Table of Contents
Document Number Rev. Document Title Page
Number
A307-0IF-VV-MR- A ENQUIRY DOCUMENT 3
6210-1189-RFQ
A307-0IF-VV-MR- A PRESSURE VESSEL - CS (26- 50 mm) 131
6210
A307-16-46-LL-6210 A LIST OF ATTACHMENTS 134
A307-16-46-TR-6210 A INSTRUCTIONS TO VENDOR/ TECHNICAL REQUIREMENTS 138
A307-16-46-SS-6210 A SCOPE OF WORK AND SUPPLY 147
A307-16-46-UR-6210 A UNIT RATES FOR ADDITION AND DELETIONS 152
A307-0IF-16-46- A VDR FOR VDR COMPILATION 157
VDR-6210
A307-0IF-16-46-DS- D PP MIX DRYERS (IFP-V-101 A/B) 161
3901
A307-0IF-16-46-DS- D PP MIX DRYERS (IFP-V-101 A/B) 162
390102
A307-0IF-16-46-DS- D ARSINE REMOVAL BED (IFP-V-107) 163
3907
A307-0IF-16-46-DS- D ARSINE REMOVAL BED (IFP-V-107) 164
390702
146609-DSH-T-IFP- 1 PP MIX DRYERS 165
V-101
146609-DSH-T-IFP- 1 ARSINE REMOVAL BED 179
V-107
A307-00H-16-46-DS- A MDS of R-V-104 195
3006
A307-00H-16-46-DS- A MDS OF R-V-151 197
3008
A307-00H-16-46-DS- A MDS OF H-V-151 199
3014
6-12-0001 5 General specification for pressure vessels. 201
6-12-0002 7 Supplementary specification for carbon steel vessels. 214
6-12-0011 7 Standard specification for boiler quality carbon steel plates. 221
6-12-0014 5 Standard specification for weldable structural quality steel plates 228
for tanks and vessels
6-12-0020 7 Standard specification for stainless steel plates. 232
A307-000-06-42- 1 JOB SPECIFICATIONS FOR SHOP AND FIELD 237
PLS-01 PAINTING/COATING AND LINING
6-14-0009 3 Packing, marking & shipping specs. for tray and tower internals. 285
6-81-0001 2 Standard specification for Positive Material Identification (PMI) at 291
Supplier's Works
6-81-0011 3 ITP for pressure vessels / columns carbon steel. 299
6-81-0060 2 ITP for wire mesh demisters. 306
6-78-0001 0 Specification for Quality Mgt. System Requirements from Bidders 311
6-78-0003 0 Specification for Documentation Requirement from Suppliers 320
7-12-0001 5 Vessel tolerances. 332
7-12-0002 5 Support for horizontal vessel. 334
7-12-0004 6 Skirt base details. 335
7-12-0005 5 Skirt opening details. 336
7-12-0010 6 Manhole with davit. 338
7-12-0011 5 Ladder rungs for manhole/demister. 340
7-12-0013 6 Nozzle reinforcement and projection. 341
7-12-0015 5 Standard bolt hole orientation. 343
7-12-0023 6 Pipe davit. 344
7-12-0024 7 Lifting lug top head type (for vertical vessels / columns). 347
7-12-0025 5 Fire proofing & insulation supports. 348
Page 1 of 395
Table of Contents
Document Number Rev. Document Title Page
Number
7-12-0026 5 Earthing lug. 350
7-12-0027 5 Name plate. 351
7-12-0028 5 Manufacturer name plate. 352
7-12-0029 5 Bracket for name plate. 353
7-12-0032 4 Supports for internal feed pipe. 354
3-35-3 0 STANDARD SPECIFICATION MIST ELIMINATORS 356
3-11-8 0 STANDARD SPECIFICATION PRESSURE VESSELS CARBON 359
STEEL
3-190-10 0 STANDARD DRAWING Tee Distributor For Horizontal And 390
Vertical Vessels
3-183-5 0 STANDARD DRAWING Pipe Distributors For Horizontal Vessels 391
3-122-6 0 STANDARD DRAWING Vortex Breakers 392
3-264-6 0 STANDARD DRAWING Mesh Blanket Support (Vapor Service) 393
3-123-6 0 STANDARD DRAWING RAISED VORTEX BREAKERS 394
3-115-7 0 STANDARD DRAWING Baffles 395
Page 2 of 395
EI Bhawan Annexe, Bhikaiji Cama Place, RK Puram, New Delhi 110 066, INDIA
Phone No : 0091-11-26762121, 26101419 ; Fax No : 0091-11-26191714, 26167664
REQUEST FOR QUOTATION (RFQ)
RFQ No. : SM/ A307-IF-VV-MR-6210/1189 Date: 15-OCT-2013
Gentlemen,
Bids are requested on behalf of our Client M/s Bharat Petroleum Corporation Limited on e-procurement
system for the subject item in total compliance to technical specifications, scope, terms & conditions of enquiry
documents / attachments.
1. Bidder should submit their bids strictly as per the requirements outlined hereunder and as specified in
the material requisition.
2. Bidder can download the RFQ Documents from EILs website http://tenders.eil.co.in/
http://www.tenderwizard.com/eil.
3. Bids are required to be submitted through EILs Authorized Service Providers (ASP) Electronic System /
Portal at www.tenderwizard.com/eil only, on or before the bid submission date and time. Bidders are
required to register themselves at www.tenderwizard.com/eil . No registration fee would be charged from
the bidders.
Bidders to refer attached Instructions to Bidders for E-Tendering.
4. Bidders in their own interest are requested to register on e- tendering portal and upload/submit their bid
well in time. Bidders should avoid the last hour rush to the website for registration of user ID &
Password, enabling of user ID and mapping of digital signature serial number etc. since this exercise
require activities from EIL & M/s Anatares System (Service Provider) and needs time. In the event of
failure in bidders connectivity with EIL/Service Provider during the last few hours, bidder is likely to miss
the deadline for bid submission.
Due date extension request due to above reason may not be entertained.
5. Bidder to ensure that they are able to download the bid documents / price schedule on e-tendering
website atleast two days before Bid Due Date (BDD).
6. Bidders are required to upload the complete bid comprising of Part-I:- Unpriced Bid along with all
supporting documents & Part-II :- Priced Bid on the e-tendering website (www.tenderwizard.com/eil)
only.- Refer General Instruction provided in SIB .
7. Technical specification should be strictly as per the Material Requisition attached. It may be noted that
Page 1 of 6
Page 3 of 395
the Bid shall be evaluated as received and technical queries may not be issued.
8. Commercial requirements are specified in the Special Instructions to Bidders, General Purchase
Conditions, Agreed Terms & Conditions (ATC) questionnaire and all other RFQ documents. The pre-
filled Agreed Terms & Conditions Questionnaire should be returned duly signed and stamped along with
copy of your un-priced bid.
10. If not bidding, please inform vide E-mail with attached regret letter within the due date & time, with
reasons(s) of not participating in the RFQ. In case there is no response, names of such bidder may
not be considered for issuance of future enquiries.
11. Direct bids only, without the intermediary of an Indian Agent will be considered from Foreign Bidder.
14. The offer should be valid for 4 (Four) months from final bid due date.
16. The bidder shall bear all costs associated with the preparation and submission of its bid, and the
Purchaser/Consultant shall in no case be responsible or liable for these costs regardless of the conduct
or outcome of the bidding process.
17. Canvassing in any form by the Bidder or by any other agency on their behalf may lead to
disqualification of their bid.
18. The E-bids received online shall be opened at EIL office on due date and time as specified above.
Bidder can view online the name of the other bidders who have submitted their e-bids after opening is
performed by EIL.
19. All technically and commercially acceptable bidders will be advised of venue, date and time of priced bid
opening. Bids shall be opened online, hence bidders may review opening status at their offices/ places.
Interested bidder may sent their representatives (duly authorised by a competent person and having the
Letter of Authority as per proforma enclosed), of such technically and commercially acceptable bidders.
Time and Date of opening of Price Bids shall be notified to the qualified and acceptable bidders at a
later date.
20. As Purchaser intends to contract directly with suppliers of the goods for which bids are invited, the bids
should be prepared by the suppliers and submitted directly. Purchaser reserves the right to reject offers
made by intermediaries.
21. Addendum / corrigendum to the RFQ documents if issued must be signed and submitted along with the
Page 2 of 6
Page 4 of 395
bid.
22. Bidders to note that price changes against Technical / commercial clarifications, in line with terms &
conditions of enquiry documents are not allowed. In case any bidder gives revised prices / price
implications against such clarifications, their bid shall be liable for rejection.
23. EIL reserves the right to use in-house information for assessment of bidders capability for consideration
of bid.
24. In case any bidder is found to be involved in cartel formation, his bid will not be considered for
evaluation/ placement of order. Such bidder will also be debarred from bidding in future.
25. The bidder who is providing the technology from the company which is recently acquired / taken over by
them or purchasing the technology by other companies, shall be provide proper documentary evidence.
In the absence of the same their offer shall be liable for rejection.
26. Bidders are requested to quote as per their capability as registered in EIL, as on the date of issue of
RFQ.
28. Owner reserves its right to allow Public Sector Enterprises (Central/State), Micro & Small Enterprises
(MSEs) and MSEs owned by Scheduled Caste (SC)/ Scheduled tribe (ST) entrepreneurs, purchase
preference as admissible/applicable from time to time under the existing Govt. policy. Bidder to submit
documentary evidence for the same duly certified by Statutory Auditor of the bidder or a practicing
Charted Account (not being an employee or a Director or not having any interest in the Bidders
company / firm) where audited accounts are not mandatory as per law.). In this regard, item wise
quantity may be splitted and the quoted price shall remain valid (For details refer Annexure-I enclosed).
29. The Net Worth of the bidder should be positive as per the immediate preceding year's audited financial
results. However, Central Public Sector Enterprises (CPSEs) are exempted from this requirement. If the
bidder is not meeting the above criteria their bid shall not be evaluated further. Bidders are therefore
requested to furnish the Audited Financial Statement for the immediate preceding year including Profit &
Loss Account.
ii) No technical details of any nature shall be included in the offer and if the offer contains any technical
deviations or clarifications or stipulates any technical specifications, the offer shall be liable for
rejection.
iii) The submission of prices by vendor shall be construed to mean that the vendor has confirmed
compliance with all technical specifications of the correspondence item.
31. Purchaser reserve the right to make any changes in the terms and conditions of purchase and to reject
any or all the bids.
Page 3 of 6
Page 5 of 395
32. Contact Persons for this RFQ are:
Mr Subhendu Mondal, AGM(C&P), Phone No. +91-(0)11-2676-3883 & email: subhendu.mondal@eil.co.in
Ms. Chandreyee M Das, Engineer (C&P), Phone No. +91-(0)11-2676-3881 & email: chandreyee@eil.co.in
(SUBHENDU MONDAL)
ASST. GEN. MANAGER(C&P)
ENGINEERS INDIA LIMITED
Enclosure: As per List Attached
LIST OF ENCLOSURES
DOCUMENT
A) Request For Quotation (RFQ)
B) Reply / Acknowledgement letter
C) Proforma of Letter of Authority for Attending Un-priced / Priced Bid Opening
D) Commercial document:
i) Agreed Terms & Conditions (For Indian Bidders)
ii) Agreed Terms & Conditions (For Foreign Bidders)
iii) Special Instruction to Bidders (SIB)
iv) General Purchase Conditions (Indian)
v) General Purchase Conditions (Imported)
vi) Price Schedule Format (For Indian Bidders)
vii) Price Schedule Format (For Foreign Bidders)
viii) Special Packaging Requirements (For Foreign Bidders)
ix) Tax Residency Certificate
x) Instruction to Bidders for e-tendering.
xi) Browser Settings
xii) Vendor Help Manual
xiii) Integrity Pact
xiv) Advance Bank Guarantee Format
E) Technical document : A307-IF-VV-MR-6210
Page 4 of 6
Page 6 of 395
Proforma of Letter of Authority
for Attending Unpriced / Priced Bid Opening
No. Date:
Dear Sir,
We confirm that we shall be bound by all and whatsoever our representative(s) shall commit.
Yours faithfully,
Signature _________________________
Name & Designation ________________
For & on behalf of __________________
Note:
This Letter of Authority should be on the letterhead of the bidder and should be signed by a
person competent and having the Power of Attorney to bind the bidder.
Page 5 of 6
Page 7 of 395
ANNEXURE-I
i) In Tender, participating Micro and Small Enterprises quoting price within price band of L1+15%
shall also be allowed to supply a portion of requirement by bringing down their prices to L1 price
in a situation where L1 price is from someone other than a micro and small enterprises and such
micro and small enterprises shall be allowed to supply upto 20% of the total tendered value. In
case of more than one such Micro and Small Enterprises, the supply shall be shared
proportionately (to tendered quantity). Further, out of above 20%, 4% (20% of 20%) shall be
from MSEs owned by SC/ST entrepreneurs. This quota is to be transferred to other MSEs in case
of non-availability of MSEs owned by SC/ST entrepreneurs.
ii) The quoted prices against various items shall remain valid in case of splitting of quantities of the
items as above.
iii) In case bidder is a micro or Small Enterprise under the Micro, Small and Medium Enterprises
Development Act, 2006, the bidder shall submit the following:
a) Documentary evidence that the bidder is a Micro or Small Enterprises registered with
District Industries Centers or Khadi and Village Industries Commission or Khadi and
Village Industries Board or Coir Board or National Small Industries Corporation or
Directorate of Handicrafts and Handloom or any other body specified by Ministry of
Micro, Small and Medium Enterprises.
b) If the MSE is owned by SC/ST Entrepreneurs, the bidder shall furnish appropriate
documentary evidence in this regard.
c) The above documents submitted by the bidder shall be duly certified by the
Statutory Auditor of the bidder or a practicing Chartered Accountant (not
being an employee or a Director or not having any interest in the bidders
company/ firm) where audited accounts are not mandatory as per law.
