Sie sind auf Seite 1von 6

THE SOUTHERN NEVADA REGIONAL HOUSING AUTHORITY. 340 N. 111~STREET. LAs VEGAS, NV 89101.

3611

This Requestfor Quotenumberis Q10099 for the following:


Rehabilitationand EnergyUpgrades@4621HutchinsonDr., Las Vegas,NV
SNRHA NeighborhoodStabilizationProgram(NSP)
QUOTE FORM

Scope of Work
4621 Hutchinson Dr., Las Vegas, NV 89147

Work listed below shall meet the following standards:


1. Home Performance Standards for Warm Climates (HPSFWC)
2. Clark County Optional Specifications for Water Saving Measures, October 2009 (WSM)
3. Clark County Housing Rehabilitation Specification Manual
4. Southern Nevada Regional Housing Authority specifications
5. Standard Materials/Appliance List included in this Work Scope
6. Other requirements specifically listed in this Work Scope (incl. Installation Notes)
7. Local building codes and amendments for new or substantially altered work
8. Saturn Mechanical Systems Field Guide, Chapter 6 (2006)
9. NSP Rental Project Standards Draft 5/25/2010
10. Guidelines for Complying with BPI's Technical Standards for the Air Conditioning and Heat Pump
Professional
11. When the above documents contain multiple or conflicting requirements, the most stringent shall apply

SCOPE OF WORK
----------'--~ ---,
_._~--------------
ITEM L DETAILS AMOUNT

Correct all $
measures listed on
Health, Safety & Building Code Measures the Building
Inspection Report
(attached)
Needs to be tested, $
Repair gas leaks call Southwest Gas
iffound.
Install self-closing hinge to door to garage $

Smoke Detectors: Replace ALL alarms and replace with hard wired smoke A 4 $
detectors with battery backup in bedrooms and near kitchen (per code) and test pprox
,
Install one CO Detector (not combined with smoke detector) per floor meeting (Approx 1) electric $

UL-2034, per manufacturer's instructions and test with battery backup


- -- -

(Approx 2) Entry $
and door to garage.
E.g. Kwikset
Install matching locksets with deadbolt for all exterior doors (except glass Polished Brass Tylo
sliders) Entrance Knob
(Combo Pack for 2
doors Model #:
042049948684)
Install Panasonic s
WhisperGreen@
(FV-08VKM2) 80
CFM Premium
Ceiling Mounted
Provide mechanical ventilation per AHSRAE 62.2.2003 based on all installed Continuous and
building shell sealing and energy efficiency measures Spot Ventilation
Fan with
SmartAction@
Motion Sensor, 6
year warranty,
Energy Star (set for
THE SOUTHERN NEVADA REGIONAL HOUSING AUTHORITY • 340 N. 1111< STREET. LAS VEGAS. NV 89101-3611
This Request for Quote number is Q10099 for the following:
Rehabilitation and Energy Upgrades @4621 Hutchinson Dr" Las Vegas, NV
Neighborhood Stabilization Program (NSP)
35 CFM
continuous) in
bathroom vented to
outside uSing 5" R-
8 reflective flex duct
and verify exhaust
CFM,

Required when air I


Combustion Appliance
subcontractor)
Zone test out and repair (to be done by contractor or
sealing or duct
sealing,
11.5
Plumbing $

Perfomn before $
making any other
improvements,
Results of whole
Perform Whole House Water Leak Detection Test house water leak
test results is
required (include
water pressure at
house),

Repair water leaks if found (inside and outside) at their source during whole I
house water leak detection test

Water Heater I

e,g, GE I
Install 40 Gallon Direct Vent Gas Water Heater (EF ,63+ and 10+ year GG50T06PVJ
warranty) Install sediment trap on gas line, new copper water lines, cold water Direct Vent,
gate valve and gas flex line, Install two seismic straps, secured to studs Seal all EF=0,64
penetrations, Insulate exposed hot and cold water pipes with foam pipe 40 gal (3-4
insulation (R-4 min), Use correct diameter of insulation sleeve so it fits tightly, bedrooms) 50 gal
(5+ bedrooms)

Repair damaged $
RebUild water heater platform
drywall and air seal,

Modify T&P Relief line to slope a minimum of 1/4" per foot Per code I

Replace all plastic stem or leaking angle slops with metal stem version, replace (Approx 8) sinks, I
line to fixture, toilets, etc
e,g, Watts Water I
Laundry Room: Install Washing Machine Outlet Box and replace both angle
Technologies 2T-
stops with metal washing machine shut off valve,
M2

