SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO.

3000698834

SCHEDULE C

ATTACHMENT I

CONTRACT PRICE BREAKDOWN (Base Bid)

Item Description Amount (SR)


A Contract Lump Sum Price
A1 Materials Price
A2 Construction Price
Total Contract Lump Sum Price (A1+A2)
B Fiscal Measures Price Adjustment
B1 Expat Levy
B2 Fuel
B3 Utilities
B4 Custom Duties
Total Fiscal Measures Price Adjustment (B1+B2+B3+B4)
A+B TOTAL

A1 MATERIALS PRICE BREAKDOWN


Percent of Materials
No. Materials Description Amount (SR)
Price
1.1 Engineered Material and Equipment
1.1.1 Potable Water Treatment Systems
1.1.2 Sanitary Treatment Systems
1.1.3 Potable Water Tanks
1.1.4 Fire Water Tanks
1.1.5 Potable Water Pumps/Controllers
1.1.6 Fire Water Pumps/Controllers
1.1.7 Fuel Pumps, Dispensers, Tanks (Diesel & Gasoline)
1.1.8 Diesel Electric Generators with Tanks
1.1.9 Engineered Communications Equipment: switches,
routers, firewalls, etc.
1.1.10 Prefabricated Buildings: Camp Support Buildings (e.g.
Cafeteria, Mosque, gathering buildings, Fuel Station,
recreation facilities, service building, etc.)
1.1.11 Prefabricated Buildings: Camp Accomodations
1.1.12 Prefabricated Buildings: Offices (Administration and PMT)
(A1) Subtotal of Items in Section 1.1
1.2 Bulk Material and Equipment
1.2.1 Switch Racks, Panelboards, & Transformers
1.2.2 Foundations
1.2.3 Backfill
1.2.4 Concrete
1.2.5 Fencing and gates
1.2.6 Reinforcement
1.2.7 Structural Steel
1.2.8 Power, Control, and Instrument Cables

Saudi Aramco: Confidential C-I-1


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

1.2.9 Bulk Communications Materials: Fiber Optic Cables,


Ethernet Cables, Patch Panels, etc.
(A2) Subtotal of Items in Section 1.2
A1. Total Materials Price 100%

Saudi Aramco: Confidential C-I-2


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

A2 CONSTRUCTION PRICE BREAKDOWN


Percent of
No. Construction Description Amount (SR)
Construction Price
For purposes of progress measurement the Construction
Price is broken down as follows:
2.1 Mobilization (at Temporary Construction Facility (TCF)
Sites 1, 2, and 3): Includes provision of Contractor Camps
and Offices and Saudi Aramco Interim Offices and Saudi
Aramco Interim Camps
2.2 Surveying, right of way, Excavation, Backfilling, completion
of eathworks at TCF 1, 2, and 3 sites.
2.3 Asphalt and Marl Roads (internal and perimiter) and
perimeter fencing at all three sites.
2.4 Temporary Construction Facilites at all three sites:
Electrical Generation and Distribution System
2.5 Temporary Construction Facilites at all three sites:
Sanitary Treatment Systems and distribution piping
2.6 Temporary Construction Facilites at all three sites: Potable
Water System and distribution piping
2.7 Temporary Construction Facilites at all three sites: Fire
Water Systems and distribution piping
2.8 Temporary Construction Facilites at all three sites: Camp
Accomodation Buildings and internal fencing
2.9 Temporary Construction Facilites at all three sites: Camp
Support Buildings (Cafeteria, Mosque, Recreation, Fuel
Station, etc.)
2.10 Temporary Construction Facilites at all three sites:
Administration and PMT Office Buildings
2.11 Temporary Construction Facilites Communication
Systems Installation, Testing and Pre-Commissioning (at
all three Sites)
2.12 Gas Compression Plants Communication Cable
Installation, Testing and Pre-Commissioning (at all three
Sites)
2.13 Commissioning and Startup Assistance
2.14 All Demolition Work
2.15 Complete field mark-up of As-Built drawings and all
exception items (Minimum 3% of the construction price)
2.16 Vendor Representatives
2.17 Demobilization at all three sites (Minimum 3% of
Construction Price)
A2. Total Construction Price 100%

NOTE: BIDDER SHALL COMPLETE THE MANDATORY ALTERNATIVE IN THE ALTERNATIVE TAB

3 COMPENSATION FOR CHANGES


WORK UNIT RATES
ABBREVIATIONS

Saudi Aramco: Confidential C-I-3


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

Unit Rate UR
Hourly Rate HR
Linear Meter LM
Cubic Meter CM
Square Meter SM
Metric Ton MT
Each EA

APPLICABLE NOTES

Unless otherwise noted, all rates shall include


transportation to and from the WORK Site including
delivery to/from the supplier facilities.

