PROJECT:SARITCENTREPHASE3
MCRFINumber: RFI125
SubcontractorRFINumber:
RFIIssue/Activity: ColumnReinforcement
REQUESTFORINFORMATION(RFI) DetailsforLevel91to98
RFIIssueDate: 5thSeptember 2017
InformationRequiredby: 13thSeptember 2017
From: LaxmanbhaiConstructionLtd(MC)
Subject: ColumnReinforcementDetailsforLevel91to98
Contract ContractStructuralDrawings
Reference:
To: BettsTownsend(PTY)Ltd.(PM) C.c.: PlanningSystems(Architect)
Attn: Mr.KennethOigo LDK(M&E)
YMR(Q.S.)
Actionby: Sutherland(Structural) Sutherland(Structural)
DETAILSOFTHEREQUESTFORINFORMATION(RFI)
FromtheSubcontractor/Contractor Comments
Withreferencetotheaboveandthemeetingheldonsiteon
Wednesday,30thAugust,pleaseissuethecolumn
reinforcementdetailsforlevel91to98forthefollowing:
Panel6andPanel8columns6thSeptember.
Panel3columns8thSeptember
Panel7columns13thSeptember