Beruflich Dokumente
Kultur Dokumente
GENERAL INFORMATION:
Client : Anonymous company ATTN : Mr. xx
Supplier/Vendor : Anonymous supplier Order Quantity : 1156 Cartons/ 128920 Rolls
Actual Loading
Factory Name : Anonymous factory : 1156 Cartons/ 128920 Rolls
Quantity
Service
: Full Container Bulk Cargo Ship to : BRAZIL
Performed
Weather
Sunny Cloudy Raining Ship Name PIL
condition
45x40 TRANS, 45x40 MARRON,
45x45 TRANS, 45x45 MARRON,
45x100 TRANS, 45x100 MARRON,
Item/ Style No. : Inspection Date : Apr 10, 2014
45x300 TRANS, 70x100 TRANS,
25x100 TRANS, 18x50 TRANS,
12x40 TRANS
Product
: Adhesive tape Ins. Location : Dongguan, Guangdong, China
Description
Inspector Name : Vincent Li Reviewed by : Lena. Wu
A. CONCLUSION:
Passed The loading was regarded as successfully completed on the spot.
The loading was completed, but the procedure of the loading was not regarded as smooth due to
Pending
the points raised under remarks.
Failed The loading was not completed due to the points raised under remarks.
XX
Report Approval by _________________________________
XXXX - Inspection Manager of CCIC
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 2 of 13
C. CONTAINER INFORMATION:
Container Number Container Type Sealed No. of Shipping Co. Sealed No. of CCIC Loaded QTY
D. LOADING DETAILS:
Product
Container Number PO No. Art No. Order Qty Loaded Qty
description
45x40 TRANS 280 boxes 280 boxes
45x40 MARRON 120 boxes 120 boxes
45x45 TRANS 100 boxes 100 boxes
45x45 MARRON 50 boxes 50 boxes
45x100 TRANS 250 boxes 250 boxes
Adhesive tape N/A
PCIU4482831 45x100 MARRON 200 boxes 200 boxes
45x300 TRANS 30 boxes 30 boxes
70x100 TRANS 30 boxes 30 boxes
25x100 TRANS 36 boxes 36 boxes
18x50 TRANS 30 boxes 30 boxes
12x40 TRANS 30 boxes 30 boxes
Total: 1156 boxes 1156 boxes
E. WITNESS ON SITE:
RESULT SUMMARY
INSPECTION CRITERIA
Passed Failed N/A Comment
Condition of Container
Condition of Goods
Condition of Packaging
22 cartons were checked and
Quantity Check
result was satisfactory
Wooden Pallet Check
F. PHOTOGRAPHS
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 3 of 13
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 4 of 13
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 5 of 13
13. The folder of tape 14. Shipping mark for 45x45 MARRON
17. The folder of tape 18. Shipping mark for 12x40 TRANS
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 6 of 13
21. The folder of tape 22. Shipping mark for 45x40 MARRON
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 7 of 13
25. The folder of tape 26. Shipping mark for 25x100 TRANS
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 8 of 13
33. The folder of tape 34. Shipping mark for 70x100 TRANS
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 9 of 13
37. The folder of tape 38. Shipping mark for 45x300 TRANS
41. The folder of tape 42. Shipping mark for 45x40 TRANS
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 10 of 13
47. Container outside condition check 48. Container inside condition check
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 11 of 13
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 12 of 13
END
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.
CHINA CERTIFICATION & INSPECTIONGROUPSHENZHEN CO., LTD.
SAMPLE LOADING Report No. CPS014BP0020 Overall Result
SUPERVISION Report Date: Apr. 11, 2014
PENGDING
REPORT Page 13 of 13
Note: The above reflects our findings at the time and place of inspection based on comparison of your sample with random
samples selected in accordance with a previously agreed random statistical sampling standard. This report/certificate does
not discharge or release sellers/suppliers from their commercial, legal or contractual obligations with regard to
quality/quantity of delivery nor does it prejudice the buyer's right of claim toward sellers/suppliers for compensation for a ny
apparent and/or hidden defects not detected during our random inspection or occurring thereafter. For inspection services
rendered before 100% of a production lot has been produced, our findings will only extend to the items that were produced
at the time of inspection. This report/certificate is not the evidence of shipment. Our services, including reports and
certificates, are subject to the General Conditions of Service of CCIC Shenzhen which have been sent to your company.
They can be re-sent upon written request.
Copyright of CCIC 2011-do not disclose this document outside your organization without CCIC prior written consent. Welcome to
visit us: www.ccic.com or email to: schedule@sz.ccic.com for detail.