If the bidder does not provide the above confirmation or appropriate document or any evidence, then it
will be presumed that they do not qualify for any preference admissible in the Public Procurement Policy
(PPP), 2012.
Note :- The provisions for micro & small enterprises under PPP, 2012 mentioned above shall only
be applicable for such items for which evaluation shall be done on item wise basis and
the same shall not be applicable for items for which group wise / block wise (more than
one tag/ item) evaluation is to be done.
Page 6 of 6
Page 8 of 395
A307_ATC (I) Page 1 of 8
2. DULY SIGNED & STAMPED COPIES OF THIS QUESTIONNAIRE, WITH ALL THE
CLAUSES DULY CONFIRMED/ PRECISELY REPLIED TO BY THE SUPPLIER, SHALL BE
ENCLOSED.
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
1. Price Basis:
i) Quoted supply prices are on FOT - Despatch Point basis Confirmed
inclusive of Packing & Forwarding.
ii) Specify Despatch Point
-----------------------
iii) Freight Charges:
a) Confirmed , Quoted in Price
a) Confirm firm transportation charges inclusive of Service Tax Schedule
and Ed Cess, upto project site, has been quoted separately
by you in Price Schedule.
b) Confirmed
b) No Variation on any account (including Statutory Variation) on
Service Tax on Transportation Charges shall be paid by the
owner.
iv) Insurance:
Page 9 of 395
A307_ATC (I) Page 2 of 8
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
b. Present Rate of Excise Duty & Edu. Cess payable extra on ..%
finished goods (including Spares)
c. Any variations in Excise Duty & Edu. Cess at the time of Confirmed
supplies for any reasons including variation due to Turnover
shall be borne by the Seller. Only Statutory Variations within
the Contractual Delivery / completion period shall be borne by
Purchaser.
d. If Excise Duty & Edu. Cess is not applicable at present due to Confirmed
any reason, the same shall be borne by Seller if it becomes
applicable later.
e. Confirm Excise Duty & Edu. Cess will not be applicable on Confirmed
transportation charges.
Page 10 of 395
A307_ATC (I) Page 3 of 8
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
7. Site Work:
For Site Work, if in the scope of the Bidder as per MR, please
confirm the following:
Confirm that quoted site work prices are exclusive of Service
a. Tax & Edu. Cess but inclusive of VAT on Works Contract and Confirmed
all other applicable taxes & duties.
b. Percentage of Service Tax & Edu. Cess as applicable extra -------------------%
on Site Work.
c. Supplier shall submit the Assessment/ Liability
Certificate from Sales Tax authorities indicating the VAT
on Works Contract payable for enabling Owner to
deduct the same from Supplier Invoices & make Confirmed
payment to the tax authorities. TDS Certificate towards
VAT on Works Contract shall be provided by Owner.
Statutory variation on VAT on Works Contract shall not
be payable by Owner.
d. Statutory Variation on Service Tax & Edu. Cess on Site work
shall be paid by the Owner against documentary evidence
Confirmed
within Contractual completion period.
Page 11 of 395
A307_ATC (I) Page 4 of 8
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
a. Charges for Supervision / Training, if in the scope of the Confirmed, Quoted in Price
Bidder as per MR have been indicated by bidder separately in Schedule
the Price Schedule.
e. Bidders shall also provide additional BG of an amount equal Noted & Confirmed
to the per diem charges for the number of days considered for
evaluation, over and above 10% PBG to cover compensation
for delay in mobilizing the erection/ commissioning personnel.
This BG will be released to the bidder upon the erection/
commissioning personnel reporting at site. This BG shall be
furnished along with payment milestone for submission of
final documentation as per MR and shall be initially valid up to
six months which shall be extended based on the request by
Owner.
Page 12 of 395
A307_ATC (I) Page 5 of 8
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
13.1 PART ORDER:
a. Confirm acceptance of Part Order clause as per GPC Confirmed (If Applicable as per MR)
(Indigenous). And bidder also confirm acceptance to part
quantity orders of any items (having quantities 5 Nos. & more)
to facilitate purchase preference to MSME bidders as per
Govt. guide lines.
13.2 MSME BIDDERS:
YES/ NO
a Confirm whether the bidder is a MSME bidder or not. (Please tick whichever is applicable)
b In case bidder is a MSME bidder, they must submit
documentary evidence for the same duly certified by
Statutory Auditor of the bidder or a practicing Charted
_________________
Account (not being an employee or a Director or not
having any interest in the Bidders company/ firm) where
audited accounts are not mandatory as per law.
c In case bidder does not submit duly authenticated
documentary evidence as required above, bidder shall Confirmed
not be considered eligible for availing MSME benefits.
d Any charges quoted extra as lumpsum (like IBR,
Testing, freight, etc.) shall be applicable prorata on
Confirmed
value basis in the event of part order / part quantities/
split order.
14. Repeat Order:
Confirm Acceptance of Repeat Order clause as per RFQ Confirmed
Covering Letter / SIB / GPC.
Page 13 of 395
A307_ATC (I) Page 6 of 8
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
Confirmed
iii) Inclusive of all statutory certification charges PESO/CCOE
etc. (if applicable) as required in the Material Requisition
Confirmed
c. Is your shop approved by IBR/CCE authority, if yes, indicate
validity.
i. IBR IBR Approved
ii. CCE
It is the responsibility of supplier to get the entire imported
materials and the built in imported contents inspected by TPIA Confirmed
(i.e. Lloyds/BV/DNV/TUV/CEIL) in the country of origin and
the quoted prices are inclusive of charges towards the same.
19. Import Content:
If your offer is based on certain imported raw materials (Applicable / Not Applicable)
required for equipments/ materials offered, please specify the (Please tick whichever is applicable)
following :
b. Indicate rate of Import Duties considered and included in the Refer Annexure to Price Schedule
quoted prices.
c. Indicate brief description/ specification with itemised CIF Refer Annexure to Price Schedule
value and country of origin of imported material.
d. Indicate classification with tariff no. under which Vendor Refer Annexure to Price Schedule
intends to import.
Page 14 of 395
A307_ATC (I) Page 7 of 8
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
l. The CIF Value(s) indicated by the vendor shall be deemed to Confirmed
be the maximum value(s) for the purpose of payment of
variation in custom duty and/or other statutory variations, if
any, thereon.
22. Whether any of the Directors of Bidder is a relative of any Confirmed No relation
Director of Owner/EIL or the Bidder is a firm in which any
Director of Owner/EIL or his relative is a Partner or the Bidder
is a private company in which any director of Owner/EIL is a
member or Director.
23. Please confirm you have not been banned or delisted by any Not Banned
Government or Quasi Government agencies or PSUs. If you
have been banned, then this fact must be clearly stated. This
does not necessarily mean cause for disqualification.
However if this declaration is not furnished the bid shall be
rejected as non-responsive.
24. Please confirm your offer contains the following:
Page 15 of 395
A307_ATC (I) Page 8 of 8
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
contradiction between the confirmations given above and
terms & conditions mentioned elsewhere in the offer, the
confirmation given/confirmed herein above shall prevail.
28. Confirm that Net worth of the Bidders company is Confirmed & Submitted
positive as per the immediate preceding years audited
financial results & Immediate preceding years audited
annual financial results has been submitted along with un-
priced bid.
Page 16 of 395
A307_ATC (F) Page 1 of 7
2. DULY SIGNED & STAMPED COPIES OF THIS QUESTIONNAIRE, WITH ALL THE CLAUSES
DULY CONFIRMED/ PRECISELY REPLIED TO BY THE SUPPLIER, SHALL BE ENCLOSED.
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
1. a) Confirm that the offer contains firm prices on Confirmed
F.O.B. International Seaport of Exit Basis
b) Indicate International Seaport of Exit -----------------------------
c) Indicate the HSN Code of the Items __________________
d) Details of any Free Trade Agreement (FTA) /
Comprehensive Economic Partnership
Agreement (CEPA) / Treaty between Bidders
country Govt. & Indian Government for availing
custom duty exemption / concession. If bidder will
not specifically mention the same, it is to be
considered that there is no specific Agreement /
Treaty between Govt. of Bidders & Purchasers Applicable / Not Applicable
County.
e) Confirm that ocean freight charges upto port of
entry- Kochi, (India) has been quoted separately Confirmed , Quoted in Price Schedule
by you in the price schedule.
Page 17 of 395
A307_ATC (F) Page 2 of 7
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
quoted FOB Price.
Confirmed
g) In case ocean freight charges are repeated
anywhere in the bid/Price Schedule/ATC, then
higher shall be considered for evaluation & lower
for ordering. (In case of CFR)
2. Insurance:
a) For Supply Only
Price quoted must exclude Marine insurance
charges from FOB International Port of Exit, as
same shall be arranged by the Owner. However
all marine insurance charges for inland transit
upto FOB International Port of Exit must be
(Applicable / Not Applicable)
included by you in your prices. (Please tick whichever is applicable)
b) For Supply + Site Work
Comprehensive Insurance (Transit/Marine-cum-
storage-cum-erection till handing over of
equipment) has been taken care by the Seller &
(Applicable / Not Applicable)
charges of the same have been included in the (Please tick whichever is applicable)
quoted prices.
3. Owner reserves the option to place order either on
FOB or CFR basis (applicable only as per Confirmed
requirement mentioned in RFQ documents).
4. Delivery / Completion Period:
a) Delivery / Completion period shall be as
Confirmed
mentioned in the RFQ covering letter.
b) Confirm delivery period shall be reckoned from
the date of Fax of Acceptance. Confirmed
c) Confirm date of clean Bill of Lading shall be
considered as date of delivery. (In case order is Confirmed
placed on FOB port of Exit basis or on CFR
basis)
5. Taxes & Duties:
a. All taxes, duties and levies of any kind payable upto
FOB International Port of Exit shall be borne by Confirmed
Bidder.
b. Export permit/ licence if required shall be vendors Confirmed
responsibility & any expenditure towards same will
be borne by Bidder.
6. Supervision / Training Charges:
a. Charges for Supervision / Training, if in the scope of Confirmed, Quoted in Price Schedule
the Bidder as per MR have been indicated by bidder
separately in the Price Schedule.
b. Per-diem rate for supervision has been quoted in Confirmed
accordance with the Terms & Conditions for
Supervision enclosed with the RFQ Documents.
Page 18 of 395
A307_ATC (F) Page 3 of 7
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
times the per diem rate for each day of delay of
reporting to site and shall be in addition to price
reduction for delayed delivery.
7. Site Work:
For Site Work, if in the scope of the Bidder as per
MR, please confirm the following:
Page 19 of 395
A307_ATC (F) Page 4 of 7
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
and charges of the same shall be included in quoted
prices and it is suppliers responsibility to arrange for
the same. No additional charges shall be paid by
owner towards the same.
b. Quoted prices are:
i) Inclusive of all testing and inspection charges (if
Confirmed
applicable) as per MR.
ii) Inclusive of all IBR/IGC/NACE charges (if
Confirmed
applicable) as required in the Material
Requisition.
iii) Inclusive of all statutory certification charges
PESO/CCOE etc. (if applicable) as required in Confirmed
the Material Requisition.
Page 20 of 395
A307_ATC (F) Page 5 of 7
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
b. i) The Performance Bank Guarantee shall be Confirmed
strictly as per proforma enclosed with the GPC
document and shall be from any Indian
Scheduled Bank or any reputed International
Bank and shall be submitted within 15 days from
date of FOA.
ii) However, if Performance Bank Guarantee are Confirmed
furnished other than the Nationalised Indian
Bank, the banks where BGs are furnished, must
be Commercial Bank having net worth in excess
of Rs. 100 crore or USD 22 Millions and any
declaration to this effect will be furnished by such
Commercial Bank either in the bank guarantee
itself or separately on a letter head.
18. Guarantee / Warranty
Confirm acceptance to Guarantee / Warranty clause Confirmed
as mentioned in the General Purchase Conditions &
Special Instructions to Bidders.
Page 21 of 395
A307_ATC (F) Page 6 of 7
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
24.
a) Letter of Credit shall be opened after receipt of
Confirmed
unconditional order acknowledgement along with
15% performance bank guarantee valid till expiry
of Material/Equipment Guarantee period as per
General Purchase Conditions and Special
Instructions to Bidders plus 3 (Three) months
claim period.
b) Letter of Credit shall be opened through a Govt.
of India Nationalised/ Scheduled Bank and hence Confirmed L/C not required
need not be confirmed.
OR
c) However, if you still insist for confirmed L/C,
confirmation charges shall be borne by you. Noted
Please confirm.
25. All Bank charges and stamp duties payable outside
India in connection with payments to be made under
Purchase Order for the item, if placed, shall be borne Confirmed
by you. All bank charges and stamp duties payable in
India shall be borne by the Purchaser.
26. Please indicate name and address of your Bankers
for L/C opening, telephone/E-mail address.
27.
a) Confirm your offer is in total compliance with RFQ Confirmed
Document containing technical specifications
including General / Technical notes, scope of
supply/services/site work (as applicable) including
documentation as per Material Requisition (MR) and
subsequent amendment and corrigendum, if any,
without any deviation.
Page 22 of 395
A307_ATC (F) Page 7 of 7
SL.
DESCRIPTION SUPPLIERS CONFIRMATION
NO.
29. Please confirm you have not been banned or delisted
by any Government or Quasi Government agencies
or PSUs. If you have been banned, then this fact
must be clearly stated. This does not necessarily be
cause for disqualification. However if this declaration Not Banned
is not furnished the bid shall be rejected as non-
responsive.
