Sie sind auf Seite 1von 76

Taameer Investment. S.A.O.

C
Muscat, Sultanate of Oman.

TENDER DOCUMENT FOR

CONSTRUCTION of

Centro Hotel Sohar Mock-up Room Package


Taameer Investment S.A.O.C
Muscat, Sultanate of Oman.

TENDER DOCUMENT FOR

CONSTRUCTION of

Centro Hotel Sohar Mock-up Room

VOLUME 3
Taameer Investment S.A.O.C
Centro Hotel Sohar
Mock-up Room

Taameer Investment. S.A.O.C

TENDER DOCUMENTS FOR


CONSTRUCTION of

Centro Hotel Sohar

__________________________________________________________________

TABLE OF CONTENTS

VOLUME 1 Instructions to Tenderers, Form of Tender and Conditions of Contract

Part 1.1 - Instructions to Tenderers and Appendices

Part 1.2 - Form of Tender and Appendix to Tender

Part 1.3 - General Conditions of Contract, Particular Conditions and Schedules

VOLUME 2 Specifications

Part 2.1 Fixed finish specification

Part 2.2 FF & E specification

VOLUME 3 Commercial Schedules

Part 3.1 - Preambles, Bills of Quantities and Daywork Schedule

VOLUME 4 Drawings

Part 4.1 Architectural drawings

Part 4.2 Interior design drawings

Part 4.3 Electrical drawings

VOLUME 5 Employers General Requirements

Part 5.1 Employers General Requirements


Muttawar Omani Company S.A.O.C
Muttawar Residential Development
Main Works

VOLUME 3

PART 3.1

PREAMBLES, BILLS OF QUANTITIES AND DAYWORK SCEHDULE


TAAMEER INVESTMENTS S.A.O.C

CENTRO HOTEL SOHAR

Mock-up Rooms

BILLS OF QUANTITIES

CONTENTS

BILLNo.

- PricingPreambles

- GeneralSummary

1 PreliminariesandGeneralRequirements

2 Superstructure

3 Finishes

4 Accessories

5 Furnishing

6 Electrical

7 Mechanical

8 ProvisionalSums

9 Dayworks
PRICING PREAMBLES
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

GENERALLY

A TheLumpsumamountenteredbytheContractorintheseBillsofQuantitiesshallconstitutetheentireclaimfor
compensationfortheworkunderthiscontractinaccordancewiththeConditionsofContract.Theworksshallnot
bere-measuredandwillbesubjecttoadjustmentonlyasaresultofchangesinthescopeofworkthrough
changesindrawingsand/orspecifications.TendererarefurtherreferredtoInstructionstoTenderersinthis
respect.

B UponawardofContract,theBillsofQuantitiesshallbeusedsolelyforevaluationofprogresspaymentsduetothe
Contractor,andasascheduleofratesforchanges.

C TheBillsofQuantitiesherein,includingallnotesandinstructions,shallformanintegralpartoftheContract
Documents.However,thedescriptionscontainedintheBillsofQuantitiesforeachitemarenotnecessarily
complete.

D TheContractoriscautionedtofamiliarisehimselfwiththefullcontentofotherDocumentsincludingtheDrawings
andSpecificationsoranyotherinformationthatcanbereasonablyinferredfromanyofthemandallobligations
containedinthedocumentsshallbeincludedinthetenderpricesandlumpsumtenderprice,evenifspecificitems
relatingtothemarenotlistedintheBillsofQuantities.

E Drawings,Specifications,ConditionsofContractandBillsofQuantitiesandallotherDocumentsare
complementaryandifanyitemisincludedinanyofthem,itshallbedeemedincludedinall.

F TheContractor'sbidfortheentireworkshallprovideforsupervisionofanyoralltradesthatisnotintendedtobe
performedwithhisownforces.Noextracompensationforservices,asaGeneralContractorwillbepaid.

G TheContractorisrequiredtoprovidewithhisTenderthreecopies(1originalandtwocopies)oftheBillsof
Quantitiesfullypricedoutinwaterproofinkwithsummationsheetsproperlycompleted.

H AmendmentshallnotbemadetotheseBillsofQuantitieswithouttheauthority,inwriting,oftheEngineer.

J TheContractorshallnotusetheseBillsofQuantitiesasthebasisforaconstructionprogrammeorforthepurpose
oforderingmaterialsorarrangingSub-Contracts,betheyNominatedorotherwise.Thereferencesforthese
activitiesshallbethedrawing,specificationsandinstructionsissuedbytheEngineer.

Page:PP/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

GENERALLY (Cont'd)

FormatofDescriptions

A Inadditiontocommonabbreviationsthefollowinghavebeenadopted:

POM(I)-PrinciplesofMeasurement(International)forWorksofConstructiondatedJune1979and
publishedbytheRoyalInstitutionofCharteredSurveyors,London.

m-Metre

m2-SquareMetre

m3-CubicMetre

No-Number

Kg-Kilograms

ha-Hectare

KN-KiloNewton

ITEM-Compositeitem

hr-hour

RO-RiyalsOmani

METHOD OF MEASUREMENT

B TheseBillsofQuantitieshavebeenmeasuredgenerallyinaccordancewiththeRulesofPOM(I).Inanycasein
theBillsofQuantitieswherethemethoddiffersthenthemethodexpressedmustbeacceptedandmeasuredin
accordancetherewith.

C ItemsinthePreambleSectionoftheseBillsofQuantitiesaredeemedtoqualifyandtoformpartofevery
descriptionofmeasuredworktowhichtheyreferincludingcompositedescriptions.

D Allmeasurementsarenetandtheratesshallincludeforalllaps,waste,workingspaceandtradeortraditional
allowances.

Page:PP/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING

A TheContractor'sunitratesaretobefullyinclusivevalueoftheworkdescribedandmustincludeallrelatedwork,
accessoryorconsumablematerials,incidentallabour,supervision,administration,tools,constructionequipment,
overheadandprofitandallcostsandexpenseswhichmayberequiredinandforthecompletionofthework
describedtogetherwithallcostsandexpensesincomplyingwithallgeneralrisks,liabilitiesandobligationsset
forthorimpliedintheDrawings,SpecificationsandConditionsofContract.

B Itemswhereunitratesareapplicableshouldnotbepricedaslumpsum.

C Wheretheword"allow"isused,thecostoftheitemsshallbetheresponsibilityoftheContractor.

D Wheretheword"item"isused,thecostoftheitemsshallbetheresponsibilityoftheContractor.

E Theamountssetagainstanyitemsofprofitshallincludeforallcostsinconnectionwiththelettersofcredit,bank
charges,interestchargesandinsuranceafterthematerialscomeunderthecontroloftheContractor.

F NovariationwillbeallowedforanyerrorinthecomputationoftheTenderdiscoveredafterdateofissueofletterof
acceptanceofthetenderandawardoftheContract.

Definitions
G "Pricesalsotoinclude";itemsunderthisheadingfallintotwocategories:

(i)Thosewhicharedeemedtobeincludedindescriptionsand,therefore,inprices.

(ii)ThoseforwhichtheContractorshallallowforinhisprices.

H "Falls","Slopes","Weathered:inclinedfromthehorizontalinoneplane

J "CrossFalls","CrossSlopes","CrossWeathered":inclinationfromthehorizontalinmorethanoneplane.

Fix Only

K Theexpression"fixonly"usedintheseBillsofQuantitiesmeansthattheContractorshallprovidethefollowing
facilities:

(i)Unloading,storing,distributingandhoistinggoodsandmaterials.

(ii)Supplyingfullsizetemplates.

(iii)Givingandmarkingdimensionsandtakingresponsibilityfortheiraccuracy.

(iv)Gettingin,protecting,handling,distributionandplacinginposition.

(v)Assemblingasrequired.

(vi)Casingupandprotection,includingclearingawayprotectiononcompletionoftheworks.

(vii)Fullcostofreplacementofanyitemswhicharedamaged,broken,lostorstolenaftertheacceptanceofthe

(viii)Othernecessaryandusualfacilitiesanddocumentation.

Page:PP/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING (CONT'D)

SupplyOnly

A Theexpression"supplyonly"usedintheseBillsofQuantitiesmeansthattheContractoristoincludeforall
liabilitiesandobligationsarisingoutoftheContractexceptfixinginposition.

B AnySub-contractorsorSupplierswhichtheContractorproposestousefortheworksaresubjecttotheapprovalof
theEngineerandEmployer.AnySub-contractororSupplierwhohasnotbeenapprovedbytheEngineerand
Employershallnotbeusedinconnectionwiththecarryingoutoftheworks.

C TheContractorshouldascertainfromSub-contractorsandSuppliersbeforetheworkisputinhandparticularof
positionsinwhichchases,holes,mortisesandthelikewillberequiredtobeformedorleft.Noclaimfortheextra
costsofcuttingawayworkalreadybuiltduetotheContractor'sfailuretoascertaintheseparticularswillbe
admitted.

D TheContractorshallallowforanyadditionalcostsincurredduetoSub-Contractorsworkingdifferenthoursfrom
andextendedhourstothoseworkedbytheContractor.

E Theword"attendance"meansthefollowing:

AttendancestobeprovidedbytheMainContractortoallSub-ContractorsandNominatedSub-Contractors
TheMainContractorshallberesponsibleforproviding,includingbutnotlimitedto,thefollowingattendances:

(I)UseofMainContractor'sadministrativearrangements.

(ii)UseofConstructionalPlant.

(iii)UseofMainContractor'smessroom,sanitaryandwelfarefacilities.

