Sie sind auf Seite 1von 25

STATE OF FLORIDA 10

CHIPLEY

INDEX OF STRUCTURE PLANS TALLAHASSEE


75
95

DEPARTMENT OF TRANSPORTATION FORT WALTON 10 JACKSONVILLE


PENSACOLA BEACH

LAKE CITY 295


PANAMA

SHEET NO. SHEET DESCRIPTION CITY

ST AUGUSTINE

GAINESVILLE

Example 1 Precast Two-Column Pier


Sheet 1 of 4 Pier Details
OCALA DAYTONA BEACH

Sheet 2 of 4 Pier Details DELAND


4

Sheet 3 of 4 Pier Details


Sheet 4 of 4 Pier Details
PREFABRICATED BRIDGE ELEMENTS AND ORLANDO
BEE LINE
EXPRESSWAY
MELBOURNE -
COCOA
NEW PORT RICHEY

75
4 F

Example 2 Precast Two-Column Pier L

SYSTEMS (PBES) CONCEPTUAL DRAWINGS


TAMPA O
R
ID
A
LAKELAND T
U S
R
N
P
BARTOW I

Sheet 1 of 3 Column Details ST PETERSBURG


K
E

Sheet 2 of 3 Column Details 275

SARASOTA - FT PIERCE
75

Sheet 3 of 3 Column Details BRADENTON

95

Prefabricated Bridge Elements and Systems (PBES) are structural components of a bridge built offsite
Example 3 Hybrid C.I.P./Precast Hammerhead Pier
or in a near site casting yard in order to reduce onsite construction time as compared to conventional WEST
PALM
BEACH
Sheet 1 of 6 Pier Details FT MYERS

construction methods. PBES components and details will vary from project to project. These drawings
Sheet 2 of 6 Pier Details 75

are not standards or preferred details; these drawings are concepts intended to assist the Designer in NAPLES

Sheet 3 of 6 Pier Details 75 FT LAUDERDALE

the development of project specific components and details. Notes to Designers have been provided as
Sheet 4 of 6 Pier Details MIAMI

boxed text in the drawings. The information presented in this document should not be relied upon for
Sheet 5 of 6 Pier Details
specific application without competent professional examination and verification of accuracy, suitability,
Sheet 6 of 6 Pier Details
and applicability by a licensed Professional Engineer.

Example 4 Precast Pier Footing


KEY WEST

Sheet 1 of 3 Pier Footing Details


Sheet 2 of 3 Pier Footing Details
Sheet 3 of 3 Pier Footing Details

Example 5 Precast Bent Cap


Sheet 1 of 2 Pile Cap Details STRUCTURE SHOP DRAWINGS
Sheet 2 of 2 Pile Cap Details TO BE SUBMITTED TO:

Example 6 Precast Bent Cap


Sheet 1 of 2 Bent Details
Sheet 2 of 2 Bent Details

NOT FOR CONSTRUCTION


Example 7 Precast Slab Units with Topping
Sheet 1 of 1 Superstructure Details
CONCEPT ONLY PLANS PREPARED BY:

Example 8 Closure Pour


Sheet 1 of 3 Connection Details
Sheet 2 of 3 Connection Details
Sheet 3 of 3 Connection Details

ISOMETRIC DRAWINGS PREPARED BY:

REFERENCED MANUALS, STANDARDS AND SPECIFICATIONS:

Florida Department of Transportation, 2015 Structures Manual


Volume 2, Chapter 25

Florida Department of Transportation, 2015 Design Standards


Index Drawings: 420, 423, 821, 926, and 21110 NOTE: THE SCALE OF THESE PLANS MAY
HAVE CHANGED DUE TO REPRODUCTION.

Florida Department of Transportation, 2015 Standard


Specifications for Road and Bridge Construction
Sections: 400-9 and 926-1

AASHTO LRFD Bridge Design Specifications, Sixth Edition with


2013 Interims
Section 5.14.2.4.2

FISCAL SHEET

YEAR NO.
INFORMATION SHOWN IS FOR CONCEPT ONLY.
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

1
2" Grout Joint

Match-Cast Dowels for insertion into


Epoxy Joint Grouted Sleeve Coupler

1
2" Grout Joint

Dowels for
insertion into
Couplers

Mechanical
Grouted
Coupler
Reinforcing Coupler
System
Sleeve System

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 1 OF 4
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 1 - PRECAST TWO-COLUMN PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Require Shop Drawings and Erection Plan. See Structures Consider tolerances and means of The Transfer Template is based on the Prefabricated Precast Pier Cap and provides
Detailing Manual, Chapter 25, for items to be included. adjustment for Precast Pedestals. orientation of bar placement in the C.I.P. Footings and orientation of Columns relative
to each other for Multi-Column Piers. Use of the optional Closure Pour in the Precast
Cap allows construction of the C.I.P. Footing prior to precasting the Pier Cap.