Unless otherwise noted, all rates are fully inclusive of all


costs including, but not limited to, indirect and direct labor,
materials and necessary installation accessories.

Rates are applicable for additional work in the quantities


set forth by SAUDI ARAMCO and in the WORK areas
under this contract.

All Labor Time Unit Rates shall include all personal


protective equipment and all necessary hand tools and/or
consumable materials associated with the applicable
activity.

Equipment rates include Operator costs and required


support personnel (e.g., flagmen, etc.)

Unit Rate (Saudi Riyals)


3.1 CIVIL/STRUCTURAL
3.1.1 Soil Excavation
Excavation including, but not limited, to shoring,
dewatering, hauling and disposal of unsuitable or
unneeded materials at a dump site.
3.1.1.1 Non-Rock, by hand CM
3.1.1.2 Non-Rock, by machine. CM
3.1.1.3 Rock, by machine. CM
3.1.2 Backfilling & Compaction

Provide back-filling material from a Saudi Aramco


approved source, including cost of material if any, loading
& transporting irrespective of distance from jobsite,
handling, placing, compaction in layers 15 to 30 cm as
required regardless of the method used, and testing.

3.1.2.1 Sand bedding CM


3.1.2.2 Marl Fill CM
3.1.2.3 Select Marl Fill CM
3.1.3 Reinforced Concrete

Saudi Aramco: Confidential C-I-4


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

3.1.3 Unit Rate (Saudi Riyals)


Provide Concrete, 4000 psi, reinforced complete in place,
ready mixed or site mixed as required including form work,
steel reinforcement, and plastic sheeting, and final coating
as applicable, per 09-AMSS-97.
3.1.3.1 CM
Reinforced slab on grade or sidewalk (100-150 mm thk.)
3.1.3.2 Small Foundations & grade beams CM
3.1.3.3 Beams, Columns & suspended slab CM
3.1.3.4 Bulk quantities for large foundations CM
3.1.3.5 Concrete: Reay Mix, Lean Concrete, FC=2500psi, CM
compressive strength.
3.1.4 Asphalt Paving:
Provide & install asphalt paving including, but not limited
to: applying prime coat, tack coat, 120 mm asphalt course,
230 mm type A base course, compaction, leveling, and
testing
3.1.4.1 5 cm asphalt binder course 4A mix SM
3.1.4.2 5 cm asphalt wearing course 6A mix SM
3.1.5 Install Fencing

This work shall include, but is not limited to, provision and
installation of all fencing materials and accessories,
including all posts, mesh, wires, struts, beams, sill, barbed
wires, and all required components per Saudi Aramco
Standard Drawings No. AA-036678, AB-036677, and AB-
036679 (including all notes and referenced drawings).

3.1.5.1 SAUDI ARAMCO SSD-1 Fence LM


3.1.5.2 SAUDI ARAMCO Type 2 Standard LM
3.1.5.3 SAUDI ARAMCO Type 3 Standard LM
3.1.5.4 SAUDI ARAMCO Type 4 Standard LM
3.1.5.5 SAUDI ARAMCO Type 5 Standard LM
3.1.5.6 Gate: Double Leaf (Vehicular) EA
3.1.5.7 Gate: Single Pedestrian EA
3.1.6 Install Structural Steel (Grating, Ladders, Handrails,
Platforms, etc.)
This work shall include, but is not limited to, providing all
materials and accessories, design, cut, fabricate, weld,
drill, ream, grind, transport to site, handle, erect, bolt,
tighten, align, plum, sandblasting, including coating or
galvanizing as per Saudi Aramco standards.
3.1.6.1 Light: Grating, hand rails, ladders, straps, stair treads,
rods, plates and structural shapes less than or equal to 20 MT
pounds per foot. (Painted)
3.1.7 Scaffolding
Provide, erect and dismantle scaffolding in accordance
with Saudi Aramco Construction Safety Manual
3.1.7.1
TYPE : BIRDCAGE, INDEPENDENT, TOWER & the LIKE
Up to 5 meters high including hire costs for 4 weeks
CM
3.1.8 Car Park Sunshades

Saudi Aramco: Confidential C-I-5


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

3.1.8 Unit Rate (Saudi Riyals)

Provide & install parking shades. Specification to be as set


out in Schedule B of the Contract, to include foundations,
fabric shade, structural framing and all bolted connections.

