Question 2
Huge Cost
Implementation
Integration
Question 3
What is meant by "change management" and why is it important for ERP projects?
Systems
Processes
Question 4
Complete
Question text
What is the go live phase of an ERP project? How does an organization prepare for this critical phase?
Go live phase is turning the entire developed SAP system make available to the end users.Organizations
prepare for this with potential human resources with proper training,ready to support and maintenance.
Question 5
Correct
Question text
Select one:
a. vanilla
b. chocolate CorrectCorrect
c. cross-functional
d. vendor-driven
e. web-enabled
Feedback
Question 6
Incorrect
Question text
Select one:
a. hardware. IncorrectIncorrect
b. databases.
c. people.
d. tools.
e. processes.
Feedback
Question 7
Correct
Question text
Select one:
a. database.
b. labor component.
d. system documentation.
e. system architecture.
Feedback
Question 8
Correct
Mark 1.00 out of 1.00
Question text
________ an ERP system during the implementation increases the cost of the system and increases the
implementation risks.
Select one:
a. Delaying
b. Outsourcing
c. Modifying CorrectCorrect
d. Diagramming
e. Integrating
Feedback
Question 9
Correct
Question text
An ERP system works on a(n) ________ database that allows various departments to share information
and communicate with each other.
Select one:
a. single CorrectCorrect
b. None of these
c. ERP
d. silo
e. archive
Feedback
The correct answer is: single
Question 10
Correct
Question text
Select one:
a. software.
b. data.
c. culture. CorrectCorrect
d. hardware.
Feedback
Question 11
Correct
Question text
A(n) ________ is a dynamic sub-organization that can be created and eliminated depending on need.
Select one:
a. strategic group
b. IT group
c. department
d. matrix group
Feedback
The correct answer is: Business Unit
Question 12
Correct
Question text
A(n) ________ is defined as a series of tasks or activities grouped to achieve a business function or goal.
Select one:
a. information system
b. system prototype
c. software design
Feedback
Question 13
Correct
Question text
An organization must first do a ________ to help narrow down the ERP vendors to a select few.
Select one:
a. vendor review
c. performance review
d. system analysis
Feedback
Correct
Question text
A "vanilla" ERP implementation is when the organization decides to implement the ERP software:
Select one:
b. quickly.
Feedback
Question 15
Correct
Question text
As opposed to ERP systems, e-Business systems are focused more on integrating ________ processes.
Select one:
a. internal
b. software
c. external CorrectCorrect
d. None of these
e. hardware
Feedback
The correct answer is: external
Question 16
Correct
Question text
As organizations grew they tended to create a hodge-podge of siloed information systems that lacked
________.
Select one:
a. None of these
b. analysis
c. diversity
d. modularity
e. integration CorrectCorrect
Feedback
Question 17
Incorrect
Question text
A strong commitment from ________ is critical for the success of an ERP system.
Select one:
a. people IncorrectIncorrect
b. system administrators
c. management
d. vendors
e. users
Feedback
Question 18
Incorrect
Question text
Because they lack the skill sets and time necessary to develop it ________, most organizations choose to
purchase ERP software from a vendor.
Select one:
a. modularized
b. organically
c. efficiently IncorrectIncorrect
d. in-house
e. cross-functionally
Feedback
Question 19
Incorrect
Question text
Select one:
a. easier to manage
b. more complex
c. less complex
d. All of these IncorrectIncorrect
e. more layered
Feedback
Question 20
Correct
Question text
Select one:
a. All of these
b. more layered
c. less complex
e. easier to manage
Feedback
Question 21
Correct
Question text
Select one:
b. database.
c. system function.
d. software function.
Feedback
Question 22
Incorrect
Question text
During the 1960s and 1970s most organizations designed their systems in a ________ manner.
Select one:
a. componentized IncorrectIncorrect
b. cross-functional
c. interrelated
d. silo
e. cohesive
Feedback
Question 23
Correct
Question text
In the ERP systems, they must meet the organizational needs in todays's competitive environment to be:
Select one:
a. None of these
Feedback
Question 24
Incorrect
Question text
In the tiered architecture, the ERP application is stored on the ________ tier.