Moisture I

Replace rain gutters and install diverter(s) I 1500


Electrical $

Install arc fault breakers for bedrooms @ Electrical Panel $

(Approx 3) e,g I
Install approved weatherproof electrical covers for outside outlets and switches,
Taymac MM410W
Requires GFCI.
(2-3/4" Deep)
(Approx 6) Garage I
Install GFCI receptacles per building code
and kitchen

Grading $
THE SOUTHERN NEVADA REGIONAL HOUSING AUTHORITY. 340 N. 11'" STREET. LAS VEGAS, NV 69101-3611

This Request for Quote number is Q10099 for the follOWing


Rehabilitation and Energy Upgrades@4621 Hutchinson Dr.. Las Vegas, NV
Neighborhood Stabilization Program (NSP)
QUOTE FORM
Page 3 of 11

Finish site grading $


requires 6"
clearance from
earth to wood
Grade yard per building code items; 2" clearance
from concrete
Smooth ground
eliminating all
holes

Total Health, Safety & Building Code Measures $

Energy Efficiency Measures $

Infiltration
Reduce air leakage of the building shell to: 750 CFM50 $

Air sealing can be done with gun foam, caulk and stucco patch .
• Begin air sealing largest holes and attic by passes. e.g. gaps around supplies
and returns to first floor .
• Seal all connections to the altic (highest) from the altic where possible. e.g
recessed cans, supply and return boots, smoke detectors, light fixtures,
electrical and plumbing in drywall and top plates, seams in top plates. Seal soffiVbypass
• Seal VOids where plumbing p'pes penetrate walls e.g. shower heads, toilets, above front
under sinks, recessed clothes washer and ice box. windows .
• Seal holes in interior finishes, around door frames, at strike plates, stairs,
thermostat(s), medicine cabinets, etc .
• Seal sill plates and fireplace .
• Seal exterior penetrations. e.g cable wire, holes ,n stucco, around doors,
doorbell, electrical outlets/switches, wall connections with garage, etc .
• Seal all outdoor light fixtures to wall. Leave boltom of f,xture unsealed .
• Weatherstrip doors.

Doors $

e.g. Benchmark by $
Replace exterior front entry door and frame with ENERGY STAR rated Therma-Tru 36"W
insulated metal panel door (R-6.5 or greater) No Windows. Install sealed peep 6.Panel Smooth
hole Fiberglass Door (R-
8)
Weatherstrip doors Garage $

Windows (sq ttl $

ALL windows and $


Replace windows and install Double Low-E Vinyl/Composite Windows
slider ( approx.175
(U=O.30/SHGC=O.30) or lower
sq ft.)
HVAC & Duct Insulation

Replace existing rooftop HVAC system(s) and install properly sized 16+ SEER
AC and 92+ AFUE gas furnace If feasible, install a split system in attic. Provide Manual J, Sand D
supporting Manual J, Sand D (where feasible to change) calculations based on must be performed
all included energy effiCiency measures. Install new R-8 optimized duct design by a registered
where feasible, minimizing duct length, located close to attic floor to be buried professional
under insulation. Seal ducts to $ 6% (Leakage to Outside) Use OBD supply mechanical
grills with operable curved blades. Install 7 day programmable thermostat(s) engineer.
and program (e.g. Goodman TSTATG3273).
THE SOUTHERN NEVADA REGIONAL HOUSING AUTHORITY. 340 N. 11T~ STREET. lAS VEGAS, NV 89101.3611

This Request for Quote number is Q1 0099 for the following


Rehabilitation and Energy Upgrades @ 4621 Hutchinson Dr., Las Vegas, NV
SNRllA Neighborhood Stabilization Program (NSP)

• Pour new concrete pad for compressor Install new electrical conduit Insulate
exposed refrigerant Iineset to min of R-4 .
• Perform comprehensive AC installation and commissioning per Chapter 6 of
the Saturn Mechanical Systems Field Guide-2006, Energy Star Checklist of
each system
Replace exhaust fans (except those designated for continuous ventilation) with
Hunter 82029 Energy Star Ultra Quiet High Efficiency Bath Fan, 70 CFM, 2 Approx 1
sones, 5 yr warranty, exterior ducted fan with damper and separate switch or
humidistat and verify exhaust.
Allie Insulation
After $
Increase ceiling insulation to R-49 with blown cellulose (Grade 1)
• Remove existing fiberglass batt insulation and air seal exposed penetrations. installationlservice
(See Infiltration) of HVAC system
• Move blown cellulose to exposed top plates and air seal exposed penetrations including ducts
and seams. (See Infiltration) After air sealing
• Eave Vent Baffles (if applicable): Remove all feasible eave vent obstructions. measures taken
Install and seal baffles to framing with gun foam. with recessed lights
• After ducts have been lowered to attic floor, bury ducts in up to 8" of blown After installation of
cellulose. mechanical
ventilation
Allic Access After air sealing
• Build a 14" Insulation dam around attic access to ensure full depth of ceiling and framing
insulation. penetrations
• Dam can be made of wood, batt, etc. Apply foam weatherstrip around After correctly
molding. installing knee wall
insulation and air
Insulate Access Panel to R-30 (see detail to right) barrier