VENDORS NAME:
Page 23 of 395
BPCL-KR
Job: A307
Page 24 of 395
BPCL-KR
Job: A307
INDEX
SECTION A (TERMS OF PAYMENT)
1.0 Payment Terms For Indian Bidders
2.0 Payment Terms For Foreign Bidders
3.0 Ocean Freight
SECTION B: EVALUATION CRITERIA FOR COMPARISION OF BIDS
4.0 Where only Indian Bids are under comparison
5.0 Where only Foreign Bids are under comparison
6.0 Where Indian as well as Foreign Bids are under comparison
7.0 General Notes
8.0 Special Notes on Taxes/Duties and CENVAT benefits
9.0 Price Reduction Schedule Towards Delay In Delivery
10.0 Guarantee / Warranty Period
SECTION-C: (COMMERCIAL LOADING OF OFFERS IN CASE OF DEVIATIONS)
11.0 Basis of Loading
12.0 Payment Terms
13.0 Performance Bank Guarantee (PBG)
14.0 Delayed Deliveries
15.0 Price Variation
16.0 Freight charges
17.0 Indian taxes/ duties
18.0 Utilities
19.0 Delivery/Completion Period
20.0 Foreign Exchange Rate Variation/Custom Duty Variation For Indian Bidders (On
Built-In Import Content)
21.0 VAT on Works Contracts/ Service Tax/ Splitting Of Orders
22.0 Entry Tax
23.0 Rejection Criteria
24.0 Suo-Moto Changes In Prices
25.0 Price Implication Not Permitted
26.0 Integrity Pact
SECTION-D: SPECIAL CONDITIONS.
27.0 Delivery Schedule/ Completion Period
28.0 Despatch Instructions for Indigenous Supplies
29.0 Additional Taxes & Duties (Applicable For Indian Bidder)
30.0 Recovery Of Custom Duty, Excise Duty And Sales Tax
31.0 Governing Law
32.0 Purchasers Rights And Remedies
33.0 Deduction At Source
34.0 Statutory Approval
35.0 Lien
36.0 Limitation Of Liability
SECTION-E: GENERAL INSTRUCTIONS
37.0 General
38.0 Fraudulent Practices
39.0 One Bid Per Bidder
40.0 Language Of Bid
41.0 Earnest Money Deposit:
42.0 Modification And Withdrawal Of Bids
43.0 Examination Of Bids And Determination Of Responsiveness
44.0 Owners Right To Accept Any Bid And To Reject Any Bid
45.0 Notification Of Award
46.0 Waiver Or Transfer Of The Agreement
47.0 T&C For Foreign Suppliers (To Whom RFQ Issued) Operated Through Their Indian
Office / Subsidiaries
48.0 Tax Residency Certificate (TRC) Format For Foreign Bidder
49.0 Requirement of Employment Visa For Foreign Nationals
Page 25 of 395
BPCL-KR
Job: A307
1.1 Where the Material Requisition is only for supply of materials and there is no Supplier Data
Requirement specified in MR e.g. Bulk Piping Items, etc.
1.1.1 100% Payment within 30 days after receipt and acceptance of materials at site and on submission of
Performance Bank Guarantee for 10% of Total Order Value, valid till the full guarantee period plus
Three months claim period.
1.2 Where the Material Requisition calls for Supplier Drawings/Technical Documentation.
1.2.1 90% Payment within 30 days of receipt and acceptance of materials at Site and on submission of
dispatch documents.
1.2.2 10% Payment after receipt of final technical documentation as per PR against EILs certification and
on submission of Performance Bank Guarantee for 10% of Total Order Value, valid till full guarantee
period plus Three months claim period.
1.3 Where Supply of materials and Erection or Site Work are in the scope of Supplier and
Package Items.
1.3.1 Supply
1.3.1.1 5% Payment on approval of all drawings atleast in CODE-2 by EIL against submission of Bank
Guarantee of equivalent amount valid till complete execution of Order plus Three months claim
period.
1.3.1.2 15% Payment after receipt of identified raw materials at Suppliers Works and against certification by
EIL and submission of Bank Guarantee of equivalent amount valid till complete execution of Order
plus Three months claim period.
1.3.1.3 60% Payment after receipt of equipment/materials at BPCLs Site. Billing Schedule to be furnished
by the Supplier in case pro-rata payments are required.
1.3.1.4 10% payment after completion of Site Work and submission of final Technical documents as
specified in the Purchase Requisition against EILs Certification and submission of Performance
Bank Guarantee for 10% of Total Order Value (Supply plus Site Work), valid till full guarantee period
plus three months claim period.
In case of delay in start of the site work beyond 6 months, the above 10% Payment shall be released
against submission of Bank Guarantee of equivalent amount valid initially for 1 year and subject to
extension upto completion of the site work. However, in the event of delay in the site work, the
Supplier is not relieved of his responsibility to carry out the same.
1.3.1.5 10% payment within 30 days of handing over the successfully commissioned equipment. Wherever
commissioning is not in the Suppliers scope, the payment will be released after completion of Site
Work as per PR and handing over of equipment.
Page 26 of 395
BPCL-KR
Job: A307
1.4.2 15% after receipt of identified raw materials at Suppliers Works and against certification by EIL and
submission of Bank Guarantee of equivalent amount valid till complete execution of Order plus
Three months claim period.
1.4.3 60% Payment through NEFT against receipt of materials at BPCLs Site. Billing Schedule to be
furnished by the Supplier in case pro-rata payments are required.
1.4.4 10% Payment after receipt of final documents as required in Purchase Requisition against EILs
certification and on submission of Performance Bank Guarantee for 10% of Total Order Value, valid
till full guarantee period plus Three months claim period.
1.4.5 Balance 10% Payment within 30 days of receipt of equipment at Site.
1.6 Payment for PGTR / Per Diem Charges for Supervision of Erection, Testing &
Commissioning
1.6.1 100% Payment of Invoice Amount shall be paid on completion of supervision services / PGTR
against submission of Invoice along with Time Sheet duly certified by EIL/BPCL Site-In-Charge.
Payment shall be made after deducting Income Tax at applicable rate. Service Tax, if any, shall be
paid on submission of Service Tax Invoice.
1.6.2 Where erection/commissioning supervision, commissioning assistance is required from the vendor,
penalty for non mobilization/delay in mobilization as per order shall also be specified in the
specifications. The penalty shall generally be 1.5 times the per diem rate for each day of delay of
reporting to site and shall be in addition to price reduction for delayed delivery.
1.6.3 Wherever supervision is in the scope of MR, bidders shall provide additional BG of an amount equal
to the per diem charges for the number of days considered for evaluation over and above 10%
PBG to cover compensation for delay in mobilising the erection/ commissioning personnel. This BG
will be released to the bidder upon the erection/ commissioning personnel reporting at site. This BG
shall be furnished along with payment milestone for submission of final documentation as per PR
and shall be valid up to six months which shall be extended based on the request by BPCL. (In case
where commissioning, Performance Guarantee Test, etc. are required and the 10% is under hold,
this condition shall not be applicable).
1.7 Transportation charges
1.7.1 100% Payment within 4 weeks after receipt of materials at site.
1.8 General
1.8.1 Excise Duty, Service Tax & VAT on Supplies shall be released only on receipt of Cenvatable/
Vatable copy of corresponding Invoice enabling availing of Input Credit by BPCL.
1.8.2 No initial advance payment along with Order shall be made by the Owner against Supplies as well
as Services (i.e. Transportation, Erection, Site Work, etc.). If a Supplier insists on the same, their
Offer shall be rejected.
1.8.3 Bank Guarantee(s) shall be issued through Scheduled Commercial Bank in India/ Indian Branch of
Foreign Bank, directly to BPCL as per the Pro-forma enclosed with RFQ documents and Supplier
shall also enclose copy of the same along with Invoice.
Page 27 of 395
BPCL-KR
Job: A307
1.8.4 All payments shall be released either through Electronic Clearing System (ECS) / Electronic Fund
Transfer (EFT)/ Real Time Gross Settlement (RTGS) or through internet, within 30 days of receipt of
Invoice and all requisite documents, complete in all respects.
1.8.5 Billing schedule shall be submitted to EIL & BPCL by the Supplier for approval within 30 days from
the date of Purchase Order wherever specified therein. No payment against pro-rata dispatch shall
be made without approval of Billing Schedule.
1.8.6 Major Raw Material: Shall be as specified below:
i. Columns and Vessels: Plates and Forgings
ii. Heat Exchangers: Plates, Forgings and Tubes
iii. Pumps/Compressors: Castings and Drivers
iv. Any other item(s) as may be defined in MR/PR.
2.2 Where the Material Requisition calls for Supply of material and Erection or Site Work in the
scope of Supplier and Package Items
For Supply Portion
2.2.1 90% Payment of FOB Supply value through an Irrevocable Letter of Credit against submission of
Shipping Documents. The Letter of Credit shall be established only on receipt of acceptance of Fax
of Acceptance/Purchase Order along with submission of Bank Guarantee of 15% of Order Value
(10% towards Performance Bank Guarantee valid till full Guarantee period plus Three months claim
period & separate 5% Bank Guarantee towards Price Reduction Schedule due to delay in delivery
valid till contractual delivery date (CDD) + Five and half Months).
2.2.2 10% Payment of FOB Supply value through direct wire transfer through banking channels on
completion of Erection or Site Work or Commissioning/Performance Guarantee Test Run (PGTR) at
site, as applicable as per Purchase Order/Purchase Requisition (PR) against submission of final
documents or Certificate of Completion of Work by BPCL Site.
For PGTR cases only
The above amount (10%) shall be released against successful demonstration of Performance
Guarantee Test Run & submission of Invoices duly certified by Site-In-charge or 6 months from
receipt of material at site (against BG of equivalent amount valid for 1 year), whichever is earlier.
However in the event of delay in conducting the PGTR, the bidder is not relieved of his responsibility
to carry out the same. No additional payment shall be made for visit of supplier to site for
demonstrating the PGTR, if the same is included in the scope of supplier.
Page 28 of 395
BPCL-KR
Job: A307
period plus Three months claim period & separate 5% Bank Guarantee towards Price Reduction
Schedule due to delay in delivery valid till contractual delivery date (CDD) + Five and half Months).
2.5.3 Wherever supervision is in the scope of MR, bidders shall provide additional BG of an amount equal
to the per diem charges for the number of days considered for evaluation over and above 10%
PBG to cover compensation for delay in mobilising the erection/ commissioning personnel. This BG
will be released to the bidder upon the erection/ commissioning personnel reporting at site. This BG
shall be furnish along with dispatch documents which shall be initially valid up to six months whixh
shall be extended based on the request by BPCL.
2.6 General
2.6.1 No initial advance payment along with Order shall be made by the Owner against Supplies as well
as Services (i.e. Transportation, Erection, Site Work, etc.). If a Supplier insists on the same, their
Offer shall be rejected.
2.6.2 All Bank Guarantee(s) shall be issued through Scheduled Commercial Bank in India or Indian
Branch of Foreign Bank as per Pro-forma provided in RFQ documents. All Bank Guarantees will be
directly to BPCL by the Bank.
2.6.3 All bank charges and stamp duties payable outside India in connection with payments shall be borne
by the Supplier. All bank charges and stamp duties payable in India shall be borne by BPCL except
L/C Amendment charges for delays in delivery. Confirmation charges for Confirmed L/C shall be
borne by Supplier.
2.6.4 Billing schedule shall be submitted to EIL & BPCL by the Supplier for approval within 30 days from
the date of Purchase Order wherever specified therein. No part shipment shall be made without
approval of billing schedule.
2.6.5 Subject to Technical Acceptability, For supplies sourced within India (if any) by Foreign
Bidder & directly dispatched to Site shall have following provisions: (Refer Annexure-A)
Page 29 of 395
BPCL-KR
Job: A307
bidder is required to furnish the shipping details within 45 days from the date of order. In case the
bidder is not able to prove the shipping details within 45 days then 4 months shall be considered
from the date of receipt of shipping details of consignment for converting FOB to CFR.
3.4 Above clause no. 3.1 to 3.3 is not applicable for Turn-Key jobs where ocean freight along with
Marine cum transit cum erection insurance in bidders scope.
Bids shall be evaluated on the basis of Net Effective Price i.e. landed cost at Site including
Third Party Inspection charges (if applicable) by Third Party Inspection Agency as nominated by
BPCL minus CENVAT/ Set Off benefit available to BPCL.
Commercial loading shall be done on FOT Dispatch Point price.
If a Bidder does not quote freight charges, his offer shall be loaded with maximum freight
charges as quoted by the other bidders.
Taxes/Duties:
Taxes and Duties will be loaded as applicable. However, if a Bidder states that the Sales
Tax/ Excise Duty is not applicable at present or quotes lesser percentage stating the same will be
charged as applicable at the time of delivery, then such Bidders price will be loaded by the highest
rate as indicated by the remaining bidders.
Bids shall be evaluated on the CIF basis including Custom Clearance (as mentioned below),
considering firm ocean freight up to Port of Entry (Kochi, India) as quoted by bidders.
Sl. No. Head Basis
1 F.O.B. Price As quoted by the Bidder (including stowage charges in case of
pipes*) and Third Party Inspection charges.
* Stowage charges, if not included in the quoted FOB Price, the
same shall be loaded @ 10% of freight quoted by the Bidder.
2 Add Ocean Freight Firm Freight charges as quoted by Bidders or provision mentioned
in the bid documents
3 Add Marine Insurance @ 1% of FOB Price
4 Add Customs Duty Prevailing Rate on (CIF value plus Landing Charges @ 1% of CIF
Value)
5 Commercial Loading, if any On FOB Value
6 Less Cenvatable Duties
7 FOT SITE PRICE Sum Total (Sl. Nos. 1 ~ 5) (Sl. No. 6)
If a Bidder does not quote Ocean freight charges, his offer shall be loaded with maximum freight
charges as quoted by the other bidders.
