Sie sind auf Seite 1von 2

Project: Project Number: Client: Boring No.

Address, City, State Drilling Contractor: Drill Rig Type:

Logged By: Started: Bit Type: Diameter:

Drill Crew: Completed: Hammer Type:

Date
USA Ticket Number: Backfilled: Hammer Weight: Hammer Drop:

Groundwater Depth: Elevation: Total Depth of Boring:

Lithology

Moisture Content
Dry Density (pcf)
Sample Number

Additional Test
Sample Type

Blow Counts

Graphic Log
(blows/foot)
Depth (feet)

Soil Group Name: modifier, color, moisture, density/consistency, grain


size, other descriptors

(%)
Rock Description: modifierm color, hardness/degree of concentration,
bedding and joint characteristics, solutions, void conditions.

10

Civil Engineering Boring Log: Sheet __of ___


Standard Penetration Slit Spoon Sampler (SPT)
California Sampler StabIlized Ground water
Shelby Tube Groundwater At time of Drilling
CPP Sampler Bulk/ Bag Sample
California State Polytechnic University, Pomona

Civil Engineering
FIELD NOTES FROM DRILLING

Date:__________________________End Time:_______________Start Time:___________


Notetaker Name:________________________________________Boring No.:___________
Surface conditions:

Das könnte Ihnen auch gefallen