 < 29 >
purposes only
Forr training
Piston ring wear.
SL2013 571
SL2013-571.

CPR-POP CPR-CL

MAN Diesel & Turbo Author Current topic 00.00.2012 < 30 >
purposes only
Forr training
Analysis Safe Area.
SL 2013-571.
2013 571

MAN Diesel & Turbo Author Current topic 00.00.2012 < 31 >
Graph to find the perfect Feed Rate
purposes only
Forr training

g
setting.
SL 2013-571

MAN Diesel & Turbo Author Current topic 00.00.2012 < 32 >
purposes only
Forr training
Running in SL2013-571.
Breaking in.
in

MAN Diesel & Turbo Author Current topic 00.00.2012 < 33 >
purposes only
Forr training
ACC Running in schedule.
SL 2013-571.
2013 571

MAN Diesel & Turbo Author Current topic 00.00.2012 < 34 >
purposes only
Forr training

ACC Cylinder Lubrication.


Lubrication

Sulphur % Minimum feed rate


Feed rate factor F
F

Fixed Feed rate

MAN Diesel & Turbo Author Current topic 00.00.2012 < 35 >
purposes only
Forr training

Correction Tables
Tables.
Runningg with Feed Rate Factor Runningg with Feed Rate Factor
0.20g/kWhxS% (Normal Running) 0.23g/kWhxS% (Running In)
[Correction factor: 0.20/0.26=0.77] [Correction factor: 0.23/0.26=0.88]
When operating the
Lubrication from MOP
without updated software,
the system will not allow
the Feed Rate Factor to be
adjusted below
0.25g/kWhxS%.
To ensure correct lubrication
oil dossage correspondig
to Feed Rate Factor
g 0,20
settings , or
0,23g/kWhxS, the factor
has to be adjusted to
g
0.26g/kWhxS% in the
MOP and correction on the
sulphur content in the fuel
oil (S%) has to be done
according to the
Correction Tables.
MAN Diesel & Turbo Author Current topic 00.00.2012 < 36 >
purposes only
Forr training

Cylinder Lubrication Back-up.


Back up

In case of CCU failure, where the


CCU cannot be changed
immediately the cylinder lubrication
immediately,
can be achieved by a temporary
cable from one of the ECU units,
plug 52
52, to the solenoid valve on
the lubricator on the unit in
question.
Th lubrication
The l b i ti will ill b
be with
ith random
d
timing.

MAN Diesel & Turbo Author Current topic 00.00.2012 < 37 >
purposes only
Forr training

Cylinder Lubrication Back-up.


Back up

MAN Diesel & Turbo Author Current topic 00.00.2012 < 38 >
purposes only
Forr training
HCUs Mounted on a Common Base Plate.

Double wall
high pressure
pipe
High pressure oil inlet
from the HPS

MAN Diesel & Turbo Author Current topic 00.00.2012 < 39 >
oses only
Forr training

Hydraulic Cylinder Units


purpo

MAN Diesel & Turbo Author Current topic 00.00.2012 < 40 >
purposes only
Forr training

HCU Line,
Line 300 Bar
Bar.

MAN Diesel & Turbo Author Current topic 00.00.2012 < 41 >
purposes only
Forr training

Double Wall Piping,


Piping Sealings.
Sealings

Flange
Fl
Outerpipe
Sealingrings
Screws
InnerPipe

Sealing
rings

SlideBearings

MAN Diesel & Turbo Author Current topic 00.00.2012 < 42 >
purposes only
Forr training

Double Wall Pipe.


Pipe

MAN Diesel & Turbo 2500/KNB April 2003. Author Current topic 00.00.2012 < 43 >
purposes only
Forr training

Leak Detection

1. CLOSE the valve 430 at the last but one Hydraulic Cylinder Unit.
2. OPEN the valve 431 at the last HCU to decrease the p pressure in the space
p
between the inner and outer pipe.
3. CLOSE the valve 431 at the last HCU again.
4. Check the pressure increase in the space between at pos. 435, at the last HCU
5
5. If the pressure increases to system pressure level
level, the leakage has been found
found.
6. When the leakage has been eliminated, bring all the valves to their normal
position.

MAN Diesel & Turbo Author Current topic 00.00.2012 < 44 >
purposes only
Forr training

Disclaimer

All data provided in these training materials is non-binding.


This data serves informational purposes only and is especially not
guaranteed in any way
way.
Depending on the subsequent specific individual projects, the relevant
data may be subject to changes and will be assessed and determined
i di id ll ffor each
individually h project.
j t Thi
This will
ill d
depend
d on th
the particular
ti l
characteristics of each individual project, especially specific site and
operational conditions.

MAN Diesel & Turbo Author Current topic 00.00.2012 < 45 >
purposes only
Forr training

Learning Objectives

The learning objective(s) of this training unit is (are) as follows:

Objective 1
Objective 2
Objective
j 3
.
.

MAN Diesel & Turbo Author Current topic 00.00.2012 < 46 >
purposes only
Forr training

Qualification

The qualification of our trainees is


realised

Qualification 1
Qualification 2
Qualification 3
...
...

MAN Diesel & Turbo Author Current topic 00.00.2012 < 47 >
purposes only
Forr training

MAN PrimeServ Academy

The PrimeServ Academy offers a


wide range of

Item 1
Item 2
Item 3
.

MAN Diesel & Turbo Author Current topic 00.00.2012 < 48 >
purposes only
Forr training
Source Information
Release History

Module Topic changed Changed Change Approved Approval


by Date by Date
Template updated Michael 10042012 Name Date
Johns
Template updated, SL2013-571 Michael 19062013 Name Date
Johns
Topic 3 Name Date Name Date

Topic 4 Name Date Name Date


Related docs:
Handout (to be included via Hyperlink)

MAN Diesel & Turbo Author Current topic 00.00.2012 < 49 >

Das könnte Ihnen auch gefallen