(iv)Co-ordinationandschedulingofallworksrelatedtoeachSub-ContractandNominatedSub-Contract.

(v)Useofstandingscaffolding

(vi)Useoftemporaryworksincludingwaterandelectricity.

(vii)Supplyingfullsizesettingouttemplates.

(viii)Givingandmarkingdimensionsandtakingresponsibilityfortheiraccuracy.

(ix)SpaceforSub-Contractorofficesandstores,betheyDomesticorNominated.

(x)Providingworkspace

Page:PP/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING (CONT'D)

A AttendancestobeprovidedbytheMainContractortoallSub-ContractorsandNominatedSub-ContractorsCont'd

(xi)OffloadingallSub-Contractors'orSuppliers'materialsandplacinginstores,betheyDomesticorNominated.

(xii)ClearingawayallandanyrubbishbeitgeneratedbyMainContractor,NominatedorDomestic
Subcontractors.

(xiii)Othernecessaryandusualfacilities,documentation,generalintergradesattendances,labourandassistance.

B AttendancestobeprovidedbytheSub-ContractororNominatedSub-Contractor
TheSub-ContractororNominatedSub-Contractorshallberesponsibleforproviding,includingbutnotlimitedto,
thefollowingattendances:-

(i)Allspecialscaffoldingrequiredbyhimintheexecutionofhisworks.

(ii)Takingfromstores,distributing,hoistingandplacinginposition,allitemsofplant,equipmentandmaterials
requiredbyhimintheexecutionofhisworks.

(iii)Alllabour,plantetc(otherthanincludedinAttendancestobeprovidedbytheMainContractor).

(iv)Siteofficesandstoresrequiredbyhimfortheexecutionofhisworks.

(v)Obtainingsecuritypassesforaccessofworkpeopletothesite.

vi)Offloadingfrommaterialdeliveryvehicleshismaterials,placingintemporarystoreson-site,distributing,hoisting
andplacinginposition.

PC and Provisional Sums

C Forallworkexecuted,orgoods,materials,plantorservicessuppliedbyanyNominatedSub-Contractoror
NominatedSupplier,theContractorshallbeentitledto:-

(a)TheactualpricepaidorduetobepaidbytheContractor,ontheinstructionsoftheEngineer.

(b)inrespectofallothercharges,profitandattendance,asumbeingapercentagerateoftheactualpricepaidor
duetobepaid.TheContractorshallinsertthepercentageorsumasapplicablerequiredforallothercharges,
profitandattendanceagainsteachitemintheBillofProvisionalSums.

(c)ShouldtheContractorbeawardedworkunderanyPCsumforwhichhehastendered,theamountforprofit
andattendanceallowedbyhimagainstthePCsumshallbededucted.

(d)ShouldworkstatedasPCitembedeletedfromtheContractandtheClientchoosestocarryoutsuchworkasa
directcontractthentheallowancefor"profitandattendance"shallbedeleted,anyattendancerequiredtobe
providedbytheContractorshallbenegotiatedwiththeClientasavariationinaccordancewiththeTermsofthe
Contract.

Page:PP/5 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

Builders Work

A WithintheBillsforProvisionalSumstheContractoristoallowforallthebuildersworkrequiredinconnectionwith
thevariousworkelementscoveredbyProvisionalSumsasnoted.Toassessthebuilder'sworkrequired,the
ContractormayreviewthedrawingsrelatedtotheseWorksattheofficesoftheEngineer.

B AllotherChargesOverheadandProfit

AllotherChargesandProfitincludesProfit,Overheads,Facilities,AssistancesandAttendancesinconnectionwith
theexpenditureofProvisionalSumsinfavourofSub-Contractors.

C GeneralandSpecialAttendances

TheexpressionGeneralAttendancesshallmean,butisnotlimitedtothefollowing:

a)TheuseoftheContractor'sadministrativefacilities.

b)Theuseofgeneralconstructionplant.

c)TheuseoftheContractor'sfacilities,includingmessrooms,sanitaryaccommodationandwelfarefacilities.

d)Theuseoftemporaryworks.

e)SpaceforSub-Contractorsoffices,storesandlaydownareas.

f)Theclearingawayofallrubbish,wasteanddebrisonaregularbasis.

g)Theprovisionandremovalofgeneralscaffoldingforgeneraluse.

h)Unloading,distributing,hoistingorloweringtotherespectivefloorlevels,andplacinginsuitablepositionsfor
theSub-Contractorallplant,machineryortheliketobeinstalledbytheSub-Contractor.

i)TheprovisionofelectricalpowerbyMainContractorfortheSub-Contractor'sworks,includingalllightingand3-
phaseorheavysupplies,whichmayberequiredforpurposesoftestingandcommissioning.

j)TheprovisionofwaterfortheSub-Contractor'sworks,includingtherequirementsfortestingandcommissioning
andsubsequentremovalofwater.

k)TheprovisionofallfuelnecessaryforthetestingandcommissioningoftheSub-Contractworks.

l)Thegeneralco-ordinationandintegrationofallSub-ContractworksintotheGeneralProgramme.

m)AscertainingfulldetailsofanyworktobeexecutedbyotherSub-Contractor'sinconnectionwiththeSub-
Contractworksandarrangingforsuchworktobeexecutedatthecorrecttime.

n)Theprovisionofalltemporaryaccessalreadyfixedorplacedinpositiononthesitefortheuseofworkmenand
thedeliveryofmaterials.

Page:PP/6 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING (CONT'D)

A GeneralandSpecialAttendances(Cont'd)

o)ProtectionoftheSub-ContractworksfromthetimetheSub-ContractorcompletestheworkuntiltheWorksasa
wholeoranySectionsthereofarehandedovertotheEmployer.

p)ThecleaningofallSub-Contractworks,aspartofthefinalcleanoperationatsubstantialcompletionofthe
WorksasaWholeoranySectionthereof.

q)Thedesignco-ordinationandnecessaryliaisonrelatedthereof.

r)TheprogrammingoftheSub-ContractWorksandthenecessaryco-ordinationtocomplywiththeContractor's
overallprogramme.

s)Supplyingfullsizesettingouttemplatesandgivingandmarkingdimensionsandtakingresponsibilityfortheir
accuracy.

t)Obtaininganynecessarysecuritypasses,accessapprovals,identitycardsandthelikeforallSub-Contractor's
personnel.

B TheexpressionGeneralAttendancesshallmean,butisnotlimitedtothefollowing:

a)Theprovisionofallspecialistsscaffolding.

b)Theprovisionofallspecialistlifting,hoistingequipmentandcrainage.

c)Cutting,ChasingandMakingGood.

Builder'sWorkinConnection

C Theexpression"Builder'sWork"shallmeanallancillaryworkcarriedoutbytheContractorinconnectionwithall
Sub-Contractworksandinstallations.

D Thedrilling,cuttingorleavingofholesoraperturesthroughstructuralfloors,walls,beams,etc.shallbeavoided,
butwherethisbecomesanecessity,theContractormustobtainthewrittenapprovaloftheEngineerbeforethe
workisputinhand.

E TheContractorshallallowforallBuilder'sWorkInConnectionwiththeinstallationwhichshouldincludebutisnot
limitedtothefollowing:

a)FixonlyandinstallallinsertsandanyotheranchoredmaterialsrequiredfortheWorks,whichrequiretobe
embeddedinthebuildingstructureandblockwork.TheseinsertsaretobeprovidedbytheSub-Contractortothe
Contractor.

b)Drilling,cuttingorleavingholesforpipes,ductsandthelikethroughwalls,floors,partitions,etc.and
subsequentlymakinggood/waterproofingwherenecessary.

Page:PP/7 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PRICING (CONT'D)

Builder'sWorkinConnection(Cont'd)

c)Cuttingandpinningendsofsupportsforpipes,equipment,appliances,fittingsandtheliketowalls,floors,
partitions,soffits,etc.andmakinggood.

d)Cuttingorleavingmortises,sinking,etc.forholdingdownbolts,brackets,supportsandthelikeandgroutingin.

e)Cuttingchasesforpipes,conduitsandthelikeinwalls,floors,partitions,etc.andsubsequentmakinggood.

f)Cuttingandfittingsaround,boringholesthroughandmakinggoodoffinishinguptopipes,ducts,fans,supports,
bracketsandthelike.

g)Theconstructionofconcrete,blockand/ortimberducts.

h)Theformationofductswithinconcreteslabs,togetherwithaccesscoversandframes.

i)Thebuildingoftimberframes,panelsanddoors,includingironmongery,togiveaccesstopipes,ducts,
equipmentandthelike.

j)Theformationofconcretebases,plinths,etc.forplantandequipment,includinganyanti-vibrationpads.

k)ThewaterproofingofallexternalductworktotheEngineer'sapproval.

l)Makinggoodfinishesaftersecondfixinstallation.

m)Secondarysteelframingnecessaryforsupportofplant,pipework,lifts,ductworkandthelike.

n)Concreteencasementtodrainagepipesandfittingsbelowslabongrade.

o)Elevatorliftingbeams,supportsandothernecessaryBuilder'sWork.

p)Firestoppingaroundservices.

q)Cuttingandmakinggoodopeningsinfalseceilings,bulkheads,wallsforgrilles,diffusers,luminaries,sprinkler
heads,loudspeakersandthelike.

r)'Builder'sWork'willincludealltheabove,butitshouldbenotedthatthislistisnotintendedtobeexhaustiveand
everythingnecessarywillbedeemedtobeincluded.

s)TheContractorisreferredtotheStructuralDrawingsforfurtherinformation.TheContractorshallallowforany
plinthsorbasesrequiredforMEPequipmentinstallations.

t)Builder'sWorkshallincludeforallpenetrationsthroughconcretesurfacesforMEPEquipment,including(but
notlimitedto)stairpressurisationfans,ventilationopeningsthroughskylightupstands,firebarriersealsas
required,andthelike.