3.1.8.1 Canopy Type (Two Car Wide) EA


3.1.8.2 Canopy Type (Four Car Wide) EA
3.1.8.3 Canopy Type (Six Car Wide) EA
3.2 ELECTRICAL
3.2.1 RGS Conduit, Aboveground:
Install RGS conduit, uncoated, aboveground, including but
not limited to: couplings, unions, sealing fittings, sealing
compound, hubs, deck penetrations, bending and cutting,
clamping, and necessary supports.
3.2.1.1 1 LM
3.2.1.2 2 LM
3.2.1.3 4 LM
3.2.1.4 6 LM
3.2.2 RGS Conduit, Belowground:
Provide & install RGS conduit, uncoated or PVC coated,
belowground, including but not limited to: trenching,
backfill material, backfilling, compaction, couplings,
unions, sealing fittings, sealing compound, hubs, deck
penetrations, bending and cutting, clamping, and
necessary supports.
3.2.2.1 1 LM
3.2.2.2 2 LM
3.2.2.3 4 LM
3.2.2.4 6" LM
3.2.3 Ground Cable:
Provide & install bare copper ground cable, including
trenching, backfilling, compaction, thermite welding, and
marking.
3.2.3.1 1/C 25 mm2 (#4 AWG) LM
3.2.3.2 1/C 70 mm2 (#4 AWG) LM
3.2.3.3 1/C 120 mm2 (#4 AWG) LM
3.2.3.4 x 10 ft. long ground rod EA
3.2.3.5 1.9 mm x 2.4m long ground rod EA
3.2.4 Out Door Lighting Fixtures
Supply and install outdoor lighting including but not limited
to lighting pole with fused terminal block, fixtures, 100 watt
HPS floodlights, suitable for hazardous areas including
stanchion pole mounted fixtures, complete with lamp,
cabling and termination:
3.2.4.1 Outdoor Flood Light Fixture EA
3.2.3.2 Outdoor Stanchion Mount Fixture EA
3.2.4.3 Lighting Pole EA
3.2.5 Power/Control/Instrument Cable, Direct Buried:

Saudi Aramco: Confidential C-I-6


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

3.2.5 Unit Rate (Saudi Riyals)


Provide & install power, control, composite, and
instrumentation cables, direct buried including trenching,
cable laying, red colored protective tiles, backfill material
and backfill, compaction, above grade cable markers,
ample length of tail for termination, sealing open ends of
cable, cable connections, wire lugs, identification numbers
and color bands. The rates for termination at both ends
and testing of cables are to be provided separately.

Power cables:
3.2.5.1 600V, 4C-2.5mm2, XLPE LM
3.2.5.2 600V, 3C-4mm2 + G, XLP LM
3.2.5.3 600V, 3C-6mm2 + G, XLPE LM
3.2.5.4 600V, 3C-10mm2 + G, XLPE LM
3.2.5.5 600V, 3C-16mm2 + G, XLPE LM
3.2.5.6 600V, 3C-35mm2 + G, XLPE LM
3.2.5.7 600V, 3C-50mm2 + G, XLPE LM
3.2.5.8 600V, 3C-70mm2 + G, XLPE LM
3.2.5.9 600V, 3C-95mm2 + G, XLPE LM
3.2.5.10 600V, 3C-150mm2 + G, XLPE LM
3.2.5.11 600V, 3C-300mm2 + G, XLPE LM
Control Cables:
3.2.5.12 600V, 1C-1.5mm2, XLPE LM
3.2.5.13 600V, 3C-1.5mm2, XLPE LM
3.2.5.14 600V, 5C-1.5mm2, XLPE LM
3.2.5.15 600V, 7C-1.5mm2, XLPE LM
3.2.5.16 600V, 7C-2.5mm2, XLPE LM
3.2.5.17 600V, 15C-1.5mm2, XLPE LM
3.2.5.18 600V, 25C-1.5mm2, XLPE LM
Instrumentation Cables:
3.2.5.19 300V, 1 PR, Shielded #16 AWG, XLPE LM
3.2.5.20 300V, 4 PR, Individually Shielded #18 AWG, XLPE LM
3.2.5.21 300V, 8 PR, Individually Shielded #18 AWG, XLPE LM
3.2.5.22 300V, 1 TR, Shielded #16 AWG LM
3.2.6 Instrument/Control Cable, in conduit or cable tray:
Provide & install power, control, composite, and
instrumentation cables, in conduits or cable trays
including, cable pulling, installation of couplings, fittings,
seals, bends, etc and ample length of tail for termination,
sealing open ends of cable, cable connections, wire lugs,
identification numbers and color bands. The rates for
termination at both ends and testing of cables are to be
provided separately.

