Sie sind auf Seite 1von 4

B Du kwcWw ioeampI.

JULY
For private
circulation
2015 only
sshIptcw 6 apX 10 hsc sshZypXn
J
b
Ghpw IcpXtemsS D]tbmKnpI.
POWER SCENE KOTTAYAM
K.S.E.B. ENGINEERS ASSOCIATION,KOTTAYAM UNIT

Cd Words of Wisdom Cd Volume III No. 1

CHAIRMANs COLUMN
Life is 10 % what happens to us and Er C.P.George, DyC.E., Electrical Circle Pala
Dear Engineers,
90 % of how we react to it.
Electrical power is the backbone of modern society
UNIT OFFICE BEARERS FOR 2015 -16 and the dependency on electricity to lead a normal life is ex-
Chairman : Er C.P. George Ph : 9446008302 pected to remain so for the foreseeable future. With the ur-
Vice - Chairman : Er James George Ph : 9447956527 banisation of the Kerala Society during the past decades, even
Secretary : Er Mahesh T. Ph : 9495600714
the domestic consumers in state cannot afford to have few
Treasurer : Er Renjit Raj K. Ph : 9496008343
hours of supply interruptions in their home and the engi-
C.E.C. Members : Er Sreeraj R. Ph : 9496008158
neers in the distribution wing is under tremendous pressure to
Er Viji Prabhakaran Ph : 9446007899
Er Yoosuf K.S. Ph : 9496008233
maintain the supply at any cost.
Power Scene Editor: Er Midhun Varghese Ph : 9496008342
In spite of the APDRP & RAPDRP programs, the most
Regional coordinators Er Anu paul Er Mathew K.T.
of the available distribution network in the state is aged and
Er Dennis Joseph T. Er Joby Zachariah
obsolete and evolved according to the requirement of the ser-
Lady Coordinators Er Aritha Krishnan G Er Shymol C Mathen
vice connection application from the consumers and not
Members are requested to give articles to the Power Scene
according to the electrical engineering principles or statutory
either to the Editor or the Area Representatives. Articles construction standards. In the end, the electricity is being sup-
from family members are most welcome. Articles may also plied through a distribution network which is compromised
be mailed to ksebeakottayam@gmail.com
8 1
with safety standards and public with incompetent & nolgy in the distribution net- tion caused especially by com-
construction standards and unskilled field staff & scarcity work to minimize the supply pressive stress. Resilience
this has resulted in compro- of resources interruptions and make con- comes from the Latin word,
mising the quality and reliabil- sumer accountable for the resilio, which is literally the
With the declaration of
ity of electricity supplied to the additional investment re- ability of an object to rebound
the 100% electrification of the
consumer. quired for improving quality or return to its original shape
state, KSEBL have practically
and reliability of the distribu- or position after being stressed
In addition to the substan- achieved the major goal and
tion network. (example bent, compressed or
dard network issues, we target of providing access to
stretched).
have terrains and vegetations the electricity for all. Now it is
which enjoy its interference time to think & plan about GRID RESILIENCE In the context of Power Sys-
with the normal delivery of the quality and reliability of - Er Anil M. tems, resilience refers to the
electricity through the distribu- electricity supplied to the ability of power system to re-
Resilience, we know, as
tion network! Add to the consumers. Quality and reli- cover quickly following a disas-
one of the properties of rubber
woes of the field engineers, ability means heavy invest- ter or more generally, to the
- when rubber is subjected to
the natural calamities and un- ments in the network and for ability of anticipating extra-
physical deformation by the
disciplined drivers have priori- the financial viability of the ordinary, high-impact, low-
application of a force or pres-
tised their first target as KSEBL sector, the level of quality probability events; rapidly re-
sure on it, it adjusts to the
Lines and poles..!! and reliability requirement covering from those disruptive
pressure/ force temporarily
need to be linked to the energy events and absorbing lessons
In spite of all these ground re- and regains its original shape
charge and make the con- for adapting its operation; and
alities, State Government, on withdrawal of the external
sumer accountable for the make structural modifications
KSERC & KSEBL offers 24 x 7 pressure/ force. The dictionary
cost. to prevent or mitigate the im-
electricity to all the consumers meaning of the word
pact of similar events in the
in the state @ subsidised It is for the engineers in the resilience is the capability of a
future. Adaptation thus refers
rate..! The field engineers are sector to go for innovative strained body to recover its
to long-term planning and op-
left to face the wrath of the ideas with appropriate tech- size and shape after deforma-
erational measures taken to