Bridge

Precast Pier Cap

Optional Closure Pour


" Grout Joint (Typ.) See Detail "B"

A A Grouted Joint accommodates


Cap-to-Column fabrication
and construction tolerances.

)
Typ.
Column Column

Precast Colum n Segm ents (


Grouted Joints at Cap-Column

Require Contractor to supply interface and Column-Footing


Epoxy Joint (Match-Cast)
three-dimensional transfer template for interface accommodate column

proper Footing-to-Column connection placement tolerance. Match-Cast

reinforcement placement within C.I.P. Footing. Two-Faced Epoxy Joints are


See Detail "A"
used for Column Segments.

Grouted Joint accommodates


Column-to-Footing fabrication
and construction tolerances.

" Grout Joint (Typ.) See Detail "B"

Provide C.I.P. Footing


flatness and elevation
tolerances for Column
interface.
Pier

Column Prestressed
Concrete Piles (Typ.)

SECTION A-A ELEVATION

NOTES:
1. For Detail "A" at Match-Cast Joint see Sheet 3 of 4.
2. For Detail "B" at " Grout Joint see Sheet 4 of 4.
3. For Precast Column Segments, see Sheet 3 of 4. Require one full-scale mock-up of each unique grouted joint. Require component-to-component fit-up in the casting INFORMATION SHOWN IS FOR CONCEPT ONLY.
4. For Precast Pier Cap Details, see Sheet 4 of 4. yard of all components prior to shipping to the erection site. In lieu of component-to-component fit-up, the contractor APPLICATION IS DESIGNER'S RESPONSIBILITY.
may demonstrate interfacing elements or precast components do not conflict through the use of a transfer template. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 2 OF 4
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 1 - PRECAST TWO-COLUMN PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
H-Section reduces
lifting weights.

Column
Column Column

A A
Alignment Key

H"
"
Mechanical
Coupler System
See Detail 'A'

B B
Key for alignment of
adjacent Precast Column
Section at Match-Cast Joint.

Match-Cast Joint
SECTION A-A SECTION B-B
ELEVATION (Typ. @ all Match-Cast Joints)

Oversize Couplers two bar sizes to


provide 12" construction tolerance.

Mechanical
Couplers

Mechanical Couplers Inside Face

Grout Tube (Typ.)

C C

Grout
Tube
(Typ.)

Couplers and
Ties must
Match-Cast Joint meet cover
requirements.

INFORMATION SHOWN IS FOR CONCEPT ONLY.


DETAIL 'A' AT MATCH-CAST JOINT SECTION C-C
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 3 OF 4
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 1 - PRECAST TWO-COLUMN PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Optional Closure Pour
Bridge

A B C

Size Cap elements for construction


equipment and boom reach using site B
specific construction access assessment. D D
A
For over-land projects, include haul
route assessment for element sizing.

Pier

U-Shape Pier Cap See PBES Example 8 for


reduces lifting weight. closure pour concepts.

Grout Bed requires highly


ELEVATION skilled workers in order to
place grout properly.

Column
Pier

Grout Tubes

Stirrups and Couplers


Mechanical
must meet cover
Coupler
requirements. Pier

Mechanical Coupler System


See Detail 'B'

E E

Grout

SECTION B-B Shim (Typ.)

SECTION D-D

SECTION A-A
Specify non-metallic shims (left in place) and DETAIL 'B'
Pier maximum shim height. Specialty Engineer is
to provide shim placement and loads as part
of the Erection Plan requirements.

Specify APL approved non-shrink Grout and


Saturated Surface Dry (SSD) condition of both
interfacing surfaces. Require surfaces and curing
be prepared by Manufacturer's recommendations.

INFORMATION SHOWN IS FOR CONCEPT ONLY.


APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.
VIEW C-C SECTION E-E

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 4 OF 4
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 1 - PRECAST TWO-COLUMN PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
INFORMATION SHOWN IS FOR CONCEPT ONLY.
APPLICATION IS DESIGNER'S RESPONSIBILITY.
Pre-Cast Column NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

Grouted Sleeve Coupler

1
2" Grout Joint with
Shim for Grade Control

A Modified Special Provision is required for


top-of-shaft elevation tolerances and C.I.P.
connection reinforcement placement tolerances.

Pre-Cast Column

Grouted Sleeve Coupler

Drilled Shaft
Connection
Dowels
(Plan Location)

Inner Cage for Grout


Sleeve Connection
to Column

Drilled Shaft
Rebar Cage

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
XXX MM-YY COLUMN DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 1 OF 3
CENTRAL OFFICE XXX MM-YY
FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33 XXX MM-YY
EXAMPLE 2 - PRECAST TWO-COLUMN PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
XXX MM-YY
A Modified Special Provision Oversize Couplers two bar sizes to Specify APL approved non-shrink
is required for top-of-shaft provide 12" construction tolerance. Grout and Saturated Surface Dry
elevation tolerances and (SSD) condition for both interfacing
reinforcement placement surfaces. Require surfaces be
tolerances. prepared and cured according to
Grout Manufacturer's recommendations.
Precast Column

Lifting Point (Typ.)