Power cables:
3.2.6.1 600V, 4C-2.5mm2, XLPE LM
3.2.6.2 600V, 3C-4mm2 + G, XLP LM
3.2.6.3 600V, 3C-7mm2 + G, XLPE LM
3.2.6.4 600V, 3C-10mm2 + G, XLPE LM
3.2.6.5 600V, 3C-16mm2 + G, XLPE LM
3.2.6.6 600V, 3C-35mm2 + G, XLPE LM
3.2.6.7 600V, 3C-50mm2 + G, XLPE LM

Saudi Aramco: Confidential C-I-7


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

Unit Rate (Saudi Riyals)


3.2.6.8 600V, 3C-70mm2 + G, XLPE LM
3.2.6.9 600V, 3C-95mm2 + G, XLPE LM
3.2.6.10 600V, 3C-150mm2 + G, XLPE LM
3.2.6.11 600V, 3C-300mm2 + G, XLPE LM
Control Cables:
3.2.6.12 600V, 1C-1.5mm2, XLPE LM
3.2.6.13 600V, 3C-1.5mm2, XLPE LM
3.2.6.14 600V, 5C-1.5mm2, XLPE LM
3.2.6.15 600V, 7C-1.5mm2, XLPE LM
3.2.6.16 600V, 7C-2.5mm2, XLPE LM
3.2.6.17 600V, 15C-1.5mm2, XLPE LM
3.2.6.18 600V, 25C-1.5mm2, XLPE LM
Instrumentation Cables:
3.2.6.19 300V, 1 PR, Shielded #16 AWG, XLPE LM
3.2.6.20 300V, 4 PR, Individually Shielded #18 AWG, XLPE LM
3.2.6.21 300V, 8 PR, Individually Shielded #18 AWG, XLPE LM
3.2.6.22 300V, 1 TR, Shielded #16 AWG LM
3.3 INSTRUMENTATION
3.3.1 Instruments
Provide and install instrument including, but not limited to,
mounting, process connection & calibration of instrument,
connection to RTU's, with all required accessories.

3.3.1.1 Pressure Gauge EA


3.3.1.2 Temperature Gauge EA
3.3.1.3 RTD with thermowell EA
3.3.1.4 Temperature Transmitter EA
3.3.1.5 Pressure Transmitter (HART, 4-20mA) EA
3.3.1.6 H2S or LEL Monitor (with 4-20mA output) EA
3.3.1.7 H2S or LEL Horn and Beacon EA
3.4 COMMUNICATIONS
3.4.1 Fiber Optic Cables
Provide and install fiber optic cable including, excavation
and direct burial, FO connectors, connection, and testing.
3.4.1.1 Fiber Optic Cables -12 strands single mode LM
3.4.1.2 Fiber Optic Cables -24 strands single mode LM
3.4.1.3 Fiber Optic Cables -48 strands single mode LM
3.4.1.4 Fiber Optic Cables -12 strands multi mode LM
3.4.1.5 Fiber Optic Cables -24 strands multi mode LM
3.4.1.6 Fiber Optic Cables -48 strands multi mode LM
3.4.2 Fiber Optic Patch Panels
Provide and install fiber optic patch panels including,
mounting, accessories, cable connection and testing.
3.4.2.1 12-Way fiber patch panel, SC - Single mode EA
3.4.2.2 24-way fiber patch panel, SC - Single mode EA
3.4.2.3 48-way fiber patch panel, SC - Single mode EA
3.4.2.4 12-Way fiber patch panel, SC - Multi mode EA
3.4.2.5 24-way fiber patch panel, SC - Multi mode EA
3.4.2.6 48-way fiber patch panel, SC - Multi mode EA
3.4.3 Pedestals

Saudi Aramco: Confidential C-I-8


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

3.4.3 Unit Rate (Saudi Riyals)


Provide and install communications pedestal including,
mounting, accessories, cable connection and testing.
3.4.3.1 Fiber Optic Pedestal EA
3.4.3.2 Copper Cable Pedestal EA
3.5 Demolition and Reinstatement of Existing Fencing
3.5.1 Safely and carefulfully demolish fencing of any type to
include all posts, mesh, wires, struts, beams, sill, barbed
wires, and all components; Store, Transport & LM
Reinstatement of same in new location inclusive of any
localised earthworks and foundations.
3.6 FUEL - GASOLINE
3.6.1 Liter of Gasoline LITER