Select one:
a. middleware
b. presentation logic
c. data IncorrectIncorrect
d. hardware
e. business logic
Feedback
Question 25
Correct
Question text
________ is the time from "go live" to about 90 days after, or until the number of issues and problems
have been reduced.
Select one:
a. Analysis
b. Rationalization
d. Stabilization CorrectCorrect
e. Implementation
Feedback
Question 26
Incorrect
Question text
It is not uncommon for employees to ________ the changes in their roles and department boundaries
due to the new ERP system.
Select one:
a. sabotage
b. request IncorrectIncorrect
c. embrace
d. resist
e. None of these
Feedback
Question 27
Incorrect
Question text
One benefit of ERP systems is that by having standard user interfaces, less ________ of employees is
required.
Select one:
a. training
b. management
c. quality
d. None of these
e. numbers IncorrectIncorrect
Feedback
Question 28
Correct
Question text
One of ERP Systems's goals is to make information flow between ________ and the system.
Select one:
a. production
b. finance
c. accounting
e. marketing
Feedback
Question 29
Correct
Question text
The CEO of a firm probably requires less quantity of information but a very high ________ of
information.
Select one:
a. amount
b. quality CorrectCorrect
c. cost
d. transfer
e. None of these
Feedback
Question 30
Correct
Question text
The concept of ________ means that clean data can be entered once and then reused across all
applications.
Select one:
a. cross-data reports
b. real-time access
d. system integration
e. data flows
Feedback
Incorrect
Question text
When an ERP system is upgraded, this means that the IT staff will have to upgrade not only the existing
application, but also any ________ they have made.
Select one:
a. designs IncorrectIncorrect
b. modifications
c. decisions
d. clarifications
e. protections
Feedback
Question 32
Incorrect
Question text
Select one:
True
False Incorrect
Feedback
Question 33
Correct
Question text
A goal of ERP systems is to make information flow be both dynamic and immediate.
Select one:
True Correct
False
Feedback
Question 34
Correct
Question text
Select one:
True Correct
False
Feedback
Question 35
Correct
Question text
One problem with ERP systems is that they do not update data in real-time.
Select one:
True
False Correct
Feedback
Question 36
Correct
Question text
One roadblock for ERP systems is that they require a substantial investment in order to be successful.
Select one:
True Correct
False
Feedback
Question 37
Correct
Question text
Select one:
True Correct
False
Feedback
The correct answer is 'True'.
Question 38
Incorrect
Question text
The architecture of the ERP system is determined well before the ERP software is chosen.
Select one:
True Incorrect
False
Feedback
Question 39
Correct
Question text
The lowest tier of the ERP tiered architectures is where the database server is located.
Select one:
True Correct
False
Feedback
Question 40
Correct
The physical architecture of an ERP system focuses on the efficiency of the system.
Select one:
True Correct
False
Feedback
Question 41
Correct
Question text
When ERP software is purchased from a vendor, this is known as a "vendor-driven" architecture.
Select one:
True
False Correct
Feedback
Week 2
At the ________ level, ERP systems require organizations to focus on business processes rather than
functions.
Select one:
a. middleware
b. logical Correct
c. hardware
d. presentation
e. physical
Feedback
Question 2
Correct
Question text
Information systems that are used for generating reports for mid-level managers are known as:
Select one:
a. ESS.
b. DSS.
c. MIS. CorrectCorrect
d. databases.
Feedback
Question 3
Correct
Question text
In general, the biggest benefits of implementing an integrated system include a reduction in inventory
and ________ costs.
Select one:
a. indirect
b. material
c. personnel CorrectCorrect
d. silo
e. direct
Feedback
Question 4
Incorrect
Question text
In silo systems information is captured and re-entered several times and is not available in ________.
Select one:
a. batches IncorrectIncorrect
b. real-time
c. hardcopy
d. back-ups
Feedback
Question 5
Correct
Question text
Select one:
a. slowly
b. seamlessly CorrectCorrect
c. never
d. rarely
Feedback
Question 6
Incorrect
Question text
Manually reentering data in a system ________ leads to more errors and inaccuracies.
