Beruflich Dokumente
Kultur Dokumente
AbstractFeasibility of oil production predicting results layer BP ANN is used to establish the ANN model with
influence the annual planning and long-term field development prediction function. The first layer of BP-ANN is input
plan of oil field, so the selection of predicting models plays a layer, the second layer of it is middle layer, and the third
core role. In this paper, a common and useful model is layer of it is the output layer, see figure 1.
introduced, it is,the neural network model. By using this
model to predict the oil production in DAQ oilfield in China, Midd
advantages and disadvantages of the model has been discussed. g1 le h1
The predicting results show: the fitting accuracy by the neural Input Outp
network model is high, and the prediction error is smaller ut
U1 g2 h2 X1
than 10%, so neural network model can be used to short-term
forecast of oil production, after changing the weighting value U2 X2
in training, we can also improve the predicting accuracy,
however, this process takes much time. Next, our team will try
to develop new theory to shorten the training time.
intput:g j wij ui j (i 1, 2 m; j 1, 2 p)
k k
(1) figure4:
i 1
output:h k f ( g k )(k 1, 2 N )
15
j j
Output layer:
p
input : ml v jl h j l (l 1, 2n)
k k 10
j 1 (2)
output:x k f (mk )
l l
5
1 N n
( xlk xlk )2
0
0 10 20 30 40 50 60
Etotal .
2 k 1 l 1 Figure2 oil production prediction value with BP neural
Error of output layer unit: network method in block-A1
dlk ( xlk xlk ) xlk (1 xlk ) (3) 2.5
(4)
l 1 1.5
value { t } can
1
be modified by the output layer
k
error {dl } and output value of middle layer unit h j : k 0.5
N
V jl (q 1) V jl (q) dlk h kj
0
(5) 0 5 10 15 20 25 30 35 40 45 50
k 1
N
Figure3 oil production prediction value with BP neural
l (q 1) l (q) d l
k
(6)
network method in block-A2
k 1 7
3
N
Wij (q 1) Wij (q) ekj uik (7)
2
k 1
N
j (q 1) j (q) ekj
1
(8) 0 10 20 30 40 50 60
k 1
Figure4 oil production prediction value with BP neural
Repeat the above-mentioned learning mode, until the network
network method in block-A3
converges to a given error range.
In figure2, figure3and figure4, the black circle means
the real oil production, the colored curve is the predicting
147
curve with ANN model. ANN model can be used to short [2] Hu Jianguo, Chen Yuanqian, Zhang Shengzong. A new
term prediction between 15 to 40 in figure 2to 4. model using for prediction of oil-gas field production, ACTA
PETROLEI SINICA, Vol.16, No.1, 1995, pp.79-86.
[3] Chen Gan,Yang Xinling. AN EXAMINATION INTO
PREDICTION METHODS BASED ON RESERVOIR
IV. CONCLUSIONS PERFORMANCE ANALYSES, CHINA OFFSHORE OIL
1Prediction with ANN model model can comply with the AND GAS(GEOLOGY), Vol.16, No.4, 2002, pp. 254-259.
actual oilfield production dynamics, the prediction errors of [4] Chen Yuanqian, Zhao Qingfei. A Combined Method of
Weibull Model and Water Drive Curve of B Type,
them are less than 10%. XINJIANG PETROLEUM GEOLOGY, 2000, 21(5): 405-407.
2It is a learning type of model; much data is needed to [5] Chen Yuanqian, Hu Jianguo, Zhang Dongjie. Deduction of
complete the prediction, so they are only suitable for the Logistic model and auto regression methods, XINJIANG
short term prediction. PETROLEUM GEOLOGY, Vol.17, No.2, 1996, pp. 150-155.
3We can improve the predicting accuracy by modifying [6] Yue Ping, Chen Xiaofan, Cui Ligong, etc. suggestion
solution of Wengs model and Logistic model in production
the weighting valuer. research, Journal of oil and gas technology, Vol.31, No.4,
2009, pp. 277-279.
[7] Yang Bin. Applied neural network in oil well
REFERENCES logging,Beijing: Petroleum Industry Press,2005
[8] Wu Xingen, Ge Jiali. oil production forecast with ANN
method,Petroleum Exploration and Development, Vol.21,
No.3, 1994, pp.31-42.
[1] Ji Bingyu. Overview of Oilfield Development Indicators
Forecasting Methods, Petroleum geology and oilfield
development in DAQING, Vol.18, No.2, 1999, pp.19-22.
148