4 COMPENSATION FOR CHANGES


TIME UNIT RATES Unit Rate (Saudi Riyals)
4.1 CONSTRUCTION LABOR RATES HR
4.1.1 Project Manager HR
4.1.2 HSE Manager HR
4.1.3 Quality Manager HR
4.1.4 Procurement Engineer HR
4.1.5 Precommissioning Engineer HR
4.1.6 Construction Manager HR
4.1.7 Construction Superintendent HR
4.1.8 General Foreman HR
4.1.9 Craft Foreman Civil HR
4.1.10 Craft Foreman Structural HR
4.1.11 Craft Foreman Mechanical HR
4.1.12 Plumber HR
4.1.13 Fabricator Steel HR
4.1.14 Pipe Fitter HR
4.1.15 Certified Structural Welder HR
4.1.16 Welder Helper HR
4.1.17 Electrician HR
4.1.18 Communications Technician HR
4.1.19 Fiber Optic Cable Splicer HR
4.1.20 Instrument Fitter HR
4.1.21 Instrument and Control Technician HR
4.1.22 Carpenter HR
4.1.23 Rigger Level 1 HR
4.1.24 Rigger Level 2 HR
4.1.25 Rigger Level 3 HR
4.1.26 Certified Cable Splicer HR
4.1.27 Mason HR
4.1.28 Rebarman HR
4.1.29 Scaffolder HR
4.1.30 Surveyor HR
4.1.31 Survey Party Chief HR
4.1.32 Labor, Skilled HR
4.1.33 Laborer, Non-skilled HR
4.1.34 Painter HR
4.1.35 QA/QC Inspector HR

Saudi Aramco: Confidential C-I-9


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

Unit Rate (Saudi Riyals)


4.1.36 Project Engineer HR
4.1.37 Communications Engineer HR
4.1.38 Safety Engineer HR
4.1.39 Senior Designer HR
4.1.40 Designer HR
4.1.41 CADD Operator complete with workstation, software, etc. HR
4.1.42 Draftsman HR
4.1.43 Work Permit Receiver HR
4.1.44 Scaffolding Supervisor HR
4.1.45 Certified Scaffolder HR
4.1.56 Technician HR
4.1.57 HSE Advisor HR
4.1.58 HSE Officer HR
4.2 PROCUREMENT LABOR RATES
4.2.1 Buyer HR
4.2.2 Material Specialist HR
4.2.3 Senior Inspector HR
4.2.4 Expediter HR
4.2.5 Traffic Coordinator HR
4.2.6 Senior Materials Engineer HR
4.2.7 Materials Engineer HR
4.2.8 Materials Control/Coordinator HR
4.2.9 Material Man
4.3 SUPPORT LABOR RATES
4.3.1 Senior Secretary HR
4.3.2 Secretary HR
4.3.3 Document Control Clerk HR
4.3.4 Clerk HR
4.4 VENDOR/COMMUNICATIONS LABOR RATES
4.4.1 Vendor Rep. Fire Water Pumps / Control Panel HR
4.4.2 Vendor Rep. Sanitary Treatment System HR
4.4.3 Vendor Rep. Potable Water Treatment System HR
4.4.4 Vendor Rep. Diesel Generators HR
4.4.5 Vendor Rep. Communications Equipment HR
4.4.6 Equipment & System Engineer HR
4.4.7 Supervising Designer HR
4.4.8 Fiber Optics System Engineer HR
4.4.9 Test Engineer HR
4.4.10 Design Specialist (Software/ Hardware) HR
4.4.11 FOC/Coax Cable Design Engineer HR
4.4.12 Telecommunications Inspector HR
4.5 EQUIPMENT RATES
4.5.1 LIGHT VEHICLE
4.5.1.1 Pick-Up Truck - Ton 4 x 2 HR
4.5.1.2 Pick-Up Truck - Ton 4 x 4 HR
4.5.1.3 Carry All ton 4 x 2 HR
4.5.2 LIGHT TRUCKS
4.5.2.1 Flatbed Truck - 5 Tons HR
4.5.2.2 Flatbed Truck - 10 Tons HR
4.5.2.3 Flatbed Truck C/W Crane - 3 Tons HR
4.5.3 HEAVY DUTY TRUCK

Saudi Aramco: Confidential C-I-10


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

Unit Rate (Saudi Riyals)


