Beruflich Dokumente
Kultur Dokumente
SOLUCION:
AREA HIDRAULICA:
A = (b + zy)y
A = (0.50 + (1)(1))1.0
A = 1.52
HALLANDO PENDIENTE:
Q
S = ( )2 (1)
K
1 2
K = 3 . A
n
1
K = (0.45)2/3 1.5
0.017
K = 51.81
PERIMETRO MOJADO:
Pm = f + 2a 1 + 2
Pm = 0.50 + 2(1) 1 + (1)2
Pm = 3.33
RADIO HIDRAULICO:
A 1.5
RH= = = 0.45 m
Pm 3.33
REEMPLAZANDO K EN S:
1.5 2
S =( )
5181
S = 8.38 X 104
S = 0.0008
28/09/17
ENTONCES
C2 C1
S =
d
C2 23
0.0008 =
24.2m
NUMERO DE FROUDE:
V 0.98
F= = = 0.40
9.81 0.60
ESPEJO DE AGUA:
T = f + 2za
T= 0.50+ 2(1) (1)
T= 2.5 m
0.41 < 1
VELOCIDAD:
1 2/3 1/2
V= .
n
1
V=0.017 (0.45)2/3 . (0.0008)1/2
V = 0.98 m/s
TIRANTE CRITICO:
2 (fac + zac2)
=
g f + 2zac
(0.50 (ac) + 1ac2
1.63 =
0.59 + 2 (1)()
ac = 0.648
VELOCIDAD CRITICA:
Vc = 0.648 (9.81)
Vc = 2.52 m/s
2
Bmin = +
2
(2.52)2
Bmin = + 0.64
2(9.81)
B min= 0.97 m-kg/kg
2. Es u tramo de donde se conoce = 1.2855/ se desea realizar la construccin de
un canal revestido (n= 0.013) y el permetro mojado mnimo, capaz de conducir en
caudal de 39600 lts/min. Determine el tirante y el ancho de solera. Use la frmula de
Munning. Es rio o tirante, critico subcrtico o supercrtico.
SOLUCION:
m = 2 (1 + (1.732 ) 1.73 )
m = 0.536
8/3 = Qn ( + 21 + 2 )2/3
S1/2 ( + )5/3
8/3 = (0.189)3/8
F=mxa
F= 0.536 (0.53)
F= 0.287
AREA HIDRAULICA:
A = (f + za)a
A=(0.29+(1.73)(0.53))0.53
A= 0.65 2
PERIMETRO MOJADO:
Pm= f+2a 1 + 2
Pm= 0.29+2(0.535) 1 + (1.73)2
Pm= 2.43 m
RADIO HIDRAULICO:
A 0.65
RH= Pm = 2.43 = 0.267 m
28/09/17
ESPEJO DE AGUA:
T= f+2za
T= 0.287+ 2(1.73) (0.535)
T= 2.14 m