Comparison shall be done on equivalent Indian Rupees considering RBI Reference rate of Foreign
Exchange published on the day of Opening of Priced Bids.
Normally, deviations in Payment terms, Firm prices & Performance Bank Guarantee are not
acceptable. However, wherever Bidder insists, the loading shall be done as applicable to Indigenous
cases on FOB price.
Page 30 of 395
BPCL-KR
Job: A307
Foreign Bidders:
Bids shall be evaluated on the basis of landed cost at Site including the charges of inspection by
Third Party Inspection Agency, all duties, taxes and ocean freight charges as under less Cenvatable
CVD/SAD, Cenvatable Service Tax, VAT on Supplies, VAT on Works Contract, whichever is
applicable.
v. The Bidder must ascertain and confirm along with supporting documents in the bid, if any Custom
duty exemption / waiver is applicable to the products being supplied by bidder under any multi-lateral
/ bi-lateral trade agreement between India and Bidders country.
The bidder shall liable to provide all documentation to ensure availment of the exemption / waiver. In
case the bidder defaults on this due to any reason whatsoever, they shall be liable to bear the
incremental Custom Duty applicable, if any.
Any Custom Duty applicability on account of any change in the bi-lateral / multi-lateral agreement
shall be in bidders account.
Documentation to be furnished for availing any exemption / waiver of Custom Duty shall be
specifically listed in Letter of Credit also as the pre-requisite for release of payment against shipping
documents and this documentation shall necessarily from a part of shipping documents.
Page 31 of 395
BPCL-KR
Job: A307
vi. BPCL shall issue Concessional Form C for Central SalesTax, for all applicable cases.
vii. Comparison shall be done on equivalent Indian Rupees considering RBI Reference Rate of Foreign
Exchange published on the day of opening of the Price Bids.
viii. Third Party Inspection charges for foreign bidder must be included in quoted prices or anything
specifically mentioned in RFQ documents..
ix. Excise Duty, Central Sales Tax, VAT on Supplies & Service Tax shall not be included in the quoted
prices and shall be payable extra at actual. BPCL shall claim eligible credit on CENVAT/Service
Tax/VAT quoted by the Bidder and therefore eligible portion of CENVAT/Service Tax/VAT shall be
considered for price comparison. Bidder shall be required to furnish proper invoices issued in
accordance with relevant rules for enabling BPCL to avail CENVAT benefits. Further, the amount of
Excise Duty, Service Tax & VAT shall only be payable against submission of CENVATABLE/
VATABLE Invoices, subject to maximum amount quoted in the Offer and in case of non-submission,
will not be paid.
x. Bidders quoted transportation charges shall be inclusive of service tax plus education cess
thereupon applicable on transportation.
xi. Transit Insurance/ Marine Insurance shall be excluded from Suppliers scope for the items where
only supply is involved, and in such cases, the same shall be arranged by the Owner. For purchases
involving Site Work, the Comprehensive Insurance (Transit/Marine cum Storage, Erection, till
handing over of equipment) shall be in the scope of Supplier.
xii. Owner reserves its right to allow Public Sector Enterprises (Central/State), Micro & Small
Enterprises (MSEs) and MSEs owned by Scheduled Caste (SC)/ Scheduled tribe (ST)
entrepreneurs, purchase preference as admissible/applicable from time to time under the existing
Govt. policy.
xiii. If various item rates are present in the RFQ and if there is correction/wrong entry or a difference
between the values entered in figures and in words, the following procedure shall be adopted for
evaluation.
i. When there is a difference between the rate in figures and in words for an item, the rate
which corresponds to the amount worked out by the Bidder for the item based on the
notional quantity specified, shall be taken as correct.
ii. When the rate quoted by the Bidder in figures and words tallies but the amount is incorrect,
the rate quoted by the Bidder shall be taken as correct.
iii. When it is not possible to ascertain the correct rate as detailed above, the rate quoted for
the item in words shall be adopted as the quoted rate.
iv. If the total amount written against an item does not correspond to the rate written in figures
and if the rate in words is missing, then the higher of the rates, i.e. higher of the rate worked
out by dividing the amount by the notional quantity and the rate quoted shall be considered
for evaluation In the event that such a bid is determined as the lowest bid, the lower of the
rates shall be considered for award of works.
Page 32 of 395
BPCL-KR
Job: A307
(v) Non Cenvatable Excise Duty, if any is to be included in quoted prices & no variation on any
account (including statutory variation) shall be paid by Owner.
Price Reduction schedule for (Supply + Site work) shall be @ 0.5% of value of total order value
(TOV) of per week of delay or part thereof subject to maximum of 5% total order value (TOV).
Price Reduction Schedule (Supply + Site work) towards delay in delivery for foreign bidder shall be
applicable as per clause no. 17 of GPC Import of RFQ subject to following modification:
Imports, for any delay in delivery of equipments / materials or part thereof beyond the delivery
date stipulated, the vendor shall be liable to pay, compensation at 0. 5% of the total FOB Value of
order per week of delay or part thereof subject to maximum of 5% of the total FOB Value of
order.
iii. Wherever the supply period and site work are indicated as two separate periods and
notice of site readiness is required for site work, intervening period, if any shall be
excluded, while calculating the price schedule for delay.
b) In case item involving supply and site work excluding comprehensive Insurance
policy:-
Performance Guarantee shall be as per clause 30 of GPC (For Indigenous materials &
equipments).
Page 33 of 395
BPCL-KR
Job: A307
In partial modification of the terms specified in clause 26 of GPC 12 months from the date of
handing over of duly completed plant/equipment/system as per the contract at site to the owner.
b. In case item involving supply and site work Excluding comprehensive Insurance
policy:-
Performance Guarantee shall be as per clause 26 of GPC (For Foreign materials & equipments).
In cases like turnkey jobs, to derive the delivery period of supply items, the total period of turnkey
jobs shall be split into delivery period of supplies & site work period in the ratio of 70:30 for loading of
differential payment terms for the supply periods as defined above.
ii. Foreign suppliers shall not be permitted to offer differential payment terms as against the terms
specified in the RFQ/ GPC and in case they insist, their offer shall be rejected.
iii. Advance along with FOA/ PO will not be allowed. If a supplier insists for advance payment along
with FOA/PO, his offer shall be rejected.
Page 34 of 395
BPCL-KR
Job: A307
c) No ceiling on the formula specified (This 1.5 times the maximum ceiling specified by
loading other Suppliers. In case all other Suppliers
shall be done only after putting efforts with have quoted firm prices then @ 1.25% for
Supplier to indicate ceiling and obtaining every month of quoted delivery period to be
BPCLs approval) taken as ceiling.
d) No formula and no ceiling specified by Offer may be rejected.
Supplier
(This shall be resorted to only after putting
efforts with Supplier and obtaining BPCLs
approval)
19.0 UTILITIES:
Cost loading in respect of utilities etc. will be considered as mentioned in RFQ documents.
20.0 FOREIGN EXCHANGE RATE VARIATION/CUSTOM DUTY VARIATION FOR INDIAN BIDDERS
(ON BUILT-IN IMPORT CONTENT) :
i. Prices shall remain firm and fixed without any escalation except for statutory variation in customs
duty rate.
The prices shall be firm and fixed on account of FE variation also.
ii. Indigenous bidders shall be required to quote their prices including customs duty (Merit rate)
towards their built in import content. CIF content in Indian Rupees shall also be furnished by
Bidders along with the merit rate of customs duty considered.
iii. The statutory variation in customs duty shall be subject to the following
guidelines and the supplier shall confirm the following in their bid:
A307_SIB Rev.4 dtd: 22.02.2012 Page 12 of 21
Page 35 of 395
BPCL-KR
Job: A307
(a) Maximum CIF value of import content shall be furnished in the bid.
(b) The material to be imported covering the above CIF value to be indicated in the bid.
(c) Any increase in price due to increase in customs duty rate beyond two-third of the quoted
delivery period will be to suppliers account. However, any decrease in price due to
decrease in customs duty rate at the time of actual clearance of imported materials shall
be passed on to BPCL.
(d) Variation in price due to customs duty rate will be dealt with separately after receipt of
materials at site against documentary evidence.
(i.) Any Suo-moto reduction in price offered by a supplier within the bid validity by way of discount or
revised prices subsequent to the bid due date and which is not as a result of any change in scope of
supply or terms and conditions, shall not be taken into account for evaluation. However, such
reduction in price shall be taken into account for ordering if such supplier happens to be the
recommended supplier as per the originally quoted prices.
Page 36 of 395
BPCL-KR
Job: A307
(ii.) However, in the event of any suo-moto price increase sought by a supplier subsequent to the bid
due date and which is not as a result of any change in scope of supply or terms and conditions, the
bid of such a supplier shall be rejected for the items in which such suo-moto increase is made.
(iii.) Any wrong interpretation of taxes & duties or any taxes & duties not specified in the offer shall be
borne by Bidder.
25.0 PRICE IMPLICATION NOT PERMITTED:
Price implications on account of technical clarifications shall not be permitted as long as
BPCL/EIL do not change the specifications/ scope spelt out in the RFQ.
29.0 NEW / ADDITIONAL TAXES & DUTIES (Applicable for Indian Bidder):
i. Within the contractual delivery period, if any new taxes and/or duties come into force the same will
be reimbursed to bidder against documentary evidence. However any new or additional taxes/
duties imposed after contractual delivery shall be to borne by seller.
ii. All necessary taxes & duties registration, if required for carrying out the site activities shall be done
by the bidder and cost towards the same shall be included in quoted prices.
iii. The statutory variations on Customs duty (rate) considered on above CIF value of built in import
content, within contractual delivery period shall be to Employers account against submission of the
A307_SIB Rev.4 dtd: 22.02.2012 Page 14 of 21
Page 37 of 395
BPCL-KR
Job: A307
documentary evidence. However, any increase in the rate of Customs duty beyond the contractual
completion period shall be to bidders account. In case of wrong classification, no variation
including statutory variation of Customs Duty will be payable extra. Any decrease in the rate of
Customs duty shall be passed on to the Employer.
iv. The statutory variations on Excise rate and amount of Excise Duty, CST with concessional form &
VAT without concessional form, which will be payable on the finished goods and Cenvatable
Service Tax, as applicable, within the contractual delivery period shall be to Employers account
against submission of the documentary evidence. Any increase in the rate of these taxes and
duties beyond the contractual completion period shall be to bidders account. However, any
decrease in the rate of taxes & duties shall be passed on to the Employer.
v. Works Contract Tax & service tax on transportation, if applicable, shall be included in the quoted
prices and no variation including statutory variations shall be payable by BPCL.
Approval from any authority (i.e. Inspector of Boiler, Electrical Inspector, and Municipal Corporation
of Greater Kochi (MCGK) etc.) required as per statutory rules and regulations of Central/ State
Government shall be the responsibility of Contractor agency.
The application on behalf of the OWNER for submission to relevant authorities along with copies of
required certificate complete in all respects shall be prepared and submitted by the Contractor
agency well ahead of time so that the actual construction/ commissioning of the work is not delayed
for want of the approval/ inspection by concerned authorities. The Contractor agency shall arrange
the inspection of the works by the authorities and necessary coordination and liaison work in this
respect shall be the responsibility of the Contractor agency. Reimbursement by the OWNER of the
statutory fees payable by Contractor agency (as per advance approval of OWNER) may be provided
for, subject to submission of receipt.
The Contractor agency shall carry out any change/ addition required to meet the requirements of the
statutory authorities, within the quoted rates. The inspection and acceptance of the work by statutory
authorities shall be the responsibility of the Contractor agency.
List of all documents, drawings, forms, affidavits etc required for the approvals shall be submitted by
the contractor agency.
35.0 LIEN:
Page 38 of 395
BPCL-KR
Job: A307
Supplier shall ensure that the Scope of Supply supplied under the Agreement shall be free from any
claims of title/liens from any third party. In the event of such claims by any party, Supplier shall at
his own cost defend, indemnify and hold harmless Purchaser or its authorised representative from
such disputes of title/liens, costs, consequences etc.
37.0 GENERAL: Bidders shall submit their Bids in following manner & containing the listed inputs, duly
filled-in, stamped & signed by authorized signatory of Bidder holding Power of Attorney, as a
minimum requirement:
a) PART-I: UNPRICED OFFER
A. All technical specifications as per requirement of MR.
B. Agreed Terms & Conditions duly filled in.
C. Terms & Conditions for Supervision of Erection/Testing/Commissioning, if applicable
D. Terms & Conditions for Site Work, if applicable
E. Copy of Registration with EIL, if applicable
F. Copy of MOU/ MOM, if any, signed with EIL and referred in offer.
G. Integrity Pact, duly filled-in, stamped & signed on each page (if applicable).
H. Audited Financial Report of latest preceding Financial year.
I. Deviation sheet, if any.
J. Price Schedule with prices blanked out but Quoted/ Not quoted to be mentioned & its
relevant enclosures, duly filled-in, stamped & signed on each page.
b) PART-II: PRICED OFFER
A. Price Schedule with prices filled in.
B. Statement that all specifications and terms & conditions are as per un-priced part of offer.
c) Bidders in their own interest are requested to register on e- tendering portal and
upload/submit their bid well in time. Bidders should avoid the last hour rush to the website
for registration of user id & password, enabling of user id and mapping of digital signature
serial number etc. since this exercise require activities from EIL & M/s Anatares System
(Service Provider) and needs time. In the event of failure in bidders connectivity with
EIL/Service Provider during the last few hours, bidder is likely to miss the deadline for bid
submission. Due date extension request due to aforesaid reasons may not be entertained.