Place on Centerline
Column
of Column Grouted Splice
Grout Ports
Coupler (Typ.)
(Typ.)
Top of Column

Grouted Splice
Coupler (Typ.)

1
2" Grout Joint
Foundation

Shim

Dowels

Specify non-metallic shims (left in


place) and maximum shim height.
Specialty Engineer to provide shim
placement and loads as part of
SECTION A-A
GROUTED SPLICE COUPLER DETAIL Erection Plan requirements.
PRECAST COLUMN
NOTE:
Reinforcement shown as are connected to
A A Drilled Shaft or Footing.

Grouted Splice

Column Ties around Coupler (Typ.)

Couplers must meet


Foundation to
cover requirements.
Column Connection Precast Column
See Detail A
Grouted Splice
Coupler (Typ.) Grouted Splice
2" Grout

Joint

Top of Foundation Coupler (Typ.)

Grout Bed requires


highly skilled workers
1

Shim for Grade Control 1


2" Grout Joint to place grout properly.

Foundation Foundation

COLUMN ELEVATION DETAIL A

(INSIDE FACE OF COLUMN SHOWN) FOUNDATION TO COLUMN CONNECTION

INFORMATION SHOWN IS FOR CONCEPT ONLY.


APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
COLUMN DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 2 OF 3
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 2 - PRECAST TWO-COLUMN PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Require the Contractor to supply a three-dimensional transfer template for Column-to-Foundation Connection
Reinforcement placement within the C.I.P. Foundation. The Transfer Template provides orientation of bar placement
within the Foundation and orientation of Columns in Multi-Column Piers. In the case of a Multi-Column Pier with a
Precast Cap, the Column spacing and orientation is critical to ensure fit-up. The critical connection is the Precast
Column to Precast Cap; therefore, the Transfer Template for the Foundation is based on the Precast Cap. In this
case, the Foundation is cast following the fabrication of the Precast Cap due to the need of a Transfer Template.
Using a C.I.P. Cap or segmenting the Precast Cap between Columns and using an optional closure pour to connect
the Cap segments allows the Foundation to be cast prior to fabrication of the Precast Cap.

Column & Drilled Shaft


Proposed
Finished
Ground
Column & Foundation
A A
Dia.
1
2" Grout Joint
Top of Drilled Shaft

A Modified Special Provision is required


for top-of-shaft elevation tolerances and
reinforcement placement tolerances.

Size top-of-shaft Pier


confinement reinforcement
for non-contact lap splice B B
(LRFD 5.11.5.2)

Grouted Splice Coupler (Typ.)


as required by design

Drilled Shaft diameter sized to accommodate


Length

inner Column Reinforcement placed inside SECTION A-A


Drilled Shaft Reinforcement Cage. Specify
PRECAST COLUMN
tolerances in Modified Special Provisions.

Foundation

Theoretical plan location of


outer Drilled Shaft Cage
Place Inner Cage
per plan location Drilled Shaft Cage placement
tolerance as specified

Pier

Bottom of Drilled Shaft

Dia.
Dia.

DRILLED SHAFT ELEVATION SECTION B-B


DRILLED SHAFT
(SHOWING CONVENTIONAL PIER
COLUMN REINFORCING)

INFORMATION SHOWN IS FOR CONCEPT ONLY.


APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN IN BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
COLUMN DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 3 OF 3
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 2 - PRECAST TWO-COLUMN PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Pier (Symm.)

A A

Pseudo Match-Cast
Surface (Typ.)

Cast-In-Place Hammerhead
Pier Column and Pier Head

PT Ducts

Dowels for
Rebar Grouted
Sleeve Couplers
Shear Keys

B B
Dowels for
Rebar Grouted
Sleeve Couplers

ELEVATION

INFORMATION SHOWN IS FOR


CONCEPT ONLY.
NOTE: APPLICATION IS DESIGNER'S
For Pseudo Match-Cast RESPONSIBILITY.
Process, see Sheet 5 of 7. NOTES TO DESIGNER ARE
SHOWN AS BOXED TEXT.
SECTION B-B

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 1 OF 6
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 3 - HYBRID C.I.P./PRECAST HAMMERHEAD PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
C D E

Cast-In-Place Hammerhead Pier

See Pseudo Match-Cast


Process on Sheet 5 of 6.

Incorporate Transfer Template into


Pseudo Pier Head Form for proper
reinforcement placement within
C D E C.I.P. Head. See Sheet 5 of 6 for
Guide locations.

VIEW A-A

PT Duct (Typ.) PT Duct (Typ.) PT Duct (Typ.)

PT Bar (Typ.) PT Bar (Typ.) PT Bar (Typ.)