Select one:
a. usually
b. never
c. rarely
d. always IncorrectIncorrect
Feedback
Question 7
Correct
Question text
Many benefits of integrated systems are ________ so they are difficult to quantify.
Select one:
a. operational
b. financial
c. decisional
d. tangible
e. intangible CorrectCorrect
Feedback
Question 8
Incorrect
Question text
One benefit of ERP systems is that they allow organizations to quickly form and break ________ with
other companies.
Select one:
a. protocols
b. networks IncorrectIncorrect
c. web services
d. alliances
Feedback
Question 9
Correct
Question text
A cross-functional task such as order processing involves interactions between sales, warehousing and
accounting.
Select one:
True Correct
False
Feedback
Question 10
Correct
Question text
Mid-level managers typically focus on planning the long-term strategy of the organization.
Select one:
True
False Correct
Feedback
Question 11
Incorrect
Question text
Select one:
True Incorrect
False
Feedback
Question 12
Correct
Question text
Silos will probably not prevent customer service representatives from accessing customer data payment
records in real-time.
Select one:
True
False Correct
Feedback
Question 13
Correct
Question text
The functional model of POSDCORB (Planning, Organizing, Staffing, Directing, Coordinating, Reporting,
Budgeting) dates back to the 1930s yet is still in use today.
Select one:
True Correct
False
Feedback
Question 14
Correct
Question text
When data has to be manually re-entered from one system into another system, this indicates that the
systems have seamless integration.
Select one:
True
False Correct
Feedback
Question 15
Complete
FlaggedRemove flag
Question text
Centralized
Decentralized
Distributed
Question 16
Incorrect
Question text
A side benefit of integration is that the organization is forced to ________ its hardware, software, and IT
policies.
Select one:
a. upgrade
b. review
c. reengineer IncorrectIncorrect
d. standardize
Feedback
The correct answer is: standardize
Question 17
Incorrect
Question text
Because of an ERP system, customers should be able to find out ________ the current status of their
orders.
Select one:
a. on the web
b. in real-time
c. eventually IncorrectIncorrect
d. quickly
Feedback
Question 18
Correct
Question text
Systems integration means allowing access to a shared data resource by people from different ________
areas of the organization.
Select one:
a. logical
b. geographical
c. decisional
d. functional CorrectCorrect
Feedback
Question 19
Correct
Question text
Being able to approve a customer's credit application on the spot is an example of how integrated
systems can provide better:
Select one:
b. resources.
c. market research.
d. support.
Feedback
Question 20
Correct
Question text
Early business organizations focused on breaking complex work tasks into ________ tasks that could be
more easily managed and controlled.
Select one:
a. more complex
b. larger
c. smaller CorrectCorrect
d. non-working
Feedback
Question 21
Incorrect
Question text
Hershey's ERP project failed initially because they failed to break their existing:
Select one:
a. functional silos.
b. hardware resources.
c. chocolate bars.
Feedback
Question 22
Incorrect
Question text
The first step in systems integration is to take inventory of the various IT ________ being used in the
organization.
Select one:
a. databases
b. resources
c. web-enabled applications
d. hardware components
Feedback
Question 23
Correct
Question text
To avoid support and maintenance problems with the integrated system it is important to create a
________ IT help desk and support.
Select one:
a. strategic
b. distributed
c. centralized CorrectCorrect
d. business
e. network
Feedback
Question 24
Incorrect
Question text
Select one:
True
False Incorrect
Feedback
Question 25
Correct
Question text
The three major types of information system architectures include centralized, decentralized and
distributed systems architectures.
Select one:
True Correct
False
Feedback
Question 26
Incorrect
Question text
Today's information systems are based on a centralized architecture that allows sharing of applications
and data resources between the end user and the server computers.
Select one:
True Incorrect
False
Feedback
The correct answer is 'False'.
