Question Text:
A dragline is specified by
Options:
(1) Bucket capacity only
(2) Boom length only
(3) Bucket capacity and Boom length
(4) Power of the machine
(5) Supplying voltage
Options:
(1) Gravitational
(2) Frictional
(3) Torsional
(4) Centripetal
(5) Centrifugal
Options:
(1) Cable belt conveyor
(2) High angle conveyor
(3) Chain conveyor
(4) Shaker conveyor
(5) None of the Options
Options:
(1) Design of the casing
(2) Design of the impeller
(3) Speed of the impeller
(4) Power of the pump
(5) Size of the delivery pipe
Options:
(1) Ohm
(2) Kilo ohm
SMC-Mining Machinary
(3) Mega ohm
(4) Giga ohm
(5) None of the Options
Options:
(1) 2 Core
(2) 3 Core
(3) 4 Core
(4) 5 Core
(5) None of the Options
Options:
(1) 1 in 8
(2) 1 in 10
(3) 1 in 12
(4) 1 in 14
(5) 1 in 16
Options:
(1) Oxygen
(2) Helium
(3) Nitrogen
(4) Hydrogen
(5) None of the Options
Options:
(1) HNO3
(2) H2SO4
(3) HCl
(4) H3PO4
(5) H2CO
Options:
(1) Endless haulage
(2) Main & tail rope haulage
(3) Tail rope haulage
(4) Belt Conveyor
(5) Chain Conveyor
Options:
(1) Automatic Catch
(2) Backstay
(3) Buffer
(4) Stoplock
(5) Backsprag
Options:
(1) Joining of two wire rope
(2) Cutting of wire rope
(3) Cleaning of rope
(4) Checking of rope
(5) None of the Options
Options:
(1) Load Haul Dump
(2) Low Haul Dumper
(3) Load Haul Dumper
(4) Low Haul Dump
(5) None of the Options
Options:
(1) At least equal to 25% of the conductivity of the smallest conductor enclosed therein
(2) At least equal to 25% of the conductivity of the largest conductor enclosed therein
(3) At least equal to 50% of the conductivity of the smallest conductor enclosed therein
(4) At least equal to 50% of the conductivity of the largest conductor enclosed therein
(5) None of the Options
SMC-Mining Machinary
Options:
(1) 25%
(2) 30%
(3) 35%
(4) 40%
(5) 50%
Options:
(1) 200 m
(2) 400 m
(3) 600 m
(4) 800 m
(5) 1000 m
Options:
(1) Schedule VI
(2) Schedule IX
(3) Schedule XI
(4) Schedule XIII
(5) Schedule XV
Options:
(1) 12V
(2) 18V
(3) 24V
(4) 30V
(5) 36V
Options:
(1) Off load switch
(2) On load switch
(3) No load switch
(4) Off load and On load switch
(5) Off load and No load switch
Options:
(1) Tail rope haulage
(2) Direct rope haulage
(3) Endless rope haulage
(4) Main & Tail rope haulage
(5) None of the Options
Options:
(1) 60 - 100m
(2) 100 - 150 m
(3) 150 - 180 m
(4) 200 m
(5) for all depths
Options:
(1) 25 cm
(2) 50 cm
(3) 75 cm
(4) 1.0 m
(5) 1.5 m
Options:
(1) for measuring rope lay
(2) for measuring wire diameter
SMC-Mining Machinary
(3) to sound for loose outer wire
(4) to facilitate study of cracks, fractures and pits in wires
(5) to scrap off corrosion products
Options:
(1) Haulage Drum
(2) Slip Ring Motor
(3) Squirrel Cage Induction Motor
(4) Synchornous Motor
(5) Conveyor Drum
Options:
(1) Lighting Arrestor
(2) Oxy-Acetylene Welding
(3) Oxy-Acetylene Cutting
(4) Electric Welding
(5) Thermit Welding
Options:
(1) Moving the machine left or right
(2) Moving the machine forward or backward
(3) Lifting & tilting of the bucket
(4) Moving the machine left or right and Lifting & tilting of the bucket
(5) Moving the machine left or right and Moving the machine forward or backward
Options:
(1) Nut & bolt clip
(2) Wedge clip
(3) Screw clip
(4) Cam clip
(5) Small man clip
Options:
(1) 2.0 lux (horizontal)
(2) 10.0 lux (horizontal)
(3) 10.0 lux (Vertical)
(4) 5.0 lux (Vertical)
(5) 5.0 lux (horizontal)
Options:
(1) 2, 30
(2) 2, 40
(3) 3, 30
(4) 3, 40
(5) 3,50
Options:
(1) Mechanical Steering lock
(2) Blind Spot Mirrors
(3) Rear View Mirrors
(4) Proximity Sending device
(5) Maximum speed of vehicle to be restricted to 20 km/hr
Options:
(1) No function cut off switch
(2) Swing motor brake
(3) Fire resistant hydraulic hoses
(4) Turbo charger guard
(5) Seat belt
Options:
(1) Bucket Wheel Excavator
(2) Shovel
SMC-Mining Machinary
(3) Drag line
(4) Scraper
(5) Pay loader
Options:
(1) force of power
(2) bucket size
(3) working mechanism
(4) force of power and bucket size
(5) All the Options
Options:
(1) Boom stick
(2) Dipper stick
(3) Saddle stick
(4) All the Options
(5) None of the Options
Options:
(1) Percussive
(2) Rotary
(3) Rotary-percussive
(4) DTH
(5) All the Options
Options:
(1) Helical Cross-section
(2) Square Cross-section
(3) Pentagonal Cross-section
(4) Hexagonal Cross-section
(5) None of the Options
Options:
(1) 2 - 5 kg
(2) 5 - 10 kg
(3) 15 - 25 kg
(4) 30 - 45 kg
(5) > 50 kg
Options:
(1) 60
(2) 90
(3) 120
(4) 150
(5) None of the Options
Options:
(1) Slow forward & quick backward stroke
(2) Quick forward & Slow backward stroke
(3) Equal forward and backward stroke
(4) Quick forward & Quick backward stroke
(5) None of the Options
Options:
(1) Driving wheel
(2) Donga or Pan
(3) Sprocket
(4) Drum
(5) None of the Options
Options:
(1) Battery loco
(2) Diesel loco
(3) Troley wire loco
(4) Compressed air loco
SMC-Mining Machinary
(5) All the Options
Options:
(1) 100 tpd
(2) 500 tpd
(3) 700 tpd
(4) 1500 tpd
(5) 5000 tpd
Options:
(1) Rope haulage
(2) Winding
(3) Belt Conveyor
(4) Aerial ropeway
(5) Train of tubs
Options:
(1) Centrifugal pump
(2) Axial flow pump
(3) Mixed flow pump
(4) Reciprocating pump
(5) None of the Options
Options:
(1) 1-3 kmph
(2) 3-5 kmph
(3) 5-8 kmph
(4) 8-11 kmph
(5) < 1 kmph
Options:
SMC-Mining Machinary
(1) Diameter of the impellar
(2) Ratio of inlet and outlet value of diameter
(3) Power of motor
(4) None of the Options
(5) All the Options
Options:
(1) 0.1
(2) 0.16
(3) 0.25
(4) 0.3
(5) 0.4
Options:
(1) smooth wearing surface
(2) smaller wearing surface
(3) often greater resistance to corrosion
(4) not easy for water to enter the inter stices between wires
(5) higher breaking load
Options:
(1) 1.2 times the maximum static torque
(2) 2 times the maximum static torque
(3) 3 times the maximum static torque
(4) should be equal to the static torque
(5) should be less than the static torque
Options:
(1) Cut out Switch
(2) Gate End Box
(3) Starter
(4) Transformer
(5) Circuit Breaker
SMC-Mining Machinary
Options:
(1) 6
(2) 9
(3) 16
(4) 6 or 9
(5) 9 or 16
Options:
(1) Tractive effort- provided is more
(2) Negotiates high gradients
(3) Ground pressure exerted is less
(4) Machine stability is more
(5) None of the Options
Options:
(1) Rear end dumper
(2) Side dump load on back truck
(3) Bottom dump dumper
(4) Rear end dumper and Side dump load on back truck
(5) All the Options
Options:
(1) 25 KW (approx)
(2) 34 KW (approx)
(3) 30 KW (approx)
(4) 45 KW (approx)
(5) None of the Options
Options:
(1) Bulldozer
(2) Tilt dozger
(3) Push dozer
(4) U-shaped dozer
(5) None of the Options
Options:
(1) Bulldozing
(2) Side casting
(3) Leveling
(4) Road making
(5) All the Options
Options:
(1) Hinge type
(2) Parallelogram type
(3) Impact type
(4) Tractor type
(5) All the Options
Options:
(1) Wear
(2) Corrosion
(3) Fatigue
(4) Deformation
(5) None of the Options
Options:
(1) Power absorbing machine
(2) Power developing machine
(3) Energy transfer machine
(4) Energy generating machine
(5) None of the Options
SMC-Mining Machinary
Options:
(1) Excessive stress are set up in the wires of ropes close to capel
(2) Tensile stress are set up in the rope due to acceleration and retardation
(3) Tortional stress are set up in the rope due to acceleration and retardation
(4) All the Options