Sie sind auf Seite 1von 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

J H3 H2 H1 H G1 G F E1 E D C B1 B A1 A
64000 3
3000 2000 2000 2000 3000 4500 7500 5000 3000 8000 7500 4500 3000 6000 3000

B B

5600
1500
NOTES
16200
4500

VOID FEMALE VOID


OTR 101
(MCB 1 : OPZ 1) OER OER PRAYER
C CORRIDOR OPA-23
VOID VOID
OPA-13 CORRIDOR ROOM C

3 3
4500

PTW OFFICE APR 101 CCR 101 CCR 101 IER


900 100

(UTILITIES & OFFSITES) CORRIDOR ( MCB 1 - OPZ 1 ) ( MCB 1 : OPZ - 1 ) (MCB 1 : OPZ - 1) ( MCB 1 - OPZ 1 ) CORRIDOR EER

D D
3
3 MCB SECTION X-X
MAIN CONTROL BUILDING (6710-MCB-601)
Scale 1 : 200

1 1a 2 2a 3 3a 4 4a 5 5a 6 7 7a 8 8a 9 3
64000
E 3000 6000 3000 4500 6000 1500 2500 5500 8000 7500 4500 3000 6000 3000 E
5600
1500

F F
16200
4500

AREA MANAGER AREA MANAGER


ELEC. DIST. ROOM VOID ROOM UTILITIES
VOID ROOM/RISER CORRIDOR (OPA 22) OPA-12 CORRIDOR ELEVATOR VOID

3 3
4500

SERVICE ELEC. DIST. IER 102 CCR 102 CCR 101 MEETING ROOM UTILITIES SERVICE
900 100

G SHAFT ROOM/RISER CORRIDOR (MCB 1 : OPZ - 2) (MCB 1 : OPZ - 2) (MCB 1 : OPZ - 1) ( OPZ 1 ) CORRIDOR ELEVATOR SHAFT G

MCB SECTION Y-Y 3


MAIN CONTROL BUILDING (6710-MCB-601)
Scale 1 : 200
H H

J H G1 3a A1 6a 7a 8 3
A9
12728 8385 5329 18813 18813 5329 8385 12728

Digitally signed by Digitally signed by


Digitally signed by Irwan
Moghana Sundaram Kanvinchelvan A/L
Dzafir Bin Sudirman
Kanagarajah
Date: 2017.03.09 16:37:25 Date: 2017.03.09 Date: 2017.03.09 16:38:21
+08'00' 16:37:53 +08'00' +08'00'
5600

I 3 09-MAR-17 IFC - ISSUED FOR CONSTRUCTION IRW MOG KAN I


2 12-JAN-17 IFC - ISSUED FOR CONSTRUCTION SHJ MOG KAN
1 15-JUL-16 IFC - ISSUED FOR CONSTRUCTION SHJ MOG KAN
1500

0 20-MAY-16 IFC - ISSUED FOR CONSTRUCTION SHJ MOG KAN


C 31-MAR-16 SHJ MOG KAN
16200

IFR - ISSUED FOR REVIEW


B 29-JAN-16 IFR - ISSUED FOR REVIEW SHJ MOG KAN
4500

VOID VOID
AREA MANAGER
CONFERENCE OER ROOM
A 30-NOV-15 IFR - ISSUED FOR REVIEW SHJ MOG KAN
SERVICE SHAFT ROOM CORRIDOR OPA - 22 (OPA - 14) CORRIDOR MALE PRAYER ROOM
Rev Date Status - Revision Memo Written by Checked by Approved by
J J
In accordance with Article 41 of the Conditions of Contract, the ownership in this document shall vest in OWNER. No part of this
4500

document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical
photocopying, recording or otherwise) without the permission of OWNER.
IER 102 CCR 102 CCR 101 IER 101
SERVICE SHAFT HVAC ROOM CORRIDOR (MCB 1 : OPZ - 2) (MCB 1 : OPZ - 2) (MCB 1 : OPZ - 1) (MCB 1 : OPZ - 1) CORRIDOR UPS ROOM CONFIDENTIAL Not to disclose without authorization.
100
900

OUI JV is a Consortium of Fluor Daniel International (Malaysia) Sdn Bhd and


Technip Geoproduction (M) Sdn Bhd PRPC Utilities and Facilities Sdn Bhd

K MCB SECTION X1-X1 PETRONAS RAPID PROJECT, PENGERANG K


MAIN CONTROL BUILDING (6710-MCB-601) PACKAGE 14 - UTILITIES, INTERCONNECTING, OFFSITE UNITS
Scale 1 : 200
ARCHITECTURAL DRAWING
MAIN CONTROL BUILDING (6710-MCB-601)
SECTION X-X, SECTION Y-Y AND SECTION X1-X1
DOC. CLASS : X SCALE : 1 : 200 SHEET : 1 OF 1
L REVISION FORMAT
CONTRACTOR L
Doc. Ref.

OWNER
Doc. Ref.
RAPID - P0014 - 0007 - ARC - DWG - 6710 - 1140 3 A1
Project Package Originator Discipline Doc. Type Unit No Serial No

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Das könnte Ihnen auch gefallen