Beruflich Dokumente
Kultur Dokumente
PIO DECIMO
_____________________________________________________
ALUNO(A):___________________________________________________________________DATA:______/_______/_________
___________________________________________________________________ TURMA:_______________________
PROFESSOR: ______________________________________________________________________________________________
EXERCICIO
4,00
4,00
FACULDADE PIO DECIMO
_____________________________________________________
COMPOSICOES
TAPUME
VALOR VALOR
DESCRICAO DO ITEM UND QNTD UNIT TOTAL
Carpinteiro h 0.8
Servente h 0.8
Compensado resinado 10mm - Madeirit ou similar m2 1.1 14.88 16.37
Madeira mista serrada (barrote) 6 x 6cm - 0,0036 m3/m (angelim, louro) m 3.15 4.80 15.12
EQUIPAMENTO
MATERIAL
MAO DE OBRA
ENCARGO SOCIAL
TERCEIROS
VALOR TOTAL
ALVENARIA DE PEDRA
VALOR VALOR
DESCRICAO DO ITEM UND QNTD UNIT TOTAL
Pedreiro h 7
Servente h 7
Pedra de mo calcrea m3 1.2 44.57
Argamassa de cimento e areia trao t-4 (1:5) - 1 saco cimento 50kg / 5
m3 0.3 224.43
padiolas areia dim. 0,35z0,45x0,23m - Confeco mecnica e transporte
EQUIPAMENTO
MATERIAL
MAO DE OBRA
ENCARGO SOCIAL
TERCEIROS
VALOR TOTAL
CINTAMENTO
VALOR VALOR
DESCRICAO DO ITEM UND QNTD UNIT TOTAL
Pedreiro h 0.286
Ao ca-50 6,3 a 12,5 mm kg 1.184
Bloco cermico tipo "u" (calha) 9 x 19 x 24 cm un 5 0.41
Concreto simples fabricado na obra, fck=15 mpa, lanado e adensado m3 0.0148 303.73
Argamassa de cimento cal e areia trao t-5 (1:2:8) - 1 saco cimento 50 kg / 2
sacos cal 20 kg / 8 padiolas de areia dim 0.35 x 0.45 x 0.13 m - Confeco m3 0.0027 295.13
mecnica e transporte
FACULDADE PIO DECIMO
_____________________________________________________
EQUIPAMENTO
MATERIAL
MAO DE OBRA
ENCARGO SOCIAL
TERCEIROS
VALOR TOTAL
ALVENARIA DE BLOCO CERAMICO
VALOR VALOR
DESCRICAO DO ITEM UND QNTD UNIT TOTAL
Pedreiro h 0.95
Servente h 0.47
Bloco cermico 6 furos 9 x 19 x 24 cm un 20 0.50
Argamassa de cimento cal e areia trao t-5 (1:2:8) - 1 saco cimento 50 kg / 2
sacos cal 20 kg / 8 padiolas de areia dim 0.35 x 0.45 x 0.13 m - Confeco m3 0.0146 295.13
mecnica e transporte
EQUIPAMENTO
MATERIAL
MAO DE OBRA
ENCARGO SOCIAL
TERCEIROS
VALOR TOTAL
CHAPISCO
VALOR VALOR
DESCRICAO DO ITEM UND QNTD UNIT TOTAL
Pedreiro h 0.1
Servente h 0.1
EQUIPAMENTO
MATERIAL
MAO DE OBRA
ENCARGO SOCIAL
TERCEIROS
VALOR TOTAL
FACULDADE PIO DECIMO
_____________________________________________________
REBOCO EXTERNO
VALOR VALOR
DESCRICAO DO ITEM UND QNTD UNIT TOTAL
Pedreiro h 0.6
Servente h 0.6
Argamassa de cimento cal e areia trao t-5 (1:2:8) - 1 saco cimento 50 kg / 2
sacos cal 20 kg / 8 padiolas de areia dim 0.35 x 0.45 x 0.13 m - Confeco m3 0.02 295.13
mecnica e transporte
EQUIPAMENTO
MATERIAL
MAO DE OBRA
ENCARGO SOCIAL
TERCEIROS
VALOR TOTAL
REBOCO INTERNO
VALOR VALOR
DESCRICAO DO ITEM UND QNTD UNIT TOTAL
Pedreiro h 0.6
Servente h 0.6
Argamassa de cimento cal e areia trao t-6 (1:2:10) - 1 saco cimento de 50 kg
/ 2 sacos de cal de 20 kg / 10 padiolas de areia grossa dim 0.35 x 0.45 x 0.13 m3 0.015 257.73
m - Confeco mecnica e transporte
EQUIPAMENTO
MATERIAL
MAO DE OBRA
ENCARGO SOCIAL
TERCEIROS
VALOR TOTAL
REVESTIMENTO CERAMICO
VALOR VALOR
DESCRICAO DO ITEM UND QNTD UNIT TOTAL
Pedreiro h 0.5
Servente h 1.2
Cermica 34 x 34 cm, Elizabeth, linha Ravena, cor Branco brilhante, ou similar m2 1.05 26.90 28.25
EQUIPAMENTO
MATERIAL
MAO DE OBRA
ENCARGO SOCIAL
TERCEIROS
VALOR TOTAL
PINTURA
VALOR VALOR
DESCRICAO DO ITEM UND QNTD UNIT TOTAL
Pintor h 0.4
Servente h 0.2
Tinta pva ltex para exterior - coralmur branco gelo l 0.18 12.50
EQUIPAMENTO
MATERIAL
MAO DE OBRA
ENCARGO SOCIAL
TERCEIROS
VALOR TOTAL
TELHAMENTO
VALOR VALOR
DESCRICAO DO ITEM UND QNTD UNIT TOTAL
Carpinteiro h 0.5
Servente h 1
Telha cermica tipo canal, cor clara, 1 qualid, comp=50cm, 26 un/m
un 26 0.59
(Itabaianinha ou similar)
EQUIPAMENTO
MATERIAL
MAO DE OBRA
ENCARGO SOCIAL
TERCEIROS
VALOR TOTAL