SEPUP TRANSFORMER
U 11kV/200V, 80KA
RESISTOR 0.4Ohms,350A/5
Neutral CT 300/1
1 INVERSE - TIME OVERCURRENT PROTECTION - Voltage
Restraint 51-2 (51V)
73 of 126
SIEMENS 400/220/33kV CHHABRA SS
Calculations:-
ISC3pol 28020 A
RATED FULL LOAD CURRENT IN,G 7125 A
CurrentTransformer Ratio 10000/1 A
Generator peak current = 1.3* ING 9262.5 A
Setting to be adopted for Ip = peak current/ CTR 0.92625 A
1 A
The pick up threshold of the over current stage depends on the voltage level . A lower voltage reduces thecurrent pickup
value.
The short circuit time constant of the generator is 1.19 sec
THE Generator must trip beforethat time 1 sec
As per the IEC characterstic
0.14
1.0= ---------------- * TL
(2.8) 0.02-1
1
TL= ----------- = 0.15
6.67
Current setting adopted 1A
Time Multiplier setting adopted 0.15
The pick up threshold depends n the voltage level and the voltage level forpick up is75V(70% of VT Sec.)
74 of 126
SIEMENS 400/220/33kV CHHABRA SS
75 of 126
SIEMENS 400/220/33kV CHHABRA SS
Underemergency tripping, a short time delay is to be given to ensure the reverse power only and also
to give time for active power swing in case of sudden valve closing
Time delay forclose the valve 2 sec
6 IMPEDANCE PROTECTION (21)
The maximum Load current 7125 A
The pick up valueof current(1.2 to 1.5 times) 8550 A
Pickup secondary Current 0.86 A
As the excitation isarrivedfrom the generator UVSeal-in is switched on
Under Voltage set at 75 %
Under voltageseal-in time 1.5 sec
Transformer Impedance 0.15 Ohms
Secondary reactance 1.5 Ohms
Zone 1 secondary(70% of Tr.Z) 1.05 Ohms
Zone2secondary(100% ofTr Z) 1.5 Ohms
Z1B Over reach (120%) 1.8 Ohms
Zone1Time 0 sec
Zone2 time 1 sec
T - end 1.3 sec
POWER SWING- the rate of changeof impedance is the measurement
To arrive the valuefor setting, the minimum operating Z, the difference to the setting of the impedance
Z1and the gradient of impedance in a time
Z1 0.103
Z1 secondary 1.03 Ohms
ZL,min 0.7293059438
ZL,min secondary 7.29 Ohms
dZ/dt = (Zlmin-Z1) /t 313 Ohms/sec
The rateof timet is taken as 20ms
dZ/dt is setat 300 Ohms/sec
The estimation oftimeistaken from the proximity of rate ofchange in 180deg.
dZ/dt(180deg.) 20 Ohms/sec
Zcharacterstic = Z1 = 1.03 Ohms
T= 2* Zcharacteristic/ dZ/dt(180deg)
0.103 sec
76 of 126
SIEMENS 400/220/33kV CHHABRA SS
77 of 126
SIEMENS 400/220/33kV CHHABRA SS
Stage.1 Disconnection from the network 48.00Hz with time delay upto 1.00sec
Stage 2 Sutdown at 47.00Hz with time delay upto 6.00sec
Stage 3 Warning at 49..50Hz with time delay of upto 20.00sec
Stage 4 Alarm or tripping at 52.00 Hz with time delay upto 10.00sec
Minimum voltage at which the function to be blocked is to be set
71.5 V
To achieve 95-100% protection a non line frequency, the 3rdharmonicis used for detection
The displacement voltage detected by Neutral transformer
Due to earth fault in the star point a reduction in 3rd harmonc compared with the non fault condition
the protective function is impimented as an under voltagestage
EARTHING TRANSFORMER 80 KVA
11kv/200V
NGR 0.4 Ohms
350 A
Voltage divder 1
CTR 300A/1A
With full neutral displacement voltage the NGR supplies
(200/3)/0.4 288.68 A
Referedto the 11kV side, this results in
IEE prim 5.27 A
The secondary current of the CT connected before the NGR
0.96 A
For a protected zone of 95% the protection must operate at 5% of thedisplacement voltage of 200/3
10 V
The earth fault current generated 5% of the full earth current
0.05
50 mA
Themagnitudeof theearth fault current is determined by the loading resistor a small angle0fdeviation may result
Theangle of deviation 15 deg.
The time delayforearth fault actuation 0.5 sec
For the 100% coverage the sensitive earth fault protection is considered
The sensitive earth faultprotection will use the same currentmeasuring input at the NGT
Theearth current isincreasedwith theloadresistor of 0.4Ohms.
With 100% Earthand with full displacement the current at the secondary of theCT calculated
0.96 A
Taking the sensitivity action the fault on the terminal of thegenerator will produce very lowcurrent
The pick up is set at I> 10 mA
Lower than the above 95% setting
A High set value is also selected for sensitivity
78 of 126
SIEMENS 400/220/33kV CHHABRA SS
I>> 25 mA
I > Pickup 0 mA
As per the drawing G719EA-XG986-WR901-A SHT26 and as per SLD there is a O/C relay 7SJ80 is used for this
protection as 51GN for E/F
The Same CT isshown for 100% StatorE/Fwith 7UM622
The Calculation is done for the 7UM 622 using the CT. CHECK
The protection uses an external system frequency auxiliary voltageof 36 to 45V from theVT andthis voltage is
symmetrically coupled to the excitation circuit
RotorEarth resistance is monitored in two stages
Warning Stage 10 k Ohms
Lowset value for tripping 2 k Ohms
COUPLING REATANCE and the series resistance enable the calculation of earth resistance
Coupling Reactance 398 Ohms
Series resistance 50 Ohms
The protection is for limiting the demage caused by the accidental energisation of the stationary or
not synchronized generator.
The Current setting adoptedmust be more sensitive than the threshold value of the O/C setting
Current setting 1.2 A
Higher than the overcurrent setting
The Voltage setting must be adopted for nominal conditions
The undervoltage settingis 60% 66 V
The time ofoperation isselectedmore than that of the O/C time setting
1.2 sec.
79 of 126