Pseudo Match-Cast Surface

VIEW C-C

VIEW D-D VIEW E-E

INFORMATION SHOWN IS FOR CONCEPT ONLY.


APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 2 OF 6
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 3 - HYBRID C.I.P,/PRECAST HAMMERHEAD PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Temporary PT
Bar Ducts

Size Precast Pier Wing for construction equipment and boom reach
using site specific construction access assessment. For over-land
Grouted Rebar
projects, include haul route assessment for element sizing.
Sleeve Couplers

ECI 6- 19

PT Ducts
ECI 6- 19

Shear Keys
Grouted
Rebar
Coupler
PLAN

Temporary Framing (Strongback or similar) for


Grouted
alignment of Pier Wing during placement to
Rebar
minimize damage to reinforcing bar extensions.
Coupler
F G H J Grouted Rebar
Sleeve Couplers
ECI6-19

Two-Face Epoxy at Pseudo


ECI6-19

Match-Cast Joint interface


19
ECI6-

Oversize Couplers two bar sized to

allow 12" construction tolerance

F G

Grouted
Rebar
H
Coupler

ELEVATION
A Temporary PT System (Temporary PT Bars
shown) provides a compressive stress across the
Pseudo Match-Cast Joint until the epoxy has
cured. See LRFD 5.14.2.4.2 for requirements.

Temporary PT Bars

INFORMATION SHOWN IS FOR CONCEPT ONLY.


APPLICATION IS DESIGNER'S RESPONSIBILITY.
PT Anchorage Blockouts
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 3 OF 6
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 3 - HYBRID C.I.P./PRECAST HAMMERHEAD PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
PT Duct PT Duct (Typ.) PT Duct (Typ.)
Anchorage (Typ.)

PT Bar (Typ.)

PT Bar (Typ.)

PT Bar (Typ.)

Provide gap between Grouted

VIEW F-F Rebar Couplers to facilitate SECTION G-G


coupling of PT Bars during
placement of Pier Wings.

SECTION H-H

PT Duct (Typ.) Grouted Rebar


Coupler (Typ.)

PT Bar (Typ.)

The PT Bars shown are temporary and used


To eliminate mild reinforcing at the Joint
for maintaining a compressive stress
and improve fit-up, consider utilizing
across the joint until the epoxy has cured.
Permanent Post Tensioning such that zero
Additional temporary PT Bars may be
tension is maintained at the joint in the
required in the lower section of the Joint
final configuration.
to meet AASHTO LRFD 5.14.2.4.2 requirements.

Grouted Rebar
Coupler (Typ.)

VIEW J-J

INFORMATION SHOWN IS FOR CONCEPT ONLY.


APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 4 OF 6
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 3 - HYBRID C.I.P./PRECAST HAMMERHEAD PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Left Pseudo Pier Temporary PT Bar Ducts
Stage 1 Notes:
Head Form
1. Manufacture two identical Steel Bulkheads (left and right).
2. Pour a Precast Template using a Steel Bulkhead.
3. Precast Template to remain in casting yard for Stage 2.
4. Steel Bulkheads go to the erection site for forming the
C.I.P. Hammerhead Pier Column.

Provide Shear Keys per AASHTO LRFD Permanent PT Tendon Ducts


Bridge Design Specifications 5.14.2.4.2.

Left Steel
Bulkhead
Shear Key

Require one full-scale mock-up of Pseudo Match-Cast Grouted Rebar Coupler


Joint prior to Pier construction. Stress across test Guides (Typ.)
joint and check for spalls and uniform epoxy squeeze.
Formwork

STEEL BULKHEAD PRECAST TEMPLATE

See AASHTO LRFD Bridge Design Specifications 5.14.2.4.2


STAGE 1
for uniform compression requirements across joint.
(PSEUDO MATCH-CAST PROCESS)

24'-0" 1'-0"
Stage 2 Notes:
1. Precast the required number of Match-Cast Wings using a Pseudo Pier Head Form.
2. Submit a Pseudo Match-Casting Process and Mock-Up Test Procedure to the
Engineer for review and approval. A Mock-Up Test of the Joint shall be performed
successfully prior to beginning installation. The Mock-Up shall consist of the
following:
a. Same surface area and shear keys as depicted in the final constructed Joint.
b. Two-faced epoxy.
c. Provide a stress of 40 psi uniform compression across Joint.
d. Measure stress at joint interface (6 locations) using pressure cells.
Pseudo Pier Head Form
e. All measured stresses shall be between XXX psi and XXXX psi. Provide a report
documenting the process and results. If measured stress falls outside of the
XXX-XXXX psi range, resubmit revised Pseudo Match-Casting Process and
Mock-Up Test Procedure to the Engineer for review and approval. Repeat the
process on a new test specimen until test requirements are met.

