Muscat, Sultanate of Oman.
CONSTRUCTION of
CONSTRUCTION of
VOLUME 3
Taameer Investment S.A.O.C
Centro Hotel Sohar
Mock-up Room
__________________________________________________________________
TABLE OF CONTENTS
VOLUME 2 Specifications
VOLUME 4 Drawings
VOLUME 3
PART 3.1
Mock-up Rooms
BILLS OF QUANTITIES
CONTENTS
BILLNo.
- PricingPreambles
- GeneralSummary
1 PreliminariesandGeneralRequirements
2 Superstructure
3 Finishes
4 Accessories
5 Furnishing
6 Electrical
7 Mechanical
8 ProvisionalSums
9 Dayworks
PRICING PREAMBLES
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
GENERALLY
A TheLumpsumamountenteredbytheContractorintheseBillsofQuantitiesshallconstitutetheentireclaimfor
compensationfortheworkunderthiscontractinaccordancewiththeConditionsofContract.Theworksshallnot
bere-measuredandwillbesubjecttoadjustmentonlyasaresultofchangesinthescopeofworkthrough
changesindrawingsand/orspecifications.TendererarefurtherreferredtoInstructionstoTenderersinthis
respect.
B UponawardofContract,theBillsofQuantitiesshallbeusedsolelyforevaluationofprogresspaymentsduetothe
Contractor,andasascheduleofratesforchanges.
C TheBillsofQuantitiesherein,includingallnotesandinstructions,shallformanintegralpartoftheContract
Documents.However,thedescriptionscontainedintheBillsofQuantitiesforeachitemarenotnecessarily
complete.
D TheContractoriscautionedtofamiliarisehimselfwiththefullcontentofotherDocumentsincludingtheDrawings
andSpecificationsoranyotherinformationthatcanbereasonablyinferredfromanyofthemandallobligations
containedinthedocumentsshallbeincludedinthetenderpricesandlumpsumtenderprice,evenifspecificitems
relatingtothemarenotlistedintheBillsofQuantities.
E Drawings,Specifications,ConditionsofContractandBillsofQuantitiesandallotherDocumentsare
complementaryandifanyitemisincludedinanyofthem,itshallbedeemedincludedinall.
F TheContractor'sbidfortheentireworkshallprovideforsupervisionofanyoralltradesthatisnotintendedtobe
performedwithhisownforces.Noextracompensationforservices,asaGeneralContractorwillbepaid.
G TheContractorisrequiredtoprovidewithhisTenderthreecopies(1originalandtwocopies)oftheBillsof
Quantitiesfullypricedoutinwaterproofinkwithsummationsheetsproperlycompleted.
H AmendmentshallnotbemadetotheseBillsofQuantitieswithouttheauthority,inwriting,oftheEngineer.
J TheContractorshallnotusetheseBillsofQuantitiesasthebasisforaconstructionprogrammeorforthepurpose
oforderingmaterialsorarrangingSub-Contracts,betheyNominatedorotherwise.Thereferencesforthese
activitiesshallbethedrawing,specificationsandinstructionsissuedbytheEngineer.
Page:PP/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
GENERALLY (Cont'd)
FormatofDescriptions
A Inadditiontocommonabbreviationsthefollowinghavebeenadopted:
POM(I)-PrinciplesofMeasurement(International)forWorksofConstructiondatedJune1979and
publishedbytheRoyalInstitutionofCharteredSurveyors,London.
m-Metre
m2-SquareMetre
m3-CubicMetre
No-Number
Kg-Kilograms
ha-Hectare
KN-KiloNewton
ITEM-Compositeitem
hr-hour
RO-RiyalsOmani
METHOD OF MEASUREMENT
B TheseBillsofQuantitieshavebeenmeasuredgenerallyinaccordancewiththeRulesofPOM(I).Inanycasein
theBillsofQuantitieswherethemethoddiffersthenthemethodexpressedmustbeacceptedandmeasuredin
accordancetherewith.
C ItemsinthePreambleSectionoftheseBillsofQuantitiesaredeemedtoqualifyandtoformpartofevery
descriptionofmeasuredworktowhichtheyreferincludingcompositedescriptions.
D Allmeasurementsarenetandtheratesshallincludeforalllaps,waste,workingspaceandtradeortraditional
allowances.
Page:PP/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
PRICING
A TheContractor'sunitratesaretobefullyinclusivevalueoftheworkdescribedandmustincludeallrelatedwork,
accessoryorconsumablematerials,incidentallabour,supervision,administration,tools,constructionequipment,
overheadandprofitandallcostsandexpenseswhichmayberequiredinandforthecompletionofthework
describedtogetherwithallcostsandexpensesincomplyingwithallgeneralrisks,liabilitiesandobligationsset
forthorimpliedintheDrawings,SpecificationsandConditionsofContract.
B Itemswhereunitratesareapplicableshouldnotbepricedaslumpsum.
C Wheretheword"allow"isused,thecostoftheitemsshallbetheresponsibilityoftheContractor.
D Wheretheword"item"isused,thecostoftheitemsshallbetheresponsibilityoftheContractor.
E Theamountssetagainstanyitemsofprofitshallincludeforallcostsinconnectionwiththelettersofcredit,bank
charges,interestchargesandinsuranceafterthematerialscomeunderthecontroloftheContractor.
F NovariationwillbeallowedforanyerrorinthecomputationoftheTenderdiscoveredafterdateofissueofletterof
acceptanceofthetenderandawardoftheContract.
Definitions
G "Pricesalsotoinclude";itemsunderthisheadingfallintotwocategories:
(i)Thosewhicharedeemedtobeincludedindescriptionsand,therefore,inprices.
(ii)ThoseforwhichtheContractorshallallowforinhisprices.
H "Falls","Slopes","Weathered:inclinedfromthehorizontalinoneplane
J "CrossFalls","CrossSlopes","CrossWeathered":inclinationfromthehorizontalinmorethanoneplane.
Fix Only
K Theexpression"fixonly"usedintheseBillsofQuantitiesmeansthattheContractorshallprovidethefollowing
facilities:
(i)Unloading,storing,distributingandhoistinggoodsandmaterials.
(ii)Supplyingfullsizetemplates.
(iii)Givingandmarkingdimensionsandtakingresponsibilityfortheiraccuracy.
(iv)Gettingin,protecting,handling,distributionandplacinginposition.
(v)Assemblingasrequired.
(vi)Casingupandprotection,includingclearingawayprotectiononcompletionoftheworks.
(vii)Fullcostofreplacementofanyitemswhicharedamaged,broken,lostorstolenaftertheacceptanceofthe
(viii)Othernecessaryandusualfacilitiesanddocumentation.
Page:PP/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
PRICING (CONT'D)
SupplyOnly
A Theexpression"supplyonly"usedintheseBillsofQuantitiesmeansthattheContractoristoincludeforall
liabilitiesandobligationsarisingoutoftheContractexceptfixinginposition.
B AnySub-contractorsorSupplierswhichtheContractorproposestousefortheworksaresubjecttotheapprovalof
theEngineerandEmployer.AnySub-contractororSupplierwhohasnotbeenapprovedbytheEngineerand
Employershallnotbeusedinconnectionwiththecarryingoutoftheworks.
C TheContractorshouldascertainfromSub-contractorsandSuppliersbeforetheworkisputinhandparticularof
positionsinwhichchases,holes,mortisesandthelikewillberequiredtobeformedorleft.Noclaimfortheextra
costsofcuttingawayworkalreadybuiltduetotheContractor'sfailuretoascertaintheseparticularswillbe
admitted.
D TheContractorshallallowforanyadditionalcostsincurredduetoSub-Contractorsworkingdifferenthoursfrom
andextendedhourstothoseworkedbytheContractor.
E Theword"attendance"meansthefollowing:
AttendancestobeprovidedbytheMainContractortoallSub-ContractorsandNominatedSub-Contractors
TheMainContractorshallberesponsibleforproviding,includingbutnotlimitedto,thefollowingattendances:
(I)UseofMainContractor'sadministrativearrangements.
(ii)UseofConstructionalPlant.
(iii)UseofMainContractor'smessroom,sanitaryandwelfarefacilities.
(iv)Co-ordinationandschedulingofallworksrelatedtoeachSub-ContractandNominatedSub-Contract.
(v)Useofstandingscaffolding
(vi)Useoftemporaryworksincludingwaterandelectricity.
(vii)Supplyingfullsizesettingouttemplates.
(viii)Givingandmarkingdimensionsandtakingresponsibilityfortheiraccuracy.
(ix)SpaceforSub-Contractorofficesandstores,betheyDomesticorNominated.
(x)Providingworkspace
Page:PP/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
PRICING (CONT'D)
A AttendancestobeprovidedbytheMainContractortoallSub-ContractorsandNominatedSub-ContractorsCont'd
(xi)OffloadingallSub-Contractors'orSuppliers'materialsandplacinginstores,betheyDomesticorNominated.
