Collaboration and Innovation in a

Post-Tensioned Waffle Slab.

Neeta City Shopping Centre

Shaun Sullivan

Structural Systems (Northern) Pty Ltd


Introduction

Collaborative Effort between


Contractor, Consultant & Specialist
Contractor

A Solution to your Weighty Problem


A Post Tensioned Waffle Slab

Structural Systems (Northern) Pty Ltd


Project Overview
Extension and refurbishment of the Neeta City Shopping Center,
Fairfield
Existing 1st Floor car-park converted to a new Big W Store.
Approx 5800m2
New Floor 300 to 400mm above the existing car-park floor.
Floor Live Load increased from 3kPa to 5KPa / 10kPa

Structural Systems (Northern) Pty Ltd


Project Constraints
Operating Woolworths supermarket in floor below +
carpark over
No space beneath could be used for construction
No significant construction noise during business hours.
Weight of new floor less than slab capacity.
Relatively long spans & falls in carpark

Structural Systems (Northern) Pty Ltd


External Upstand
Remained

Kerbs & Planter


Upstand Removed

Structural Systems (Northern) Pty Ltd


Existing Risers

Stormwater pipes
through slab

Structural Systems (Northern) Pty Ltd


Conforming RC Scheme
New waffle slab composite with existing PT floor
Dowels @ 250cts
Reinf. Mat typ +
& scabbling
extra bars at
existing concrete
columns

Locate existing tendons


Styrene void formers

Ribs @ 1600max cts


Existing Tendons

PLAN
Structural Systems (Northern) Pty Ltd
Construction Noise
Approx 30,000 Dowels & 8000m of 200wide scabbling

Scabbling and drilling outside business hours. Costly and timely!

Night Day Night

Local Woolworths Trading Local


Residents Hours Residents

Limited time to perform noisy work!

Structural Systems (Northern) Pty Ltd


Alternative PT Scheme
Post-tensioned waffle slab

Isolated from the existing floor surface.

Connection to Existing Columns by Dowels

Temporary IJ to existing columns to allow movement.

Structural Systems (Northern) Pty Ltd


Typical Scheme Details
200 wide ribs @ 1500 cts
Joint locations reflect existing slab
90mm thick RC slab between ribs
Pour strips for stressing access
Bond breaker to existing slab

Structural Systems (Northern) Pty Ltd


Structural Systems (Northern) Pty Ltd
Structural Systems (Northern) Pty Ltd
Structural Systems (Northern) Pty Ltd
Core Connections
Bars epoxied into core

Sleeved for movement

10mm isolation to
existing slab

Structural Systems (Northern) Pty Ltd


Why Isolate?
Typical Slab Columns deflect to accommodate PT force

As slab is poured directly on existing, columns cannot deflect - post-


tensioned force lost

Structural Systems (Northern) Pty Ltd


Column Connections
Column Reinf. Located

Oversized holes cores

Tapered isolation gap


(preformed metal mesh)

Grouted at 56 days

Structural Systems (Northern) Pty Ltd


Column Connections

Structural Systems (Northern) Pty Ltd


Back of House Hanging Load
Wider ribs (extra DL) required
in 10KPa area
Carpark
Unable to prop from below
Load hung from carpark slab
over
New Slab
Reidbar threaded
reinforcement & plates Existing Slab

Woolworths

Structural Systems (Northern) Pty Ltd


Back of House Hanging Load

Structural Systems (Northern) Pty Ltd


Hanging Support
Very long span in 10Kpa area
Unable to span with available
depth
Room underneath slab not
available
Blade column introduced

Structural Systems (Northern) Pty Ltd


Curved Beam
Irregular column grid
Extra concrete and DL
required to span
Composite section used
similar to RC scheme

Structural Systems (Northern) Pty Ltd


Summary
PT solution eliminated significant amount of
construction noise.
Minimal disturbances to existing tenancies
Savings in construction time.
Challenges solved through collaboration of
interested parties

Thankyou