Sie sind auf Seite 1von 1

STAGES 1 AND 2 ETTS

MEP PRELIMINARY COORDINATION DRAWINGS


M.C. BIM Team

CIVIL MODEL BASED ON IFC DRAWINGS AND ETTS


LATEST AVAILABLE INFORMATION MEP WALLS MEP SLAB BUILDER MEP SHOP DRAWINGS
BUILDER WORKS WORKS DRAWINGS

STRUCTURAL ARCHITECTURE
Main Contractor
GAS WATER F.F DRAINAGE HVAC CONTAINMENT
COORDINATION GENERAL ARRANGEMENT DRAWINGS

VISUAL CHECK CLASH

MARKUP

SCHEDULE STAGE 9

RESOLVE M.C. BIM Team ETTS


CIVIL COORDINATED MODEL BASED ON IFC Main Contractor
REVALIDATION OF MEP BUILDER WORKS
DRAWINGS DRAWINGS
RAISE RFI CIVIL ENGINEERING
REVISE AND RESUBMIT OF MEP BUILDER
WORKS DRAWINGS IF ANY

STAGES 3,4, 5 AND 6


M.C. BIM Team
CIVIL COORDINATED MODEL BASED ON ETTS
SHOP DRAWINGS MEP MODEL BASED ON IFC DRAWINGS.

MECHANICAL ELECTRICAL

COORDINATION

ETTS
VISUAL CHECK CLASH DETECTION MEP COORDINATION DRAWINGS

MARKUP

SCHEDULE
STAGES 7 AND 8
RESOLVE R ETTS
CIVIL VS MEP CLASH FREE COORDINATED
MODEL. ETTS
RAISE RFI R
BASED ON CIVIL SHOP DRAWINGS MEP MODEL BASED ON MEP SHOP
MEP IFC DRAWINGS DRAWINGS

MECHANICAL ELECTRICAL

COORDINATION

VISUAL CHECK CLASH

MARKUP

SCHEDULE

RESOLVE
ETTS
FINAL COORDINATED MODEL
RAISE RFI MEP FINAL CLASH FREE COORDINATED
MODEL.
BASED ON CIVIL SHOP DRAWINGS
AND MEP SHOP DRAWINGS

Das könnte Ihnen auch gefallen