(xii)ClearingawayallandanyrubbishbeitgeneratedbyMainContractor,NominatedorDomestic
Subcontractors.
(xiii)Othernecessaryandusualfacilities,documentation,generalintergradesattendances,labourandassistance.
B AttendancestobeprovidedbytheSub-ContractororNominatedSub-Contractor
TheSub-ContractororNominatedSub-Contractorshallberesponsibleforproviding,includingbutnotlimitedto,
thefollowingattendances:-
(i)Allspecialscaffoldingrequiredbyhimintheexecutionofhisworks.
(ii)Takingfromstores,distributing,hoistingandplacinginposition,allitemsofplant,equipmentandmaterials
requiredbyhimintheexecutionofhisworks.
(iii)Alllabour,plantetc(otherthanincludedinAttendancestobeprovidedbytheMainContractor).
(iv)Siteofficesandstoresrequiredbyhimfortheexecutionofhisworks.
(v)Obtainingsecuritypassesforaccessofworkpeopletothesite.
vi)Offloadingfrommaterialdeliveryvehicleshismaterials,placingintemporarystoreson-site,distributing,hoisting
andplacinginposition.
C Forallworkexecuted,orgoods,materials,plantorservicessuppliedbyanyNominatedSub-Contractoror
NominatedSupplier,theContractorshallbeentitledto:-
(a)TheactualpricepaidorduetobepaidbytheContractor,ontheinstructionsoftheEngineer.
(b)inrespectofallothercharges,profitandattendance,asumbeingapercentagerateoftheactualpricepaidor
duetobepaid.TheContractorshallinsertthepercentageorsumasapplicablerequiredforallothercharges,
profitandattendanceagainsteachitemintheBillofProvisionalSums.
(c)ShouldtheContractorbeawardedworkunderanyPCsumforwhichhehastendered,theamountforprofit
andattendanceallowedbyhimagainstthePCsumshallbededucted.
(d)ShouldworkstatedasPCitembedeletedfromtheContractandtheClientchoosestocarryoutsuchworkasa
directcontractthentheallowancefor"profitandattendance"shallbedeleted,anyattendancerequiredtobe
providedbytheContractorshallbenegotiatedwiththeClientasavariationinaccordancewiththeTermsofthe
Contract.
Page:PP/5 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
Builders Work
A WithintheBillsforProvisionalSumstheContractoristoallowforallthebuildersworkrequiredinconnectionwith
thevariousworkelementscoveredbyProvisionalSumsasnoted.Toassessthebuilder'sworkrequired,the
ContractormayreviewthedrawingsrelatedtotheseWorksattheofficesoftheEngineer.
B AllotherChargesOverheadandProfit
AllotherChargesandProfitincludesProfit,Overheads,Facilities,AssistancesandAttendancesinconnectionwith
theexpenditureofProvisionalSumsinfavourofSub-Contractors.
C GeneralandSpecialAttendances
TheexpressionGeneralAttendancesshallmean,butisnotlimitedtothefollowing:
a)TheuseoftheContractor'sadministrativefacilities.
b)Theuseofgeneralconstructionplant.
c)TheuseoftheContractor'sfacilities,includingmessrooms,sanitaryaccommodationandwelfarefacilities.
d)Theuseoftemporaryworks.
e)SpaceforSub-Contractorsoffices,storesandlaydownareas.
f)Theclearingawayofallrubbish,wasteanddebrisonaregularbasis.
g)Theprovisionandremovalofgeneralscaffoldingforgeneraluse.
h)Unloading,distributing,hoistingorloweringtotherespectivefloorlevels,andplacinginsuitablepositionsfor
theSub-Contractorallplant,machineryortheliketobeinstalledbytheSub-Contractor.
i)TheprovisionofelectricalpowerbyMainContractorfortheSub-Contractor'sworks,includingalllightingand3-
phaseorheavysupplies,whichmayberequiredforpurposesoftestingandcommissioning.
j)TheprovisionofwaterfortheSub-Contractor'sworks,includingtherequirementsfortestingandcommissioning
andsubsequentremovalofwater.
k)TheprovisionofallfuelnecessaryforthetestingandcommissioningoftheSub-Contractworks.
l)Thegeneralco-ordinationandintegrationofallSub-ContractworksintotheGeneralProgramme.
m)AscertainingfulldetailsofanyworktobeexecutedbyotherSub-Contractor'sinconnectionwiththeSub-
Contractworksandarrangingforsuchworktobeexecutedatthecorrecttime.
n)Theprovisionofalltemporaryaccessalreadyfixedorplacedinpositiononthesitefortheuseofworkmenand
thedeliveryofmaterials.
Page:PP/6 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
PRICING (CONT'D)
A GeneralandSpecialAttendances(Cont'd)
o)ProtectionoftheSub-ContractworksfromthetimetheSub-ContractorcompletestheworkuntiltheWorksasa
wholeoranySectionsthereofarehandedovertotheEmployer.
p)ThecleaningofallSub-Contractworks,aspartofthefinalcleanoperationatsubstantialcompletionofthe
WorksasaWholeoranySectionthereof.
q)Thedesignco-ordinationandnecessaryliaisonrelatedthereof.
r)TheprogrammingoftheSub-ContractWorksandthenecessaryco-ordinationtocomplywiththeContractor's
overallprogramme.
s)Supplyingfullsizesettingouttemplatesandgivingandmarkingdimensionsandtakingresponsibilityfortheir
accuracy.
t)Obtaininganynecessarysecuritypasses,accessapprovals,identitycardsandthelikeforallSub-Contractor's
personnel.
B TheexpressionGeneralAttendancesshallmean,butisnotlimitedtothefollowing:
a)Theprovisionofallspecialistsscaffolding.
b)Theprovisionofallspecialistlifting,hoistingequipmentandcrainage.
c)Cutting,ChasingandMakingGood.
Builder'sWorkinConnection
C Theexpression"Builder'sWork"shallmeanallancillaryworkcarriedoutbytheContractorinconnectionwithall
Sub-Contractworksandinstallations.
D Thedrilling,cuttingorleavingofholesoraperturesthroughstructuralfloors,walls,beams,etc.shallbeavoided,
butwherethisbecomesanecessity,theContractormustobtainthewrittenapprovaloftheEngineerbeforethe
workisputinhand.
E TheContractorshallallowforallBuilder'sWorkInConnectionwiththeinstallationwhichshouldincludebutisnot
limitedtothefollowing:
a)FixonlyandinstallallinsertsandanyotheranchoredmaterialsrequiredfortheWorks,whichrequiretobe
embeddedinthebuildingstructureandblockwork.TheseinsertsaretobeprovidedbytheSub-Contractortothe
Contractor.
b)Drilling,cuttingorleavingholesforpipes,ductsandthelikethroughwalls,floors,partitions,etc.and
subsequentlymakinggood/waterproofingwherenecessary.
Page:PP/7 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
PRICING (CONT'D)
Builder'sWorkinConnection(Cont'd)
c)Cuttingandpinningendsofsupportsforpipes,equipment,appliances,fittingsandtheliketowalls,floors,
partitions,soffits,etc.andmakinggood.
d)Cuttingorleavingmortises,sinking,etc.forholdingdownbolts,brackets,supportsandthelikeandgroutingin.
e)Cuttingchasesforpipes,conduitsandthelikeinwalls,floors,partitions,etc.andsubsequentmakinggood.
f)Cuttingandfittingsaround,boringholesthroughandmakinggoodoffinishinguptopipes,ducts,fans,supports,
bracketsandthelike.
g)Theconstructionofconcrete,blockand/ortimberducts.
h)Theformationofductswithinconcreteslabs,togetherwithaccesscoversandframes.
i)Thebuildingoftimberframes,panelsanddoors,includingironmongery,togiveaccesstopipes,ducts,
equipmentandthelike.
j)Theformationofconcretebases,plinths,etc.forplantandequipment,includinganyanti-vibrationpads.
k)ThewaterproofingofallexternalductworktotheEngineer'sapproval.
l)Makinggoodfinishesaftersecondfixinstallation.
m)Secondarysteelframingnecessaryforsupportofplant,pipework,lifts,ductworkandthelike.
n)Concreteencasementtodrainagepipesandfittingsbelowslabongrade.
o)Elevatorliftingbeams,supportsandothernecessaryBuilder'sWork.
p)Firestoppingaroundservices.
q)Cuttingandmakinggoodopeningsinfalseceilings,bulkheads,wallsforgrilles,diffusers,luminaries,sprinkler
heads,loudspeakersandthelike.
r)'Builder'sWork'willincludealltheabove,butitshouldbenotedthatthislistisnotintendedtobeexhaustiveand
everythingnecessarywillbedeemedtobeincluded.
s)TheContractorisreferredtotheStructuralDrawingsforfurtherinformation.TheContractorshallallowforany
plinthsorbasesrequiredforMEPequipmentinstallations.
t)Builder'sWorkshallincludeforallpenetrationsthroughconcretesurfacesforMEPEquipment,including(but
notlimitedto)stairpressurisationfans,ventilationopeningsthroughskylightupstands,firebarriersealsas
required,andthelike.
