Instructions For Performance Improvement.

1. Do not use DT laptop for personal use like


watching online movies and plying online
games cause this way your laptop get
infected as which occupies
Unnecessary RAM space (Slow down system
processing) also affect your installed
software like TEMS/Actix etc.
2. Connect DT KIT once before leaving for any
activity so that you can confirm that you KIT
is working properly to avoid unnecessary
time wasting on field.
3. The time when you reached to the place of
activity you are required to inform the
concerned optimizer and the DT coordinator
if you were requested to.
4. Now you are going to start your activity be
careful about your equipment is not hanged
or stuck.
5. Before initiate the CALL start the RECORDING
first so that you can record the call attempt
& end the CALL before ending the
RECORDING so that the call-end
Is recorded.
6. Being a DT man you are supposed to
throughout monitor your Certain things to
avoid different issue arises from your side i.e.
Make sure that your mobile phones are
working proper and are connected.
Carefully monitor Radio parameter/Serving
Cell/Serving Neighbor window for CS
connectivity.
Carefully monitor HSDPA analysis window for
3G throughput test.
Carefully monitor your equipment and make
sure they are connected.
Keep your mobiles phone on the dash board
of Car to so that you can receive good
coverage.
Be careful about the pre/post DT cause
normally we need good results in post.
Do not dragged the calls from one Cell , when
understand that you have entered in another
Cells vicinity but still served from the
previous cell you can end the call or slow
your speed
To save the call from getting dropped.
Try to not bring many call drops especially in
the customer complaint where you drive two
streets but bring 5 drops.
Pre DT in clusters are always better than post
.
If you observed many bad events in one
place you better to inform the coordinator.
Try to follow the same route/same
equipment/same DT guy to have the better
results.
In customer complaints you are required to
monitor the serving
Cell/Coverage/Overshooting etc.

For 2G Reference::
In the above snap all the necessary parameters are mentioned and should be monitored.

For 3G Reference::

In the above snap all the necessary parameters are mentioned and should be monitored for
3G.
For 4G Reference::

In the above snap all the necessary parameters are mentioned and should be monitored for
4G.

For cluster/Highway drives we have provide you necessary training on actix but still for the
reference a guide line is given below.
Please note that this is after when you successfully finished you test not you want to check for
miss route or bad patches in the following steps.
Step:1

Step:2
Now your logfiles are loaded the next step is to super stream them means to merge all the
logfiles to gather MS wise please see the snaps below.

Click on the data click on Create then see the next picture.
Write the MS name in the mentioned areas then Click Matching.
Now your super stream is ready you can get the required parameters like below.
Click on the super stream Click on the specified technology e.g 3G Click on the Downlink
measurements then select the required parameter like SC, RSCP, EcNo etc.