Expert Course Faculty:

40 years of international experience in the dredging & reclamation industry


Founder and Former President Director of the Dosco Group BV
Designer of customized inland dredging equipment

International Dredging & Reclamation Projects:

The Philippines, Metro Manila Flood Management Project Phase 1


Bangladesh, Dhaka-Chittagong Corridor Performance Dredging Contract
Vietnam, Mekong Delta Soil Bank feasibility study
Bangladesh, Dhaka Urban Pilot Dredging project
Vietnam, Mekong Delta water resources management for rural development
Vietnam, Identification mission Urban Dredging
Jakarta Emergency Dredging Initiative (JEDI-JUFMP)
Malawi, Technical solution for emptying pit latrines
Jakarta Jatiluhur Pipeline stage 2a
Pilot Dredging Project for Jakarta
Drinkwater solutions for Sudan

Researched & Developed By:

Email: enquiry@equip-global.com| Tel: +65 6376 0908 | http://www.equip-global.com/dredging-and-reclamation-2016


Dredging & Reclamation Masterclass

Course Overview
This 4-day course has been designed to provide you with a complete guide to planning and executing dredging &
reclamation projects. The comprehensive agenda covers all the necessary knowledge of the project stages,
stakeholder management, as well as physical & chemical properties of the sediments, managing environmental
impacts resulting from dredging and reclamation works and how these can be minimized through project planning
and environmental management during execution. In addition to presentations of the subjects, participants will be
challenged in actual project case studies to apply the principles discussed.

Course objectives
Capitalize on expert knowledge to gain maximum value on these vital issues:
MASTER the project phase of dredging & reclamation, the parties involved & the contractual issues
UNDERSTAND Dredging & Reclamation Process and Techniques
IDENTIFY the potential risks of a dredging & reclamation project and MITIGATE them
LEARN about the sediments types and best practices of handling the sediments
KNOW the environmental considerations of dredging and reclamation works
DISCUSS case studies of past and current dredging & reclamation projects to avoid the possible mistakes and
apply the best practices to ensure the success of your current projects

Who should attend?


Engineers (Dredging Engineers, Civil engineers, Environmental Engineers, Operations Engineers, Principal
Engineers, Planning Directors) and practitioners representing project owners
Professionals from port, coastal and environmental authorities
Dredging contractors
Consultants

Course Format
This course will be held in a highly interactive workshop format with Role Simulation Exercises based on real world
examples. Places are limited to ensure all participants gain maximum insight into world class strategic thinking.

Pre - Course
A Pre-Course Questionnaire will be sent to you prior to the workshop. The Trainer will customize the training to suit
your specific needs.

Certificate
Upon completion of the course, you will receive a Certificate of Attendance bearing the signatures of both the
Trainer and the Course Organizer. This Certificate will testify to your professional development and assist in your
advancement.

Would you like to run this course in-house? (Save up to 35%)


This course can be presented exclusively for your organisation on an in-house basis, tailored to meet your specific
needs, at a place and time of your convenience. If you have a team of 10 or more interested in this course, lets
discuss how we can work together to meet your training needs. Please contact us and we will be pleased to assist.

Email: enquiry@equip-global.com| Tel: +65 6376 0908 | http://www.equip-global.com/dredging-and-reclamation-2016


Dredging & Reclamation Masterclass

Program Schedule (Day1 to Day4)


08.30am Registration and welcome coffee
08.30am Morning session begins
10.30am Refreshments & Networking Break
11.00am Morning session continues
12.30am Lunch
13.30pm Afternoon session begins
15.00pm Refreshments & Networking Break
15.30am Afternoon session continues
17.30pm End of Day/Course

About your Expert Trainer:

The Trainer has more than 40 years of experience in the dredging and reclamation industry. His career
started in 1975 when he worked as an operator, foreman and project manager for Konijn Baggerwerken
BV, Netherlands. He then moved to Westminster Dredging Ltd in England in 1978 to gain experience with
sea-going dredging equipment. In 1985, he started his own company and successfully built up an
international dredging company specializing in logistics, dredging operation, developing dredging
equipment, design and handling of deposit areas for sediments and solid waste, consulting for the Dutch
government, Municipalities, Water Boards etc. From 2009 to the present day, he is the CEO of ID
Consultancy BV in Holland, where he leverages on his vast experience as a consultant for strategies in
dredging/ drainage works, logistics, sediment handling and capacity building for government organizations,
international and local companies.

He is currently involved in big dredging projects in the Philippines, Bangladesh, and Vietnam. He is
contracted by the World Bank to prepare a long term Performance Based Contract (PBC) maintenance
dredging on operation and maintenance in the Metro Manial waterways and drainage system including
logistics and sediment handling or recycling. He is an adviser on the different types of dredging equipment,
dredging methods and related transport methods. For the Dhaka-Chittagong Corridor Performance
Dredging Contract in Bangladesh, he prepares the hydrographic surveys and Bidding Documents for a
Performance Based Maintenance Dredging Contract to maintain 53 navigational routes, starting with the
Dhaka Chittagong corridor over a period of 6-10 years. He is also appointed by the Dutch Embassy in
cooperation with the World Bank to prepare a dredging and logistic plan for the primary, secondary and
tertiary canals in the Mekong Delta (Vietnam) under the World Bank 6 project.

