Grande Tukan during transshipment operation
TUKAN
O
Containers waiting for dispatch
TUKAN
O
Reliable handling of general cargo
A further advantage of the Ardelt double The Tukan, with its slewing bearing and
jib level luffing system: the jib cannot large-diameter tubular column, has a clear
crash to the ground, even in the event design concept providing great flexibility:
of failure of the luffing gear. It is held The slewing bearing allows the crane
absolutely secure by the tie-back. to be mounted on many different
types of portal. The Tukan can there-
And: optimum guidance of the rope fore be very easily adapted to suit
minimises the bending load on the ropes the prevailing local conditions.
and increases the life of the rope The machinery house platform is
therefore reducing the operating costs. compact, modular and low-mainte-
nance, and arranged on the
The special double jib level luffing counterweight side of the crane.
concept of the Tukan provides a coun-
terweight balancing lever. The movable Moreover, the Tukan is an extremely
counterweight ensures that, in every energy-efficient crane. Its primary ener-
position, the centre of gravity of the gy consumption, already low, is further
whole jib system remains close to the reduced by means of the latest converter
slewing axis. This minimises the torques technology. Through recovery of the
acting on the slewing bearing and also braking energy fed back into the power
reduces the luffing energy required. supply system the Tukan exhibits a
In both cases, this means reduced wear significantly better energy balance than O
and therefore lower costs. a comparable mobile harbour crane. Efficient bulk handling
TUKAN
01 THE DOUBLE JIB LEVEL LUFFING 03 THE MACHINERY HOUSE LAYOUT 05 THE SLEWING GEAR
SYSTEM Typical of the extremely easy-mainte- The Tukan slewing gear systems are
Decades of experience pay off. Ardelt nance machinery house layout is the compact, low-maintenance drive units
builds what is not only the most robust, excellent accessibility of all components. with planetary gears. The slewing
but also the lightest double jib level The rope entry funnel into the machi- bearing is secured with Superbolt con-
luffing system in the world. The Tukan nery house roof is provided with excel- nections which prevent any uncontrolled
is manufactured in three size classes, lent protection against rain or spray loading of the bolts. No special tools
each with specific characteristics related water by means of floating guide rollers are required for checking the pre-ten-
to the lifting capacity: Tukan 750, Tukan (with reliable sealing). sion settings. Furthermore, the central
1500, Grande Tukan 3000. lubrication system contributes to the
ease of maintenance. Which means
simply: Tukan slewing gear lasts longer.
O Proven hoisting gear block O Rope pressure device for safe hoisting rope winding O Travelling gear from construction kit
TUKAN
08 THE ELECTROCONTAINER
We only install first-class components
in the modular-designed Tukan electro-
container. We manufacture the control
cabinets, for example, in Eberswalde,
install them completely, test them meti-
culously and then deliver them as
a compact unit together with the opera-
tor cabin.
The benefits:
well-arranged structure thanks to
the modular design
high-quality components and
functional testing
low freight costs thanks to reduced
dimensions
less installation work during assembly.
O
Handling of parts of wind power plants by Tukan cranes
The Tukan is at home in any location movement therefore becomes secondary Q INFO
where there are loads to be moved. and the effects of braking and accele- In general cargo, heavy load and
ration processes which normally occur container handling too, the Tukan
In the port, for example, it is the ideal, during the trolley travel movements is able to make full use of its
economical machine for handling bulk of ship unloaders are eliminated. One inherent advantages:
goods, as well as other cargos. In the of the reasons crane drivers simply love
highly accurate positioning
so-called kangaroo operation it achie- the Tukan.
ves peak handling capacities. With horizontal load path (mechanical
this method, besides the short load It is highly regarded in the dockyards principle)
paths and swing lengths arising from the for the assembly of ship components.
high working speed
articulated jib design principle, there is This is due to the short rope lengths,
a second decisive benefit: the handling the short load swings and the ability
operation is carried out essentially to make very fine and precisely-control-
by the luffing movement. The slewing led movements.
TUKAN
Q SERVICE
By excellent service, we understand
this to mean, among other things: to be
present and available. After all, its
always possible for something unpre-
dictable to happen. For this reason, our
customers can contact us around the
clock via a Hotline. In order to ensure your O
safety and satisfaction we employ only The Offices
TUKAN
TECHNICAL DATA.
TUKAN 750
80
carrying capacity (t)
70
60
50 heavy lift 1
40
30 heavy lift 2
20 general cargo
10 grab operation
0
28 24 20 16 12 8
outreach (m)
TUKAN 1500
90
80 heavy lift 1
carrying capacity (t)
70
60
50
40 general cargo
30 grab operation
20
10
0
40 36 32 28 24 20 16 12 10
outreach (m)
TUKAN
120
110
100 heavy lift 2
90
carrying capacity (t)
heavy lift 1
80
70 general cargo
60 grab operation
50
40
30
20
10
0
70 66 62 58 54 50 46 42 38 34 30 26 22 18
outreach (m)
OVERVIEW
Outreach 27 m 27 m 40 m 40 m 70 m
KRANUNION.
WORLD MARKET LEADERS
UNITED.
ARDELT
HEEGERMHLER STRASSE 64
16225 EBERSWALDE / GERMANY
WWW ARDELT.DE