Question 27
Incorrect
Question text
Select one:
True Incorrect
False
Feedback
Question 28
Correct
Question text
Until recently, information systems and organizations have evolved into functional silos.
Select one:
True Correct
False
Feedback
Question 29
Incorrect
When organizations get large and complex sharing of information happens only at higher levels of
management.
Select one:
True
False Incorrect
Feedback
Question 30
Correct
Question text
When organizations get large and complex they tend to break functions into larger units and assign one
or more staff the responsibility for these activities.
Select one:
True
False Correct
Feedback
Question 31
Correct
Question text
Select one:
True Correct
False
Feedback
Question 32
Complete
Question text
High Cost
Question 33
Complete
Question text
What is the difference between logical and physical systems integration? Give an example of each.
Logical integration involves with business process that can be shared through out the system.
Question 34
Incorrect
Question text
The business process view flattens the organization from a hierarchical to a ________ structure.
Select one:
a. horizontal
b. vertical
c. relational IncorrectIncorrect
d. matrix
Feedback
Question 35
Incorrect
Question text
The current generation of ERP systems does not work well with ________ architecture on legacy
platforms.
Select one:
a. in-house
b. cross-platform
c. grid IncorrectIncorrect
d. distributed
e. centralized
Feedback
Question 36
Incorrect
Mark 0.00 out of 1.00
Question text
The evolution of Information Systems is often viewed as a(n) ________ change process in which
technologies, human factors, organizational relationships and tasks change continuously.
Select one:
a. socio-technical
b. easy
c. simplified
d. automated IncorrectIncorrect
Feedback
Question 37
Correct
Question text
The hierarchical layers of an organization from strategic planning to operational control represent
________ silos.
Select one:
a. horizontal
b. vertical CorrectCorrect
c. corn
d. matrix
Feedback
Question 38
Correct
Question text
To get employees to do their task in a new way, managers must get them to shift their focus from
achieving ________ goals to organizational goals.
Select one:
a. individual
b. functional
c. procedural
d. practical
e. departmental CorrectCorrect
Feedback
Question 39
Correct
Question text
________ tools are good for short-term integration of existing applications in the organization.
Select one:
a. Middleware CorrectCorrect
c. Data integration
d. Real-time access
e. Hardware
Feedback
The correct answer is: Middleware
Question 40
Correct
Question text
ERP systems come with built-in ________ for a variety of functions such as entering a customer order.
Select one:
a. processes CorrectCorrect
b. tasks
c. vendors
d. users
e. roles
Feedback
Week-3
Select one:
a. departmental staff
b. marketing literature
c. building security
d. mission CorrectCorrect
Feedback
Question 2
Correct
Question text
Select one:
a. None of these
Feedback
Question 3
Incorrect
Question text
Select one:
a. None of these
b. downsizing
c. stealing
e. leadership
Feedback
Question 4
Correct
Mark 1.00 out of 1.00
Question text
BPR studies not only identify process and procedural changes for the business, but also ________ that
can create industry advantages.
Select one:
b. high rewards
d. case studies
Feedback
Question 5
Correct
Question text
BPR teams will be composed of functional users and ________ along with facilitators.
Select one:
a. managers CorrectCorrect
b. IT Staff
c. attorneys
d. consultants
e. None of these
Feedback
Question 6
Correct
Question text
Select one:
a. marketing
b. reporting CorrectCorrect
c. staffing
d. accounting
Feedback
Question 7
Correct
Question text
Functional and technical staff on the ERP implementation project should report to ________ rather than
their home departments.
Select one:
b. None of these
c. executives
d. consultants
e. attorneys
Feedback
Correct
Question text
Half of all ERP projects fail to deliver all the anticipated benefits because they do not do a good job of:
Select one:
a. training users.
c. blueprinting.
d. data migration.
Feedback
Question 9
Incorrect
Question text
Having a strong sense of ________ will help provide continuity and a basis for moving forward as
decisions are made and business processes change.
Select one:
a. teamwork
b. commitment IncorrectIncorrect
c. functionality
d. participation
Feedback
Correct
Question text
In order to reengineer a business process, it must be first dismantled into individual ________ and then
put back together into a new set of business flows.