4.5.3.1 Dump Truck - 5 C.M. HR
4.5.3.2 Dump Truck - 15 C.M. HR
4.5.3.3 Dump Truck - 20 C.M. HR
4.5.3.4 Tractor Unit - 4 x 2 HR
4.5.3.5 Tractor Unit - 6 x 4 HR
4.5.4 TANKERS
4.5.4.1 Water - 22,700 Liters with Pump (6,000 GAL) HR
4.5.4.2 Water - 37,800 Liters with Pump (10,000 GAL) HR
4.5.4.3 Vacuum - 22,700 Liters (6,000 GAL) HR
4.5.5 TRAILERS
4.5.5.1 Flatbed - 50 Tons with Tractor HR
4.5.5.2 Lowboy - 100 Tons with Tractor HR
4.5.5.3 Lowboy - 200 Tons with Tractor HR
4.5.5.4 40 Ton High Bed Trailer with Tractor HR
4.5.4.5 40 Ton Pipe Trailer with Tractor HR
4.5.6 FRONT END LOADERS
4.5.6.1 Bobcat HR
4.5.6.2 Backhoe/Excavator HR
4.5.6.3 Cat D6 or Equivalent HR
4.5.6.4 Cat D8 or Equivalent HR
4.5.6.5 Cat D9 (with ripper) or Equivalent HR
4.5.6.6 Backhoe Cat 225 HR
4.5.6.7 Backhoe Cat 245 HR
4.5.6.8 Backhoe Cat 236 HR
4.5.6.9 Cat 950 or Equivalent HR
4.5.6.10 Cat 966 or Equivalent HR
4.5.6.11 Cat 980 or Equivalent HR
4.5.6.12 Cat with Rock Drill HR
4.5.6.13 Front-end Loader CAT 16 Motorgrader (or Equal) HR
4.5.6.14 Front-end Loader CAT 14 Motorgrader (or Equal) HR
4.5.7 COMPACTORS
4.5.7.1 Vibratory Plate HR
4.5.7.2 Jumping Jack HR
4.5.7.3 Trench Roller - Self Propelled - 2 Tons HR
4.5.7.4 Vibratory Roller - 10 Tons HR
4.5.7.5 Vibratory Roller - 20 Tons HR
4.5.8 CRANES
(Including minimum of two (2) sets of rigging for each
crane comprising a total of eight (8) slings and eight (8)
shackles per crane, lengths and strengths compatible with
crane capacity and reach)
4.5.8.1 18 Tons Grove or Equivalent HR
4.5.8.2 35 Tons Grove or Equivalent HR
4.5.8.3 55 Tons Grove or Equivalent HR
4.5.8.4 80 Tons Grove or Equivalent HR
4.5.9 COMPRESSORS AND TOOLS
4.5.9.1 Diesel-385 CFM w/Filter and Oiler ACC w/100 ft hose HR
4.5.9.2 Diesel-600 CFM w/Filter and Oiler ACC w/100 ft hose HR
4.5.9.3 Jackhammer - 65 lbs min with breaking tools and 100 ft.
HR
length hose including coupling
4.5.10 PUMPS

Saudi Aramco: Confidential C-I-11


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

Unit Rate (Saudi Riyals)


4.5.10.1 Bumble Bee (Submersible) w/100 ft hose HR
4.5.10.2 Centrifugal - 4 w/100 ft. Hose HR
4.5.10.3 Centrifugal - 6 w/100 ft. Hose HR
4.5.11 WELDING/CUTTING EQUIPMENT
4.5.11.1 Diesel - 300 AMPS w/200 ft of Leads HR
4.5.11.2 Diesel - 400 AMPS w/200 ft of Leads HR
4.5.11.3 Air Arc Cutting Equipment Set HR
4.5.11.4 Oxy/Acetylene Cutting Set complete with accessories
including, but not limited to, gauges, gases, bottle rack, HR
cutting torch
4.5.11.5 Drilling Machine HR
4.5.11.6 Grinder, pedestal 6 in. HR
4.5.11.7 Grinder, pedestal 12 in. HR
4.5.11.8 Grinder, electric 6 in. HR
4.5.12 FLOODLIGHTS/LIGHTING EQUIPMENT
4.5.12.1 Portable Diesel Light Tower, 5 to 9 kW HR
4.5.12.2 Portable Diesel Light Tower, 10 to 25 kW HR
4.5.12.3 Portable Diesel Light Tower, 26 to 50 kW HR
4.5.13 CONCRETE EQUIPMENT
4.5.13.1 Concrete Pump, Truck Mounted, 4 Line, 80 Boom HR
4.5.13.2 Concrete Mixer, 6 cu ft HR
4.5.13.3 Ready Mix Truck HR
4.5.13.4 Concrete Vibrator HR
4.5.13.5 Concrete Finisher HR
4.5.13.6 Curbing Machine HR
4.5.14 PIPING EQUIPMENT
4.5.14.1 WACHS Saw - Travel Cutter w/Chain HR
4.5.14.2 Guillotine Saw HR
4.5.14.3 Hacksaw electric HR
4.5.14.4 Bender, Hydraulic, Pipe/Conduit HR
4.5.15 GENERATOR SETS COMPLETE WITH CONTROL
PANEL, TANKS
4.5.15.1 10 kW HR
4.5.15.2 60 kW HR
4.5.15.3 100 - 150 kW HR
4.5.15.4 400 - 600 kW HR
4.5.16 TOOLS/EQUIPMENT MISC.
4.5.16.1 Rebar Bender HR
4.5.16.2 Hydrotest Pressure Recorder with charts HR
4.5.16.3 Chain Hoist (up to 1-1/2 tons) HR
4.5.16.4 Come-A-Long (up to 1-1/2 tons) HR
4.5.16.5 500 volt, portable, electrical cable megger test set HR
4.5.16.6 1,000 volt, portable, electrical cable megger test set HR
4.5.16.7 5,000 volt, portable, electrical cable megger test set HR
4.5.16.8 Portable circuit tester, volt/ohm/amp meter HR
4.5.16.9 Portable grounding tester HR
4.5.16.10 Rollers, Cable Pulling (up to 4 in. Outside Diameter cable) HR
4.5.16.11 Transformer/motor low resistance and power factor tester HR
4.5.16.12 Line frequency rotation indicator HR
4.5.17 ELECTRIC POWER TOOLS