Page:PP/8 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION A - PRELIMINARIES

A PaymentfortheestablishmentoftheitemssiteofficeandfacilitieswillbeLumpSumwhichwillbemadeonlyafter
thecompletionofallfacilities.BreakdownofallLumpSumamountstobesubmittedtogetherwiththeTender
Submission.

B Paymentforthemaintenanceofsiteofficeandfacilitiesitemswillbeinmonthlyinstalments.

C PaymentfortheremovalofsiteofficeandfacilitiesitemswillbebyLumpSumwhichwillbemadeonlyafterthe
completionoftheirremoval.TheremovaloftheSiteOfficefortheEngineershallbeonemonthafterthe
completionoftheWorks.

D Paymentforcontractorssupervisionandthelike,billitemsshallbeinmonthlyinstalments.

E Instalmentscanbesuspended,reducedordeletedfromanyContractPayment,if,intheopinionoftheEngineer,
theContractorisnotfulfillinghisobligations.

F TherateinsertedforGeneralProtectionofthesiteshallincludeforthecosttomaintainaccesstoareasadjacent
totheworksite.

G Theitemfortrafficsafetyandcontrolshallincludethecostofalltemporarytrafficdiversionsandtraffic
managementnecessarytocompletetheworks.Theitemshallincludebutnotlimitedtoforliaisonwiththelocal
authoritiestoconfirmtheirrequirementsforsafety.

H Temporaryworks,diversions,sitecleaning,etc,andotheritemsnototherwisecoveredinthispreambleor
otherwisedetailedintheBillsofQuantitieswillbecostrelateditemsandwillbepaidasapercentageofwork
completedtototalvalueofwork.

J Paymentfortheestablishmentofsurveyingequipmentwillbelumpsumanditwillbemadeonlyafterthedelivery
ofalltheequipmentspecified.Paymentforitemsmaintainedwillbeinmonthlyinstalments.

K PaymentforassistingEngineershallbeinmonthlyinstalmentsandisdeemedtocoverallcostsinproviding
assistancetotheEngineerbytheContractorasstatedintheContract.

L PaymentforProjectSignBoardsshallincludeforerection,maintenance,removalwithinonemonthofcompletion
andreinstatementofgroundtoitsoriginalstate.

M PaymentforprogressphotographswillbebysetofmonthlyprogressphotographsasdefinedintheSpecification.

N Paymentforconditionsofcontractwillbebymonthlyinstalmentsandshallcoverallcostsandexpensesincluding
overheadandprofitsincurredbytheContractorincarryingouttherequirementsoftheConditionsofContractnot
otherwiseincludedintheBillofQuantities.Breakdownofalllumpsumamountstobesubmittedtogetherwiththe
TenderSubmission.

Page:PP/9 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION A - PRELIMINARIES (CONT'D)

A Itemsforwhichthemeasurementunitisindays,suchitemsshallbemeasuredfortheactualperiodforwhich
facilities,services,etc.,areprovidedinaccordancewiththeconstructionprogramme.Measurementwill
commenceonlyafterthecompletionoftheMobilisationperiodandonthedayasapprovedbytheEngineerin
agreementforthefacilities,services,etc.,whenfullyprovided.

B Theseinstalmentscanbesuspended,reducedordeletedfromanyContractPayment,ifintheopinionofthe
Engineer,theContractorisnotfulfillinghisobligations.

SECTION B - SITE WORK

C Allquantitiesforexcavationhavebeenmeasurednetwithnoallowanceforincreaseinbulkorworkingspace.
CommencementofexcavationshallbefromthelevelasstatedonthedrawingsandasleftbytheEnablingWorks
Contractor.

D Thetenderershallallowinhisratesforexcavationforexcavatinginanymaterialexceptrockincludingrunningsilt,
runningsand,commencingexcavationatanydepth,excavatingbelowthenormalwatertable,excavatingaround
existingservicesandmainssupportingtheverticalsidesofexcavations,workingspaceandfillingsoftspots.

E Ratesforallexcavationshallincludeforkeepingexcavationsfreefromwaterbywhatevermeans.

F Ratesfordisposalofexcavatedmaterialshallincludeforanynecessarydoublehandlingandtheprovisionofatip,
ifnecessary,includingandchargesinconnectiontherewith.

G Theratesfortrenchesforpipesshallincludefordisposalandbackfilling.

H Theratesfordrains,inspectionchambers,etc.aretoallowfortesting.

J Ratesfordrainpipesgenerallyaretoincludeforallshortlengths,backstops,woodenplugsandretainingand
alignmentpegsrequiredinlayingandfortheextrainvolvedovernormaltrenchexcavatinginhandpackingand
tampingselectedfinematerialaroundthelowerhalfofthepipestobuttressthemagainstthesideofthetrench.
Ratesaretoincludeforleavingallpipescleanandclear.

K Pipesaremeasurednetthroughtheircentrelineaslaidandaretoincludeforalldrainfittingsonalltypesofdrain
pipes,extrajointsofalltypes,cuttings,waste,etc.forlayingintrenchesofanydepth,andbuildingintosidesof
inspectionchambersandmakinggoodasnecessary.

L Ratesfordrainfittingsonalltypesofdrainpipesaretoincludeforextrajointsofalltypesandcuttingandwasteon
allpipes.

M Ratesforaccessoriesshallincludeforconcretesurroundsandanyadditionalexcavationanddisposal.

Page:PP/10 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION C - CONCRETE WORK

A Theratesforconcreteshallincludeforhoistingtoanyheights,orloweringtoanydepth,compactionbyvibratorsif
required,curing,hacking,hackingsurfacesforkey,formingandgroutingmortises/holes/chases/grooves,making
goodconcreteinconnectionwithholesandmortisesandallsurfacetreatmentsandprotectiontounsetorcuring
concrete,allconstructionjointsincludingtemporaryformworktoformjoggledjointsandcleaningandpreparingfor
subsequentpour.

B Reinforcementhasbeenmeasuredbyweightandincludesforbothmeshandbarreinforcement.Ratesfor
reinforcementshallincludeforlaps,cutting,bending,allnecessaryspacers,hangers,chairs,stools,blocks,waste,
tyingwireandrollingmarginetcexceptthatweightsofdesignedhangersandspacersformedbytheuseof
reinforcementbarshavebeenincludedinitemquantities.Ratesforreinforcementshallincludeforproviding
bendingschedules.

C Shutteringismeasurednetbysurfaceincontactwiththeconcrete.

D Shutteringshallbedeemedtoincludeforformingchamfers,splays,grooves,rebates,overlaps,internalangels,
notching,corners,andallnarrowwidths,shortlengthsandthelike.Theyshallalsoincludeformouldoil,
temporaryopeningsforinspection,cleaning,fixinginposition,strikingandremoval.

E Shutteringtoblindingshallbeincludedintherateforblinding.

F BendingSchedulesaretobeinaccordancewithBS8110andBS8666.

G Ratesfortensionedconcreteshallincludeforallpretensioningsteelwiresandcablesincludingpipesleeves,
grouting,tensionblocksandanchors.

H Finishingofsurfacetofallsorcrossfallsasrequiredshallbeincludedintherates.

J Ratesforconcrete,reinforcementandshutteringshallbedeemedtoincludefor:-
i)Thegroutingandmakinggoodarounditemsfixedorinstalledtothestructureincludingtobaseplates,control
plates,switches,architravesandalike.

ii)Sealingandmakinggoodaroundequipmentandappliancesincludingsanitaryware

K Thereshallbenore-measurementofreinforcementexceptasprovidedbythevariationclausesoftheConditions
ofContract.

Page:PP/11 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION D - MASONRY

A Theratesforblockworkaretoincludeforallcuttings,buildingtoanyheightofslabsorbeams,rakingoutjointsor
hackingsurfacestoformkey,beddingandpointingframes,etc.,buildingindoorandwindowframesandthelike,
buildinginorcuttingandpinninginendsoflintelssteps,timbers,steelsections,andthelike,mortisesandmaking
goodinconnectionwithbuildingin,cuttingandpinningin,holesandmortises.

B Theratesforhollowblockworkshallincludeforfillingblockssolidwithin-situconcreteandsteelbarreinforcement
whereshownonthedrawingsordescribedinthespecificationandforprovidingsolidcourseofblockworkatsill
levelofallopeningsandbearingofallin-situconcreteandatthetopofallfreestandingwalls.

C Theratesofcavitywallsshallincludeforallexpansionjointswithcompressiblejointfillerandjointsealantwhere
necessaryorshowninthedrawings.

D Theratesforblockworkshallincludeforallexpansionjointswithcompressiblejointfillerandjointsealantwhere
necessaryorshownonthedrawings.

E Theratesforblockworkshallincludeforstarterbars,ties,atverticalabutmentstoconcretecolumns.

SECTION E - METALWORK / STRUCTURAL STEELWORK

F Ratesformetalwork/steelworkshallincludeforallcutting,drilling,countersinking,bolting,riveting,welding,
boring,grinding,bracing,grindingoffflushetc,assembling,hoistingandfixinginposition,adjusting,siteandshop
priming,andtouchingupasnecessary.