Insulating Allie
Access
Ensure access
frame will support
the following .
• Glue y," plywood
to drywall
• Glue and screw 3-
4" extruded
polystyrene (R-5/in)
to plywood
• Glue another 3-4"
extruded
polystyrene (R-5/in)
on top
• Glue and screw
518" Type-X drywall
to extruded
polystyrene
Extruded
Polystyrene (EPS)
- The two most
common brands of
XPS are Dow
Styrofoam, which is
blue, and Owens
Corning Foamular,
which is pink.
THE SOUTHERN NEVADA. REGIONAL HOUSING AUTHORITY • 340 N. 11'" STREET. LAS VEGAS, NV 89101-3611

This Request for Quote number is 010099 for the following


Rehabilitation and Energy Upgrades @ 4621 Hutchinson Dr., Las Vegas NV
Neighborhood Stabilization Program (NSP)
QUOTE FORM
Page g of 11

Garage $

Repair garage door $

Insulate garage door (R-4 min) With radiant barrier $

Repair garage door opener for proper operation $

Clean garage floor and driveway $

Attic $

Remove antennae $

Exterior $

Repair hose bib (front) $

Remove satellite dish(es), associated wiring and patch $


'(

'\J-'\
~E-~;~
W V-/
(Approx1 ,850 sq tt)
Use Owens
Corning Duration
~re shingles.
$

Include cost to
Remove and replace eXisting asphalt singles on roof.
replace ten 4x8
sheets of damaged
sheathing with LP's
Tech Shield or
equivalent.
Repair block wall, $
remove mesh on
Side gate(s): Remove rust and paint gate and properly
secure to block
wall.
Complete air $
sealing/patching of
exterior
Paint all exterior building surfaces
penetrations before
painting (see
infiltration)
Site / Landscaping $

Use $
environmentally
Treat home for pests/bugs
and pet safe
products
Test all spnnkler valves and heads and emitters. Repair as needed. $

Remove red pavers $


in entry and fill with
Paving
cement. (approx
100 sq tt)
Remove wood on $
entry fence. Repair
Fences/walls
any damage to
block wall.
THE SOUTHERN NEVADA REGIONAL HOUSING AUTHORITY • 340 N 11'H STREET. LAS VEGAS, NV 89101-3611

This Request for Quote number is Q10099 for the following:


Rehabilitation and Energy Upgrades@ 4621 Hutchinson Dr., Las Vegas, NV
Neighborhood Stabilization Program (NSP)
QUOTE FORM
Page 10 of 11

Remove Cyprus $
like bush in front
and stump.
Remove all debns
Clean up and trim all landscaping. Remove dead plants in complete yard including bar by
Replace dead plants In front Spray for weeds. entry and backyard
Tnm all vegetation
from touching
house walls and
roof.

Fill in missing/thin rock to match in front $

Install fines on side and backyard $

Tolal Non-Energy Efficiency Measures $

SNRHA Typical Work Items for NSP Properties (any items not included above)
i Testing/Misc.
Perform blower door test per attached Testing Schedule and provide written report
Perform duct leakage for all HVAC systems test after work is completed and duct
sealing speCIfications have been met and provide written report
Test and calibrate all systems for proper operation per codes, manufacturer's
specifications and HPSWFC Ch. 5, provide written report of items tested and results.
Adjust equipment to comply with operational standards.
Test combustion equipment and adjusUrepair as needed (per BPI Performance
Specifications and HPSFWC Ch. 6), provide written report of items tested and results
• Subcontracted Professionals: $

• Structural Engineer (as apphcablelif not included in above work) $

• Mechanical Engineer (as applicablefif not included in above work) $ t600


• Certified Energy Consultant (as applicable/if not included in above work) ~ .s A 1>ov'f.-
_=t-_
--- -

. Total TestinglSubcontracted Professional


Other Cosls
Permit
1
Dumpster/Recycling
J
TOTAL CONTRACTOR COSTS of ALL MEASURES
Contractor Profit I Overhead I Other
---------------------~
Add Total CONTRACTOR COSTS of All Measures Total $