Saudi Aramco: Confidential C-I-12


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

Unit Rate (Saudi Riyals)


4.5.17.1 Threading Machine, Pipe and Bolt Complete with two sets
HR
of dies 1/8 - 2 (set) and 2-1/4 - 4 (set) Rigid 300
4.5.17.2 Threading Machine, Pipe and Bolt Complete with three
sets of Dies 1/8 - 2 (set) and 2-1/2-4 (set) and 4 - 6 HR

4.5.17.3 Engine Powered, Hydraulic, auto tension sensing cable


HR
puller
4.5.18 COMMUNICATIONS/RTU EQUIPMENT RATES
4.5.18.1 Agilant Service Advisor Test Set - BER/tims/End-to-end
HR
Test Equipment
4.5.18.2 Telephone Cable Analyzer HR
4.5.18.3 64/26bit to 2.5 Gbit Error Rate Test Set HR
4.5.18.4 Digital Multimeter HR
4.5.18.5 Optical Variable Attenuator HR
4.5.18.6 Optical Power Meter HR
4.5.18.7 Fixed Optical Attenuator HR
4.5.18.8 1550 nm Stabilized Laser Light Source HR
4.5.18.9 Optical Time Domain Reflectometer HR
4.5.18.10 Frequency Selective Level Meter HR
4.5.18.11 Dial Pulse/Tone (Signaling) Test Set HR
4.5.18.12 Digital Transmission analyzer - 64 Kb/s, 2, 8, 34, 140 and
HR
155 Mb/s
4.5.18.13 Oscilloscope - 200 MHz bandwidth HR
4.5.18.14 Oscilloscope - 20 MHz bandwidth HR
4.5.18.15 Frequency Counter - 1O MHz-20 GHz HR
4.5.18.16 Tracking Generator/Counter HR
4.5.18.17 Directional Coupler - 2.7 -12.4 GHz HR
4.5.18.18 Noise Meter/Signal-to-Quantizing Measurement
HR
Equipment
4.5.18.19 Spectrum Analyzer - Audio Band HR
4.5.18.20 Spectrum Analyzer - 1 0 Hz - 160 MHz HR
4.5.18.21 Spectrum Analyzer - 1 00 Hz - 7 GHz HR
4.5.18.22 Digital Transmission Analyzer HR
4.5.18.23 Synchronous Digital Hierarchy (SDH) Analyzer HR
4.5.18.24 Volt/Ohm Meter HR
4.5.18.25 Radio frequency (RF) Signal Generator HR
4.5.18.26 Radio frequency (RF) Signal Level Meter HR
4.5.19 WIRELESS INTERNET BROADBAND
4.5.19.1 One Wireless Internet Broadband connection MONTH

5 COMPENSATION FOR CAMP/OFFICES EXPANSION Unit Rate (Saudi Riyals)


5.1 CAMP ACCOMMODATIONS
Additional Permanent Camp Building (Including complete
manufacture, transportation, unloading, earthworks,
foundation, assembly, utilities tie-ins, stairways, rails,
furniture, appliances, air conditioners, sidewalks, gravel,
etc., necessary for building occupancy.)

5.1.1 Two-Man Suite (2-Occupants/Building)


EA
Reference Drawing: AR-DKP-0107
5.1.2 Four-Man Suite (4-Occupants/Building)
EA
Reference Drawing: AR-DKP-0102

Saudi Aramco: Confidential C-I-13


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

Unit Rate (Saudi Riyals)


5.1.3 Ten-Man Standard Building (10-Occupants/Building)
EA
Reference Drawing: AR-DKP-0103

END OF ATTACHMENT I TO SCHEDULE C


(Base Bid)

Saudi Aramco: Confidential C-I-14


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

SCHEDULE C

ATTACHMENT I

CONTRACT PRICE BREAKDOWN (Mandatory Alternative Bid)

Item Description Amount (SR)


A Contract Lump Sum Price
A1 Materials Price
A2 Construction Price
Total Contract Lump Sum Price (A1+A2)
B Fiscal Measures Price Adjustment
B1 Expat Levy
B2 Fuel
B3 Utilities
B4 Custom Duties
Total Fiscal Measures Price Adjustment (B1+B2+B3+B4)
A+B TOTAL