G Preparingandsubmittingworkshopdrawingsbeforefabricationcommences.

H Scribing,rebates,grooves,chambers,splayedandroundededges,fairandreturnedends,mitres,andthelikeand
forallshortisolatedlengths.

J Ratesforbalustradeandhandrailsshallincludeforbends,mitres,crosses,tees,flangedends,angles,
intersections,ramps,bearers,holes,conduitsandthelike.

K Theratesforsteelworkshallincludeforallstanchionsandrafters,gussets,endplates,andthelikeandforthe
preparationofallshopdrawings.Nongalvanizedsteelshallincludeforrustproofprimer.

L Onlymainsteelworkmembershavebeenmeasured.Allfixingsandfittingsaretobeincludedintherates.

M Thecarryingoutofspecialteststoweldedorotherjointsorconnectionsinsteelworkshallbegivenasanitem.

N Guttershavebeenmeasuredbylengthtakenalongthecentrelineoverallfittings.Allpaintingandfittingsto
guttersshallbeincludedintherates.

P Weightsdonotincludeanysecondarymembersthatmayberequiredbythecladdingcontractortosupport
cladding.

Page:PP/12 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION F - WOODWORK

A Theratesforallwoodworkshallincludeforallraking,curvedorsplayedcutting,mitresandendstoallmembers,
foralljointsinmembersover200mmwideforobtainingtimbersinonewidth,notching,sinking,roundedcurves,
splayededges,extratimberinjoints,homes,etc.,alldowelsandcrampsandholesforpipes,tubes,bar,cables,
conduits,ducting,trunkingandthelike.

B Theratesfordoorsaretoincludeforfittingandhanginganytype,weight,sizeandinanymaterial.

C Theratesshallfurtherincludeforrebates,chamfers,grooves,scribededges,roundededges,gluing,clamping,
laboursandthelike,andshallincludeforallcrossgrainandstoppedworkandforallstops,ends,anglesand
mitres.

SECTION G - THERMAL AND MOISTURE PROTECTION

D Ratesforwaterproofingshallincludeforallcutting,lapping,formationofholesforpipes,sleeves,standardsand
thelike,includingdressingandsealingaroundperforationsandinandaroundoutlets.

E Allnarrowwidths,smallareas,dubbingout,internalandexternalangles,makinggoodaroundfittings,working
aroundandformingcollarstopipesetcafteralltrades,jointingbetweendifferentmaterialsandallcutting
(includingcircularandraking)

F Ratesforskirtingandthelikeshallincludefortops,angles,intersectionsandendsandforextramaterialinlaps
andpassings.

G Ratesforflashingsandthelikeshallincludeforangles,intersections,endsandforextramaterialinlapsand
passings.Ratesshallincludefordressingintogroovesandsealing.

H Ratesforrooffinishesshallincludeforallnecessaryexpansionjoints.

J Ratesfordampproofcoursesshallincludeforlapsatanglesandintersections.

SECTION J - FINISHES
K Ratesforfinishesgenerallyshallbedeemedtoincludefor:

i)Thoroughlywettingsolidsurfacestoberenderedorscreededincludingdubbingouttowallsandprovisionof
levellingscreedtofloorsorthelike.

ii)Rakingoutjointsofblockwork,hackingsurfacesofconcreteorapplyingbondingagenttoformakey.

iii)Makinggoodorcuttingandfittingaroundpipes,gratings,sanitary,fittings,standardsandthelike,makinggood
uptodoorandwindowframes,skirting'sandthelike,temporaryrulesworkingaroundburiedservices.

Page:PP/13 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION J - FINISHES (CONT'D)

A iv)Narrowwidths,smallandisolatedareas,roundedarises,fairandchamferededgesandthelike.

v)Anglebeads,cornerbead,tiletrimsandrenderstopsarounddoors,windows,verticalandhorizontalabutments
andthelike,reinforcingmeshatjointsandbetweendifferentsurfaces;internalanglebeadsshallbegalvanized
metalandexternalanglebeadsshallbestainlesssteelunlessotherwisespecified.

vi)Workexecutedoverhead,inrestrictedareasandthelike.

vii)Maskingbeforetheapplicationofsprayedfinishes.

viii)Accesspanels.

ix)Workingatoruptoanyheight,narrowwidths,smallareasandallcuttings.

x)Expansionjointsandcontroljointsasspecification.

B Ratesforscreedshallbedeemedtoincludefor:

i)Finishingwithatemped,floatedortrowelledsurfaceorpowerfloatasrequired.

ii)Layinglevelortofalls,crossfallsorslopesasrequired,particularlyinwetareasandprovidingalevellingcoat
asrequired.

C Ratesforpaintingshallbedeemedtoincludefor:

i)Allcleaningandpreparatoryworktothesurfacestobepainted,cuttingtoline;rubbingdownbetweencoats.

ii)Workingtooratanyheight,andallnarrowwidths.

iii)Theratesforpaintingonwoodshallincludeforworkonhardwoodandsoftwoodincludingknottingandprimer
coat.

iv)Paintingtoopeningedgesofdoorsandworkonadditionalsurfacesexposedbysuchopeningedges.

v)Paintingtoallpipes,ducts,fittings,etc.asnoallowancehasbeenmadeinmeasureditems.

D Ratesforsuspendedceilingsshallincludefor:

i)Supplyingshopdrawingsandforobtainingapprovalofdetailsbeforecommencingwork.

ii)Primaryandsecondarygridsasnecessaryandforsuspendingthesamewithrequisitehangersfromthesoffits.
Perimetertrimandallcuttingandfittingpluscostofprovidingallaccesspanelsshallbeincludedintherates.

iii)Anyadditionalsuspensionmembernecessarytosupportlightingfittingsorsimilar.

iv)Alldecorativeandbulkheadslightingcores.Allcircular,squareorrectangularcuttingforlightfittingsincluding
allnecessarysupports.

Page:PP/14 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION Q - MECHANICAL ENGINEERING INSTALLATIONS

A Ratesforalltubingaretoincludeforprovidingsuitablesleeveswheretubingpassesthroughinternalandexternal
walls,partitions,ceilings,etc.

B Ratesforallpipesandtubingshallincludeforallshortlengths,sockets,runningcouplingsandjoints,standard
pipesupports,cuttingandwaste.Measurementshallbethroughcentrelineofpipesandtubesandthroughfittings.

C Unlessotherwisestated,teecouplingsandconnectionsareidentifiedbythenominaldiameterofthelargestpipe
connectedtheretoandtheratesfortheseitemsaretoincludeforanyreducingteerequired.

D Ratesshallincludeforstoppingendsofpipesbyanapprovedmethodwhiletheworkisinprogresstoprevent
ingressofrubbishandforleavingallpipescleanandclearoncompletion.

E Ratesshallincludeforcoordinationwithotherengineeringinstallations.

F Ratesshallincludeforcuttingforformingholes,mortises,chasesorthelikeandmakinggoodfinishing's(tobeby
MainContractor).

G Ratesshallincludeforbuildingin,cuttingandpinningbracketsorthelikeandmakinggoodfinishing's.

H Ratesforallductworkofanytype,systemormaterialshallincludeforallfittings,flanges,accessdoors,bolting
andthelike.Measurementshallbethroughcentrelineofductsmeasuredthroughfittings.

SECTION R - ELECTRICAL ENGINEERING INSTALLATIONS

J Ratesfortheinstallationsshallincludeforanyportionoftheworkswhichcouldbereasonablyandobviously
inferredasnecessaryforthecompleteandsatisfactoryoperationfortheinstallationasawhole,althoughno
expresslydescribedorspecified.

K Theratesforswitchboards,switchgear,distributionboards,controlgear,fittings,equipmentandthelikeshall
includefor:

a) Allidentificationlabels,warningnotices,circuitschedulesandthelike
b) Thecompletionofthecircuitschedules
c) Allnecessaryglandplatesandcableentryboxes
d) Allearthtapes,cablesandconnectionstoassociatedcableterminationglands,conduitand/ortrunking.

L Maincircuits(definedastheincomingsupplytothedistributionboardswithinabuilding)shallbemeasuredas
follows)

a) Cablesshallbemeasuredbylengthandshallbedeemedtoincludecolourcoding,marking,joints,boxes,line
tops,shrouds,terminationglands,connectors,supports,sleeves,platesandthelike.
b) Conduitshallbemeasuredbylengthandshallbedeemedtoincludeconduitboxes,allfittings,saddles,
crumpetsbending,cutting,screwing,jointingandthelike.

c)Traysandtrunkingshallbemeasuredbylengthandshallbedeemedtoincludeallfittings,stools,saddles,
cleats,clips,firebarriers,pinracks,cutting,jointing,earthcontinuitycomponentsandthelike.Trunkingshallalso
bedeemedtoincluded.

Page:PP/15 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION R - ELECTRICAL ENGINEERING INSTALLATIONS (CONT'D)

A Submaincircuits(definedassupplyfromadistributionboardtoasub-maindistributionboard)shallbe
measuredinaccordancewithPOM(I)ClauseR2.

B Theratesforenumeratedpoints,outlets,equipmentandthelikeshallbedeemedtoincludecables,conduit,
trunking,trays,earthingtapeandallequipmentandaccessoriesnecessarytoprovidepower.

C Spacingofcomponentsforsupportingearthingtapesorcableshasnotbeenstatedandtheratesforearthing
tapesandcablesshallincludeforallsaddles,cleats,clipsholdfastsandtheliketosuitsiteconditions.