Page:PP/8 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
SECTION A - PRELIMINARIES
A PaymentfortheestablishmentoftheitemssiteofficeandfacilitieswillbeLumpSumwhichwillbemadeonlyafter
thecompletionofallfacilities.BreakdownofallLumpSumamountstobesubmittedtogetherwiththeTender
Submission.
B Paymentforthemaintenanceofsiteofficeandfacilitiesitemswillbeinmonthlyinstalments.
C PaymentfortheremovalofsiteofficeandfacilitiesitemswillbebyLumpSumwhichwillbemadeonlyafterthe
completionoftheirremoval.TheremovaloftheSiteOfficefortheEngineershallbeonemonthafterthe
completionoftheWorks.
D Paymentforcontractorssupervisionandthelike,billitemsshallbeinmonthlyinstalments.
E Instalmentscanbesuspended,reducedordeletedfromanyContractPayment,if,intheopinionoftheEngineer,
theContractorisnotfulfillinghisobligations.
F TherateinsertedforGeneralProtectionofthesiteshallincludeforthecosttomaintainaccesstoareasadjacent
totheworksite.
G Theitemfortrafficsafetyandcontrolshallincludethecostofalltemporarytrafficdiversionsandtraffic
managementnecessarytocompletetheworks.Theitemshallincludebutnotlimitedtoforliaisonwiththelocal
authoritiestoconfirmtheirrequirementsforsafety.
H Temporaryworks,diversions,sitecleaning,etc,andotheritemsnototherwisecoveredinthispreambleor
otherwisedetailedintheBillsofQuantitieswillbecostrelateditemsandwillbepaidasapercentageofwork
completedtototalvalueofwork.
J Paymentfortheestablishmentofsurveyingequipmentwillbelumpsumanditwillbemadeonlyafterthedelivery
ofalltheequipmentspecified.Paymentforitemsmaintainedwillbeinmonthlyinstalments.
K PaymentforassistingEngineershallbeinmonthlyinstalmentsandisdeemedtocoverallcostsinproviding
assistancetotheEngineerbytheContractorasstatedintheContract.
L PaymentforProjectSignBoardsshallincludeforerection,maintenance,removalwithinonemonthofcompletion
andreinstatementofgroundtoitsoriginalstate.
M PaymentforprogressphotographswillbebysetofmonthlyprogressphotographsasdefinedintheSpecification.
N Paymentforconditionsofcontractwillbebymonthlyinstalmentsandshallcoverallcostsandexpensesincluding
overheadandprofitsincurredbytheContractorincarryingouttherequirementsoftheConditionsofContractnot
otherwiseincludedintheBillofQuantities.Breakdownofalllumpsumamountstobesubmittedtogetherwiththe
TenderSubmission.
Page:PP/9 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
A Itemsforwhichthemeasurementunitisindays,suchitemsshallbemeasuredfortheactualperiodforwhich
facilities,services,etc.,areprovidedinaccordancewiththeconstructionprogramme.Measurementwill
commenceonlyafterthecompletionoftheMobilisationperiodandonthedayasapprovedbytheEngineerin
agreementforthefacilities,services,etc.,whenfullyprovided.
B Theseinstalmentscanbesuspended,reducedordeletedfromanyContractPayment,ifintheopinionofthe
Engineer,theContractorisnotfulfillinghisobligations.
C Allquantitiesforexcavationhavebeenmeasurednetwithnoallowanceforincreaseinbulkorworkingspace.
CommencementofexcavationshallbefromthelevelasstatedonthedrawingsandasleftbytheEnablingWorks
Contractor.
D Thetenderershallallowinhisratesforexcavationforexcavatinginanymaterialexceptrockincludingrunningsilt,
runningsand,commencingexcavationatanydepth,excavatingbelowthenormalwatertable,excavatingaround
existingservicesandmainssupportingtheverticalsidesofexcavations,workingspaceandfillingsoftspots.
E Ratesforallexcavationshallincludeforkeepingexcavationsfreefromwaterbywhatevermeans.
F Ratesfordisposalofexcavatedmaterialshallincludeforanynecessarydoublehandlingandtheprovisionofatip,
ifnecessary,includingandchargesinconnectiontherewith.
G Theratesfortrenchesforpipesshallincludefordisposalandbackfilling.
H Theratesfordrains,inspectionchambers,etc.aretoallowfortesting.
J Ratesfordrainpipesgenerallyaretoincludeforallshortlengths,backstops,woodenplugsandretainingand
alignmentpegsrequiredinlayingandfortheextrainvolvedovernormaltrenchexcavatinginhandpackingand
tampingselectedfinematerialaroundthelowerhalfofthepipestobuttressthemagainstthesideofthetrench.
Ratesaretoincludeforleavingallpipescleanandclear.
K Pipesaremeasurednetthroughtheircentrelineaslaidandaretoincludeforalldrainfittingsonalltypesofdrain
pipes,extrajointsofalltypes,cuttings,waste,etc.forlayingintrenchesofanydepth,andbuildingintosidesof
inspectionchambersandmakinggoodasnecessary.
L Ratesfordrainfittingsonalltypesofdrainpipesaretoincludeforextrajointsofalltypesandcuttingandwasteon
allpipes.
M Ratesforaccessoriesshallincludeforconcretesurroundsandanyadditionalexcavationanddisposal.
Page:PP/10 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
A Theratesforconcreteshallincludeforhoistingtoanyheights,orloweringtoanydepth,compactionbyvibratorsif
required,curing,hacking,hackingsurfacesforkey,formingandgroutingmortises/holes/chases/grooves,making
goodconcreteinconnectionwithholesandmortisesandallsurfacetreatmentsandprotectiontounsetorcuring
concrete,allconstructionjointsincludingtemporaryformworktoformjoggledjointsandcleaningandpreparingfor
subsequentpour.
B Reinforcementhasbeenmeasuredbyweightandincludesforbothmeshandbarreinforcement.Ratesfor
reinforcementshallincludeforlaps,cutting,bending,allnecessaryspacers,hangers,chairs,stools,blocks,waste,
tyingwireandrollingmarginetcexceptthatweightsofdesignedhangersandspacersformedbytheuseof
reinforcementbarshavebeenincludedinitemquantities.Ratesforreinforcementshallincludeforproviding
bendingschedules.
C Shutteringismeasurednetbysurfaceincontactwiththeconcrete.
D Shutteringshallbedeemedtoincludeforformingchamfers,splays,grooves,rebates,overlaps,internalangels,
notching,corners,andallnarrowwidths,shortlengthsandthelike.Theyshallalsoincludeformouldoil,
temporaryopeningsforinspection,cleaning,fixinginposition,strikingandremoval.
E Shutteringtoblindingshallbeincludedintherateforblinding.
F BendingSchedulesaretobeinaccordancewithBS8110andBS8666.
G Ratesfortensionedconcreteshallincludeforallpretensioningsteelwiresandcablesincludingpipesleeves,
grouting,tensionblocksandanchors.
H Finishingofsurfacetofallsorcrossfallsasrequiredshallbeincludedintherates.
J Ratesforconcrete,reinforcementandshutteringshallbedeemedtoincludefor:-
i)Thegroutingandmakinggoodarounditemsfixedorinstalledtothestructureincludingtobaseplates,control
plates,switches,architravesandalike.
ii)Sealingandmakinggoodaroundequipmentandappliancesincludingsanitaryware
K Thereshallbenore-measurementofreinforcementexceptasprovidedbythevariationclausesoftheConditions
ofContract.
Page:PP/11 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
SECTION D - MASONRY
A Theratesforblockworkaretoincludeforallcuttings,buildingtoanyheightofslabsorbeams,rakingoutjointsor
hackingsurfacestoformkey,beddingandpointingframes,etc.,buildingindoorandwindowframesandthelike,
buildinginorcuttingandpinninginendsoflintelssteps,timbers,steelsections,andthelike,mortisesandmaking
goodinconnectionwithbuildingin,cuttingandpinningin,holesandmortises.
B Theratesforhollowblockworkshallincludeforfillingblockssolidwithin-situconcreteandsteelbarreinforcement
whereshownonthedrawingsordescribedinthespecificationandforprovidingsolidcourseofblockworkatsill
levelofallopeningsandbearingofallin-situconcreteandatthetopofallfreestandingwalls.
C Theratesofcavitywallsshallincludeforallexpansionjointswithcompressiblejointfillerandjointsealantwhere
necessaryorshowninthedrawings.
D Theratesforblockworkshallincludeforallexpansionjointswithcompressiblejointfillerandjointsealantwhere
necessaryorshownonthedrawings.
E Theratesforblockworkshallincludeforstarterbars,ties,atverticalabutmentstoconcretecolumns.
F Ratesformetalwork/steelworkshallincludeforallcutting,drilling,countersinking,bolting,riveting,welding,
boring,grinding,bracing,grindingoffflushetc,assembling,hoistingandfixinginposition,adjusting,siteandshop
priming,andtouchingupasnecessary.