Select one:
a. activities CorrectCorrect
b. transactions
c. functions
d. data flows
Feedback
Question 11
Correct
Question text
In the FoxMeyer case, at a high level, they failed to develop a(n) ________ for the change that came
with their ERP implementation.
Select one:
a. presentation
b. training
d. example
Feedback
The correct answer is: business case
Question 12
Correct
Question text
________ is a methodology for assessing whether an organization has the skills in place to successfully
implement an ERP system.
Select one:
a. Business blueprinting
b. BPR
c. CSF
d. OPM3 CorrectCorrect
Feedback
Question 13
Correct
Question text
Over the years, ________ has been equated with downsizing in ERP projects.
Select one:
a. CSF
b. BPR CorrectCorrect
c. OPM3
d. Business blueprinting
Feedback
The correct answer is: BPR
Question 14
Correct
Question text
Resistance to change may be high but can be reduced with a significant ________ effort early and often
in the project.
Select one:
a. functional management
b. risk management
d. development
Feedback
Question 15
Incorrect
Question text
Select one:
a. Oracle.
b. Adobe.
c. IBM. IncorrectIncorrect
d. EMC.
e. All of these
Feedback
Question 16
Correct
Question text
Some BPR tools are ________ while others address certain market niches.
Select one:
a. stylish
b. expensive
c. cheap
d. comprehensive CorrectCorrect
e. None of these
Feedback
Question 17
Correct
Question text
Select one:
a. None of these
b. dumb founded
c. fired
d. threatened CorrectCorrect
e. prompted
Feedback
Question 18
Correct
Question text
Select one:
b. None of these
Feedback
Question 19
Correct
Question text
Select one:
a. preparation
b. definition
c. testing
d. reevaluation CorrectCorrect
e. mapping
Feedback
Question 20
Correct
Question text
Select one:
a. mapping
b. preparation
c. testing CorrectCorrect
d. reevaluation
e. definition
Feedback
Question 21
Correct
Question text
Select one:
a. reevaluation
b. preparation
c. definition CorrectCorrect
d. mapping
e. testing
Feedback
Question 22
Correct
Question text
Select one:
a. definition
b. preparation
c. testing
d. mapping CorrectCorrect
e. reevaluation
Feedback
Question 23
Correct
Question text
Select one:
a. preparation CorrectCorrect
b. mapping
c. definition
d. testing
e. reevaluation
Feedback
Question 24
Correct
Question text
The goal of the ________ process is to measure whether the organization has the skills and experience
necessary to implement an ERP system.
Select one:
a. PMO
b. BPR
c. OPM3 CorrectCorrect
d. staffing analysis
Feedback
Question 25
Correct
Question text
Select one:
a. Super User
b. change management team
d. Steering Committee
Feedback
Question 26
Correct
Question text
The objective of ________ is to minimize the risk of failure and maximize the benefits of the change.
Select one:
a. project management
c. ERP projects
d. communication
Feedback
Question 27
Correct
Question text
Select one:
a. knowledge CorrectCorrect
b. training
c. conversion
d. design
Feedback
Question 28
Correct
Question text
The overall policy, budget, and scope of the project are determined by the:
Select one:
a. owners. CorrectCorrect
b. Project Executive.
c. Steering Committee.
d. PMO.
Feedback
Question 29
Correct
Question text
The Project Executive must oversee project activities and provide broad ________ for the project and
resolve policy level issues.
Select one:
a. growth
b. functions
c. oversight CorrectCorrect
d. technical requirements
Feedback
Question 30
Correct
Question text
The "to be" phase is ________ difficult than the "as is" phase.
Select one:
a. equally as
b. less
c. more CorrectCorrect
d. None of these
Feedback
Question 31
Correct
Question text
To fully utilize the new ERP system, the ________ results need to be incorporated into the ERP
implementation scope and plan.
Select one:
a. functional analysis
b. OPM3
c. blueprinting
d. BPR CorrectCorrect
Feedback
Question 32
Correct
Question text
Two factors that help ensure organizational commitment to the ERP project include the OPM3 process
and a ________ plan.