D Thelengthofpendantdropsarenotstatedandtheratesforlightingfittingsshallincludeforpendantdrops,boxes,
conduitboxes,woodblocks,mouldedpattresses,breakjointrings,ceilingroses,connectorblocks,domecovers,
backplates,ballandsocketbackplates,earthcontinuity,flexiblecords,chokes,capacitors,starters,lampholders
andthelike.

E Theratesforalllightingfittingsshallincludeforallassociatedlamps,controlgear,diffusers,shadesandthelike.

F Theratesforclocks,telephones,firealarms,burglaralarms,loudspeakersandthelikeshallincludewhere
requiredforallboxes,conduitboxes,woodblock,mouldedpattresses,coverplatesandthelike.

G Theratesforallsocketoutletsincludeforassociatedplugtops.

H Theratesforsurfaceaccessoriesshallincludeforanynecessarybackplatesandsurfacemountingboxes.

J Theratesforallflush,semi-flush,recessed,semi-recessedandinsertionitemsshallincludeforanynecessary
boxes.

K Theratesforallaccessories,fittings,equipmentandthelikeshallincludeforallnecessaryearthingtailsand
terminals.

L Thetermconnectionunitalsocoversspurunitsandspurboxes.

M Ratesshallincludeforcoordinationwithotherengineeringinstallations.

Page:PP/16 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

SECTION R - ELECTRICAL ENGINEERING INSTALLATIONS (Cont'd)

A Ratesshallincludeforcuttingorformingholes,mortises,chasesorthelikeandmakinggoodfinishings(tobe
donebyMainContractor).

B Ratesshallincludebuildinginorcuttingandpinningbracketsorthelikeandmakinggoodfinishings(tobedoneby
MainContractor)

SERVICES GENERALLY

C TheContractorshallbecompletelyresponsibleforobtainingtherequirementsforholes,fixings,andanyother
BuildersWork.HeshallcoordinatetherequirementsforBuildersWorkbetweentradesandensurethatsuch
informationisasshownontheDrawingsinaccordancewithhisownandtheEmployer'srequirements.Detailsof
Builder'sWorkwhichisnotshownontheDrawingsbutwhichisrequiredbytheContractorshallbeforwardedto
theEngineerforhiswrittenapprovalbeforetheworkisputinhand.Anycostofunnecessaryworkduetothe
Contractorfailingtocomplywiththeseconditionsorfailingtoactuponsuchinformationgivenbeborneentirelyby
theContractor.

D Thedrilling,cuttingorleavingofholesoraperturesthroughstructuralfloors,walls,beams,etc.,shallbeavoided,
butwherethisbecomesanecessitythecontractormustobtainthewrittenapprovaloftheEngineerbeforesuch
workisputinhand.

BUILDERS WORK

E TheexpressionusedhereBuildersWorkrelatedtoservicesincludesbutisnotlimitedtothefollowing:

a) Drilling,cuttingorleavingofholesforpipes,ductsandthelikethroughwalls,floors,partitions,roofs,etcand
subsequentlymakinggood.
b) Cuttingandpinningendsofsupportsforpipes,equipment,appliances,fittingsandtheliketowalls,floors,
partitions,soffits,etc.,andmakinggood.
c) Cuttingorleavingmortises,sinking,etc.,forholdingdownbolts,brackets,supportsandthelikeandgrouting
in.
d) Cuttingchasesforpipesandthelikeinwalls,floors,partitions,etc.,andsubsequentlymakinggood.
e) Cuttingandfittingaround,boringholesthroughandmakinggoodoffinishingsuptopipes,supports,brackets,
andthelike.
f) Theformationofsmallconcretebases,plinths,etc.forplant,tanksandequipment,includinganti-vibration
padsasnecessary.
g) Thepaintingofexposedpipework,fittings,equipment,etc.

F BuildersWorkwillincludealltheabove,butitshouldbenotedthatthislistisnotintendedtobeexhaustiveand
everythingnecessarywillbedeemedtobeincluded.

Page:PP/17 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:

PROVISIONAL SUMS

A ProvisionalSumsincludedintheseBillsofQuantitiesmaybeexpendedtotally,inpartornotatallandasdirected
bytheEngineer.

B TheContractorwillhavenoentitlementtoanyclaimforlossofprofitintheeventthatanyorallProvisionalSums
areomittedinpartorintheirentirety.WheretheContractorhasinsertedanassociated%age(notcomposite
items)forattendancesandbuildersworkstheseshallalsobeadjustedforanyomissionoradditionasrequired
undertheConditionsofContract.

Page:PP/18 FGOULD.COM
GENERAL SUMMARY
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
GeneralSummary
ITEM TOTAL PRICE
ITEM DESCRIPTION
REF: RIYALS OMANI

BILLS OF QUANTITIES

GENERAL SUMMARY

BillNo. PageNo.

1 PreliminariesandGeneralRequirements 1/6

2 Superstructure 2/6

3 Finishes 3/4

4 Accessories 4/3

5 Furnishing 5/4

6 ElectricalEngineeringInstallation 6/5

7 MechanicalEngineeringInstallation 7/4

8 ProvisionalSums 8/2

9 DayWorks 9/7

SUB TOTAL

TOTAL CARRIED TO FORM OF TENDER

GS-1 FGOULD.COM
BILL NO. 1

PRELIMINARIES
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

BILL NO. 1 - PRELIMINARIES & GENERAL
REQUIREMENTS

Contractual Requirements '(reference General &


Particular Conditions of Contract)

A Performancesecurity 1 Item

B InsuranceofContractor'sequipment 1 Item

C Workmen'sCompensationInsurance 1 Item

D ThirdPartyLiabilityInsurance 1 Item

E Programofworksasperclause14oftheGeneral 1 Item
Conditions

SafetyEquipment

F Contractorshallprovidenecessarysafetyequipmentas 1 Item
listedoutinthespecifications

G ProvideprotectiveclothingasrequiredbytheEmployer 1 Item
representativeandtheEngineer

ToCollection

Page:1/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

BILL NO. 1 - PRELIMINARIES & GENERAL


REQUIREMENTS (CONT'D)

Employer's Facilities

ProjectClose-OutReport

A Contractorshallprepareafinalclose-outreportas 1 Item
specified

ProgressReport

B SetofProgressReports,ProgressPhotographsas 5 No
specified

CostControlReport

C SetofCostControlReport 5 No

ToCollection

Page:1/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

BILL NO. 1 - PRELIMINARIES & GENERAL


REQUIREMENTS (CONT'D)

Contractor's Facilities

Contractorshallberesponsibleforproviding
accommodationandbuildings,includingoffices,
compounds,stores,messroomsandlivingaccommodation
asstatedinthespecifications

A Establishment 1 Item

B Maintenance 70 Day

C Removal 1 Item

ServicesfortheContractor(Lighting,Power,Waterand
Sanitation)

D Establishment 1 Item

E Maintenance 70 Day

F Removal 1 Item

SiteManagementandSupervision

G Contractor'sSiteManagementandSupervisionStaff 70 Day

ScaffoldingfortheContractor'sownuseandfortheuseof
allthesub-Contractors

H Allowforprovide,erect,maintain,dismantleandclear 1 Item
awayatcompletionproperandadequatescaffoldingfor
theContractor'sownuseandfortheuseofallthesub-
Contractors

ConstructionPlantforPermanentWorks

J Establishment 1 Item

K Maintenance 70 Day

L Removal 1 Item

OtherCosts

M Compliancewiththeconditionsofcontractand 1 Item
specification(theTenderershallseparatelylistandprice
belowanyotherclauseconsideredtohavemonetary
value)-Transport of people & HSE requirements

ToCollection

Page:1/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

BILL NO. 1 - PRELIMINARIES & GENERAL


REQUIREMENTS (CONT'D)

Sundry Items

Testingofmaterials

A AllowforalltestsrequiredbytheSpecification 1 Item

B Allowforprovidingsamplesasspecified 1 Item

Protectingtheworks

C Allowforprotectionofworksfrominclementweather 1 Item

D TheContractorshallprotectallexistingservicesduringthe 1 Item
construction.Anydamagetoexistingservicesshallbe
makegoodbyhisowncosts.Ifanytemporaryor
permanentre-routingofexistingservicesarerequired,the
Contractorshallberesponsibleforgivingnoticetothe
relevantauthoritiesandallowforattendance.

CleaningtheWorks

E TheContractorshallremoverubbishatregularintervals, 1 Item
provideprotectivecasingsandcoveringsandcleanthe
worksatcompletion

Trafficregulations

F TheContractorshallcomplywithalltrafficregulationsand 1 Item
shallliaisewiththepoliceandotherauthorities

PetroleumRegulations

G TheContractorshallcomplywithanypetroleum 1 Item
regulationsinforce

H Allowforattendanceontheworkscarriedoutbythe 1 Item
statutoryauthorities

J TheContractorshallgiveallnotices,seekpermissionsand 1 Item
payallfeesnecessaryfortheissueofbuildingpermits,
approvals,permanentserviceconnectionsandthelike

ToCollection

Page:1/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

BILL NO. 1 - PRELIMINARIES & GENERAL


REQUIREMENTS (CONT'D)

Sundry Items (Cont'd)

Shopdrawings,Asbuiltdrawings,etc.

