Ok /not ok required At K-101 p/f near T-106 stairs cover broken N ok yes E-123 at CWR side near KS strainer PA system jb 0k yes Near PSV-1 under K-101 p/f 0k yes 02 jbs above PRC-6T 0k yes Near E-122 CWR side 0k yes Under V-101 p/f 0k yes At over head crane 0k yes At V-101 stairs 0k yes Near SD-53,54 pit electrical cable redundant portion removal req yes Main electrical jb power supply coming from 03area infront of v-104 0k yes Near fire alarm at K-101 p/f 0k yes BULAB 9067 pumps common jb 0k yes
Above MP-117 cable joint
02 tube lights fused above E-122 02 tube lights fused at KS block valve p/f 02 tube lights under over head crane 01 tube lights fused near FRC 15 01 tube light fused near LPSA 105 Instruments JBs at TK-101 NAME of JB and location Status Sealing req ok/not ok yes/no 01-S-7 near E-120 CWR side main cable dressing req Ok No 01-A-3 near V-111 Ok No 01-E-2 near V-111 Ok No 01-T-1 near K-101 sample point 3rd suction Ok No 01-A-2 near V-112 Ok No 01-SO-4 near PT-3A Ok Yes 01-SO-23 near O2 analyzer Ok Yes 01-S-22 near K-101 stairs Ok Yes 01-E-22 near K-101 stairs Ok Yes 01-E-17 near LPSA 105 Ok No 01-V-7A near PSV 1 Ok No 01-V-6A near ejectors header Ok No 01-V-5A near ejectors header Ok No 01-T-16 near PSV 152 Ok No 01-V-1B near barring motor Ok No 01-V-2B near LPSA 5 A/B/C Ok No 01-V-5B near Gear Box Ok no 01-V-6B and 01-V-7B near 2BCL ok yes Muhammad Shafqat Abbas