G Preparingandsubmittingworkshopdrawingsbeforefabricationcommences.
H Scribing,rebates,grooves,chambers,splayedandroundededges,fairandreturnedends,mitres,andthelikeand
forallshortisolatedlengths.
J Ratesforbalustradeandhandrailsshallincludeforbends,mitres,crosses,tees,flangedends,angles,
intersections,ramps,bearers,holes,conduitsandthelike.
K Theratesforsteelworkshallincludeforallstanchionsandrafters,gussets,endplates,andthelikeandforthe
preparationofallshopdrawings.Nongalvanizedsteelshallincludeforrustproofprimer.
L Onlymainsteelworkmembershavebeenmeasured.Allfixingsandfittingsaretobeincludedintherates.
M Thecarryingoutofspecialteststoweldedorotherjointsorconnectionsinsteelworkshallbegivenasanitem.
N Guttershavebeenmeasuredbylengthtakenalongthecentrelineoverallfittings.Allpaintingandfittingsto
guttersshallbeincludedintherates.
P Weightsdonotincludeanysecondarymembersthatmayberequiredbythecladdingcontractortosupport
cladding.
Page:PP/12 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
SECTION F - WOODWORK
A Theratesforallwoodworkshallincludeforallraking,curvedorsplayedcutting,mitresandendstoallmembers,
foralljointsinmembersover200mmwideforobtainingtimbersinonewidth,notching,sinking,roundedcurves,
splayededges,extratimberinjoints,homes,etc.,alldowelsandcrampsandholesforpipes,tubes,bar,cables,
conduits,ducting,trunkingandthelike.
B Theratesfordoorsaretoincludeforfittingandhanginganytype,weight,sizeandinanymaterial.
C Theratesshallfurtherincludeforrebates,chamfers,grooves,scribededges,roundededges,gluing,clamping,
laboursandthelike,andshallincludeforallcrossgrainandstoppedworkandforallstops,ends,anglesand
mitres.
D Ratesforwaterproofingshallincludeforallcutting,lapping,formationofholesforpipes,sleeves,standardsand
thelike,includingdressingandsealingaroundperforationsandinandaroundoutlets.
E Allnarrowwidths,smallareas,dubbingout,internalandexternalangles,makinggoodaroundfittings,working
aroundandformingcollarstopipesetcafteralltrades,jointingbetweendifferentmaterialsandallcutting
(includingcircularandraking)
F Ratesforskirtingandthelikeshallincludefortops,angles,intersectionsandendsandforextramaterialinlaps
andpassings.
G Ratesforflashingsandthelikeshallincludeforangles,intersections,endsandforextramaterialinlapsand
passings.Ratesshallincludefordressingintogroovesandsealing.
H Ratesforrooffinishesshallincludeforallnecessaryexpansionjoints.
J Ratesfordampproofcoursesshallincludeforlapsatanglesandintersections.
SECTION J - FINISHES
K Ratesforfinishesgenerallyshallbedeemedtoincludefor:
i)Thoroughlywettingsolidsurfacestoberenderedorscreededincludingdubbingouttowallsandprovisionof
levellingscreedtofloorsorthelike.
ii)Rakingoutjointsofblockwork,hackingsurfacesofconcreteorapplyingbondingagenttoformakey.
iii)Makinggoodorcuttingandfittingaroundpipes,gratings,sanitary,fittings,standardsandthelike,makinggood
uptodoorandwindowframes,skirting'sandthelike,temporaryrulesworkingaroundburiedservices.
Page:PP/13 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
A iv)Narrowwidths,smallandisolatedareas,roundedarises,fairandchamferededgesandthelike.
v)Anglebeads,cornerbead,tiletrimsandrenderstopsarounddoors,windows,verticalandhorizontalabutments
andthelike,reinforcingmeshatjointsandbetweendifferentsurfaces;internalanglebeadsshallbegalvanized
metalandexternalanglebeadsshallbestainlesssteelunlessotherwisespecified.
vi)Workexecutedoverhead,inrestrictedareasandthelike.
vii)Maskingbeforetheapplicationofsprayedfinishes.
viii)Accesspanels.
ix)Workingatoruptoanyheight,narrowwidths,smallareasandallcuttings.
x)Expansionjointsandcontroljointsasspecification.
B Ratesforscreedshallbedeemedtoincludefor:
i)Finishingwithatemped,floatedortrowelledsurfaceorpowerfloatasrequired.
ii)Layinglevelortofalls,crossfallsorslopesasrequired,particularlyinwetareasandprovidingalevellingcoat
asrequired.
C Ratesforpaintingshallbedeemedtoincludefor:
i)Allcleaningandpreparatoryworktothesurfacestobepainted,cuttingtoline;rubbingdownbetweencoats.
ii)Workingtooratanyheight,andallnarrowwidths.
iii)Theratesforpaintingonwoodshallincludeforworkonhardwoodandsoftwoodincludingknottingandprimer
coat.
iv)Paintingtoopeningedgesofdoorsandworkonadditionalsurfacesexposedbysuchopeningedges.
v)Paintingtoallpipes,ducts,fittings,etc.asnoallowancehasbeenmadeinmeasureditems.
D Ratesforsuspendedceilingsshallincludefor:
i)Supplyingshopdrawingsandforobtainingapprovalofdetailsbeforecommencingwork.
ii)Primaryandsecondarygridsasnecessaryandforsuspendingthesamewithrequisitehangersfromthesoffits.
Perimetertrimandallcuttingandfittingpluscostofprovidingallaccesspanelsshallbeincludedintherates.
iii)Anyadditionalsuspensionmembernecessarytosupportlightingfittingsorsimilar.
iv)Alldecorativeandbulkheadslightingcores.Allcircular,squareorrectangularcuttingforlightfittingsincluding
allnecessarysupports.
Page:PP/14 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
A Ratesforalltubingaretoincludeforprovidingsuitablesleeveswheretubingpassesthroughinternalandexternal
walls,partitions,ceilings,etc.
B Ratesforallpipesandtubingshallincludeforallshortlengths,sockets,runningcouplingsandjoints,standard
pipesupports,cuttingandwaste.Measurementshallbethroughcentrelineofpipesandtubesandthroughfittings.
C Unlessotherwisestated,teecouplingsandconnectionsareidentifiedbythenominaldiameterofthelargestpipe
connectedtheretoandtheratesfortheseitemsaretoincludeforanyreducingteerequired.
D Ratesshallincludeforstoppingendsofpipesbyanapprovedmethodwhiletheworkisinprogresstoprevent
ingressofrubbishandforleavingallpipescleanandclearoncompletion.
E Ratesshallincludeforcoordinationwithotherengineeringinstallations.
F Ratesshallincludeforcuttingforformingholes,mortises,chasesorthelikeandmakinggoodfinishing's(tobeby
MainContractor).
G Ratesshallincludeforbuildingin,cuttingandpinningbracketsorthelikeandmakinggoodfinishing's.
H Ratesforallductworkofanytype,systemormaterialshallincludeforallfittings,flanges,accessdoors,bolting
andthelike.Measurementshallbethroughcentrelineofductsmeasuredthroughfittings.
J Ratesfortheinstallationsshallincludeforanyportionoftheworkswhichcouldbereasonablyandobviously
inferredasnecessaryforthecompleteandsatisfactoryoperationfortheinstallationasawhole,althoughno
expresslydescribedorspecified.
K Theratesforswitchboards,switchgear,distributionboards,controlgear,fittings,equipmentandthelikeshall
includefor:
a) Allidentificationlabels,warningnotices,circuitschedulesandthelike
b) Thecompletionofthecircuitschedules
c) Allnecessaryglandplatesandcableentryboxes
d) Allearthtapes,cablesandconnectionstoassociatedcableterminationglands,conduitand/ortrunking.
L Maincircuits(definedastheincomingsupplytothedistributionboardswithinabuilding)shallbemeasuredas
follows)
a) Cablesshallbemeasuredbylengthandshallbedeemedtoincludecolourcoding,marking,joints,boxes,line
tops,shrouds,terminationglands,connectors,supports,sleeves,platesandthelike.
b) Conduitshallbemeasuredbylengthandshallbedeemedtoincludeconduitboxes,allfittings,saddles,
crumpetsbending,cutting,screwing,jointingandthelike.
c)Traysandtrunkingshallbemeasuredbylengthandshallbedeemedtoincludeallfittings,stools,saddles,
cleats,clips,firebarriers,pinracks,cutting,jointing,earthcontinuitycomponentsandthelike.Trunkingshallalso
bedeemedtoincluded.
Page:PP/15 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
A Submaincircuits(definedassupplyfromadistributionboardtoasub-maindistributionboard)shallbe
measuredinaccordancewithPOM(I)ClauseR2.
B Theratesforenumeratedpoints,outlets,equipmentandthelikeshallbedeemedtoincludecables,conduit,
trunking,trays,earthingtapeandallequipmentandaccessoriesnecessarytoprovidepower.