A TheContractorshallprepareandsubmit"shop"drawings 1 Item
asspecified

B Allowforproviding,operatingandmaintenancemanuals 1 Item
asspecified

C TheContractorshallprovideallsparesasspecified 1 Item

D TheContractorshallprepareasbuiltdrawingsasspecified 1 Item

Co-ordination

E Allowforallco-operationandco-ordinationwithallother 1 Item
Contractors

TheEmployersRequirementsarestatedintheTender
Documents(VolumeFive)

F TheContractorshallincludesuchsumsasheconsiders
necessarytocoverhisobligations,liabilitiesandservices
underthisdocuments,butnotlimitedtothefollowingitems
1 Item

ToCollection

Page:1/5 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

Collection Page : Preliminaries

PageNo.1/1

PageNo.1/2

PageNo.1/3

PageNo.1/4

PageNo.1/5

ToGeneralSummary

Page:1/6 FGOULD.COM
BILL NO. 2

SUPERSTRUCTURE
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SUPERSTRUCTURE

SECTION C - CONCRETE WORK

Floors

A TheContractorshallconstructaFloorscreedin
accordancewiththedrawingsandspecification 24 m2

SECTION D - MASONRY


Masonryblockwallswithcorefiller,incementsandmortar
asperthedetailsonDrawings(TK101)andSpecification

B 150mmthickBlockWoks 40 m2

C 200mmthickBlockWoks 20 m2

SECTION F - WOOD WORKS

Roof

D Supplyandinstall200x50mmmerantijoistroofframeat
450mmcentersasperdrawingsandspecifications. 1 Item

Headboards

Supplyandfixheadboardsincludingfabricfinishes,
necessaryfittingsandaccessoriesallasperdrawings,
specificationsandtotheapprovalof
theEngineer

E HeadboardwithUpholsteryfabricOverallsize1600x
1700mm 1 No

Wardrobe

SupplyandfixWardrobeincludingtimberveneeredfinish,
otherfinishes,ironmongeries,socket&electricalitems,
necessaryfittingsandaccessoriesallasperdrawings,
specificationsandtotheapprovaloftheEngineer

F 440mmwide,1600mmwide&2400mmhighWardrobe
includingStonetop,drawerwithTimber,custommadepull
handle,hookforshoe&umbrella,Railhanger,Robe
hook,Beltbar. 1 No

ToCollection

Page:2/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION F - WOOD WORKS (CONT'D)

Desk & TV enclosure

A SupplyandfixDesk&TVenclosuredrawingref;GD-313
asperdrawings,specificationsandtotheapprovalofthe
Engineer.Toincludefinishtype100mediumgreystained
oakasperdrawingspecification 1 No

SECTION H - DOORS AND WINDOWS

DOORS

Note;

a)Theratesforalldoorsshallincludeforallframes,sub-
frames,architraves,transoms,stops,glazing,decorations
etc.allinaccordancewiththeSpecification,Schedulesand
Drawings,

b)Sizesreferredtoareoverallstructuralopeningsizes
shownonDrawings

c)Alltimberandveneersshallbewellconditioned,
seasoned,driedandvacuumtreatedallasspecified

d)Allhardwoodtimbershallbebestqualitywoodtoapproval

e)Thetendererattentionisdrawntothedoorschedulefor
thereferenceNos..etc.priortopricingofthissection

f)Finaldecorations/Finishestoinclude,primerasStandard
Specifications

g)Detailsofcustombuilthandles,hingesandpivotstobe
submittedforapprovalofjoineryspecialist

h)ShopDrawingsandsamplesofalltimberelementstobe
submittedforapprovalpriortofabrication

j)Ratesfordoorsshallincludeforsealswhereverindicated-
followironmongeryschedule

k)Doorfireratingrequirementsshallbeasperthedoor
scheduleandSpecification

ToCollection

Page:2/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION H - DOORS AND WINDOWS (CONT'D)

DOORS (CONT'D)

TheContractorshallinaccordancewiththedrawingsand
specificationsupplyandinstallSingletimberhingeddoor
concealedcloser-witharchitrave-FD60

A TypeD1,2.395x1.05mmsized 1 No

TheContractorshallinaccordancewiththedrawingsand
specificationsupplyandinstallsingletimberexposedsliding
door-frameless

B TypeD2,2.400x0.800mmsized 1 No

Ironmongery

Supplyandfixingofironmongerysettodoorsinaccordance
withtheDrawingsandHardwareSpecifications

Doortype01Singletimberhingeddoorconcealedcloser
witharchitrave

C TypeA,EllesseleverhandleBD21AssembledwithMM13
HDkitroses,finish:polishedcrome 1 No

D TypeB,Elementansiwallreaderbysaltosystems,finish
tomatchdoorcolour 1 No

E TypeC,931.84.039XPC-hingeswithtemplatedrilling,2
ballbearing4x4 1 No

F TypeD,959.00.003XSPC-doorviewer200degree 1 No

G TypeE,ElementANSImortiselockmodelLA1T17with
privacyfunctionanddeadbolt. 1 No

H TypeF,Recessed'Ansi'STDstrikingplatebyvingcard
1 No

J TypeG,903.99.891XPC-Escutcheonplatewithsteel
innerbase902.53.106XPC-WCreleaseandinsideTum
1 No

K TypeH,905.10.381Hafele'startec'PVC/FH1.12Rebate
Seal 1 No

L TypeJ950.05.931XPC-hafeleautomaticdoorbottomfor
fire/smokeproofwithacousticratingandsingleend
release 1 No

ToCollection

Page:2/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION H - DOORS AND WINDOWS (CONT'D)

DOORS (CONT'D)

Ironmongery (Cont'd)

A TypeK,911.59.095XPC-Hafelesecuritydoorguide 1 No

B TypeL950.11.107Hafeleintumescentfireprotectionkits
forhinges950.11.123-hafeleinstumensentfireprotection
kitsforconcealedcloser. 1 No

C TyaoeM950.11.041-Hafele20mminstumescentfireand
smokeseal.Fireresistancefor60mins(Darkbrown
colour) 1 No

D TypeN937.52.070XPC-FloormountedDoorstop 1 No

DoorType02Singletimberexposedslidingdoor-Frameless

E TypeACustommadehandle 1 No

F TypeB940.80.002/940.80180XPC-hafeleslidingdoor
fittingsjunior80/Bwithadditionalcomponents
940.80.043XPC-Hafele'Smuso'soft 1 No

G TypeC-950.10.381-Doorrebateseal-Fireresistant 1 No

H TypeD-940.40.031XPC-Hafelefloorguidefreeofplay
1 No

WINDOWS

J TheContractorshallsupplyandinstallwindowin
accordancewiththedrawings(MA-AL-8011)and
specification 1 No

ToCollection

Page:2/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

BILL NO 02 - SUPERSTRUCTURE (CONT'D)

ADDITIONAL ITEMS

Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.

A .

B .

C .

ToCollection

Page:2/5 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

Collection Page : Superstructure

PageNo.2/1

PageNo.2/2

PageNo.2/3

PageNo.2/4

PageNo.2/5

ToGeneralSummary

Page:2/6 FGOULD.COM
BILL NO. 3

FINISHES
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.03Finishes
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION J - FINISHES

Internal Finishes

Floor Finishes

Supplyandinstallfloorfinishesallinaccordancewiththe
Drawings,SpecificationandasperEngineer'sinstruction

A Carpetstype01.001refWN6002-1580-2,80%wool20%
Nylon. 19 m2

B Ceramicfloortiles,Type403refSNSCRFL,3-5mmthick
adhesivebed,2mmgroutlinecolourtomatchtiles. 3 m2

Wall finishes

Supplyandinstallwallfinishesincludingplasteringallin
accordancewiththeDrawings,Specificationandasper
Engineer'sinstruction

Cementsandplaster

C 12mmthickcementsandplastersmoothplastertoreceive
paint(Paintingmeasuredseparately) 22 m2

Painting and Decorations

Internal

Walls

D Painttype002.Jotun-NCSS1002-Y50R,satinmatt,2
coats.Ceilingthroughout.Toguestrooms&apartment
wallsandcorridorwalls. 8 m2

E Painttype003.Jotun-NCSS3005-Y50R,Fenomastic
matt,2coats.Ceilingthroughout.Featurewallto
guestrooms&apartment. 14 m2

Glass/Mirror Finishes

Mirror

F Supplyandinstallclearsilverbackedsafetyglassmirror.
Mirrorwithplainedge,6mmthickasperdrawing
specification 1 No

Glass

G Supplyandinstallgreytintedlaminatedglass,12mmthick
toughenedtintedsafetyglassasperdrawingspecification
6 m2

ToCollection

Page:3/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.03Finishes
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION J - FINISHES (CONT'D)

Tile Finishes

A Supplyandinstalltype404SNSCRFLwhitemodern,
brickeffectasperdrawingspecification 1 m2

B Supplyandinstalltype403,Ceramictile,3-5mmthick
adhesivebed,2mmgroutlinecolourtomatchtilesasper
drawingspecification 11 m2

Ceiling Finishes

Suspendedceiling

Supplyandinstallceilingfinishesallinaccordancewiththe
Drawings,SpecificationandasperEngineer'sinstruction

12.5mmthk.moistureresistantplasterboard 32 m2

Painting

C Painttype001.Jotun-whiteRAL9010,fermostatic,matt,2
coats.Ceilingthroughout.Toguestrooms&apartment
wallsandcorridorwalls. 16 m2

Timber Skirting

D Type100mediumgreystainedoakasperdrawing
specification 12 m

Bulkhead

SupplyandfixBulkhead/Curtainbox/Covelight,
necessaryfittingsallasperdrawings,specificationsandto
theapprovaloftheEngineer

E Bulkhead,370mmhigh 2 m


ToCollection

Page:3/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.03Finishes
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
BILL NO 03 - FINISHES (CONT'D)

ADDITIONAL ITEMS

Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.