Select one:
a. stabilization
b. communication CorrectCorrect
c. go live
d. training
Feedback
Question 33
Correct
Question text
With a new ERP system, not only do workers fear a loss or change in their jobs, but they also fear an
overall change in the:
Select one:
a. business process.
b. control structure. CorrectCorrect
c. management.
d. organization.
Feedback
Question 34
Correct
Question text
Working through the as is phase of the BPR process is often tedious and stressful, so it is good to
counter this with ________ and events.
Select one:
a. conferences
b. None of these
c. meetings
e. vacation
Feedback
Question 35
Correct
Question text
Select one:
True
False Correct
Feedback
Question 36
Correct
Question text
Select one:
True
False Correct
Feedback
Question 37
Correct
Question text
Select one:
True
False Correct
Feedback
Correct
Question text
BPR is often used as the main reason for moving from legacy systems to an ERP system.
Select one:
True Correct
False
Feedback
Question 39
Correct
Question text
ERP implementation project CEOs are created just for the project.
Select one:
True
False Correct
Feedback
Question 40
Correct
Question text
ERP implementations can use the existing organization and reporting structure.
Select one:
True
False Correct
Feedback
Question 41
Correct
Question text
In the "as is" phase, all the new processes must have estimates of timing and who is responsible.
Select one:
True
False Correct
Feedback
Question 42
Correct
Question text
Select one:
True
False Correct
Feedback
Question 43
Correct
Question text
Less skilled companies can raise their ERP skills by training employees or hiring external consultants.
Select one:
True Correct
False
Feedback
Question 44
Correct
Question text
The "to be" processes are the same as the existing processes.
Select one:
True
False Correct
Feedback
Week4
Question 1
Complete
Question text
RAD (rapid application development) is a concept that products can be developed faster and of higher
quality through: Gathering requirements using workshops or focus groups Prototyping and early,
reiterative user testing of designs The re-use of software components A rigidly paced schedule that
defers design improvements to the next product version Less formality in reviews and other team
communication Some companies offer products that provide some or all of the tools for RAD software
development.
Question 2
Complete
Question text
How is the traditional ERP life cycle different from the traditional SDLC?
the major difference between traditional SDLC and ERP life cycle approaches is the concept of who/what
is expected to adapt (or change). The key idea with ERP systems is that an organisation should adapt to
the acquired ERP package that is assumed to be built according to best business practices. Whereas with
the traditional SDLC, the new information system is developed to be adapted or fitted to the
requirements of the organisation.
Question 3
Not answered
Question text
Why is the traditional SDLC process not always a good fit for developing systems?
Question 4
Correct
A(n) ________ analysis is used to compare the functions provided by the ERP system to the operational
processes necessary to run the business.
Select one:
a. None of these
b. gap CorrectCorrect
c. iterative
d. scope
e. investigation
Feedback
Question 5
Correct
Question text
An example of a deliverable that would be due at the end of each stage of the traditional ERP life cycle
would be a(n):
Select one:
a. database.
b. report. CorrectCorrect
c. project.
d. application.
Feedback
Question 6
Correct
Mark 1.00 out of 1.00
Question text
Compared with the traditional SDLC, the ERP life cycle is more focused on reengineering organizational
________ and change management.
Select one:
a. products
b. decisions
c. practices
d. functions
e. processes CorrectCorrect
Feedback
Question 7
Correct
Question text
Consultants may use scripts and ________ to help automate some of the more common tasks that occur
during an implementation.
Select one:
a. hardware
b. merlins
c. None of these
d. consultants
e. wizards CorrectCorrect
Feedback
The correct answer is: wizards
Question 8
Correct
Question text
ERP system development can make use of prototyping methodologies by using a(n) ________ to get
more immediate user feedback as the system is being developed.
Select one:
a. sandbox CorrectCorrect
b. CASE tool
c. Web server
Feedback
Question 9
Correct
Question text
For ERP implementations, it is best if the ________ is composed of people with a wide variety of IT and
business skills.