C Spacingofcomponentsforsupportingearthingtapesorcableshasnotbeenstatedandtheratesforearthing
tapesandcablesshallincludeforallsaddles,cleats,clipsholdfastsandtheliketosuitsiteconditions.
D Thelengthofpendantdropsarenotstatedandtheratesforlightingfittingsshallincludeforpendantdrops,boxes,
conduitboxes,woodblocks,mouldedpattresses,breakjointrings,ceilingroses,connectorblocks,domecovers,
backplates,ballandsocketbackplates,earthcontinuity,flexiblecords,chokes,capacitors,starters,lampholders
andthelike.
E Theratesforalllightingfittingsshallincludeforallassociatedlamps,controlgear,diffusers,shadesandthelike.
F Theratesforclocks,telephones,firealarms,burglaralarms,loudspeakersandthelikeshallincludewhere
requiredforallboxes,conduitboxes,woodblock,mouldedpattresses,coverplatesandthelike.
G Theratesforallsocketoutletsincludeforassociatedplugtops.
H Theratesforsurfaceaccessoriesshallincludeforanynecessarybackplatesandsurfacemountingboxes.
J Theratesforallflush,semi-flush,recessed,semi-recessedandinsertionitemsshallincludeforanynecessary
boxes.
K Theratesforallaccessories,fittings,equipmentandthelikeshallincludeforallnecessaryearthingtailsand
terminals.
L Thetermconnectionunitalsocoversspurunitsandspurboxes.
M Ratesshallincludeforcoordinationwithotherengineeringinstallations.
Page:PP/16 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
A Ratesshallincludeforcuttingorformingholes,mortises,chasesorthelikeandmakinggoodfinishings(tobe
donebyMainContractor).
B Ratesshallincludebuildinginorcuttingandpinningbracketsorthelikeandmakinggoodfinishings(tobedoneby
MainContractor)
SERVICES GENERALLY
C TheContractorshallbecompletelyresponsibleforobtainingtherequirementsforholes,fixings,andanyother
BuildersWork.HeshallcoordinatetherequirementsforBuildersWorkbetweentradesandensurethatsuch
informationisasshownontheDrawingsinaccordancewithhisownandtheEmployer'srequirements.Detailsof
Builder'sWorkwhichisnotshownontheDrawingsbutwhichisrequiredbytheContractorshallbeforwardedto
theEngineerforhiswrittenapprovalbeforetheworkisputinhand.Anycostofunnecessaryworkduetothe
Contractorfailingtocomplywiththeseconditionsorfailingtoactuponsuchinformationgivenbeborneentirelyby
theContractor.
D Thedrilling,cuttingorleavingofholesoraperturesthroughstructuralfloors,walls,beams,etc.,shallbeavoided,
butwherethisbecomesanecessitythecontractormustobtainthewrittenapprovaloftheEngineerbeforesuch
workisputinhand.
BUILDERS WORK
E TheexpressionusedhereBuildersWorkrelatedtoservicesincludesbutisnotlimitedtothefollowing:
a) Drilling,cuttingorleavingofholesforpipes,ductsandthelikethroughwalls,floors,partitions,roofs,etcand
subsequentlymakinggood.
b) Cuttingandpinningendsofsupportsforpipes,equipment,appliances,fittingsandtheliketowalls,floors,
partitions,soffits,etc.,andmakinggood.
c) Cuttingorleavingmortises,sinking,etc.,forholdingdownbolts,brackets,supportsandthelikeandgrouting
in.
d) Cuttingchasesforpipesandthelikeinwalls,floors,partitions,etc.,andsubsequentlymakinggood.
e) Cuttingandfittingaround,boringholesthroughandmakinggoodoffinishingsuptopipes,supports,brackets,
andthelike.
f) Theformationofsmallconcretebases,plinths,etc.forplant,tanksandequipment,includinganti-vibration
padsasnecessary.
g) Thepaintingofexposedpipework,fittings,equipment,etc.
F BuildersWorkwillincludealltheabove,butitshouldbenotedthatthislistisnotintendedtobeexhaustiveand
everythingnecessarywillbedeemedtobeincluded.
Page:PP/17 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
PricingPreambles
ITEM
ITEM DESCRIPTION
REF:
PROVISIONAL SUMS
A ProvisionalSumsincludedintheseBillsofQuantitiesmaybeexpendedtotally,inpartornotatallandasdirected
bytheEngineer.
B TheContractorwillhavenoentitlementtoanyclaimforlossofprofitintheeventthatanyorallProvisionalSums
areomittedinpartorintheirentirety.WheretheContractorhasinsertedanassociated%age(notcomposite
items)forattendancesandbuildersworkstheseshallalsobeadjustedforanyomissionoradditionasrequired
undertheConditionsofContract.
Page:PP/18 FGOULD.COM
GENERAL SUMMARY
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
GeneralSummary
ITEM TOTAL PRICE
ITEM DESCRIPTION
REF: RIYALS OMANI
BILLS OF QUANTITIES
GENERAL SUMMARY
BillNo. PageNo.
1 PreliminariesandGeneralRequirements 1/6
2 Superstructure 2/6
3 Finishes 3/4
4 Accessories 4/3
5 Furnishing 5/4
6 ElectricalEngineeringInstallation 6/5
7 MechanicalEngineeringInstallation 7/4
8 ProvisionalSums 8/2
9 DayWorks 9/7
SUB TOTAL
GS-1 FGOULD.COM
BILL NO. 1
PRELIMINARIES
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
BILL NO. 1 - PRELIMINARIES & GENERAL
REQUIREMENTS
A Performancesecurity 1 Item
B InsuranceofContractor'sequipment 1 Item
C Workmen'sCompensationInsurance 1 Item
D ThirdPartyLiabilityInsurance 1 Item
E Programofworksasperclause14oftheGeneral 1 Item
Conditions
SafetyEquipment
F Contractorshallprovidenecessarysafetyequipmentas 1 Item
listedoutinthespecifications
G ProvideprotectiveclothingasrequiredbytheEmployer 1 Item
representativeandtheEngineer
ToCollection
Page:1/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Employer's Facilities
ProjectClose-OutReport
A Contractorshallprepareafinalclose-outreportas 1 Item
specified
ProgressReport
B SetofProgressReports,ProgressPhotographsas 5 No
specified
CostControlReport
C SetofCostControlReport 5 No
ToCollection
Page:1/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Contractor's Facilities
Contractorshallberesponsibleforproviding
accommodationandbuildings,includingoffices,
compounds,stores,messroomsandlivingaccommodation
asstatedinthespecifications
A Establishment 1 Item
B Maintenance 70 Day
C Removal 1 Item
ServicesfortheContractor(Lighting,Power,Waterand
Sanitation)
D Establishment 1 Item
E Maintenance 70 Day
F Removal 1 Item
SiteManagementandSupervision
G Contractor'sSiteManagementandSupervisionStaff 70 Day
ScaffoldingfortheContractor'sownuseandfortheuseof
allthesub-Contractors
H Allowforprovide,erect,maintain,dismantleandclear 1 Item
awayatcompletionproperandadequatescaffoldingfor
theContractor'sownuseandfortheuseofallthesub-
Contractors
ConstructionPlantforPermanentWorks
J Establishment 1 Item
K Maintenance 70 Day
L Removal 1 Item
OtherCosts
M Compliancewiththeconditionsofcontractand 1 Item
specification(theTenderershallseparatelylistandprice
belowanyotherclauseconsideredtohavemonetary
value)-Transport of people & HSE requirements
ToCollection
Page:1/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Sundry Items
Testingofmaterials
A AllowforalltestsrequiredbytheSpecification 1 Item
B Allowforprovidingsamplesasspecified 1 Item
Protectingtheworks
C Allowforprotectionofworksfrominclementweather 1 Item
D TheContractorshallprotectallexistingservicesduringthe 1 Item
construction.Anydamagetoexistingservicesshallbe
makegoodbyhisowncosts.Ifanytemporaryor
permanentre-routingofexistingservicesarerequired,the
Contractorshallberesponsibleforgivingnoticetothe
relevantauthoritiesandallowforattendance.
CleaningtheWorks
E TheContractorshallremoverubbishatregularintervals, 1 Item
provideprotectivecasingsandcoveringsandcleanthe
worksatcompletion
Trafficregulations
F TheContractorshallcomplywithalltrafficregulationsand 1 Item
shallliaisewiththepoliceandotherauthorities
PetroleumRegulations
G TheContractorshallcomplywithanypetroleum 1 Item
regulationsinforce
H Allowforattendanceontheworkscarriedoutbythe 1 Item
statutoryauthorities
J TheContractorshallgiveallnotices,seekpermissionsand 1 Item
payallfeesnecessaryfortheissueofbuildingpermits,
approvals,permanentserviceconnectionsandthelike
ToCollection
Page:1/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Shopdrawings,Asbuiltdrawings,etc.