2 3
Reduce the vulnerability to ex- stand and recover from delib- Including Information and thereupon. Resilience is quan-
ternal sudden shocks. erate attacks, accidents or Communication Technology tified based on the degree of
naturally occurring threats or (ICT). robustness to initial shock to
Due to climate change is-
incidents involving man-made the power grid, the functional-
sues, the weather disaster Micro-grids can discon-
disasters. ity achieved during the event
plays havoc with electric power nect from the traditional grid,
or post-event recovery dura-
distribution and cause a catas- Contributions from RESs and operate autonomously, help
tion.
trophic situation resulting in Micro-grids mitigate grid disturbances,
power outages affecting thou- serve as a grid resource for The resilience assessment
Renewable Energy faster system response and re- method should be capable of
sands and crores of customers.
Sources (RESs) will displace en- covery, and hence strengthen quantifying the frequency and
With increasing dependence
ergy produced by conventional grid resilience. Thus the micro duration of customer discon-
on electricity for most daily ac-
plants, but their ability to dis- -grids are self-healing and self- nections due to severe disas-
tivities including life saving
place conventional generation organizing miniature grids ca- ters and also the number of
equipment and vital services
capacity shall be very limited. pable of flaw less operation customers disconnected.
like transportation, water sup-
Micro-grids, with appropriate and deliver power to the desig-
ply, health care, communica-
enabling technologies will fa- Boosting Resilience of Power
tions, emergency services etc. nated areas in a catastrophe.
cilitate the paradigm shift re- System
are affected and an urgent
quired in delivering resilience How to quantify Resilience?
need exists to enhance the re- Networks and Components
and security of supply from re- Resilience is a multi- hardening measures can be
silience of our nations electric-
dundancy in assets. Preventive dimensional dynamic concept undertaken to achieve high re-
ity delivery infrastructure to
control measures to achieve with several intrinsic complexi- silience. Hardening measures
reduce the impact from natural
more intelligent operation ties. However, it needs to be include converting the over-
disasters and climate change
through corrective control ac- quantified for evaluating the head Distribution and Trans-
events on quality of life, sus-
tions also shall be supported effectiveness of the strategies mission lines underground;
tained economic activity and
by micro-grids with the aid of a aimed at achieving resilience upgrading poles and structures
national security. Resilience
host of enabling technologies and to make amendments with stronger and more robust
includes the ability to with-
5
4
Materials; Elevating substatio- faster Disaster Response Sys-
Transfer and Postings- Orders Issued
ins; Relocating facilities to ar- tem and Risk Management etc.
1.Transfer and posting of Chief Engineers(Ele.) and promotion and posting of
eas less affected by deterring
Co-existence of large intercon- Deputy Chief Engineers(Ele.) to the cadre of CE(Ele.) -orders issued- B.O. (FTD)
weather and by creating re- No. 1378/2015(Estt.III/25/2015). Dated, Thiruvananthapuram, 05.06.2015.
nected traditional grids and
dundant transmission line 2. Transfer and posting of Deputy Chief Engineers(Ele.) and promotion and post-
smaller balancing areas, with ing of Excutive Engineers to the cadre of D.C.E(Ele.) -orders issued-
routes to provide operational
distributed and decentralized A) B.O. (FTD) No. 1379/2015 (Estt.III/1390/2015). Dated, Thiruvanan-
flexibility, as they offer ability thapuram, 05.06.2015.
control, that could be operated
to bypass damaged lines which B) B.O. (FTD) No. 1383/2015 (Estt.III/1390/2015). Dated, Thiruvanan-
as micro-grids, if need be, con-
contribute to prevention of thapuram, 06.06.2015.
tribute to the robustness of C) B.O. (FTD) No. 1419/2015 (Estt.III/1390/2015). Dated, Thiruvanan-
cascading failures.
the grid and it increases opera- thapuram, 10.06.2015.
The grid can be made smarter tional flexibility and grid secu- 3.Transfer and posting of Executive Engineers(Ele.) -and promotion and posting
of Assistant Executive Engineers to the cadre of E.E(Ele.) -orders issued-
as a smart grid provides the rity.
A) B.O. (FTD) No. 1485/2015 (Estt.III/1611/2015). Dated, Thiruvanan-
system operators with moni- U n i t m e e t i n g N o t i c e thapuram, 17.06.2015.
-
toring and control assets for B) B.O. (FTD) No. 1498/2015 (Estt.III/1611/2015). Dated, Thiruvanan-
- On 7th July 2015 (Tuesday)
dealing with unfolding disaster thapuram, 19.06.2015.
- At Bestotel Kottayam C) B.O. (FTD) No. 1611/2015 (Estt.III/1611/2015). Dated, Thiruvanan-
in a timely and efficient way,
thapuram, 02.07.2015.
thus saving the grid from a col- - 4 PM
3. Transfer and posting of Assistant Executive Engineers(Ele.) -orders issued-
lapse or catastrophe. Smart in- Invitees : A) Endt. on EB.1/AEE(E)/T&P/GT/2015 Dtd., Tvpm., 26.05.2015
tervention strategies can be Er George Mathew, Gen- B) Endt. on EB.1/AEE(E)/T&P/M&C-1/2015 Dtd., Tvpm., 29.05.2015
Distributed Energy Systems & eral Secretary, KSEBA C) Endt. on EB.1/AEE(E)/T&P/M&C-3/2015 Dtd., Tvpm., 09.06.2015.

Decentralized Control, Micro- Er Anil , Secretary(S), Be- D) Endt. on EB.1/AEE(E)/T&P/M&C-5/2015 Dtd., Tvpm., 25.06.2015.
E) Endt. on EB.1/AEE(E)/T&P/M&C-6/2015 Dtd., Tvpm., 26.06.2015.
grid Implementation, Deploy- novolent Fund
4. Transfer and posting of Assistant Engineers(Ele.) -orders issued-
ment of Advanced Grid Visuali-
A) Endt. on EB.1/AE(E)/T&P/2015 Dtd., Tvpm., 26.05.2015
zation and Situational Aware- Technical Presentation : B) Endt. on EB.1/AE(E)/GT-AN-2/2015 Dtd., Tvpm., 09.06.2015
ness Systems, Adoption of Mr Sreejith, ABB C) Endt. on EB.1/AE(E)/GT-AN-3/2015 Dtd., Tvpm., 26.06.2015
XXXXXXXXXXXXXXXXXXXXX D) Endt. on EB.1/AE(E)/GT-AN-4/2015 Dtd., Tvpm., 27.06.2015

6 7

Das könnte Ihnen auch gefallen