DATE

5TH JULY

6TH JULY

7TH JULY

8TH JULY

9TH JULY

10TH JULY

12TH JULY

13TH JULY

14TH JULY

16TH JULY
17TH JULY

19TH JULY

20TH JULY

21ST JULY

22ND JULY

23RD JULY

24TH JULY

26TH JULY
27TH JULY

30TH JULY

31ST JULY
JOB CARRIED OUT
FORWARD BLOCK CUTTING STARTED
SPONSONS FRAMES RECEIVED FROM CNC
FITTING AND WELDING OF SPONSON FRAMES 9 NOS

FORWARD BLOCK CUTTING COMPLETED


FITTING AND WELDING OF BOX BAX SUPPORT BELOW BED AND WOODEN BHD
FITTING AND WELDING OF SPONSONS FRAMES 7 NUBMERS

SHELL CUTOUT IWO OF BUCKING


PREPARING OF SIDE SHELL PLATES FOR BENDING
BENDING OF SHELL PLATES STARTED
4 NOS OF SHELL PLATE BENDING COMPLETED

FITTINF UP OF SPONSON FRAMES 10 NUMBERS


CUTTING UP OF EXTRA MATERIAL IWO OF BHD AT AFT #17
REMOVAL OF 7 NUMBERS OF SIDE SHELL PLATES

CUTTING UP OF BHD MATERIAL FOR #17


FITTING UP OF SPONSON FRAMES 12 NUMBERS
FITTING UP OF NEW SIDE SHELL PLATES

FITTING UP OF STIFFERNERS ON BHD #17


REMOVAL OF BOX BARS IWO OF PARTITIONS
REMOVAL OF WOOD STUFF BELOW MAIN DECK
FITTING UP OF TIE PLATES IWO OF CORNERS (CABLE ROUTING)

WELDING OF BULKHEAD STARTED


FITTING UP OF SIDE SHELL PLATES STARTED (NEW)
SIDE SHELL RE CUT , BULWARK DESIGN CHANGED

REPLACING THE LONGITUDINAL BOX BARS


WELDING UP OF OF SPONSONS FRAMES
TEMPORARY FITTING OF BULWARK
REMOVEAL OF BULWARK AS FITTED
FITTING UP OF SIDE SHELL PLATES

CUTTING UP OF UPPER DECK EDGES STARTED (WOODEN)


#WELDING UP OF BHD #17
REMOVAL OF BUCKLING AT BOTTOM
WELDING UP OF MISSING WELDS IWO BOTTOM LONGITUDINAL

GRINDING UP OF SPOTS ON BULWARK AREA


FITTING UP OF SPONSON FRAMES
FITTING UP OF SIDE SHELL PLATES 80% COMPLETED
REMOVAL UP OF CEILING INSULATION AT AFT
PARTITIONING UP OF TOILET AND KITCHEN WITH VERTICAL BOX BAR SUPPORT
REMOVAL OF UPPER DECK EDGES (WOOD) COMPLETED

REMOVAL UP OF OLD CABLES


CUTTING UP OF ALL WOODEN STRUCTURE STARTED
REMOVAL UP OF ALL SPACED LONGITUDINAL BOX BARS
REMOVAL UP OF ALL PARTITION (TRANSVERSE BOX BARS )

REMOVAL OF WOODEN STRUCTURE COMPLETED BY 80%


REMOVAL UP OF ALL BOX BARS IN AFT AREA
REMOVAL OF DECK CEILING AT FORWARD
BUILDING UP AND GRINDING SPOTS
WELDING OF FRAMES IN SPONSON STARTED

WELDING UP BOTTOM AND TRANSVERSE GIRDERS STARTED


REMOVAL OF WOODEN STRUCTURE COMPLETED
REMOVAL OF FOAM MATERIAL FROM SIDE SHELL
RE ALIGNING OF BOTTOM LONGITUDINAL AND TRANSVERSE GIRDERS

SIDE SHELL TRIMMED ALONG FULL LENGTH PORT AND STBD


LEVELING OF SIDE SHELL TRIMMED EDGE WITH PASSAGE DECK STIFFERNER
REMOVAL OF SIDE SHELL CORNER ANGLE AND TRIMMING OF CABLE SUPPORT
BOTTOM TRANSVERSE AND LONGITUDINAL GIRDERS COMPLETED

SIDE SHELL FITTING COMPLETED WITH TACK WELDS


SPONSONS FRAMES TACKING COMPLETED
ALL WELDING OF ADDITIONAL TIE PLATE FITTING AT CORNERS ON PORT AND STBD COMPLETED
ALL BOX BARS GRINDED FOR RE-USE

FITTING OF TANKTOP PLATE


LEVELLING UP OF ALL BOTTOM GIRDER STARTED
ADDITIONAL ANGLE SUPPORT AT BOTTOM BENDING STARTED
LEVELLING UP OF BOTTOM GIRDERS COMPLETED BY 35%
BENDING UP OF ANGLES COMPLETED BY 30%

FITTING UP OF ANGLE WITH LEVELLING STARTED


WELDING UP OF TRANSVERSE GIRDER IWO OF BHD STARTED
FITTING UP OF TANK TOP PLATE STARTED
FITTING UP OF 2 PANELS COMPLETED
ANGLE FITTING COMPLETED BY 25%
BENDING UP OF ANGLES COMPLETED BY 50%

FITTING UP OF PANEL 3 NOS


FIITNG UP OF 2 PANELS WITH SLOT WELD(TANK TOP)
BENDING UP OF ANGLE COMPLETED BY 68%
FITTING UP OF PANEL ON TANK TOP 3 NOS
SLOT WELDING OF TANK TOP STARTED

FITTING UP OF PANEL AND WELDING SEAMS COMPLETED 3 NOS


FITTING UP OF ANGLES WITH LEVELLING COMPLETED BY 50% ALONG WITH WELDING
WELDING UP OF PANEL SLOT WELDS
CUTTING UP OF BHD PLATES STARTED

BENDING OF ANGLES COMPLETED BY 100%


FIITING UP OF TANK TOP PANEL PLATES ALONG WITH SEAM JOINT 2 NOS
FITTING UP OF ANGLES WITH LEVELING AND WELDING COMPLETED BY 100%
SLOT WELDING OF 2 PANELS COMPLETED
TANK TOP PLATES FROM # 17 TO # 46 COMPLETED BY 100%

BENDING UP OF CORNER ANGLE STARTED


FIITNG UP OF BHD 25 STARTED
CUTTING UP OF BOX BARS FOR BULKHEAD STARTED
CUTTING UP PLATES FOR # 33 STARTED
FITTING UP OF BOX BARS ON #25 STARTED WITH LEVEL CHECK
REMARK

INSTRUCTED BY OWNER

DESIGN CHANGED BY OWNER

INSTRUCTED BY OWNER
INSTRUCTED BY OWNER

DESIGN CHANGED BY OWNER

INSTRUCTED BY OWNER

INSTRUCTED BY OWNER
DESIGNED CHANGED BY OWNER
INSTRUCTED BY OWNER
INSTRUCTED BY OWNER

INSTRUCTED BY OWNER

DESIGNED CHANGED BY OWNER


DESIGNED CHANGED BY OWNER

INSTRUCTED BY OWNER

INSTRUCTED BY OWNER

INSTRUCTED BY ENGINEERING