A .

B .

C .

ToCollection

Page:3/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.03Finishes
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Collection Page : Finishes

PageNo.3/1

PageNo.3/2

PageNo.3/3

ToGeneralSummary

Page:3/4 FGOULD.COM
BILL NO. 4

ACCESSORIES
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.04Accessories
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION K - ACCESSORIES/ FIXTURES & FITTINGS

SANITARYWARE AND FITTINGS

Supply&Installthefollowingsanitaryfittingswithnecessary
mixers,accessoriescompleteasperdrawings,
specificationsandtoapprovaloftheEngineer

A Code700-WallhungWCpan,Size280x360x560mm 1 No

B Code701-Concealedcistern&flushplate 1 No

C Code702-Countertopwashbasin 1 No

D Code703-Washbasinmixer 1 No

E Code704-Showermixer 1 No

F Code705-Showerset 1 No

G Code706-Ablutionset 1 No

H Code706-Floordrain 2 No

I Code800-ToiletrollholderwithLID 1 No

J Code801-Sparetoiletrollholder 1 No

K Code802-Cornersoapbasketwithsmalltowelrail 1 No

L Code803-Robehook 1 No

M Code804-Towelrack 1 No

N Code805-MagnifyingMirror 1 No

O Code806-Wastebin 1 No

P Code807-Clothesline 1 No

Q Code810-Grabbar 1 No

R Code811-Hairdryerwithshaversocket 1 No

S Mirror 1 No

DOOR SIGNAGE

T SupplyandinstallStandardguestroomnumberplate 1 No
Drawingref;GD-316asperdrawingsandspecification
andtoapprovaloftheengineer

ToCollection

Page:4/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.04Accessories
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
BILL NO 04 - ACCESSORIES/ FIXTURES & FITTINGS
(CONT'D)

ADDITIONAL ITEMS

Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.

A .

B .

C .

ToCollection

Page:4/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.04Accessories
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Collection Page : Accessories

PageNo.4/1

PageNo.4/2

ToGeneralSummary

Page:4/3 FGOULD.COM
BILL NO. 5

FURNISHING
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.05Furnishing
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION M- FURNISHING

Supplyandinstallincludingnecessaryfittings,accessories
completeasshownontheDrawingsandSpecificationsand
totheapprovaloftheEngineer;

Windowtreatment-includingcurtain,curtainrailandsheer
curtain

A Code01.100MainCurtain 3 m

B Code01.101SheerCurtain 3 m

Supplyandinstallincludingnecessaryfittings,accessories
completeasshownontheDrawingsandSpecificationsand
totheapprovaloftheEngineer;

C Code01.200-Cushionfabrictype1atBed 1 No

D Code01.201-Losecushionfabrictype2atArmchair 1 No

E Code01.202-Loosecushionfabrictype2atChaise 1 No

F Code01.300-Chaise 1 No

G Code01.300.1-UpholsteryatChaise 1 No

H Code01.301-Sidetable 1 No

J Code01.302-DeskChair 1 No

K Code01.302.1-UpholsteryatDeskChair 1 No

L Code01.303-BedBase&MattressatKingBedSize
1600x2000mm 1 No

M Code01.303.1-UpholsteryatKingBed 1 No

N Code01.400-Bedsidewalllight 2 No

O Code01.401-Floorlamp 1 No

P Code01.402-Desklamp 1 No

ToCollection

Page:5/1
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.05Furnishing
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION M- FURNISHING (Cont'd)

Supplyandinstallincludingnecessaryfittings,accessories
completeasshownontheDrawingsandSpecificationsand
totheapprovaloftheEngineer;

Art works

A Code01.500-Artwork,Size750x1500mm 1 No

B Code01.504-ArtworkType1overallsize750x1700mm 1 No

C Code01.505-Artworktype2Overallsize750x1700mm 1 No

D Code01.506-ArtworkType3Overallsize750x1700mm 1 No

Room equipment

E Code01.602-Safebox,Size360x410x190mm 1 No

F Code01.603-MiniBar,Size554x401x446mm 1 No

ToCollection

Page:5/2
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.05Furnishing
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
BILL NO 05 - FURNISHING (CONT'D)

ADDITIONAL ITEMS

Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.

A .

B .

C .

ToCollection

Page:5/3
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.05Furnishing
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Collection Page : Furnishing

PageNo.5/1

PageNo.5/2

PageNo.5/3

ToGeneralSummary

Page:5/4
BILL NO. 6

ELECTRICAL ENGINEERING INSTALLATIONS


Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.06ElectricalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION R- ELECTRICAL ENGINEERING
INSTALLATIONS

MAIN POWER INSTALLATION

Incoming HV power supply

A TheContractorshallinaccordancewithdrawingsand
speceficationssupplyandinstallalltemporaryhighvoltage
mainpowersupply,Contractortoallowforallnecessary
andincidentalworks. 1 Item

LV POWER SUPPLY

DistributionBoardincluding,fixingandsupports

B Distributionboardtobelocatedwithinwardrobe.Approx.
boarddimension293mmwidex408mmhighx118mm
deep 1 No
C TheContractorshallinaccordancewithdrawingsand
speceficationssupplyandinstallisolatorsincluding
supportsaccessoriesandallfixing 1 Item

D TheContractorshallinaccordancewithdrawingsand
speceficationsSupplyandinstallsubmainpowercables
includingallnecessaryfixingsfromMainDistribution
BoardstoSubMainDistributionBoards,Distribution
Boards,MotorControlcentres,ControlPanelsand
Isolatorsincludingconnections,terminations,fixings,etc.
1 Item

FINAL SUB-CIRCUITS AND AUXILIARY INSTALLATION

Lighting Installation

TheContractorshallinaccordancewithdrawingsand
speceficationssupplyandfixlightfittingsandfixtures
includingallnecessaryfixingsandaccessories

E Recessednarrowbeamfixeddownlight 6 No

F Recessedmediumbeamshelfdownlight 1 No

G LEDstripintegratedinwardroberail 5 m

Wiringtolightingfixturepointsfromdistributionboards;
includingwires,conduits,cabletrays,connections,
terminations,fixings

H Lightpoints,generally 8 No

ToCollection

Page:6/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.06ElectricalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION R- ELECTRICAL ENGINEERING


INSTALLATIONS (CONT'D)

FINAL SUB-CIRCUITS AND AUXILIARY INSTALLATION


(CONT'D)

Lighting Switching

Supplyandfixthefollowingaccessoriesinaccordancewith
theDrawingsandSpecification

A 1gang1wayswitch 1 No

B 3gang3wayswitch 3 No

C CombinedDND/MURswitch 1 No

D Cardholder 1 No

Small Power Installation

Supplyandfixingsmallpoweraccessoriesincludingsupport,
connectionsandterminations

E 5A,Singlespuroutlet 3 No

F 13A,Singlespuroutlet 3 No

G 13A,Singleswitchedsocketoutlet 4 No

H 13A,DoubleSwitchedSocketOutlet 1 No

Wiringtosocket/power/DPoutletsfromdistributionboards
includingwires,conduitsandladders

J 5A,Singlespuroutlet 3 No

K 13A,Singlespuroutlet(multi) 3 No

L 13A,Singleswitchedsocketoutlet 4 No

M 13A,DoubleSwitchedSocketOutlet 1 No

Fire Detection and Fire Alarm System

N TheContractorshallinaccordancewiththedrawingsand
specificationssupplyandinstalltheFireAlarmpanelsand
detectors 1 Item

ToCollection

Page:6/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.06ElectricalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

TELEPHONE AND DATA INSTALLATION

Note:

TelephonenetworktobecarriedoutaspertheDrawings
andSpecifications

Equipments

A CAT6datafeedforwirelessrouter 1 No

Accessories

B Telephoneoutlet 1 No

C CAT6dataoutlet 2 No

D RG6dataoutlet 1 No

WiringincludingconduitstotelephoneoutletsfromTJB

E Telephoneoutletpoint 1 No

F CAT6dataoutletpoint 2 No

G RG6dataoutletpoint 1 No

ToCollection

Page:6/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.06ElectricalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

BILL NO 06 - ELECTRICAL INSTALLATION (CONT'D)

ADDITIONAL ITEMS

Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.

A .

B .

C .