Formwork

STAGE 2
(PSEUDO MATCH-CAST PROCESS)
INFORMATION SHOWN IS FOR CONCEPT ONLY.
LEFT PRECAST CANTILEVER SHOWN; RIGHT PRECAST CANTILEVER SIMILAR
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 5 OF 6
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 3 - HYBRID C.I.P./PRECAST HAMMERHEAD PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Information shown is for concept only.
Application is Designer's responsibility.
Notes to Designer are shown as boxed text.
Install Second
Coordinate work operations with Temporary Traffic
Control Plans to eliminate over-traffic work. Match-Cast Wing

Couple and Stress


Pour C.I.P. Pier Temporary PT Bars
using Steel Bulkheads

Grout Rebar Sleeve


Couplers at
Match-Cast Joints

Grout Rebar Sleeve


Couplers at
Match-Cast Joints

Contractor may utilize 2 ft. closure pour


in lieu of pseudo match-cast joints.

LANE LANE NIGHT

CLOSURE CLOSURE CLOSURE

STAGE 1 STAGE 3

Incorporate Segmental Specification for Hybrid


C.I.P./Precast Hammerhead Pier construction. Install Permanent
Modify for pseudo match-cast process. PT Tendons

Install and Stress


Temporary PT Bars
Install Permanent
PT Tendons
Install Match-Cast Wing

Grout PT Tendons

Size Precast Cap Wing for construction


equipment and boom reach using Site
Specific Construction Access Assessment.

NIGHT LANE LANE

CLOSURE CLOSURE CLOSURE

STAGE 2 STAGE 4

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 6 OF 6
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 3 - HYBRID C.I.P./PRECAST HAMMERHEAD PIER
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
INFORMATION SHOWN IS FOR CONCEPT ONLY.
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.
Vent PVC Pipes

Closure Pour

Rebar Cage/Plug
for Pile/Cap Connection

Cast-In-Place
Column Connection

Square
Prestressed
Concrete Pile

Shear Key
Pattern
Pile Void

Pre-Cast
Foundation

Plug

Plug

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER FOOTING DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 1 OF 3
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 4 - PRECAST PIER FOOTING
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Require Shop Drawings and Erection Plan. See Structures Size Foundation for construction equipment and
Detailing Manual, Chapter 25, for items to include. boom reach using site specific construction access
assessment. For over-land projects, include haul
route assessment for element sizing.

Column Pier (Symm. About) Column

A A Pier

Require Full-Scale Mock-Up of


a Single Pile-Cap Connection.

HALF PLAN (BOTTOM REINFORCING) HALF PLAN (TOP REINFORCING)

PILE CAP REINFORCING PLAN

NOTES:

1. Remove forms after concrete obtains a minimum


strength of XXXX psi.
2. Use high range water reducer and X" max. aggregate
size for Class V Concrete (Spec).
3. Locate pick-up points symmetrical about center lines of
Column and Pier (Footing).

Vent PVC Pipe

INFORMATION SHOWN IS FOR CONCEPT ONLY.


APPLICATION IS DESIGNER'S RESPONSIBILITY.
PILE COLLAR DETAIL NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER FOOTING DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 2 OF 3
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 4 - PRECAST PIER FOOTING
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Column

Form Shear Key with removable Specify shrinkage reducing Vent PVC Pipes
corrugated pipe for transfer of admixture and seven day
Pile
C C moist cure.
shear without need for
Grout and cover
reinforcement through plug-cap
Vents after use.
interface. Use hard pocket former

Column with compressible (e.g. rubber)


liner to reduce shrinkage cracks.
Rebar Cage

Pile (Typ.) SHEAR KEY DETAIL Specify minimum


gap between top of

Hole Pile and Cap


surface to
ensure concreting
Square Pile with circular hole Vent pipe to minimize of oversized pocket
provides bearing area for Cap. potential for trapped and to accommodate
air and honeycombing. 3" pile placement
tolerance

E E

See Pile Collar Detail

Two-phase pour
Horizontal area for Shims consisting of
Pile
grouting to seal,
Use non-metallic shims (to be
SECTION A-A
Seal then monolithic
left in place). Specify maximum
concrete pour.
Inclined surface typical
shim height. Specialty Engineer Column
to minimize potential for
to provide shim placement and F F Class VI Concrete w/silica fume
trapped air and
loads as part of the erection (XXXX psi) (Min.)
honeycombing. Also
plan requirements.
facilitates concrete infill D D
placement around Pile.

Pile Void

Size hole Hole


diameter for Square Prestressed Concrete Pile

3" pile
placement
tolerance.

Plug

Pile Pile SECTION E-E

SECTION F-F
PILE CONNECTION DETAIL

Pile & Void


Column Prepare interfacing concrete
surfaces prior to concrete pour:
1. Sand or water blast interfacing
surfaces.
2. Seal and fill void with potable
Pier

water for 4 to 5 hours.


3. Remove water to achieve SSD
condition prior to pouring
concrete.

Void

Class VI Concrete w/silica fume


(XXXX psi) (Min.)