Since the bidders are already registered at ASP e-tendering portal, bidders are advised to
furnish the details of Digital Signature (serial no.) by email within one week of receipt of
intimation of issuance of RFQ to save time and avoid mapping of Digital Signature details to
the bidders User ID at the bid uploading stage.
d) Request for extension or any queries or issues related to difficulties in
uploading/downloading bids, if any, received from any with less than four working days prior
to bid due date shall generally be ignored, since there will not be adequate time for proper
communication with Client and other Bidders.
e) Bidders to refer Instruction to Bidders for E-Tendering provided in the RFQ. Bidder shall
download the Price Schedule in *.xls format from EILs Authorised Service Providers
Electronic system / portal at www.tenderwizard.com/eil only, and use the same for uploading
their Price Bids as per the Instruction provided.
Note:
Bidding currency shall be Indian Rupees for supplies dispatched from India & and USD/EURO for
supplies dispatched from foreign.
Page 39 of 395
BPCL-KR
Job: A307
The OWNER requires that Bidders/ Contractors observe the highest standard of ethics during
the award/ execution of Contract. "Fraudulent Practice" means a misrepresentation of facts in order
to influence the award of a Contract to the detriment of the Owner, and includes collusive practice
among bidders (prior to or after bid submission) designed to establish bid prices at artificial non-
competitive levels and to deprive the Owner of the benefits of free and open competition.
a) The OWNER will reject a proposal for award if it determines that the bidder recommended for
award has engaged in fraudulent practices in competing for the Contract in question.
Bidder is required to furnish the complete and correct information/ documents required for
evaluation of their bids. If the information/ documents forming basis of evaluation is found to be
false/ forged, the same shall be considered adequate ground for rejection of bids and forfeiture
of Earnest Money Deposit.
b) In case, the information/ document furnished by the Bidder/ Contractor forming basis of
evaluation of his bid is found to be false/ forged after the award of the contract, Owner shall
have full right to terminate the contract and get the remaining job executed at the risk & cost of
such Bidder/ Contractor without any prejudice to other rights available to Owner under the
contract such as forfeiture of CPBG/ Security Deposit, withholding of payment etc.
c) In case, this issue of submission of false documents comes to the notice after execution of
work, Owner shall have full right to forfeit any amount due to the Bidder/ Contractor along with
forfeiture of CPBG/ Security Deposit furnished by the bidder/ contractor.
d) Further, such bidder/ contractor shall be put on Blacklist/ Holiday/ Negative List of OWNER/EIL
debarring them from future business with Owner & EIL for a time period, as per the prevailing
policy of OWNER & EIL.
b) In the event of submission of any document/ certificate by the Bidder in a language other than
English, the English translation of the same duly authenticated by Chamber of Commerce of
Bidders country shall be submitted by the Bidder. Metric measurement system shall be
applied.
41.0 EARNEST MONEY DEPOSIT:
Bidder shall furnish, as part of its Bid, EMD for an amount as indicated in the NIT/ IFB. If the
Bidder is unable to submit Bid Document Fee & EMD in original within the due date & time, then
bidder shall submit the original Bid Document Fee & EMD within 7 days from the date of unpriced
bid opening, provided copy of the same have been uploaded on E-Tendering Website. In case
the bidder fails to submit the same in original within 7 days, then their bid shall be rejected,
irrespective of their status/ ranking in tender and notwithstanding the fact that a copy of Bid
Document Fee & EMD was earlier uploaded by the bidder. OWNER shall not pay any interest on
EMD furnished.
The EMD shall be in favour of BPCL and shall be acceptable in the form of Crossed Demand Draft
or Bank Guarantee in the prescribed pro-forma.
The Bank Guarantees/DD for EMD shall be issued by any Scheduled Commercial Bank (other than
co-operative Bank) in India or any Indian Branch of Foreign Bank and same shall be as per the
format given in this bidding document. Swift Message or Cash or Cheque in lieu EMD shall not be
acceptable.
The bank guarantee for submission of EMD shall be valid as period mentioned in EMD / Bid
Security format or elsewhere mentioned in Bid Document / RFQ.
EMD/ Bid securities of unsuccessful bidders will be returned upon award of Contract. However,
EMD of the successful Bidder will be returned upon the Bidder's acceptance of PO/ signing the
Contract and furnishing the PBG.
The EMD may be forfeited:
Page 40 of 395
BPCL-KR
Job: A307
If a Bidder withdraws its bid during the period of Bid Validity or does any breach of
tendering terms and conditions, or
In case of a successful Bidder, if the Bidder fails, within the specified period:
i. To submit the order acceptance.
ii. To furnish the PBG.
c) No bid shall be allowed to be withdrawn in the interval between the deadline for submission
of bids and the expiration of the period of bid validity specified by the bidder. Withdrawal of a
bid during this interval shall result in the forfeiture of bidders bid security.
Page 41 of 395
BPCL-KR
Job: A307
in quadruplicate. Three copies of the same without any condition/ deviation will be returned duly
signed and stamped by the bidder as a token of acknowledgement to Owner and EIL.
46.0 WAIVER OR TRANSFER OF THE AGREEMENT:
The successful bidder shall not waive the Agreement or transfer it to third parties, whether in part
or in whole, nor waive any interest that is included in the Agreement without the prior written
permission of the Owner.
47.0 T&C FOR FOREIGN SUPPLIERS OPERATED THROUGH THEIR INDIAN OFFICE /
SUBSIDIARIES:
I. The parent company shall issue an authorization from the authorized signatory like CEO, CFO, CS
to confirm their authorization to the subsidiary to manufacture & supply the equipments.
II. The parent company shall furnish a back-up guarantee duly signed by above signatory for the
performance of the equipment.
III. The order shall be placed on Indian subsidiary and the payment shall be released to Indian
subsidiary.
IV. Indian subsidiary shall be a manufacturing company in the same product & not a liaison /
representative office.
V. Bidder to submit bipartite agreement between parent & subsidiary to ensure experience &
compliance to contract.
VI. All critical components / parts to be supplied by parent company only which is enlisted with EIL.
Page 42 of 395
BPCL-KR
Job: A307
Arbitrator in the Department of Public Enterprises to be nominated by the Secretary to the Government
of India in-charge of the Department of Public Enterprises. The Arbitration and Conciliation Act, 1996
shall not be applicable to arbitration under this clause. The award of the Arbitrator shall be binding upon
the parties to the dispute, provided, however, any party aggrieved by such award may make a further
reference for setting aside or revision of the award to the Law Secretary, Department of Legal Affairs,
Ministry of Law & Justice, Government of India. Upon such reference, the dispute shall be decided by
the Law Secretary or the Special Secretary/Additional Secretary, when so authorized by the Law
Secretary, whose decision shall bind the Parties finally and conclusively. The Parties to the dispute will
share equally the cost of arbitration as intimated by the Arbitrator.
ANNEXURE-A
INTEGRATED REFINERY EXPANSION PROJECT (IREP) OF
M/s BPCL KOCHI REFINERY,
KOCHI, KERALA (INDIA)
(Job No. A307)
TERMS & CONDITIONS FOR INDIAN SOURCED COMPONENTS / SERVICES BY FOREIGN
BIDDER
Foreign bidder may source components / sub-supplies and services from India, if allowed as per Material
Requisition. Such sub-supplies / services shall be subject to following Commercial Terms & Conditions:
1. PRICING:
1.1 The Foreign bidder shall quote firm price for items being sourced from India in Indian rupees on FOT
Site basis inclusive of packing, forwarding, transportation, all applicable taxes, duties & levies payable
upto site.
1.2 Materials if ordered against this Bidding Document are required to be dispatched on door delivery basis
through a reliable bank approved Road Transport Company unless the transport company is named by
the Owner.
2. AWARD OF ORDER:
Client may pace two separate order in this situation considering single point responsible taken care
by foreign (principal) bidder under Umbrella Contract. However obligation of Performance Bank
Guarantee & Price Reduction Schedule for complete package shall always lies with foreign
(principal) Bidder.
3. DELIVERY:
The delivery period for items being sourced from India, shall be on FOT site basis within the delivery
period specified for foreign bidder as per Terms of Bidding document.
5. OVERALL RESPONSIBILTY:
Overall responsibility towards the contractual obligations like delivery, bid security, order execution,
performance guarantee etc. including supplies being sourced from India shall be only with the
foreign (principal) bidder.
7. INSPECTION
i. Inspection of Item being sourced from India shall be by EIL/Owner.
ii. Any change in sourcing from indigenous supplies to imported supplies and vice-versa after bid
submission is not permitted.
Page 43 of 395
BPCL-KR
Job: A307
iii. Considering EIL Inspection charges, during evaluation prices of Indigenous source item shall be
loaded by @1.25% of FOT Despatch Point Price price.
8. PAYMENT TERMS:
8.1 Indian Source supplies:
100% payment along with taxes and duties will be paid against receipt & acceptance of Indian sourced
goods/material at project site and on presentation of invoice suitable for availing Cenvat.
8.2 Payment of Indian source supplies/Services shall be released directly to Indian counterpart against
Invoices raised by Indian counterpart duly endorsed by Foreign principal for payment.
8.3 The payments shall be made after Adjustment of Price Reduction Schedule.
9. In case of any deviation to above requirement, loading shall be applicable as mentioned for Indian
Bidder.
Page 44 of 395
Page 45 of 395
Page 46 of 395
Page 47 of 395
Page 48 of 395
Page 49 of 395
Page 50 of 395
Page 51 of 395
Page 52 of 395
Sham
PatroleUI"
INDEX
1. NON-WAIVER
ADDRESSES
ARBITRATION
TECHNICAL
VENDOR'S
DELAYED
DELAYS
OILS
SPARE
PACKING
SHIPPING
RESPECT
CANCELLATION
PART
RECOVERY
MODIFICATIONS
INSPECTION-CHECKING-
PRICE
CONFIRMATION
COMPLETE
PATENTS
EXPEDITING
NO ASSIGNMENT
&ORDER/REPEAT
TRANSITLUBRICANTS
PARTS
DUE
AND
DELIVERY
DEFINITIONS
TERMS
SHIPMENT
SERVICES
WEIGHTS
SALES
IMPORT
PERFORMANCE
REFERENCE FOR
DRAWINGS
AGREEMENT
OF
INFORMATION
TO
MARKING
ROYALTIES
CONDITIONS
OF
LICENCE
REJECTION,RISK
AND
OF
AND DELIVERY
SUMS
PAYMENT
FOR OF
FORCE
ORDER
VENDOR'SDUE
ORDER
AND
INSURANCE
MEASURES
SHIPMENTMAJEURE
TESTING
GUARANTEE
REMOVAL DATES
DOCUMENTATION
OFPERSONNEL
NOTICES
REJECTED 19.
34.
33.
30.
31.
32. DATA REQUIREMENT
GOODS AND REPLACEMENT 25.
28.
20.
24.
27.
26.
21.
23.
29.
22.
-1-
Page 53 of 395
1. DEFINITIONS: 7.1 All tests mechanical and others and particularly
The following expressions used in the purchase order those required by relevant codes will be performed
shall have meaning indicated against each of these; at the Vendor's expenses and in accordance with
inspector's instructions. The vendor will also bear
The OWNER means BHARAT PETROLEUM
the expenses.
CORPORATION LIMITED a company incorporated in
India having its registered office at Mumbai. India and 7.2 Concerning preparation and rendering of tests
shall include its successors and assigns. required by Boiler Inspector~te or such other
"GoodslMaterials" : Goods and/or materials shall mean statutory testing agencies or by L10yds register of
shipping as may be required.
any of the articles, materials, machinery, equipment,
supplies drawings, data and other property and all 7.3 Before shipping or despatch, the equipment and/
services Including but not limited to assigning, delivery, or materials will have to be checked and stamped
Installation, Inspection. testing and commissioning by Inspectors who are authorised also to forbid
specified or required to complete the order. the use and despatch of any equipment and/or
materials which during tests and inspection fail to
Vendor" : Vendor shall mean the person, firm or
comply with the specification. codes and testing
corporation to whom this purchase order is issued, and
requirements.
include its successors and assigns.
7.4 The Vendor will have to-
"Inspectors" : Inspectors deputed by Owner.
2. REFERENCE FOR DOCUMENTATION: Inform Owner at least fifteen days in advance of
the exact place date and time of rendering the
Purchase order Number must appear on all equipment or materials for required Inspection.
correspondence, drawings, invoices, shipping notes,
Provide free access to inspectors during normal
packing and on any documents or papers connected
working hours to Vendors or his /lts sub-Vendor's
with the order.
work and place at their disposal all useful means
3. IMPORT LICENCE: of performing, checking, marklhg testing,
Relevant particulars of the import licence if any shall be inspection and final stamping.
duly indicated in the invoice and shipping documents Even if the inspection and tests are fully carried
as well as on the packages or consignments. out Vendor is not absolved to any degree of his
4. CONFIRMATION OF ORDER: responsibilities to ensure that all equipments and
The vendor shall acknowledge the receipt of the materials supplied comply strictly with
Purchase order within ten days following the mailing of requirements as per agreement both during
this order and shall thereby confirm his acceptance of requirements as per agreements both during
this Purchase Order in its entirety without exceptions. construction, at the time of delivery, inspection on
This acknowledgment will be on both purchase order arrival at site and after Its erection or start-up and
and General Purchase Conditions. Vendor shall also guarantee period as stipulated In clause 26 hereof.
submit along with order acceptance a Bank Guarantee 7.5The Vendor's responsibility will not be lessened to
as per clause 26 hereunder. any degree due to any comments made by Owner/
6. SALES CONDITIONS: Owner's representatives and inspectors on the
Vendor's drawings or specifications or by
With Vendor acceptance of provisions of this Purchase
inspectors witnessing any chemical or physical
Order he waives and considers as cancelled any of his
tests. In any case the equipment must be in strict
general sales conditions. accordance with the Purchase Order and or its
6. COMPLETE AGREEMENT: attachments failing which the Owner shall have the
The terms and conditions of this Purchase Order right to reject the goods and hold the Vendor liable
constitute the entire agreement between the parties for non-performance of contract.
thereto. Changes will be binding only if the amendments 8. EXPEDITING:
are made in writing and signed by an authorised
Owner/Owner's representatives have been assigned to
representative of the Owner and the Vendor.
expedite both manufacture and shipment of equipment
7. INSPECTION-CHECKING-TERMS: and materials covered by the Purchase Order. The
The equipment, materials and workmanship covered by Owner/Owner's representatives shall have free access
the Purchase Order is subject to inspection and testing to Vendor's shop and/or sub supplier's shop at any time
at any time prior to shipment and/or despatch and to and they shall provide all necessary assistance and
final Inspection within a reasonable time after arrival at Information to help them perform their job.
site. Inspectors shall have the right to carry out the 9. WEIGHTS AND MEASUREMENTS:
Inspections and testing which will Include the raw
The shipping documents, invoices, packing lists and all
materials at manufacturer's shop, at fabricator's shop other relevant documents shall contain the same units
and at the time of actual despatch before and after
of weight and measurements as given in the Owner's
completion of packing. Purchase Order.
