Water Reticulation Design Calculation

Day 1, 12:00 AM

TP1

PIPE 1

PIPE
2 34 PIPE 4 H1 PIPE 5 H2
PIPE 6 H3

PIPE 2

PIPE 7
PIPE 12
H7

PIPE 11
H5 5 H4
H6

PIPE 10 PIPE 9 PIPE 8

EPANET 2 Page 1
Network Table - Nodes

Elevation Base Demand Demand Head Pressure


Node ID m LPS LPS m m
Junc 2 50.00 0.00 0.00 57.29 7.29

Junc 3 34.75 2.87 2.87 57.17 22.42


Junc 4 50.00 0.00 0.00 57.06 7.06
Junc H1 50.50 0.00 0.00 56.83 6.33
Junc H2 44.60 0.00 0.00 56.41 11.81

Junc H3 42.25 0.00 0.00 55.95 13.70


Junc 5 38.00 0.00 0.00 55.51 17.51

Junc H4 38.00 22.73 22.73 55.14 17.14


Junc H5 38.00 0.00 0.00 55.87 17.87

Junc H6 44.20 0.00 0.00 56.36 12.16

Junc H7 50.00 0.00 0.00 56.80 6.80


Resvr TP1 57.50 #N/A -25.60 57.50 0.00

EPANET 2 Page 1
Network Table - Links

Length Diameter Roughness Flow Velocity Unit Headloss


Link ID m mm LPS m/s m/km
Pipe 1 104.4 250 100 25.60 0.52 2.04

Pipe 2 275.4 150 100 2.87 0.16 0.43


Pipe 3 11.5 150 100 22.73 1.29 19.67
Pipe 4 46 150 100 11.00 0.62 5.13
Pipe 5 81.5 150 100 11.00 0.62 5.13

Pipe 6 88.6 150 100 11.00 0.62 5.13


Pipe 7 87.5 150 100 11.00 0.62 5.13

Pipe 8 18.6 150 100 22.73 1.29 19.67


Pipe 9 63.8 150 100 11.73 0.66 5.78

Pipe 10 84.4 150 100 11.73 0.66 5.78

Pipe 12 44.9 150 100 11.73 0.66 5.78


Pipe 11 76.2 150 100 11.73 0.66 5.78

EPANET 2 Page 1