ToCollection

Page:6/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.06ElectricalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

Collection Page : Electrical Engineering


Installations

PageNo.6/1

PageNo.6/2

PageNo.6/3

PageNo.6/4

ToGeneralSummary

Page:6/5 FGOULD.COM
BILL NO. 7

MECHANICAL ENGINEERING INSTALLATIONS


Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.07MechanicalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

SECTION Q - MECHANICAL ENGINEERING
INSTALLATIONS

AIR CONDITIONING AND VENTILATION SYSTEM

Pipe Works

A TheContractorshallsupplyandinstallinaccordancewith
thedrawingsandspecificationschilledwaterpipesforthe
temorarycoolingsystemincludingpipefittingsand
accessories,layingorfixinghorizontallyorverticallywith
brackets,GI.clamps,bolts,nuts,cliphangers,anti-
vibrationsprings,pluggedandscrewedtoconcreteor
blockwork. 1 Item

Thermal insulation

B TheContraorshallprovideinaccordancewithdrawings
andspecificationsthermalInsulationtochilledwaterpipe
andfittings 1 Item

Duct Works

C TheContractorshallsupplyandinstallinaccordancewith
thedrawingsandspecificationsSupplyandinstallof
Galvanizedsheetmetalrectangularductwork,including
joints,bends,reducers,bellmouths,accessdoorsandall
necessarysupports,hangers,brackets,fittingsand
accessories 1 Item

Duct accessories

A TheContractorshallinaccordancewithdrawingsand
specification,localauthorityregulationsandtothe
approvaloftheEngineer,supplyandinstallDuct
accessoriesincludingallnecessaryfittings,supports,joints
,fixing,sealantetc. 1 Item

B VolumeControlDampersVCD 2 No

C 100mmdiaExhaustAirValve 1 No

D FireDamper 1 No

E AccessDoor 1 No

F Doorgrille 1 No

ToCollection

Page:7/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.07MechanicalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

AIR CONDITIONING AND VENTILATION SYSTEM


(CONT'D)

HVAC equipments

A TheContractorshallinaccordancewithdrawingsand
specificationsupplyandinstallFanCoilUnitand
temporarychillerswithThermostatincludingflexible
couplings,motorizedcontrolvalves,FODRV,IV,flushing
valves,actuators,vibrationisolators,T.P.andD.C.
1 No

ToCollection

Page:7/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.07MechanicalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

BILL NO 07 - MECHANICAL INSTALLATION (CONT'D)

ADDITIONAL ITEMS

Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.

A .

B .

C .

ToCollection

Page:7/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.07MechanicalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

Collection Page : Mechanical Engineering


Installations

PageNo.7/1

PageNo.7/2

PageNo.7/3

ToGeneralSummary

Page:7/4 FGOULD.COM
BILL NO. 8

PROVISIONAL SUMS
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.08ProvisionalSums
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

PROVISIONAL SUMS

ProvidethefollowingProvisionalSumstocoversupplyand
installationofworkandthesupplyorinstallationofmaterial/
equipmenttobecarriedoutbytheMainContractoror
NominatedSubcontractororNominatedSupplier,as
directedbytheEngineer

A AllowtheProvisionalSumof Sum

B AllowforMainContractor'soverheadandprofit %

C AllowforGeneral&Specialattendance 1 Item

D AllowforallassociatedBuildersworkinconnectionwith
theseworks 1 Item

ToCollection

Page:8/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.08ProvisionalSums
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

Collection Page : Provisional Sums

PageNo.8/1

ToGeneralSummary

Page:8/2 FGOULD.COM
BILL NO. 9

DAY WORKS
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

DAYWORK SCHEDULE

A) Day work

1)TheContractormayberequiredtoexecutecertainworkduetothenatureofwhichthemethodofvaluationwill
beonadayworkbasis.

2)TheContractoristomaintainanaccuraterecordoftimespentandmaterialsandplantusedforeachseparate
instructiongiven.Dayworksheetsaretobenumberedandshoulddescribefullyinstructionstowhichtheyrefer
andtheyaretobesummarized,pricedandsubmittedtotheEngineereachweek.Thesubmissionofsuchday
worksheetsdoesnotnecessarilymeanthattheworkwillbevaluedundertheConditionsofContractorthatany
paymentisinfactdue.

B) Labour

1)TheContractor,whentendering,istogivetheratesherequiresforlabourersandcraftsmenagainsteachitem
stated.

2)Theratesaretobecomprehensiveandinclude:

a)Wagesandallcosts,paymentsandchargesincludingpensions,annualandpublicholidays,travellingtime,
expenses,faresandtransport,guaranteedtime,nonproductivetimeandotherexpensesinconnectionwith
overtime,incentiveandbonuspayments,andotherdisbursementsarisingfromemploymentoflabourincluding
b)Chargesincurredinrespectofsiteandofficesupervisionincludingforeman'stimeandextraemoluments
paidtoforemenandleadingcraftsmenandgangers.

c)SiteandHeadOfficeoverheadchargessuchasrent,rates,insurances,electricity,gas,fuel,water,printing,
stationery,postage,telephonecharges,motorcarexpenses,renewals,maintenanceanddepreciationof
premises,machinery,plantandthelike.

d)Profit.

C) Materials

1)Materialsusedindayworkstobechargedatinvoicecost.AlldiscountsaretobeallowedtotheEmployer.
InvoicesaretobemadeavailabletotheEngineeratthetimetherelevantdayworksheetsaresubmitted.

2)TheContractoristoallowintheitemprovidedtheadditionalpercentageherequirestobeaddedtothe
invoicecostofmaterialstocoveralldeliverycoststosite,includingfeespayableunloading,storing,transport,
overheadchargesaspreviouslydefinedandprofit.

Page:9/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

DAYWORK SCHEDULE (CONT'D)

A) Plant

1)Thecontractoristoentertheratesherequiresperhourforplantandmachineryagainsttheitemsstated.

2)Theratesaretobecomprehensiveandwillinclude:

a)Mobilizationanddemobilizationcosts.

b)Fuel,oil,lubricantsandallotherconsumables.

c)Servicing,repairsandreplacements.

d)SiteandHeadofficeoverheadchargesasdefinedabove.

e)Profit.

3)Theratesaretobeexclusiveofattendantsanddriverswhoshallbechargedatlabourratesassetoutabove.

4)IftheContractorisunabletopricetheparticulartypeofplantlisted,heshouldpriceforthenearestequivalent
itemavailabletohimandstatewhathasbeenincludedinhistender.

Page:9/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

DAYWORK SCHEDULE (CONT'D)

Labour

A Labourers/helpers 1 perhr

B Scaffolders 1 perhr

C Steelfixers 1 perhr

D Drainagelayers 1 perhr

E Carpenters 1 perhr

F Plasterers 1 perhr

G Blocklayers 1 perhr

H Plumbers 1 perhr

J Painters 1 perhr

K Electricians 1 perhr

L Plantandmachineryoperators&drivers(LightDuty) 1 perhr

M Plantandmachineryoperators&drivers(HeavyDuty) 1 perhr

N Welders 1 perhr

P PipeFitter 1 perhr

Q MetalWorker 1 perhr

R Attendant 1 perhr

S Chargehand 1 perhr

Materials

T Contractor'spercentageonthenetcostofmaterial %

ToCollection

Page:9/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

DAYWORK SCHEDULE (CONT'D)

Plant

A Bulldozerupto100H.P. 1 perhr

B Bulldozerfrom100-200H.P. 1 perhr

C Bulldozerover200H.P. 1 perhr

D Crawlerloaderwithbucketcapacitylessthan2m3 1 perhr NotApplicable

E Crawlerloaderwithbucketcapacity2m3orgreater 1 perhr NotApplicable

F Wheeledloaderwithbucketcapacitylessthan2m3 1 perhr

G Wheeledloaderwithbucketcapacitym3orgreater 1 perhr

H Smoothsteel-wheeledroller10T 1 perhr

J Pneumatictyredroller10T 1 perhr

K Selfpropelledvibratingroller10T 1 perhr

L Selfpropelledvibratingtrenchroller10T 1 perhr

M Tracked360degreehydraulicexcavatorwithunitweight 1 perhr
lessthan20Torgreater

N Tracked360degreehydraulicexcavatorwithunitweight 1 perhr
20Torgreater

P Wheeledoffsetexcavatorwithbackhoe&shovel(JCB) 1 perhr

Q Waterbowserwithpump&spraybar(capacity5000gl) 1 perhr

R Tippertrucklessthan15Tcapacity 1 perhr

S Tippertruck15Torgreatercapacity 1 perhr

T Lowsidetrucklessthan6Tcapacity 1 perhr

U Lowsidetruck6Torgreatercapacity 1 perhr

V Lowsidetruck6Torgreatercapacitywithliftingarm 1 perhr
(Hiab)

ToCollection

Page:9/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

DAYWORK SCHEDULE (CONT'D)

Plant (Cont'd)

A Pickuptruckto3Tcapacity 1 perhr

B Fourwheeldrivepickuporstationwagon 1 perhr

C Concretetransittippertruck6m3capacity 1 perhr

D Mobileconcretemixer0.5m3 1 perhr

E Mobileconcretemixer5m3 1 perhr NotApplicable

F Fourwheeldrivedumper1m3capacity 1 perhr

G Mobilegeneratorandweldingset25KVAorlarger 1 perhr
completewithallaccessories

H Lorrymountedcraneupto25Tcapacity 1 perhr

J Pilingrig 1 perhr

K Portabletrafficsignalset 1 perhr NotApplicable

L Concretepumpcomplete(capacity38/45m3/h) 1 perhr

M Mobilegenerator250KVA 1 perhr

N Mobilefloodlightsetwithgenerator 1 perhr NotApplicable

P Gascuttingsetwithallaccessories 1 perhr

Q Dieseldriven2"vibratingpokerunit 1 perhr

R Trenchwackerplate 1 perhr NotApplicable

S Dewateringpumpwith200mlengthof150dia.hose 1 perhr

T Trenchshuttering(perm2) 1 week NotApplicable

U Sheetpiling(perm2) 1 week NotApplicable

V 3"portablepumpandhoses 1 perhr

W 6"portablepumpandhoses 1 perhr

ToCollection

Page:9/5 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

DAYWORK SCHEDULE (CONT'D)

TheContractorshouldinsertbelowanyotherplantor
equipmentwhichmayberequiredtogetherwiththe
appropriaterate:

A .

B .

C .

ToCollection

Page:9/6 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)

Collection Page : Day Works

PageNo.9/1

PageNo.9/2

PageNo.9/3

PageNo.9/4

PageNo.9/5

PageNo.9/6

ToGeneralSummary

Page:9/7 FGOULD.COM