A TheContractorshallprepareandsubmit"shop"drawings 1 Item
asspecified
B Allowforproviding,operatingandmaintenancemanuals 1 Item
asspecified
C TheContractorshallprovideallsparesasspecified 1 Item
D TheContractorshallprepareasbuiltdrawingsasspecified 1 Item
Co-ordination
E Allowforallco-operationandco-ordinationwithallother 1 Item
Contractors
TheEmployersRequirementsarestatedintheTender
Documents(VolumeFive)
F TheContractorshallincludesuchsumsasheconsiders
necessarytocoverhisobligations,liabilitiesandservices
underthisdocuments,butnotlimitedtothefollowingitems
1 Item
ToCollection
Page:1/5 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.01Preliminaries&GeneralRequirements
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
PageNo.1/1
PageNo.1/2
PageNo.1/3
PageNo.1/4
PageNo.1/5
ToGeneralSummary
Page:1/6 FGOULD.COM
BILL NO. 2
SUPERSTRUCTURE
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
SUPERSTRUCTURE
Floors
A TheContractorshallconstructaFloorscreedin
accordancewiththedrawingsandspecification 24 m2
SECTION D - MASONRY
Masonryblockwallswithcorefiller,incementsandmortar
asperthedetailsonDrawings(TK101)andSpecification
B 150mmthickBlockWoks 40 m2
C 200mmthickBlockWoks 20 m2
Roof
D Supplyandinstall200x50mmmerantijoistroofframeat
450mmcentersasperdrawingsandspecifications. 1 Item
Headboards
Supplyandfixheadboardsincludingfabricfinishes,
necessaryfittingsandaccessoriesallasperdrawings,
specificationsandtotheapprovalof
theEngineer
E HeadboardwithUpholsteryfabricOverallsize1600x
1700mm 1 No
Wardrobe
SupplyandfixWardrobeincludingtimberveneeredfinish,
otherfinishes,ironmongeries,socket&electricalitems,
necessaryfittingsandaccessoriesallasperdrawings,
specificationsandtotheapprovaloftheEngineer
F 440mmwide,1600mmwide&2400mmhighWardrobe
includingStonetop,drawerwithTimber,custommadepull
handle,hookforshoe&umbrella,Railhanger,Robe
hook,Beltbar. 1 No
ToCollection
Page:2/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
A SupplyandfixDesk&TVenclosuredrawingref;GD-313
asperdrawings,specificationsandtotheapprovalofthe
Engineer.Toincludefinishtype100mediumgreystained
oakasperdrawingspecification 1 No
DOORS
Note;
a)Theratesforalldoorsshallincludeforallframes,sub-
frames,architraves,transoms,stops,glazing,decorations
etc.allinaccordancewiththeSpecification,Schedulesand
Drawings,
b)Sizesreferredtoareoverallstructuralopeningsizes
shownonDrawings
c)Alltimberandveneersshallbewellconditioned,
seasoned,driedandvacuumtreatedallasspecified
d)Allhardwoodtimbershallbebestqualitywoodtoapproval
e)Thetendererattentionisdrawntothedoorschedulefor
thereferenceNos..etc.priortopricingofthissection
f)Finaldecorations/Finishestoinclude,primerasStandard
Specifications
g)Detailsofcustombuilthandles,hingesandpivotstobe
submittedforapprovalofjoineryspecialist
h)ShopDrawingsandsamplesofalltimberelementstobe
submittedforapprovalpriortofabrication
j)Ratesfordoorsshallincludeforsealswhereverindicated-
followironmongeryschedule
k)Doorfireratingrequirementsshallbeasperthedoor
scheduleandSpecification
ToCollection
Page:2/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
DOORS (CONT'D)
TheContractorshallinaccordancewiththedrawingsand
specificationsupplyandinstallSingletimberhingeddoor
concealedcloser-witharchitrave-FD60
A TypeD1,2.395x1.05mmsized 1 No
TheContractorshallinaccordancewiththedrawingsand
specificationsupplyandinstallsingletimberexposedsliding
door-frameless
B TypeD2,2.400x0.800mmsized 1 No
Ironmongery
Supplyandfixingofironmongerysettodoorsinaccordance
withtheDrawingsandHardwareSpecifications
Doortype01Singletimberhingeddoorconcealedcloser
witharchitrave
C TypeA,EllesseleverhandleBD21AssembledwithMM13
HDkitroses,finish:polishedcrome 1 No
D TypeB,Elementansiwallreaderbysaltosystems,finish
tomatchdoorcolour 1 No
E TypeC,931.84.039XPC-hingeswithtemplatedrilling,2
ballbearing4x4 1 No
F TypeD,959.00.003XSPC-doorviewer200degree 1 No
G TypeE,ElementANSImortiselockmodelLA1T17with
privacyfunctionanddeadbolt. 1 No
H TypeF,Recessed'Ansi'STDstrikingplatebyvingcard
1 No
J TypeG,903.99.891XPC-Escutcheonplatewithsteel
innerbase902.53.106XPC-WCreleaseandinsideTum
1 No
K TypeH,905.10.381Hafele'startec'PVC/FH1.12Rebate
Seal 1 No
L TypeJ950.05.931XPC-hafeleautomaticdoorbottomfor
fire/smokeproofwithacousticratingandsingleend
release 1 No
ToCollection
Page:2/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
DOORS (CONT'D)
Ironmongery (Cont'd)
A TypeK,911.59.095XPC-Hafelesecuritydoorguide 1 No
B TypeL950.11.107Hafeleintumescentfireprotectionkits
forhinges950.11.123-hafeleinstumensentfireprotection
kitsforconcealedcloser. 1 No
C TyaoeM950.11.041-Hafele20mminstumescentfireand
smokeseal.Fireresistancefor60mins(Darkbrown
colour) 1 No
D TypeN937.52.070XPC-FloormountedDoorstop 1 No
DoorType02Singletimberexposedslidingdoor-Frameless
E TypeACustommadehandle 1 No
F TypeB940.80.002/940.80180XPC-hafeleslidingdoor
fittingsjunior80/Bwithadditionalcomponents
940.80.043XPC-Hafele'Smuso'soft 1 No
G TypeC-950.10.381-Doorrebateseal-Fireresistant 1 No
H TypeD-940.40.031XPC-Hafelefloorguidefreeofplay
1 No
WINDOWS
J TheContractorshallsupplyandinstallwindowin
accordancewiththedrawings(MA-AL-8011)and
specification 1 No
ToCollection
Page:2/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
ADDITIONAL ITEMS
Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.
A .
B .
C .
ToCollection
Page:2/5 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.02Superstructure
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
PageNo.2/1
PageNo.2/2
PageNo.2/3
PageNo.2/4
PageNo.2/5
ToGeneralSummary
Page:2/6 FGOULD.COM
BILL NO. 3
FINISHES
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.03Finishes
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
SECTION J - FINISHES
Internal Finishes
Floor Finishes
Supplyandinstallfloorfinishesallinaccordancewiththe
Drawings,SpecificationandasperEngineer'sinstruction
A Carpetstype01.001refWN6002-1580-2,80%wool20%
Nylon. 19 m2
B Ceramicfloortiles,Type403refSNSCRFL,3-5mmthick
adhesivebed,2mmgroutlinecolourtomatchtiles. 3 m2
Wall finishes
Supplyandinstallwallfinishesincludingplasteringallin
accordancewiththeDrawings,Specificationandasper
Engineer'sinstruction
Cementsandplaster
C 12mmthickcementsandplastersmoothplastertoreceive
paint(Paintingmeasuredseparately) 22 m2
Internal
Walls
D Painttype002.Jotun-NCSS1002-Y50R,satinmatt,2
coats.Ceilingthroughout.Toguestrooms&apartment
wallsandcorridorwalls. 8 m2
E Painttype003.Jotun-NCSS3005-Y50R,Fenomastic
matt,2coats.Ceilingthroughout.Featurewallto
guestrooms&apartment. 14 m2
Glass/Mirror Finishes
Mirror
F Supplyandinstallclearsilverbackedsafetyglassmirror.
Mirrorwithplainedge,6mmthickasperdrawing
specification 1 No
Glass
G Supplyandinstallgreytintedlaminatedglass,12mmthick
toughenedtintedsafetyglassasperdrawingspecification
6 m2
ToCollection
Page:3/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.03Finishes
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Tile Finishes
A Supplyandinstalltype404SNSCRFLwhitemodern,
brickeffectasperdrawingspecification 1 m2
B Supplyandinstalltype403,Ceramictile,3-5mmthick
adhesivebed,2mmgroutlinecolourtomatchtilesasper
drawingspecification 11 m2
Ceiling Finishes
Suspendedceiling
Supplyandinstallceilingfinishesallinaccordancewiththe
Drawings,SpecificationandasperEngineer'sinstruction
12.5mmthk.moistureresistantplasterboard 32 m2
Painting
C Painttype001.Jotun-whiteRAL9010,fermostatic,matt,2
coats.Ceilingthroughout.Toguestrooms&apartment
wallsandcorridorwalls. 16 m2
Timber Skirting
D Type100mediumgreystainedoakasperdrawing
specification 12 m
Bulkhead
SupplyandfixBulkhead/Curtainbox/Covelight,
necessaryfittingsallasperdrawings,specificationsandto
theapprovaloftheEngineer
E Bulkhead,370mmhigh 2 m
ToCollection
Page:3/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.03Finishes
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
BILL NO 03 - FINISHES (CONT'D)
ADDITIONAL ITEMS
Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.