-2-
Page 54 of 395
10. OILS & LUBRICANTS: CARE GLASS FRAGilE, DON'T ROLL. THIS END UP.
The first filling of oils and lubricants for every equipment THIS END DOWN. to be indicated by arrow.
shall be included In the price. The vendor shall also A distinct colour splash in say red-black around each
recommend for quality and quantity of oils and lubricants package crate/bundle shall be given for identification.
required for one year's continuous operation. Ail pipes and sheets shall be marked with strips bearing
11. SPARE PARTS: progressive No.
The vendor must furnish itemised and priced list of spare In case of bundles, the shipping marks shall be
parts required for two years operation of the equipment. embossed on metal or similar tag and wired securely
The vendor shall provide the necessary cross sectional on each end.
drawing to Identify the spare parts numbers and their For bulk uniform material when packed in several cases,
location as well as inter-changeability chart. progressive serial numbers shall be indicated on each
12. PACKING AND MARKING: cases. All nozzles, holes and opening and also all
delicate surfaces shall be carefully protected against
All equipment/materials shall be suitably packed in
damage and bad weather. Flange faces of all nozzles
weather proof, seaworthy packing for ocean transport
shall be protected by blanks. All manufactured surfaces
under tropical conditions and for rail or road or other
shall be painted with rust proof paint.
appropriate transport in India. The packing shall be
strong and efficient enough to ensure safe preservance All threaded fittings shall be packed in cases.
upto the final point of destination. The vendor shall be held liable for all damages or
Equipment / Materials shall be protected by suitable breakages to the goods due to defective or Insufficient
coat of paint and all bright parts protected from rust by packing as well as for corrosion due to insufficient
application of rust preventive as may be necessary. All greasing/ protection.
machined surface shall be suitably protected. On three sides of the packages, the following marks
All fragile and all exposed parts will be packed with care shall appear clearly visible in indeliable paint and on
and the packages shall bear the words -HANDLE WITH Vendor's care and expense.
To:
Chief Manager (Projects)
Bharat Petroleum Corporation Ltd.
Koehl Refinery, Ambalamugal
Kochi - 682 302
Item:
Equipment:
NetWeight: Kgs.
Dimensions:
-3-
Page 55 of 395
l!!RI.;. MarKIngshall be bold-minimum letter height 5cm. charges, if any, surcharge, discount, etc. cleal
for every order and every shipment, packages must be and separately and the net total freight payab
marked with serial progressive numbering. All packages shown at the bottom.
will bear warning signs on the outside denoting the All documents vlz. bill of lading/airway bi,
center of gravity and sling marks. Packages that require Invoices/packing list, freight memos, country 4
special handing and transport should have their centres origin certificates, test certificate, drawings an
of gravity and points at which they may be gripped catalogues should be in English language.
clearly indicated and marked -Attention Special Load
In addition to the bill of lading which should b
Handle with Care" In English Language. Any other
obtained In 3 stamped original plus as many copiei
direction for handling shall be clearly indicated on the
as required, Invoices packing lists, freight memos
package.
(If the freight particulars are not shown In the billl
Top heavy containers will be so marked either Top of lading), country of origin certificate, test
Heavy or Heavy Ends. When packing material is clean composition certificate, shall be made out agains',
and light coloured, a dark black stencil paint shall be each shipment in as many number of copies as
acceptable. However, where packaging material is shown below. The bill of lading, invoice and
soiled or dark, a coat of flat zinc white paint shall be packing list specifically must show uniformly, the
applied and allowed to dry before applying the specific marks and numbers, contents case wise country
markings. of origin, consignees name, port of destination and
In case of large equipments like vessels, heat all other particulars as indicated under clause 12.
exchangers, etc. documents contained in the envelope The invoice must show the unit rates and net total
shall be fastened Inside a shell connection with an EO.B. prices. Items packed separately should also
identifying arrow sign -documents" applied with Indelible be Invoiced and the value shown accordingly.
paint. Packing list must show apart from other particulars
13. SHIPMENT AND SHIPMENT NOTICES: actual contents in each case, net and gross
weights and dimensions, and the total number of
The Vendor shall make shipment only after prior
packages. All documents should be duly signed
approval of Inspector whenever specifically mentioned.
by the Vendor's authorised representatives.
As soon as any shipment is made, the Foreign Supplier
shall send advance information by way of Fax message Shipping arrangements shall be made by
to Chief Manager (Projects), Bharat Petroleum Chartering Wing Ministry of Surface Transport,
Corporation Ltd., Koehl Refinery, Ambalamugal, Kochi- New Delhi through their respective forwarding
682 302 giving particulars of the shipment, vessel's agents, M/s. Schenker & Co., P.O. Box 110313
name, port of shipment, bill of lading number and date, 02043 Hamburg West Germany, Ph. 49 (040)
total FOB and freight value with confirmation copies by 361350, Fax (040) 36135216 Gr.2/a, Telex
post to the owner, Bharat Petroleum Corporation 217004-33 Sh.d, for shipping consignments from
Limited, Koehl Refinery, Ambalamugal, Kochi -682 302 UK / continent port; M/s. OPT Overseas Project
In case of air shipment a copy each of airway bill & Transport Inc. 46 sellers Street, kearny, N.J.
Invoice shall be sent by fax to BPCL as soon as 07032, Tel (201) 998-7771, Telex 673-3586, Fax
shipment is made. (201 )998-7833. In respect of consignments form
US/CANADA, MEXICO & SOUTH AMERICA and
14 SHIPPING:
the Embassy of India in Japan, Tokyo in respect
14.1 SEA SHIPMENT: of consignments from Japaneses ports. Supplier
All shipment of materials shall be made by first shall furnish to the respective agents the full details
class direct vessels, through the chartering wing, of consignments such as outside dimensions,
Ministry of Surface Transport Govt, of India, New weights (both gross and net) No. of packages,
Delhi as per procedure detailed hereunder. The technical descriptions and drawings, name ofthe
Foreign supplier shall arrange with Vessels Supplier, ports of loading, etc. 6 weeks notice shall
Owners or Forwarding Agents for proper storage be given by the supplier to enable the concerned
of the entire Cargo intended for the project in a agency to arrange shipping space.
specific manner so as to facilitate and to avoid The bill of lading Shall Indicate the following:
any over carriage at the port of discharge. All
Shipper: Government of India
shipment shall be under deck unless carriage on
deck is unavoidable. Consignee:
Bharat Petroleum Corporation Ltd.-
The bills of lading should be made out in favour of
Koehi Refinery,
Bharat Petroleum Corporation Ltd.,
Ambalamugal,
All columns in the body of the bill of lading namely Kochl - 682 302.
marks and nos. material description, weight
In case of supplies from USA, Export licences, if
particulars, etc. should be uniform in all the
any required from the American Authorities shall
shipping documents. The freight particulars should
be obtained by the U.S. suppliers. If need be
mention the basis of freight tonnage, heavy lift
-4-
Page 56 of 395
assistance for obtaining such export licences their delivery. By time delivery, is meant the date on the
would be available from India supply Mission at Bill of lading/Air way Bill at FOB port of despatch.
Washington. 17. DELAYED DELIVERY:
14.2 AIRSHIPMENT:
The time and date of delivery of materials/equipment
In case of Airshipment, the material shall be as stipulated in the Purchase Order shall be deemed
shipped through freight consolidator (approved by to be the essence of the agreement. For any delay in
us). The airway bill shall be made out in favour of delivery of equipment materials or part thereof beyond
BHARAT PETROLEUM CORPORATION LTD, the delivery date stipulated, the vendor shall be liable
Kochi Refinery, Ambalamugal, Kochi - 682 302 to pay compensation at O. 5% per week or part thereof
Tel: 91-484-2722061-69, Fax: 91-484- 2721094/ the FOB Port of embarkation value of the non-delivered
2720855/56. items of equipment subject to maximum of 5% of the
14.3 TRANSMISSION OF SHIPPING DOCUMENTS: total FOB value. The Owner reserves the right of
cancelling the Purchase Order for any delay exceeding
Foreign supplier shall obtain the shipping
the period of maximum compensation and the vendor
documents in eleven complete sets including three
shall be liable to all consequences thereof. If the delay
original stamped copies of the Bill of lading/Airway
in delivery is due to Force Majeure, the owner shall be
Bill as quickly as possible is made, and airmail as
free to act in terms under clause 18 of this text.
shown below so that they are received at least
three weeks before the Vessels' arrival in case of 18. DELAYS DUE TO FORCE MAJEURE:
sea shipment and immediately on air freighting in In the event of causes of Force Majeure occuring within,
case of air-shipment. Foreign supplier shall be fully the contractual date of delivery the Owner on receipt of
responsible for any delay and/or demurrage in application from the Vendor may extend the contractual
clearance of the consignment at the port due to date of delivery without imposition of penalty. Only those
delay in transmittal of the shipping documents. causes which depend on natural calamities, civil wars
If in terms of latter of otherwise, the complete and national strikes which have a duration of more than
original set of documents are required to be sent seven consecutive calendar days are considered the
to BPCL through Bank the distribution indicated causes of force majeure. The decision of Owner shall
below will confine to copies of documents only be final and binding on Vendor.
minus originals. The Vendor must advise the Owner by a Registered
Documents letter duly certified by a local chamber of statutory
BPCL, Kochi Refinery
authorities, the beginning and the end of the delay
Bill of lading/ 4 (including 1 immediately, but in no case later than within 10 days of
Airway Bill original) the beginning and end of such cause of Force Majeure
Invoice 4 condition as defined above.
Packing List 4 19. REJECTION, REMOVAL OF REJECTED GOODS
Freight Memo 4 AND REPLACEMENT:
Country of Origin-
Certificate 4 In case the testing and inspection at any stage of
4 inspection reveal that the equipment, materials and
Drawing
1 workmanship do not comply with the specification and
Catalogue
Invoice ofthird 4 requirements, the same shall be removed by the Vendor
at his/its own expense and risk within the time allowed
Party/Lloyd for
by the Owner. The Owner shall be at liberty to dispose
Inspection charges,
of such rejected goods in such a manner as he may
wherever applicable.
think appropriate. In the event the Vendor fails to remove
15. TRANSIT RISK INSURANCE:
the rejected goods within the period as aforesaid, all
Insurance against all marine and transit risk on FOB to expenses incurred by the Owner for such disposal shall
warehouse basis shall be covered under the owner's be to the account of the Vendor. The freight paid by the
marine policy. However, the Vendor shall ensure the in Owner, if any, on the inward joumey of the rejected
effecting shipments clear bills of lading/airway bills are materials shall be reimbursed by the vendor to the
obtained and the carriers responsibility is fully retained Owner before the rejected materials are removed by
the carriers so that the consignee's interests are fully the Vendor. The Vendor will have to proceed with the
secured and are in no way jeopardized. replacement of that equipment without claiming any
16. RESPECT FOR DELIVERY DATES: extra payment if so required by the Owner. The time
taken for replacement in such event will not be added
Time of delivery mentioned in the Purchase Order shall
to the contractual delivery period.
be the essence of the agreement and no variation shall
be permitted except with prior authorisation in writing 20. PRICE:
from the Owner. Goods should be delivered securely Unless otherwise agreed to in the terms of the Purchase
packed and in good order and condition at the place Order, the price shall be :
and within the time specified in the Purchase Order for
-5-
Page 57 of 395
Firm and not subject to escalation for any reason equipment and/or materials or which can, in any way.
whatsoever even though It might be necessary for the 26. PERFORMANCE GUARANTEE:
order execution to take longer than the delivery period
The Vendor shall guarantee that any and all materials
specified in the order. used in execution of the Purchase Order shall in strict
21. TERMS OF PAYMENT: compliance with characteristics, requirements and
Payment will be made by the Owner against submission specifications and that the same shall be free from any
of despatch documents by Cash Against Documents/ defects. Checking of the Vendor's drawings by the
Letter of Credit. Owner/Owner's representatives and their approval and
22. RECOVERY OF SUMS DUE: permission to ship or despatch the equipment and
materials granted by Inspectors shall not relieve the
Whenever any claim against the Vendor for payment
Vendor from any part of hlsllts responsibilities for proper
of a sum of money arises out of or under the contract,
fulfillment of the requirements. The Vendor will
the Owner shall be entitled to recover such sums from
guarantee that all materials and equlpments shall be
any sum them due or when at any time thereafter may
repaired or replaced as the case may be at site, at its
become due from the Vendor under this or any other
contract with the Owner and should this sum be not own expense, in case the same have been found to be
defective in respect of material, workmanship or smooth
sufficient to cover the recoverable amount, the vendor
and rated operation within a period of twelve months
shall pay to the Owner on demand the balance after the same have been Commissioned or 18 months
remaining due.
from despatch whichever is earlier.