INFORMATION SHOWN IS FOR CONCEPT ONLY.


SECTION B-B SECTION C-C SECTION D-D
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PIER FOOTING DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 3 OF 3
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 4 - PRECAST PIER FOOTING
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
INFORMATION SHOWN IS FOR CONCEPT ONLY.
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

Pedestal Cast
Monolithically with
Plug Closure

Friction Collar not shown. Require


friction collars on piles to support cap
prior to grouting. Do not use shims to
support cap due to the small bearing
area they provide and because they tend
to block the flow of grout resulting in
an insufficiently grouted interface.

1
2" Grout Joint
Pre-Cast
Cap

Rebar Cage

* Fiction Collar
not shown for Plug
clarity
Step 5: Presoak
5 hours to SSD
condition. Cast
Plug and Pedestal.
Step 4: Field
Bend Pedestal
Bars
High Capacity Square
Prestressed Concrete Piles
Step 3: Insert Cage/Plug

Step 2: Set Pre-Cast Cap on


bed of grout and friction
collar at desired elevation,
displacing excess grout.

Step 1: Cut Piles to


prescribed elevations
(Modified Special Provision)

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PILE CAP DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 1 OF 2
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 5 - PRECAST BENT CAP
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Require Shop Drawings and Erection Plan. See Structures
Taper hole to transfer shear Require one full-scale
Detailing Manual, Chapter 25, for items to include.
and to minimize potential for mock-up of a single
Pile & Pier Cap
trapped air and honeycombing. Pile-to-Cap Connection.

Cast-In-Place Pedestal (Typ.)

See Detail 1

ELEVATION C C
Precast Concrete Cap

Cap installation procedure:


DETAIL 1
1. Cut piles to top of pile elevations.
2. Insert rebar cage in Cap and Pile.
3. Erect Cap on Temporary Supports or Friction Collar to
appropriate elevations. Install Form around top of Pile and
under Cap (if necessary). Ensure the surface of Cap and
1
Pile are prepared in accordance with Specification 400-9. Aligning Beams and Piles allows Pedestals to 2" Grout Joint
4. Use high range water reducer and X" Max. aggregate size be cast monolithically with plug. Monolithically
for Class V Concrete (Spec). D D
cast Pedestals also offer protection against Two-Phase Grout Joint/Concrete
5. Remove Forms at top of Pile after concrete obtains a water intrusion through Cap/Pile interface. Plug placement consisting of
minimum strength of XXXX psi. (1) a grout bed using APL
approved non-shrink grout and Prepare all interfacing concrete
(2) a monolithic concrete pour. surfaces prior to concrete pour
Cast-In-Place as follows:
Pedestal (Typ.) 1. Sand or water blast
Class V Concrete (Spec) (6000 psi)
interfacing surfaces.

A B 2. Seal and fill void with potable


water for 4 to 5 hours.
Specify shrinkage reducing admixture
3. Remove water to a SSD
and seven day moist cure.
condition prior to pouring
concrete.
High Capacity Square
Prestressed Concrete Pile
A B Pile (Typ.)
Seal Plug

Size Cap based on equipment and


ELEVATION boom reach using site specific PILE CONNECTION DETAIL Hole diameter allows for 3"
NOTE: Reinforcing symmetrical about Pier construction access assessment. Pile placement tolerance. Pile
For over-land projects include haul placement is shown at
route assessment for cap sizing. theoretical center.
Require friction collars on piles to support cap prior to grouting. Do not use
Pile & Pier Cap
Pier Cap shims to support cap due to the small bearing area they provide and because they
tend to block the flow of grout resulting in an insufficiently grouted interface. Pile & Void

Pier Cap

Pier Cap

Beam

SECTION A-A SECTION B-B PLAN ELEVATION SECTION D-D

NOTE: Pile connection and Pedestal


PEDESTAL DETAILS SECTION C-C INFORMATION SHOWN IS FOR CONCEPT ONLY.
reinforcing not shown
(PEDESTALS LESS THAN 1'-0" IN HEIGHT) APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
PILE CAP DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 2 OF 2
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 5 - PRECAST BENT CAP
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Pier & Cap Shear Key is formed with a removable
corrugated pipe. Shear is transferred
without need for reinforcement through
C.I.P./Precast interface. Pier & Cap

Use hard pocket former with a


compressible liner (e.g. rubber) to
minimize shrinkage cracks.

Require one full-scale mock-up


of a single Pile-to-Cap Connection.

Concrete Prestressed
Pile (Type I) (Typ.)
SECTION B-B
SHEAR KEY DETAIL
Concrete Prestressed
Pile (Type I) (Typ.)
SECTION A-A

VIEW C-C
CAP/PILE INTERFACE REINFORCEMENT NOT SHOWN FOR CLARITY

Size Cap for construction equipment and boom reach


using site specific construction access assessment. Require friction collars on piles to support cap
For over-land projects, include haul route prior to grouting. Do not use shims to support cap Hole Concrete Prestressed
assessment for element sizing. due to the small bearing area they provide and Pile (Type I) (Typ.)
because they tend to block the flow of grout
resulting in an insufficiently grouted interface.