Select one:
a. technical group
b. consulting team
d. management team
Question 10
Correct
Question text
Hardware and software are acquired and installed in the ________ of the traditional SDLC life cycle.
Select one:
a. design
b. analysis
c. implementation CorrectCorrect
d. investigation
e. maintenance
Feedback
Question 11
Incorrect
Question text
If a sales manager developed a Microsoft Access database to help his salespeople track their customer
contact information, this would be an example of an application developed using:
Select one:
b. prototyping. IncorrectIncorrect
c. end-user development.
d. SDLC processes.
Feedback
Question 12
Incorrect
Question text
In a ________ ERP life cycle implantation, employees are empowered to make the decisions to keep the
project moving forward.
Select one:
a. traditional IncorrectIncorrect
b. vendor driven
c. object-oriented
d. None of these
e. rapid
Feedback
Question 13
Incorrect
Question text
In the ERP life cycle, one of the key early decisions is the ________ selection.
Select one:
a. network
b. systems
c. vendor
d. programs IncorrectIncorrect
Feedback
Question 14
Correct
Question text
In the ________ phase of the traditional SDLC, the functional requirements have to be converted to
system and process flow charts, user input screens, sample reports, etc.
Select one:
a. implementation
b. analysis
c. investigation
d. maintenance
e. design CorrectCorrect
Feedback
Question 15
Correct
Question text
In the ________ phase of the traditional SDLC, the team should do a thorough analysis of the costs and
benefits of the proposed system.
Select one:
a. implementation
b. maintenance
c. design
d. investigation CorrectCorrect
e. analysis
Feedback
Question 16
Correct
Question text
In the traditional ERP life cycle a gap analysis should be conducted in the ________ stage.
Select one:
a. implementation
e. investigation
Feedback
Question 17
Correct
Question text
In the traditional ERP life cycle, by the end of the ________ stage, the team should have a prototype or
sandbox of the ERP software up and running and accessible to the entire team, consultants, and SMEs.
Select one:
a. implementation
e. operations
Feedback
Question 18
Incorrect
Question text
Select one:
a. BIM
b. Total Solutions
c. ASAP IncorrectIncorrect
d. FastTrack
e. Rapid-ERP
Feedback
Question 19
Correct
Question text
Select one:
a. Implementation
d. Investigation CorrectCorrect
Feedback
Question 20
Correct
Question text
Most ERP vendors and consultants try to compete against each other by having different:
Select one:
a. databases.
b. APIs.
c. GUIs.
d. application servers.
Feedback
Question 21
Incorrect
Mark 0.00 out of 1.00
Question text
Stage ________ of the ERP life cycle is similar to the investigation stage of the SDLC.
Select one:
a. one
b. two
c. four
e. three
Feedback
Question 22
Incorrect
Question text
System conversion and training are done in stage ________ of the ERP life cycle.
Select one:
a. two
b. three
c. None of these
d. one
e. four IncorrectIncorrect
Feedback
Question 23
Correct
Question text
System failures often occur when not enough attention is devoted to ________ management from the
beginning.
Select one:
a. lower
b. None of these
c. shrinking
d. change CorrectCorrect
e. upper
Feedback
Question 24
Correct
Question text
The ________ approach to ERP system conversion is the least disruptive conversion approach.
Select one:
a. direct cutover
b. pilot
c. parallel
d. None of these
e. phased CorrectCorrect
Feedback
The correct answer is: phased
Question 25
Correct
Question text
The ________ approach to system conversion has the highest risk of the different conversion
approaches.
Select one:
a. phased
b. parallel
d. None of these
e. pilot
Feedback
Question 26
Correct
Question text
The ________ ERP life cycle approach has a deliverable due at the end of each stage.
Select one:
a. rapid
b. None of these
c. traditional CorrectCorrect
d. object oriented
e. vendor driven
Feedback
Question 27
Incorrect
Question text
The ERP life cycle is often just as rigorous as the traditional ________ life cycle.