Other projects he is and has been involved include: Mekong Delta Soil Bank feasibility study in Vietnam,
Dhaka Urban Pilot Dredging project in Bangladesh, Jakarta Emergency Dredging Initiative (JEDI-JUFMP),
Technical solution for emptying pit latrines in Malawi, Pilot Dredging Project for Jakarta and Drinkwater
solutions for Sudan.

Email: enquiry@equip-global.com| Tel: +65 6376 0908 | http://www.equip-global.com/dredging-and-reclamation-2016


Dredging & Reclamation Masterclass
15 March 2016 Day One Session 4:
Dredging Process and Techniques
Session 1: Cutting of sand, clay and rock
Overview of Dredging & Reclamation Sedimentation process in hopper dredges
Breaching process
Key Definitions & Statistics Case study sharing and how various dredging processes
The need for and benefits of dredging techniques will fit in
The Dredging Industry
Types of Dredging
Advantages and disadvantages of each dredge type 16 March 2016 Day Two
and how they can impact your project
Session 5:
Reclamation Process and Techniques
Session 2:
Landscape maintenance and design
Dredging & Reclamation Project Phasing
Management and restructuring of overburden and soil
Planning and Design Phase Backfilling
Define Project Functional Requirements Topsoil management
Prepare Conceptual Design Management and reuse of waste materials
Comply with Regulatory Framework Case Study Discussions
Stakeholder Input
Characterise the Baseline Environment Session 6:
Assess Potential Environment Impacts Hydraulic Considerations of Dredging &
Prepare Final Project Design and Specifications Reclamation Works
Construction Phase The development cycle of a hydraulic fill project
Tendering and Contract Award How technical data are acquired and applied
Performance-Based Contract Design of the hydraulic fill mass
Contractor Defines Construction Methods and Boundary conditions for the design
Selects Equipment Effects of the design on its surroundings
Project Execution Strength and stiffness of the fill mass
Density, sensitivity to liquefaction
Post-Construction Phase Design considerations for special fill material
Area/Facility Operations such as silts, clays and carbonate sands
Future Maintenance Problematic subsoils and natural hazards
Long-term Monitoring Case Studies

Case Studies on Project Phasing Session 7:


Dredging Process Equipment & Techniques
Session 3: Types of Dredging Equipment
Environmental Regulations & Stakeholder Mechnical Dredgers
management Hydraulic Dredgers
Comparing different types of equipment and their
Considering the legislation, conventions and other suitability to your project
documents concerning clean and contaminated
sediments throughout the whole management Session 8:
process Dredging Operations and Dredged Material
The parties politicians, financiers, activists, Management Alternatives
contractors, consultants, administrators or Excavation of the material from the bottom
standards institutes, owners, and polluters Removal of the loosened material to the dredge vessel
Knowing from which point of view each party Transportation of Dredged Material
approaches the issues Placement or Disposal Operations
Understanding the interrelationship of all these Open-water disposal
groups of parties Confined disposal
Case Studies & Hands On Activities Beneficial use
Case Studies
Email: enquiry@equip-global.com| Tel: +65 6376 0908 | http://www.equip-global.com/dredging-and-reclamation-2016
Dredging & Reclamation Masterclass
17 March 2016 Day Three 18 March 2016 Day Four
Session 9: Session 13:
Sediment Physical Properties In depth Land Reclamation Methods In-depth
analysis analysis & lessons learned
Rock sandstone, coral, granite, basalt Using sand fills
Gravel and Sand Using hill cut materials
Consolidated Clay Using dredged soft soil
Silt/Soft Clay Using cement treated soil
Mixture (rock/sand/silt/soft clay) Using cement mixed soil

Session 10: Case Studies


Soil improvement & Managing Geo-Technical Session 14:
Challenges for Dredging & Reclamation Use of Waste for Land Reclamation
Purposes and advantages of soil improvement Alternative fill materials excavated clay/soil,
Assessment of soil improvement requirements and copper slag, sewage sludge etc
methodologies Soil liquefaction, vacuum Using sludge for land reclamation
consolidation, prefabricated vertical drains (PVDs) or Methods of treatment
wick drains Chemical treatment
Recent Advances in Soft Soil Consolidation Mechanical treatment
Predictions and Observations of Soft Clay Thermal treatment
Foundations A combination of the above
Overcoming common geo-technical challenges in
projects
Session 15:
Session 11: Environmental Considerations of Dredging
Risk Mitigation & Cost Management in and Reclamation works
Dredging & Reclamation Projects Characterization of the affected environment
Environmental Impact Assessment Potential physical changes and environmental
Risk Analysis impacts from dredging & dredged material
Risks and uncertainties in dredging & reclamation placement
projects Spatial and Temporal scales of effects
Risk management and risk communication Environmental control measures
Cost management best practices & lessons learned Silt screens
in dredging & reclamation Air bubble screen
Controlled placement
Session 12: Reducing effects of blasting
Dredge Monitoring and Control
Session 16:
Types and purposes of Monitoring Philosophies and The Future of Dredging &
Defining objectives & baseline conditions
Monitoring criteria
Reclamation
Determining methodology for measuring Key Lessons Learned from past dredging &
change reclamation projects
Defining threshold values Updating on worldwide dredging & reclamation
Timely review procedures projects
Action and communication Key trends & latest technologies of dredging &
reclamation
Case Studies
Case Studies

End of Seminar & Certificate Presentation


Email: enquiry@equip-global.com| Tel: +65 6376 0908 | http://www.equip-global.com/dredging-and-reclamation-2016