A .
B .
C .
ToCollection
Page:3/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.03Finishes
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Collection Page : Finishes
PageNo.3/1
PageNo.3/2
PageNo.3/3
ToGeneralSummary
Page:3/4 FGOULD.COM
BILL NO. 4
ACCESSORIES
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.04Accessories
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Supply&Installthefollowingsanitaryfittingswithnecessary
mixers,accessoriescompleteasperdrawings,
specificationsandtoapprovaloftheEngineer
A Code700-WallhungWCpan,Size280x360x560mm 1 No
B Code701-Concealedcistern&flushplate 1 No
C Code702-Countertopwashbasin 1 No
D Code703-Washbasinmixer 1 No
E Code704-Showermixer 1 No
F Code705-Showerset 1 No
G Code706-Ablutionset 1 No
H Code706-Floordrain 2 No
I Code800-ToiletrollholderwithLID 1 No
J Code801-Sparetoiletrollholder 1 No
K Code802-Cornersoapbasketwithsmalltowelrail 1 No
L Code803-Robehook 1 No
M Code804-Towelrack 1 No
N Code805-MagnifyingMirror 1 No
O Code806-Wastebin 1 No
P Code807-Clothesline 1 No
Q Code810-Grabbar 1 No
R Code811-Hairdryerwithshaversocket 1 No
S Mirror 1 No
DOOR SIGNAGE
T SupplyandinstallStandardguestroomnumberplate 1 No
Drawingref;GD-316asperdrawingsandspecification
andtoapprovaloftheengineer
ToCollection
Page:4/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.04Accessories
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
BILL NO 04 - ACCESSORIES/ FIXTURES & FITTINGS
(CONT'D)
ADDITIONAL ITEMS
Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.
A .
B .
C .
ToCollection
Page:4/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.04Accessories
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Collection Page : Accessories
PageNo.4/1
PageNo.4/2
ToGeneralSummary
Page:4/3 FGOULD.COM
BILL NO. 5
FURNISHING
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.05Furnishing
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
SECTION M- FURNISHING
Supplyandinstallincludingnecessaryfittings,accessories
completeasshownontheDrawingsandSpecificationsand
totheapprovaloftheEngineer;
Windowtreatment-includingcurtain,curtainrailandsheer
curtain
A Code01.100MainCurtain 3 m
B Code01.101SheerCurtain 3 m
Supplyandinstallincludingnecessaryfittings,accessories
completeasshownontheDrawingsandSpecificationsand
totheapprovaloftheEngineer;
C Code01.200-Cushionfabrictype1atBed 1 No
D Code01.201-Losecushionfabrictype2atArmchair 1 No
E Code01.202-Loosecushionfabrictype2atChaise 1 No
F Code01.300-Chaise 1 No
G Code01.300.1-UpholsteryatChaise 1 No
H Code01.301-Sidetable 1 No
J Code01.302-DeskChair 1 No
K Code01.302.1-UpholsteryatDeskChair 1 No
L Code01.303-BedBase&MattressatKingBedSize
1600x2000mm 1 No
M Code01.303.1-UpholsteryatKingBed 1 No
N Code01.400-Bedsidewalllight 2 No
O Code01.401-Floorlamp 1 No
P Code01.402-Desklamp 1 No
ToCollection
Page:5/1
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.05Furnishing
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Supplyandinstallincludingnecessaryfittings,accessories
completeasshownontheDrawingsandSpecificationsand
totheapprovaloftheEngineer;
Art works
A Code01.500-Artwork,Size750x1500mm 1 No
B Code01.504-ArtworkType1overallsize750x1700mm 1 No
C Code01.505-Artworktype2Overallsize750x1700mm 1 No
D Code01.506-ArtworkType3Overallsize750x1700mm 1 No
Room equipment
E Code01.602-Safebox,Size360x410x190mm 1 No
F Code01.603-MiniBar,Size554x401x446mm 1 No
ToCollection
Page:5/2
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.05Furnishing
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
BILL NO 05 - FURNISHING (CONT'D)
ADDITIONAL ITEMS
Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.
A .
B .
C .
ToCollection
Page:5/3
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.05Furnishing
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Collection Page : Furnishing
PageNo.5/1
PageNo.5/2
PageNo.5/3
ToGeneralSummary
Page:5/4
BILL NO. 6
A TheContractorshallinaccordancewithdrawingsand
speceficationssupplyandinstallalltemporaryhighvoltage
mainpowersupply,Contractortoallowforallnecessary
andincidentalworks. 1 Item
LV POWER SUPPLY
DistributionBoardincluding,fixingandsupports
B Distributionboardtobelocatedwithinwardrobe.Approx.
boarddimension293mmwidex408mmhighx118mm
deep 1 No
C TheContractorshallinaccordancewithdrawingsand
speceficationssupplyandinstallisolatorsincluding
supportsaccessoriesandallfixing 1 Item
D TheContractorshallinaccordancewithdrawingsand
speceficationsSupplyandinstallsubmainpowercables
includingallnecessaryfixingsfromMainDistribution
BoardstoSubMainDistributionBoards,Distribution
Boards,MotorControlcentres,ControlPanelsand
Isolatorsincludingconnections,terminations,fixings,etc.
1 Item
Lighting Installation
TheContractorshallinaccordancewithdrawingsand
speceficationssupplyandfixlightfittingsandfixtures
includingallnecessaryfixingsandaccessories
E Recessednarrowbeamfixeddownlight 6 No
F Recessedmediumbeamshelfdownlight 1 No
G LEDstripintegratedinwardroberail 5 m
Wiringtolightingfixturepointsfromdistributionboards;
includingwires,conduits,cabletrays,connections,
terminations,fixings
H Lightpoints,generally 8 No
ToCollection
Page:6/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.06ElectricalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Lighting Switching
Supplyandfixthefollowingaccessoriesinaccordancewith
theDrawingsandSpecification
A 1gang1wayswitch 1 No
B 3gang3wayswitch 3 No
C CombinedDND/MURswitch 1 No
D Cardholder 1 No
Supplyandfixingsmallpoweraccessoriesincludingsupport,
connectionsandterminations
E 5A,Singlespuroutlet 3 No
F 13A,Singlespuroutlet 3 No
G 13A,Singleswitchedsocketoutlet 4 No
H 13A,DoubleSwitchedSocketOutlet 1 No
Wiringtosocket/power/DPoutletsfromdistributionboards
includingwires,conduitsandladders
J 5A,Singlespuroutlet 3 No
K 13A,Singlespuroutlet(multi) 3 No
L 13A,Singleswitchedsocketoutlet 4 No
M 13A,DoubleSwitchedSocketOutlet 1 No
N TheContractorshallinaccordancewiththedrawingsand
specificationssupplyandinstalltheFireAlarmpanelsand
detectors 1 Item
ToCollection
Page:6/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.06ElectricalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Note:
TelephonenetworktobecarriedoutaspertheDrawings
andSpecifications
Equipments
A CAT6datafeedforwirelessrouter 1 No
Accessories
B Telephoneoutlet 1 No
C CAT6dataoutlet 2 No
D RG6dataoutlet 1 No
WiringincludingconduitstotelephoneoutletsfromTJB
E Telephoneoutletpoint 1 No
F CAT6dataoutletpoint 2 No
G RG6dataoutletpoint 1 No
ToCollection
Page:6/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.06ElectricalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
ADDITIONAL ITEMS
Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.
A .
B .
C .
ToCollection
Page:6/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.06ElectricalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
PageNo.6/1
PageNo.6/2
PageNo.6/3
PageNo.6/4
ToGeneralSummary
Page:6/5 FGOULD.COM
BILL NO. 7
Pipe Works
A TheContractorshallsupplyandinstallinaccordancewith
thedrawingsandspecificationschilledwaterpipesforthe
temorarycoolingsystemincludingpipefittingsand
accessories,layingorfixinghorizontallyorverticallywith
brackets,GI.clamps,bolts,nuts,cliphangers,anti-
vibrationsprings,pluggedandscrewedtoconcreteor
blockwork. 1 Item
Thermal insulation
B TheContraorshallprovideinaccordancewithdrawings
andspecificationsthermalInsulationtochilledwaterpipe
andfittings 1 Item
Duct Works
C TheContractorshallsupplyandinstallinaccordancewith
thedrawingsandspecificationsSupplyandinstallof
Galvanizedsheetmetalrectangularductwork,including
joints,bends,reducers,bellmouths,accessdoorsandall
necessarysupports,hangers,brackets,fittingsand
accessories 1 Item
Duct accessories
A TheContractorshallinaccordancewithdrawingsand
specification,localauthorityregulationsandtothe
approvaloftheEngineer,supplyandinstallDuct
accessoriesincludingallnecessaryfittings,supports,joints
,fixing,sealantetc. 1 Item
B VolumeControlDampersVCD 2 No
C 100mmdiaExhaustAirValve 1 No
D FireDamper 1 No
E AccessDoor 1 No
F Doorgrille 1 No
ToCollection
Page:7/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.07MechanicalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
HVAC equipments
A TheContractorshallinaccordancewithdrawingsand
specificationsupplyandinstallFanCoilUnitand
temporarychillerswithThermostatincludingflexible
couplings,motorizedcontrolvalves,FODRV,IV,flushing
valves,actuators,vibrationisolators,T.P.andD.C.