23. MODIFICATIONS:
The guarantee period for the part that may be altered,
The Owner shall have the right to make technical repaired or replaced shall be 12 months from the date
changes or modifications in the technical documents/ on which the same is commissioned.
specifications. Any major changes or modifications shall
Acceptance by the Owner or Its inspectors of any
be at the cost, if any, of the Owner. As soon as possible
equipment and materials or its replacement will not
after receipt of the written request for changes the
relieve the Vendor of its responsibility of supplying the
vendor shall furnish in writing to the owner an estimate
equipment/materials strictly according to the guarantee
of cost for such major changes and modifications and
agreed by the Vendor. The Vendor shall furnish a Bank
its effect on the FOB delivery date. On receipt of
Guarantee along with the order acceptance for the
Owner's written authorisation, the Vendor shall promptly
amount equivalent to 10% of the F.O.B. value of
proceed with the changes/modifications.
equipment/ materials to support Vendor's performance
24. CANCELLATION: (as per proforma hereunder). This Bank Guarantee shall
The owner reserves the right to cancel this Purchase remain in force for the entire period covered by the
Order or any part thereof and shall be entitled to rescind performance guarantee. It will be the responsibility of
the contract wholly or in part In a written notice to the the Vendor to keep the Bank Guarantee fully
Vendor if: subscribed. Any shortfall in the value of the Bank
The Vendor fails to comply with the terms of this Guarantee as a result of encashment by the owner
Purchase Order. either in full or in part in terms of the performance
Guarantee shall be made good by the Vendor within
The Vendor fails to deliver the goods on time and/or one week thereof.
replace the rejected goods promptly:
27. NON-WAIVER:
The Vendor makes a general assignment for the benefit
of creditors; and Failure of the Owner/Owner's representatives to insist
upon any of the terms or conditions incorporated in the
A receiver is appointed for any of the property owned
Purchase Order or failure or delay to exercise any rights
by the Vendor.
or remedies specified herein or by law or failure to
Upon receipt of the said cancellation notice, the Vendor properly notify Vendor in the event of breach, or the
shall discontinue all work on the Purchase Order and acceptance of payment of any goods hereunder or
matters connected with it. approval of design shall not release the Vendor and
The owner in that event will be entitled to procure the shall not be deemed waiver of any right of the Owner
requirement in the open market and recover excess or Owner's representatives to Insist upon the strict
payment over the Vendor reserving to Itself the right to performance thereof or any of his or their rights or
forfeit the security deposit, if any, placed by the Vendor remedies as to any such goods regardless of when
against the contract. goods are shipped, received or accepted nor shall any
25. PATENTS AND ROYALTIES: purported modification or revision ofthe order by Owner/
Owner's representative act as waiver of the terms
On acceptance of this order, the Vendor will be deemed hereof.
to have entirely indemnified the Owner's representatives
from any legal action or claims regarding compensation 28. NO ASSIGNMENT:
for breach of patent rights which the Vendor deems The purchase Order shall not be assigned to any other
necessary to comply for manufacturing the orclefed agency by the Vendor without obtaining prIor-written
-6-
Page 58 of 395
consent of the Owner. maintenance of the equipment if required by the Owner.
29. VENDOR'S DRAWINGS AND DATA REQUIREMENT: The terms and conditions for the services of the
Vendor's personnel shall be indicated in the quotation
The Vendor shall submit drawings data and itself.
documentation in accordance with but not limited to
32. ARBITRATION:
what is specified in the bid document and lor In Vendor's
drawings and data form attached to the Purchase Order Any dispute or difference between the Vendor on one
and as called for in clause 8, vlz, 'Expediting' above. hand and the Owner on the other. of any kind
The types, quantities and time limits of submitting this whatsoever at any time or times, arising out of or in
must be respected in its entirety failing which the connection with or incidental to the Purchase Order
purchase Order shall not be deemed to have been including any dispute or difference regarding the
executed for all purposes including settlement of interpretation of the terms and conditions or any clause
payment since the said submission is an integral part thereof shall be referred to arbitration under the Rules
of purchase Order execution. of International Chamber of Commerce in Paris. The
30. TECHNICAL INFORMATION: venue of such arbitration shall be in India. The Indian
law shall apply.
Drawings, specifications & details shall be the property
of the Owner and shall be returned by the Vendor on 33. PART ORDER I REPEAT ORDER:
demand. The Vendor shall not make use of drawings Vendor shall agree to accept part order at owner's
and specifications for any purpose at any time save option without any limitations whatsoever and also
and except for the purposes of the Owner. The Vendor accept repeat order during a period of six months after
shall not disclose the technical Information furnished placement of purchase order at the same unit prices
or gained by the Vendor to any person, firm or body or terms and conditions.
corporate authority and shall make all endeavours to 34. ADDRESS:
ensure that the technical Information is kept
Bharat Petroleum Corporation Ltd.
CONFIDENTIAL. The technical information imparted
and supplied to the Vendor by the Owner shall at all Kochi Refinery
times remain the absolute property ofthe Owner. Ambalamugal
31. SERVICES OF VENDOR'S PERSONNEL: Kochi - 682 302
Upon two weeks advance notice, the Vendor shall INDIA
depute the necessary personnel to India for supervision Tel: 91-484-2722061-69
of erection and start up of the equipment and train a Fax: 91-484-2721094/2720855/56
few of the Owner's personnel for the operation and
-7-
Page 59 of 395
PROFORMA OF BANK GUARANTEE
( Performance )
(Ref. clause 26)
To
Bharat Petroleum Corporation Limited
Koehl Refinery, Ambalamugal, Kerala- 682302
Dear Sir,
In consideration of the Bharat Petroleum Corporation Limited (hereinafter called 8the Company8 which expression shall
include its suceessorsand assigns) having awarded to MIs. (Name) (address)
......................................................................................................................................................................... (hereinafter
referred to as ~he Supplier- which expression wherever the subject or context so permits Include Its successors and assigns) a
supply contract In terms Interalia, of the Company's Purchase Order No dated and the
General Purchase Conditions of the company and upon the condition of supplier's fumishing security for the Performance of the
supplier's obligation and/or discharge of the supplier's liability under and/or In connection with the said supply contract up to a
sum of (in figure) (in words) .
................ ) contract value.
we, (Name) (constitution) ; (hereinafter called
8the Bank8 which expression shall include its successors and assigns) hereby jointly and severally undertake the guarantee to
pay to the Company In (Currency) forthwith on demand in writing and without protest or demur of any and all moneys anywise
payable by the Supplier to the Company under in respect of or in connection with the said supply contract inclusive of all the
Company's losses and damages and costs, (Inclusive between attorney and client), charges and expenses and other moneys
anywise payable In respect to the above as specified in any notice of demand made by the Company to the Bank with reference
to this Guarantee up to aggregate limit of Rs (Rupees .
.. ... . ... .. . .. .... .. . ... .. ... ... ... ... .... ..only)
AND the Bank hereby agrees with company that:
This Guarantee / Undertaking shall be a continuing / undertaking and shall remain valid and irrevocable for all claims of the
Company and liabilities of the Supplier arising up to and until midnight of .
This date shall be 6 months from the last date of guarantee period
This Guarantee / Undertaking shall be in addition to any other guarantee or security whatsoever that the company may now or at
any time anywise have in relation to the Supplier's obligationslliabilities under and/or connection with the said supply contract,
and the Company shall have full authority to take recourse to or reinforce this security in preference to the other securlty(ies) at
its sole discretion, and failure on the part of the Company in enforcing or requiring enforcement of any other security shall have
the effect of releasing the Bank from its liability hereunder.
The company shall be at liberty without reference to the bank and without affecting the full liability of the Bank hereunder to take
any other security in respect of the Supplier's obligations and/or liabilities under or In connection with the said supply contract
and to vary the terms vis a vis the supplier of the said supply contract or to grant time and/or Indulgence to the supplier or to
reduce or to Increase or otherwise vary the prices of the total contract value or and/or the remedies of the company under any
other security (Ies) now or hereafter held by the company and no such dealing(s), varlation(s), reduction(s), Increase(s) or the
indulgence(s) or arrangement(s) with the supplier or release or forbearance whatsoever shall have the effect of releasing the
Bank from its full liability to the Company hereunder or of prejudicing rights of the Company, against the Bank.
The Guarantee / Undertaking shall not be determined or affected by the liquidation or winding up, dissolution or change of
constitution or insolvency of the supplier but shall in all respects and for all purposes be binding and operative until payment of all
moneys payable to the Company in terms hereof.
The Bank hereby waives all rights at any time inconsistent with the terms of its Guarantee / Undertaking and the obligations of the
Bank in terms hereof shall not be anywise affected or suspended by reason of any dispute or disputes having been raised by the
supplier (whether or not pending before any Arbitrator, office, Tribunal or Court) or any denial of liability by the supplier or any
other of communication whatsoever by the supplier stopping or preventing or purporting to stop or prevent any payment by the
Bank to the Company in terms hereof.
The amount stated in any notice of demand addressed by the Company to the Guarantor as liable to be paid to the Company by
the supplier or as suffered or incurred by the Company on account of any losses or damages of costs, charges and or expenses
shall as between the Bank and the company be conclusive of the amount so liable to be paid to the Company or suffered or
incurred by the Company, as the case may be and payable by the Guarantor to Company in terms hereof.
Yours faithfully,
-8-
Page 60 of 395
PREAMBLE TO PRICE SCHEDULE (INDIAN)
RFQ NO. SM/A307-IF-VV-MR-6210/1189
ITEM : PRESSURE VESSEL - CS (26-50 MM )
1 Scope of supply including testing, inspection, documentation etc., shall be strictly as per Material Requisition and other documents which are part of RFQ.
2 Bidder shall furnish built-in CIF value if any, against each quoted item, giving details of description of goods, qty. rate of Custom Duty etc. in attached FORM- 2..
3 All the Columns of quoted items in the Price Schedule must be filled with required information, as applicable.
4 Bidder to quote transportation charges inclusive of Service Tax and Ed. Cess. there upon.
5 Bidder must quote the price in enclosed Price Schedule formats only. The formats shall not be changed and/or retyped.
6 Quoted prices are firm and fixed till complete execution of the entire order and no variation on any account is allowed.
7 Bidders shall quote Unit Rates for Addition/ Deletion purpose, as per Format provided with Material Requisition.
8 Bidder to note that inspection shall be carried out by EIL and the charges for the same shall be borne by Owner. However, in case of certain Import Contents as required by bidder for subject
item the same shall be procured under TPIA (Lloyds/BV/DNV/TUV/CEIL) inspection in the country of origin and the quoted prices shall be inclusive of the same.
9 Bidder must submit signed and stamped Un-Priced copy of Price Schedule indicated "Quoted"or "Not Quoted" against each item with their Unpriced offer.
10 In case of any discrepancy between Unit Price and Total Price, Unit Price shall prevail.
11 Bidder to confirm that he has noted the contents of the Preamble to the Price Schedule, Price Schedule, RFQ, Material Requisition etc and quoted his prices accordingly without any deviation.
NOTES: 1.Bidders must submit this document duly signed and stamped with both unpriced & priced offer.
Page 61 of 395
PRICE SCHEDULE (INDIAN BIDDER)
RFQ NO. SM/A307-IF-VV-MR-6210/1189
ITEM : PRESSURE VESSEL - CS (26-50 MM )
NAME OF BIDDER: M/S __________________________
01.04 Tag No. R-V-151 for ISOM FEED SURGE DRUM (NEW) 1
Page 62 of 395
Page 2 of 3
FORM-2
DETAILS OF BUILT-IN-CIF VALUE OF IMPORT CONTENT CONSIDERED AND INCLUDED IN QUOTED FOT DESPATCH POINT PRICES UNDER PRICE SCHEDULE
DESCRIPTION CIF value of Import RATE OF IMPORT DUTY INCLUDED IN QUOTED SUPPLY PRICES
For Item Sl Description Qty. Content included in CUSTOM BASIC CVD + EDU. EDU. CESS SAD (%) TOTAL CUSTOM
. No. as per of Imported (Unit____) quoted supply TARIFF CUSTOMS CESS ON ON DUTY (%)
MR Items *(1) prices for column NO. DUTY (%) CVD (%) CUSTOM
(2) Qty. DUTY (%)
(In Rs)
1 2 3 4 5 6 7 8 9
i)_____
ii)_____
Page 63 of 395
PREAMBLE TO PRICE SCHEDULE (FOREIGN)
RFQ NO. SM/A307-IF-VV-MR-6210/1189
ITEM : PRESSURE VESSEL - CS (26-50 MM )
1 Scope of supply including testing, inspection, documentation etc., shall be strictly as per Material Requisition and other documents which are part of RFQ.
2 Bidder must quote in USD / Euro / INR only.
3 All the Columns of quoted items in the Price Schedule must be filled with required information, as applicable.
4 Bidder shall quote Ocean freight from FOB International Port of exit to Kochi Port of entry India
5 Bidder must quote the price in enclosed Price Schedule formats only. The formats shall not be changed and/or retyped.
6 Quoted prices are firm and fixed till complete execution of the entire order and no variation on any account is allowed.
7 Bidders shall quote Unit Rates for Addition/ Deletion purpose, as per Format provided with Material Requisition.
8 Bidder's quoted prices are inclusive of TPI Charges, TPI Agency will be Lloyds/BV/DNV/TUV/CEIL.
9 Bidder must submit signed and stamped Un-Priced copy of Price Schedule indicated "Quoted"or "Not Quoted" against each item with their Unpriced offer.