A1 MATERIALS PRICE BREAKDOWN


Percent of Materials
No. Materials Description Amount (SR)
Price
1.1 Engineered Material and Equipment
1.1.1 Potable Water Treatment Systems
1.1.2 Sanitary Treatment Systems
1.1.3 Potable Water Tanks
1.1.4 Fire Water Tanks
1.1.5 Potable Water Pumps/Controllers
1.1.6 Fire Water Pumps/Controllers
1.1.7 Fuel Pumps, Dispensers, Tanks (Diesel & Gasoline)
1.1.8 Diesel Electric Generators with Tanks
1.1.9 Engineered Communications Equipment: switches,
routers, firewalls, etc.
1.1.10 Prefabricated Buildings: Camp Support Buildings (e.g.
Cafeteria, Mosque, gathering buildings, Fuel Station,
recreation facilities, service building, etc.)
1.1.11 Prefabricated Buildings: Camp Accomodations
1.1.12 Prefabricated Buildings: Offices (Administration and PMT)
(A1) Subtotal of Items in Section 1.1
1.2 Bulk Material and Equipment
1.2.1 Switch Racks, Panelboards, & Transformers
1.2.2 Foundations
1.2.3 Backfill
1.2.4 Concrete
1.2.5 Fencing and gates
1.2.6 Reinforcement
1.2.7 Structural Steel
1.2.8 Power, Control, and Instrument Cables

Saudi Aramco: Confidential C-I-15


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

1.2.9 Bulk Communications Materials: Fiber Optic Cables,


Ethernet Cables, Patch Panels, etc.
(A2) Subtotal of Items in Section 1.2
A1. Total Materials Price 100%

A2 CONSTRUCTION PRICE BREAKDOWN


Percent of
No. Construction Description Amount (SR)
Construction Price
For purposes of progress measurement the Construction
Price is broken down as follows:
2.1 Mobilization (at Temporary Construction Facility (TCF)
Sites 1, 2, and 3). Includes provision of Contractor Camps
and Offices and Saudi Aramco Offices and
accommodations at Hawiyah HR&IP.
2.2 Surveying, right of way, Excavation, Backfilling, completion
of eathworks at TCF 1, 2, and 3 sites.
2.3 Asphalt and Marl Roads (internal and perimiter) and
perimeter fencing at all three sites.
2.4 Temporary Construction Facilites at all three sites:
Electrical Generation and Distribution System
2.5 Temporary Construction Facilites at all three sites:
Sanitary Treatment Systems and distribution piping
2.6 Temporary Construction Facilites at all three sites: Potable
Water System and distribution piping
2.7 Temporary Construction Facilites at all three sites: Fire
Water Systems and distribution piping
2.8 Temporary Construction Facilites at all three sites: Camp
Accomodation Buildings and internal fencing
2.9 Temporary Construction Facilites at all three sites: Camp
Support Buildings (Cafeteria, Mosque, Recreation, Fuel
Station, etc.)
2.10 Temporary Construction Facilites at all three sites:
Administration and PMT Office Buildings
2.11 Temporary Construction Facilites Communication
Systems Installation, Testing and Pre-Commissioning (at
all three Sites)
2.12 Gas Compression Plants Communication Cable
Installation, Testing and Pre-Commissioning (at all three
Sites)
2.13 Commissioning and Startup Assistance
2.14 All Demolition Work
2.15 Complete field mark-up of As-Built drawings and all
exception items (Minimum 3% of the construction price)
2.16 Vendor Representatives
2.17 Demobilization at all three sites (Minimum 3% of
Construction Price)
A2. Total Construction Price 100%

Saudi Aramco: Confidential C-I-16


SCHEDULE C, PRICING ATTACHMENT I REQUISITION NO. 3000698834

MANDATORY ALTERNATIVE BID 1: Bidder to propose accommodating all CONTRACTOR personnel at the
Tamimi Hawiyah Residential and Industrial Park (HR&IP). CONTRACTOR offices, warehouses, shops,
laydown and storage yards must also be located at the Tamimi HR&IP. CONTRACTOR must use Tamimi
HR&IP for camp and offices and transport personnel to the worksites. Mandatory Alternative Bid 1 also
includes offices and accommodations at Tamimi HR&IP for Saudi Aramco instead of the "Interim" Saudi
Aramco offices and camps at the three Temporary Construction Facilities.

END OF ATTACHMENT I TO SCHEDULE C


(Mandatory Alternative Bid)

Saudi Aramco: Confidential C-I-17

Das könnte Ihnen auch gefallen