1 No
ToCollection
Page:7/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.07MechanicalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
ADDITIONAL ITEMS
Thebidderistodetailbelowanyadditionalitemswith
quantitiesandratesnotincludedinthisSectionbut
mentionedintheTenderDocumentsorrequiredfor
completionofthelumpsumtenderprice.Shouldthe
tendererfailtoinsertanyitemshere,itisdeemedthatthe
lumpsumpricefortheTenderincludesallrelevantitems
andnosubsequentclaimforanyadditionalpaymentsshall
beentertained.
A .
B .
C .
ToCollection
Page:7/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.07MechanicalEngineeringInstallations
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
PageNo.7/1
PageNo.7/2
PageNo.7/3
ToGeneralSummary
Page:7/4 FGOULD.COM
BILL NO. 8
PROVISIONAL SUMS
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.08ProvisionalSums
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
PROVISIONAL SUMS
ProvidethefollowingProvisionalSumstocoversupplyand
installationofworkandthesupplyorinstallationofmaterial/
equipmenttobecarriedoutbytheMainContractoror
NominatedSubcontractororNominatedSupplier,as
directedbytheEngineer
A AllowtheProvisionalSumof Sum
B AllowforMainContractor'soverheadandprofit %
C AllowforGeneral&Specialattendance 1 Item
D AllowforallassociatedBuildersworkinconnectionwith
theseworks 1 Item
ToCollection
Page:8/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.08ProvisionalSums
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
PageNo.8/1
ToGeneralSummary
Page:8/2 FGOULD.COM
BILL NO. 9
DAY WORKS
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
DAYWORK SCHEDULE
A) Day work
1)TheContractormayberequiredtoexecutecertainworkduetothenatureofwhichthemethodofvaluationwill
beonadayworkbasis.
2)TheContractoristomaintainanaccuraterecordoftimespentandmaterialsandplantusedforeachseparate
instructiongiven.Dayworksheetsaretobenumberedandshoulddescribefullyinstructionstowhichtheyrefer
andtheyaretobesummarized,pricedandsubmittedtotheEngineereachweek.Thesubmissionofsuchday
worksheetsdoesnotnecessarilymeanthattheworkwillbevaluedundertheConditionsofContractorthatany
paymentisinfactdue.
B) Labour
1)TheContractor,whentendering,istogivetheratesherequiresforlabourersandcraftsmenagainsteachitem
stated.
2)Theratesaretobecomprehensiveandinclude:
a)Wagesandallcosts,paymentsandchargesincludingpensions,annualandpublicholidays,travellingtime,
expenses,faresandtransport,guaranteedtime,nonproductivetimeandotherexpensesinconnectionwith
overtime,incentiveandbonuspayments,andotherdisbursementsarisingfromemploymentoflabourincluding
b)Chargesincurredinrespectofsiteandofficesupervisionincludingforeman'stimeandextraemoluments
paidtoforemenandleadingcraftsmenandgangers.
c)SiteandHeadOfficeoverheadchargessuchasrent,rates,insurances,electricity,gas,fuel,water,printing,
stationery,postage,telephonecharges,motorcarexpenses,renewals,maintenanceanddepreciationof
premises,machinery,plantandthelike.
d)Profit.
C) Materials
1)Materialsusedindayworkstobechargedatinvoicecost.AlldiscountsaretobeallowedtotheEmployer.
InvoicesaretobemadeavailabletotheEngineeratthetimetherelevantdayworksheetsaresubmitted.
2)TheContractoristoallowintheitemprovidedtheadditionalpercentageherequirestobeaddedtothe
invoicecostofmaterialstocoveralldeliverycoststosite,includingfeespayableunloading,storing,transport,
overheadchargesaspreviouslydefinedandprofit.
Page:9/1 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
A) Plant
1)Thecontractoristoentertheratesherequiresperhourforplantandmachineryagainsttheitemsstated.
2)Theratesaretobecomprehensiveandwillinclude:
a)Mobilizationanddemobilizationcosts.
b)Fuel,oil,lubricantsandallotherconsumables.
c)Servicing,repairsandreplacements.
d)SiteandHeadofficeoverheadchargesasdefinedabove.
e)Profit.
3)Theratesaretobeexclusiveofattendantsanddriverswhoshallbechargedatlabourratesassetoutabove.
4)IftheContractorisunabletopricetheparticulartypeofplantlisted,heshouldpriceforthenearestequivalent
itemavailabletohimandstatewhathasbeenincludedinhistender.
Page:9/2 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Labour
A Labourers/helpers 1 perhr
B Scaffolders 1 perhr
C Steelfixers 1 perhr
D Drainagelayers 1 perhr
E Carpenters 1 perhr
F Plasterers 1 perhr
G Blocklayers 1 perhr
H Plumbers 1 perhr
J Painters 1 perhr
K Electricians 1 perhr
L Plantandmachineryoperators&drivers(LightDuty) 1 perhr
M Plantandmachineryoperators&drivers(HeavyDuty) 1 perhr
N Welders 1 perhr
P PipeFitter 1 perhr
Q MetalWorker 1 perhr
R Attendant 1 perhr
S Chargehand 1 perhr
Materials
T Contractor'spercentageonthenetcostofmaterial %
ToCollection
Page:9/3 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Plant
A Bulldozerupto100H.P. 1 perhr
B Bulldozerfrom100-200H.P. 1 perhr
C Bulldozerover200H.P. 1 perhr
F Wheeledloaderwithbucketcapacitylessthan2m3 1 perhr
G Wheeledloaderwithbucketcapacitym3orgreater 1 perhr
H Smoothsteel-wheeledroller10T 1 perhr
J Pneumatictyredroller10T 1 perhr
K Selfpropelledvibratingroller10T 1 perhr
L Selfpropelledvibratingtrenchroller10T 1 perhr
M Tracked360degreehydraulicexcavatorwithunitweight 1 perhr
lessthan20Torgreater
N Tracked360degreehydraulicexcavatorwithunitweight 1 perhr
20Torgreater
P Wheeledoffsetexcavatorwithbackhoe&shovel(JCB) 1 perhr
Q Waterbowserwithpump&spraybar(capacity5000gl) 1 perhr
R Tippertrucklessthan15Tcapacity 1 perhr
S Tippertruck15Torgreatercapacity 1 perhr
T Lowsidetrucklessthan6Tcapacity 1 perhr
U Lowsidetruck6Torgreatercapacity 1 perhr
V Lowsidetruck6Torgreatercapacitywithliftingarm 1 perhr
(Hiab)
ToCollection
Page:9/4 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
Plant (Cont'd)
A Pickuptruckto3Tcapacity 1 perhr
B Fourwheeldrivepickuporstationwagon 1 perhr
C Concretetransittippertruck6m3capacity 1 perhr
D Mobileconcretemixer0.5m3 1 perhr
F Fourwheeldrivedumper1m3capacity 1 perhr
G Mobilegeneratorandweldingset25KVAorlarger 1 perhr
completewithallaccessories
H Lorrymountedcraneupto25Tcapacity 1 perhr
J Pilingrig 1 perhr
L Concretepumpcomplete(capacity38/45m3/h) 1 perhr
M Mobilegenerator250KVA 1 perhr
P Gascuttingsetwithallaccessories 1 perhr
Q Dieseldriven2"vibratingpokerunit 1 perhr
S Dewateringpumpwith200mlengthof150dia.hose 1 perhr
V 3"portablepumpandhoses 1 perhr
W 6"portablepumpandhoses 1 perhr
ToCollection
Page:9/5 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
TheContractorshouldinsertbelowanyotherplantor
equipmentwhichmayberequiredtogetherwiththe
appropriaterate:
A .
B .
C .
ToCollection
Page:9/6 FGOULD.COM
Taameer Investment. S.A.O.C
CentroHotelSohar
Mock-upRooms
BILLNo.09DayworksSchedule
ITEM UNIT RATE TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF: (RO) (RO)
PageNo.9/1
PageNo.9/2
PageNo.9/3
PageNo.9/4
PageNo.9/5
PageNo.9/6
ToGeneralSummary
Page:9/7 FGOULD.COM