D D A
C B

Pier & Cap

C B

Concrete Prestressed
Pile (Type I) (Typ.)
VIEW D-D

STIRRUPS AND CAP/PILE INTERFACE

REINFORCEMENT NOT SHOWN FOR CLARITY

NOTE: Work this sheet with Bent Details Sheet 2 of 2.

Require Shop Drawings and Erection Plan submittal. See


Structures Detailing Manual, Chapter 25, for items to include.

A
INFORMATION SHOWN IS FOR CONCEPT ONLY.
ELEVATION APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
BENT DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 1 OF 2
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 6 - PRECAST BENT CAP
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Cap installation procedure:
Pile & Void Class VI (8500psi) 1. Cut piles to Top of Pile Elevations.
Concrete * 2. Insert rebar cage in Cap and Pile.

Size hole diameter for 3" pile 3. Erect Cap on temporary supports to appropriate elevations. Install Form around top of Pile and

placement tolerance. Use hard under Cap (if necessary). Ensure the surface of Cap and Pile are prepared in accordance with

pocket former with a Specification 400-9.

compressible (e.g. rubber) liner 4. Use two-phase pour sequence.

to mitigate shrinkage cracks. Specify shrinkage reducing Phase one - use grout and friction collar to level Cap.

admixture and seven day Phase two - place concrete in Cap and Pile.

moist cure. 5. Contractor shall vibrate concrete to reduce the potential of trapping air in concrete.
6. After concrete reaches a strength of XXXX psi, remove Form at top of Pile.
7. Place zero slump grout at all locations not fully concreted in previous operations. All concrete
Require friction collars on
surfaces shall be wetted to Saturated Surface Dry (SSD) conditions prior to grouting.
piles to support cap prior to 1
2" Grout Joint
grouting. Do not use shims to
support cap due to the small
bearing area they provide and
because they tend to block the
flow of grout resulting in an Top of Pile EL.
insufficiently grouted interface.
A A

Optional Plug Construction Joint

Surface preparation of void:


1. Sand/water blast
2. Seal void and fill with potable
Vent Hole Pile & Void
water for 4 to 5 hours.
3. Remove water to SSD
conditions.

Pile & Void


Two-Phase Grout Joint/Concrete Plug placement
consisting of a Grout Bed using (1) APL approved
non-shrink grout and (2) a monolithic concrete pour.

Require one full-scale mock-up of


a single Pile-to-Cap Connection.

SECTION A-A
Seal Plug

NOTES:
Concrete Prestressed Pile & Void
1. Work this sheet with Bent Details Sheet 1 of 2.
2. Venting of the voided piles shall be provided by the use of 1" PVC conduit & shall remain open.
Contractor shall provide a galvanized steel wire cloth with 12" x12" mesh and 0.063" diameter wires over
the vent pipes to prevent vermin and debris from entering the void.

PILE CAP CONNECTION DETAIL


(PILE HEAD CUT OFF)

INFORMATION SHOWN IS FOR CONCEPT ONLY.


* C.I.P. Plug shall utilize an approved concrete mix, which contains #XX coarse
APPLICATION IS DESIGNER'S RESPONSIBILITY.
aggregate (pea gravel) and has a minimum compressive strength of XXXX psi.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
BENT DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 2 OF 2
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 6 - PRECAST BENT CAP
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Require Shop Drawings and Erection Plan submittal. See
Structures Detailing Manual, Chapter 25, for items to include.
Survey & PGL

32" F-Shape Traffic


Railing - Index 420
(Modified) &
32" Vertical Shape Traffic
Pedestrian/Bicycle
Railing - Index 423 (Modified)
Railing w/Post "C"
Require 5-Hour presoaking Require shrinkage-reducing & Pedestrian/Bicycle Railing
Index 821
Saturated Surface Dry (SSD) admixture in concrete mix. w/Post "C" - Index 821
condition prior to topping pour.

PGP
Construction Joint Construction Joint

See Pocket Detail Prestressed Slab Beam


(PSB) (Typ.)

SUPERSTRUCTURE SECTION

Inset Bearing and include End Pour


to facilitate Expansion Joint fit-up.
Provide adequate
Hooked-Bar
development length.

Add connection reinforcing to eliminate


conflicts during Unit placement.
Traffic Railing
Reinforcement (Typ.)
FFBW
C.I.P. Composite
Topping Detail Bars to avoid conflict with adjacent
Poured Joint
C.I.P. Composite Topping
Units and for vertical placement of Unit.
with Backer Rod
Index 21110

EPS

C.I.P. Concrete Beam Seat


Expandable Foam
PSB
Bearing
and Backer Rod Prestressed Strands
Section Bearing Pad

TYPICAL SECTION
JOINT DETAIL AT BEGIN/END BRIDGE

POCKET DETAIL Space Units and provide flexibility in Bearing Design to better accommodate shrinkage of
Topping. Specify gap distance greater than combined construction plus fabrication tolerances.