Select one:
a. BIM IncorrectIncorrect
b. SDLC
c. project
d. network
Feedback
Question 28
Correct
Question text
The implementation phase of the ERP life cycle is also sometimes called the ________ stage.
Select one:
a. longest
b. shortest
c. Go-Live CorrectCorrect
d. None of these
e. failure
Feedback
Question 29
Correct
Question text
The most critical success factor for ERP systems is to have a solid commitment of the:
Select one:
a. IT department.
b. end users.
d. consultants.
Feedback
Question 30
Correct
Question text
The phases of the traditional SDLC include investigation, design, implementation, ________,
maintenance.
Select one:
a. value proposition
b. ASAP
c. purchasing
d. analysis CorrectCorrect
e. feasibility
Feedback
Question 31
Correct
Question text
The primary task of the ________ phase of the traditional SDLC is to determine the user requirements of
the new system.
Select one:
a. investigation
b. implementation
c. analysis CorrectCorrect
d. design
e. maintenance
Feedback
Question 32
Incorrect
Question text
The ________ provide knowledge to embed business rules and input for interface and report design.
Select one:
a. IT gurus IncorrectIncorrect
b. decision makers
c. SMEs
d. managers
Feedback
Question 33
Correct
Question text
The SDLC provides a systematic process for planning, ________, and creating an information system for
organizations.
Select one:
a. designing CorrectCorrect
b. purchasing
c. visualizing
d. financing
e. managing
Feedback
Question 34
Incorrect
Question text
Select one:
a. logical
b. technical
c. heuristic IncorrectIncorrect
d. system
e. direct
Feedback
Question 35
Incorrect
Question text
To keep the costs down and also to minimize the chance of surprises, it is generally a good rule of thumb
to minimize the number of:
Select one:
a. customizations. IncorrectIncorrect
b. special tools.
c. purchases.
d. embedded processes.
Feedback
Question 36
Incorrect
Question text
When the government wants to develop a new procurement tracking system for its military they would
probably build it using:
Select one:
a. end-user development.
b. SDLC processes.
d. prototyping. IncorrectIncorrect
Feedback
Question 37
Incorrect
Question text
When using the prototyping approach, one does not go through the ________ stages of the traditional
SDLC.
Select one:
Feedback
Question 38
Incorrect
Question text
Which of the following is not a typical problem with using the SDLC process for developing a new
system?
Select one:
b. too rigorous
Feedback
Question 39
Correct
Question text
Select one:
True Correct
False
Feedback
Question 40
Correct
Question text
ASAP, and FastTrack are examples of vendor driven ERP development methodologies.
Select one:
True Correct
False
Feedback
Question 41
Incorrect
Question text
At the end of the investigation phase, a report is prepared for management and stakeholders.
Select one:
True
False Incorrect
Feedback
Question 42
Correct
Question text
Select one:
True
False Correct
Feedback
Incorrect
Question text
During the Acquisition and Development stage of the ERP life cycle, the data team works on multiplying
data from the old system to the new one.
Select one:
True Incorrect
False
Feedback
Question 44
Correct
Question text
ERP packages are complex software packages with embedded business processes.
Select one:
True Correct
False
Feedback
Question 45
Correct
In the analysis phase, the development team should consist of just consultants and technical specialists.
Select one:
True
False Correct
Feedback
Question 46
Correct
Question text
Like SDLC, the ERP development life cycle provides a systematic approach to implementing ERP
software.
Select one:
True Correct
False
Feedback
Question 47
Correct
Question text
System handover, or knowledge transfer is the major activity of the operation stage of the ERP life cycle.
Select one:
True
False Correct
Feedback
Question 48
Incorrect
Question text
The ERP life cycle expands at a much faster pace than in the traditional SDLC.
Select one:
True Incorrect
False
Feedback
Question 49
Correct
Question text
The main reason for the early system development failures was a lack of clear leadership.
Select one:
True
False Correct
Feedback
Question 50
Correct
Question text
The SDLC process actually begins when someone in the organization identifies a need for a new system.
Select one:
True Correct
False
Feedback