INFORMATION SHOWN IS FOR CONCEPT ONLY.


APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN IN BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
SUPERSTRUCTURE DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 1 OF 1
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 7 - PRECAST SLAB UNITS WITH TOPPING
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Headed Bars

Staggered Hooks to
ELEVATION
facilitate placement

Staggered Hooks/
Headed Bars to
PLAN
facilitate placement

"U" Bar Stirrups


Shear Keys formed by
Lapped
Corrugated Metal Forms

Closure Pour tolerance dictated by Hook


Length and Hook Development Lengths

READY FOR CLOSURE

INFORMATION SHOWN IS FOR CONCEPT ONLY.


APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
CONNECTION DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 1 OF 3
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 8 - CLOSURE POUR
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
ST986KD 12/17/2014 1:39:00 PM S:\Public\SpecialProjects\StructuresManual\2015StructuresManual\2015StructuresManual\Ima
"U" Bar Stirrup
Combination of Hooked Bars and Couplers Pairs (Lapped) STEP 1 Place Precast Segments.
reduce bar congestion at closure pour.
STEP 2 Field cut Link Bar. Place Couplers with removable stops or pins on
Link Bar. Place Link Bar in position and slide Coupler to splice Link Bar to
Dowels. Quality control of Coupler positioning is required. Secure Coupler
according to Manufacturer's recommendations. See sketch below.

STEP 3 Install "U" shaped Rebar (Top and Bottom).

STEP 4 Install "U" Bar Stirrup Pairs (Lapped).

"U" Shaped Rebar


(Top and Bottom)

"U" Bar Stirrup


Pairs (Lapped)

Hooked Bars are used in conjunction


with Link Bars and Double Couplers "U" Shaped Rebar
in order to develop several planes (Top and Bottom)
of reinforcement across the closure
pour. If all bars are developed with
Hook and Headed Bars, the heads and
hook tails will conflict when elements
are lowered vertically into place.

Coupler
Connections

Link Bar

Dowels for
Coupler Connection
Tolerance of Closure
Pour determined by gap
Hooked Bars
between Hooked Bars,
Hook Bar development
length, and fit of "U"
Shaped Rebar.

INFORMATION SHOWN IS FOR CONCEPT ONLY.


CONNECTION POINT
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. READY FOR CLOSURE POUR

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
CONNECTION DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 2 OF 3
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 8 - CLOSURE POUR
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
D

D/2 D/2

Precast Element/
Closure Pour U-Shaped Rebar
C.I.P. Closure Pour
(Top and Bottom)
P. Closure Pour

Dowels from Dowels from Dowels from


A
Precast Elem ent/

Precast Element Precast Element Precast Element


2" Chamfer (Typ.)

U-Shaped Bar
Coupler (Typ.) Stirrup Pairs
(Lapped)
I.
C.

Precast

Dowels from
Precast Element

Rotate Bars
as required

A U-Shaped Rebar
Precast Element Precast Element Dowels from
(Top and Bottom)
Precast Element

Shear Keys formed by


Corrugated Metal Forms DOUBLE COUPLER SPLICE SECTION A-A

Apply Bonding Agent meeting Specification 926 (Type A)


Closure Pour to Construction Joint before Closure Pour.

(Measured along D
Precast Element) Dimension "D" determined Precast Element/
D/2 D/2 by Hook Splice length. C.I.P. Closure Pour

2" Chamfer (Typ.) Bars from Precast


B
P. Closure Pour
Precast Elem ent/

Dowels from Dowels from Stagger Hooks to


Precast Element Precast Element facilitate placement
Arch Rib
I.
C.

Bars from Precast

B
Provide additional Confinement
Steel for Non-Contact Lap Splice. SECTION B-B
INFORMATION SHOWN IS FOR CONCEPT ONLY.
OVERLAP SPLICE
APPLICATION IS DESIGNER'S RESPONSIBILITY.
NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT.

DRAWN BY: SHEET TITLE:


REVISIONS REF. DWG. NO.
STRUCTURES DESIGN OFFICE STATE OF FLORIDA
DATE BY DESCRIPTION DATE BY DESCRIPTION
CONNECTION DETAILS
CHECKED BY: DEPARTMENT OF TRANSPORTATION
SHEET 3 OF 3
CENTRAL OFFICE FINANCIAL PROJECT ID
ROAD NO. COUNTY
DESIGNED BY: PROJECT NAME:
SHEET NO.
605 Suwannee Street, MS 33
EXAMPLE 8 - CLOSURE POUR
CHECKED BY:
Tallahassee, Florida 32399-0450 PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS

Das könnte Ihnen auch gefallen