10 In case of any discrepancy between Unit Price and Total Price, Unit Price shall prevail.
11 Bidder to confirm that he has noted the contents of the Preamble to the Price Schedule, Price Schedule, RFQ, Material Requisition etc and quoted his prices accordingly without any deviation.
NOTES: 1.Bidders must submit this document duly signed and stamped with both unpriced & priced offer.
Page 64 of 395
PRICE SCHEDULE (FOREIGN BIDDER)
RFQ NO. SM/A307-IF-VV-MR-6210/1189
ITEM : PRESSURE VESSEL - CS (26-50 MM )
NAME OF BIDDER: M/S __________________________
MAIN SUPPLY PRICE
01.04 Tag No. R-V-151 for ISOM FEED SURGE DRUM (NEW) 1
Page 65 of 395
Page 2 of 2
Job No. : A307
BPCL-KR - IREP
All raw/solid wood packaging material used for packaging shall be appropriately treated and marked as
per ISPM-15 (International Standards of Phyto-sanitary measures 15) OR shall be accompanied by a
Phytosanitary Certificate with the treatment endorsed.
The treatment of raw/solid wood packaging material prior to export shall include either Methyl Bromide
(MB) @ 48 g/m3 for 16 hrs at 21 C and above or any equivalent thereof or heat treatment (HT) at 56
C for 30 min (core temperature of wood) or Kiln Drying (KD) or Chemical Pressure Impregnation (CPI)
or any other treatments provided that these meet the HT specifications of the ISPM-15.
However, the above conditions shall not be applicable to wood packaging material wholly made of
processed wood products such as ply wood, particle board, oriental strand board of veneer that have
been created using glue, heat and pressure or combination thereof. The above conditions shall also
not be applicable to wood packaging material such as veneer peeler cores, wood wool & shavings and
thin wood pieces (less than 6mm thickness) unless they are found to be harboring any pests.
SPR-Foreign Page 1 of 1
Page 66 of 395
Tax Residency Certificate (TRC) Format for Foreign Bidder
Note:-
1. Tax Residency Certificate (TRC) containing above details is compulsory for claiming tax
relief under Double Taxation Avoidance Agreement (DTAA) in respect of foreign
remittances.
2. TRC containing the details as above shall be verified by the Govt of the country or the
specified territory of which the contractor/ Licensor (ie, assessee) claims to be a resident
for the purpose of tax.
3. Bidder must submit TRC containing the details as above along with invoice for the
purpose of effecting payment. Please be noted that non furnishing of TRC will delay
the payment to non residents.
Page 67 of 395
Annexure - I
Bidders who wish to participate for RFQs/ Tenders which are uploaded on EILs
Authorised service providers website (i.e. www.tenderwizard.com/eil) should follow
the following instructions which shall permit them to Search, View, Download and
Submit their Electronic Bids online in a secure manner ensuring confidentiality. These
Instructions for E-Tendering shall be read in conjunction with various instructions,
wherever appearing with the RFQ/ Bidding Document. The conditions & instructions
mentioned here in under shall supersede and shall prevail over the conditions &
instructions enumerated elsewhere in the RFQ/ Bidding Document.
3) DIGITAL SIGNATURE
Bidders cannot submit e-bids without having valid Digital Signature. The Digital
Signature shall be issued by C.A. (Certifying Authority) in India, in the name of a
person authorized for E- Tendering on behalf of his Company.
Page 1 of 5
Page 68 of 395
Annexure - I
Note: In terms of Indian I.T Act 2000, only a digitally signed document will be
considered as a valid signed document.
Bidders are required to submit the Bid Document Fee & EMD (in the prescribed
format) in original as per the manner prescribed in the RFQ/ Bidding Document at
the time of bid submission in sealed envelope. However, bidders are required to
upload the scanned copy of both Bid Document fee as well as EMD on E- Tendering
website along with the e-bid.
If the Bidder is unable to submit Bid Document Fee & EMD in original within the due
date & time, he may submit the original Bid Document Fee & EMD within 7 days
from the date of unpriced bid opening, provided copy of the same have been
uploaded on E-Tendering Website. In case the bidder fails to submit the same in
original within 7 days, his bid shall be rejected, irrespective of their status/ ranking
in tender and notwithstanding the fact that a copy of Bid Document Fee & EMD
was earlier uploaded by the bidder.
5) SUBMISSION OF BID :
Bidders are required to upload the bid along with all supporting documents & Priced
part on the E-Tendering website (www.tenderwizard.com/eil) only. However,
documents required to be submitted physically, viz., Bid Document Fee, EMD, etc.,
need to be submitted in a sealed envelope as per the provisions of RFQ/ Bidding
Document.
Bidders shall ensure that all the required documents are uploaded in time and
failure to upload the same before bid submission date & time is the sole
responsibility of bidder. Under no circumstances, EIL shall entertain any request for
acceptance of bid documents in physical form or any other form, which are required
to be uploaded on E- Tendering Website.
The bidders needs to submit prices on-line strictly as per the Price Schedule
format provided in our E-Tender.
Bidders can submit their Bids on-line only after digitally signing the bid/documents
with the Digital Signatures used for log-in.
Page 2 of 5
Page 69 of 395
Annexure - I
No Late Bids after due date & time shall be permitted in E -Tendering website.
The system time (IST) being displayed on the E-Tendering website shall be final and
binding on bidder and bids have to be submitted by bidders considering this time only
and not the time as per their location / country. Bidder who intends to change the bid
already submitted may change/revise the same on or before the closing date &
time of bid submission.
Note:
i) Bidders are advised in their own interest to ensure that bids are uploaded in E-
tendering website well before the closing date and time of bid submission.
ii) No bid can be modified after the dead line for submission of bids.
iii) EIL shall not be responsible for any failure on the part of the bidder to follow the
instructions.
iv) Inadvertently, if a document is uploaded in E- tendering website by the
bidders, such document can be deleted by the Bidder and a new/modified
document can be uploaded digitally signed within the bid due date & time.
v) Bidders are requested to upload small sized documents preferably (upto 5 MB)
at a time to facilitate easy uploading into E- Tendering website. EIL does
not take any responsibility in case of failure of the bidder to upload the
documents within specified time of Bid submission.
vi) Wherever, the bidders are asked to upload the required document in Mandatory
folders, the bidders must upload the required document only in the Mandatory
folders.
6) OPENING OF BIDS:
The unpriced bids shall be opened online, at the specified date and time given in the
RFQ document or extended otherwise. The price bids shall also be opened online
on the date & time which will be informed to all the techno-commercially qualified/
acceptable bidders in advance.
The bidders who have submitted their bid will be able to view online the name &
status of all the bidders at their respective windows, after unpriced bid opening by
buyer. Similarly, the techno-commercially acceptable bidders will be able to view
online the price sheets of other techno-commercially acceptable bidders at their
respective windows, after priced bid opening by buyer.
Page 3 of 5
Page 70 of 395
Annexure - I
Wherever the composite bids are invited, the composite bids shall be opened
accordingly.
System does not allow for submission of bids beyond the deadline for bid
submission. The system time displayed on EILs ASP E-Tendering website shall be
final and binding on the bidders for all purposes pertaining to various events of the
subject RFQ/ Bidding Document and no other time shall be taken into cognizance.
8) GENERAL
The bidders may quote from their own offices/ place of their choice. Internet
connectivity shall be ensured by bidders on its own.
Bidders agree to non-disclosure of trade information regarding the purchase,
identity of EIL, bid process, bid technology, bid documentation and bid details.
EIL shall not have any liability to bidders for any interruption or delay in access to
the site irrespective of the cause.
EIL shall not be responsible for any indirect / consequential losses / damages,
including but not limited to systems problems, inability to use the system, loss of
electronic information, etc.
EIL decision on award of Contract shall be final and binding on all the Bidders.
EIL reserves the right to prescribe different Security Devices for accessing and/or
using E-Tendering System or any part thereof, including but not limited to
prescribing different Security Device(s) for accessing and/or using different parts
of E-Tendering System.
EIL reserves the right to prescribe password(s) and Login ID(s) for the bidders
and its representatives as well as any combination and/or sequence of letters
and/or numerals for the password(s) and Login ID(s).
The actions, failures, omissions and defaults of the bidder's representative(s)
shall be construed and be given legal effect as if they are the actions, failures,
omissions and defaults of the bidder and the bidder shall be fully responsible for
all such matters.
The bidder shall bear all costs and expenses in relation to its access and use of
E-Tendering System, including but not limited to the costs and expenses incurred
in ensuring its continued access and use of E-Tendering System.
EIL shall not be responsible or held liable under these Terms and Conditions for
any loss or damage that is caused to any party due to use or misuse of the
E-Tendering System or breach, by any party, of the Terms and Conditions
mentioned herein.
Page 4 of 5
Page 71 of 395
Annexure-II
2: Mr. Sachin
Contact no: 8401982112
Email: sachin.t@antaressystems.com
Page 72 of 395
Page 5 of 5
First of all you need to open internet explorer
Type the website address http://www.tenderwizard.com/EIL in the address bar and click
Go to access the Login Screen.
Page 73 of 395
Now open IE and go to the tools ->internet options->
Page 74 of 395
Page 75 of 395
Make all settings as per follows
Page 76 of 395
Page 77 of 395
Page 78 of 395
Page 79 of 395
Page 80 of 395
Page 81 of 395
Page 82 of 395
Page 83 of 395
Page 84 of 395
Page 85 of 395
Page 86 of 395
Page 87 of 395
Page 88 of 395
Follow same in the next
Page 89 of 395
Page 90 of 395
Page 91 of 395
Page 92 of 395
Page 93 of 395
Page 94 of 395
Page 95 of 395
Page 96 of 395
After making all setting you need to login and you will get the page as follows
And install java by clicking the link but before uninstalling the older java version.
Page 97 of 395
E-Tendering Help Manual
for Bidders
ENGINEERS INDIA LIMITED
Page 98 of 395
Overview
Tender Wizard is an exclusive, most vibrant end to end solution for buying / selling of products and
services through tendering process. It supports A - Z activities of tendering based on proactive work
flow concept. Fine details of tendering like vendor registration, Bid Document announcement and
corrigendum, Bid Document form processing, opening, negotiation and Bid Document awarding are
supported in a real time interactive environment. Tender Wizard creates a true dynamic market place
for both buyers and vendors to interact with each other and transact business.
Purpose
The objective of developing the TENDERWIZARD is to automate the departments of Governments.
The key objectives of this exchange are Reduced Inventory, consistency in costs across all
departments, consistent and sustainable Vendor Development, transactional effectiveness,
procurement lead time reduction, transparency etc.,
Audience
This product is extensively used by the Government officials and contractors to enhance the
transparency in the day to day tendering activities of the Government offices as well as in contractor
community.
Disclaimer
ANTARES assumes no responsibility for any errors that may appear in this document. The
information contained herein is subject to change without notice and should not be construed as a
commitment by Antares. No responsibility is assumed for the reliability of software or equipment that
is not supplied by Antares.
Copyright
This document is confidential and proprietary information of Antares. It should not be disclosed in
whole or in part to any third party except to the document to whom it has been submitted without the
express written authorization of Antares and should not be duplicated in whole or part for any other
purpose other than evaluation of the Technical capability of Antares and shall be returned upon
request.
Any reference used in this response is proprietary and is covered under non-disclosure agreement.
The information should not be divulged to any other party other than for whom it is intended. Clients
and partners may not be contacted about these references or divulge the information contained there-
in unless duly authorized by Antares.
Copyright 2007
Strictly private and confi dential
Page 99 of 395
Login screen
Type the website address http://www.tenderwizard.com/EIL in the address bar and click Go to
access the Login Screen.
Login procedure
Enter the given USER ID in the box provided. Enter the given PASSWORD in the box provided.
Click ENTER to login to the tendering website. The screen directs you to the PKI based login screen
(as shown below):
As a Security purpose the system automatically asks the user to change the password as shown in
Figure during the first login. Enter the Old and New Password along wit the Hint Question and Answer
and the click Submit to update the new Password. The user needs to login once again with the new
password (note the User Id remains the same) which gives the user the authentication to the change
of password.
Copyright 2007
Strictly private and confi dential
Once again the system will ask you to enter the password as shown below. Enter your password and
click Enter to proceed:
Copyright 2007
Strictly private and confi dential
Once the user logs in to the system, by default In Progress screen will be displayed where all the
applied Bid Documents are viewed.
Click Un Applied to view the new / unapplied Bid Documents. If the Bid Document is due for
request, then a Blue colour icon will appear on the screen as displayed below:
Once the user requested for the Bid Document, he can access this Bid Document through In
Progress section and the status of the Bid Document will be displayed as Received. The Bid
document has to be paid during submission of Bid document.
Note:
1: Do not upload the SOR or Price Schedule which is in the form of the excel sheet in
which you are required to fill the price, this will upload directly from your system.
2: If there is EMD required and it is in the form of BG then scan the EMD in the two
ways
a: First page in the JPEG or JPG format, this page is not required to upload in the
document library it will upload directly from your system.
b: Scan all pages in the PDF format, this should be uploaded in the doc library.
Copyright 2007
Strictly private and confi dential
Copyright 2007
Strictly private and confi dential
Note: The file name should not contain any special character and not even <space> but you can give
one space in the attach name and description.
Copyright 2007
Strictly private and confi dential
Now again come back on in progress and click on the edit attachment level 1
Copyright 2007
Strictly private and confi dential
Now you are required to attach the document one by one in the given link as below
Copyright 2007
Strictly private and confi dential
But before submission you are required to upload rest of other supporting document besides the
document which was showing in the red color otherwise you will get the below message.
Copyright 2007
Strictly private and confi dential
Copyright 2007
Strictly private and confi dential
Copyright 2007
Strictly private and confi dential
Once the user submits the form, the following confirmations shall appear as an authentication to the
submission of the Bid Document. Preserve the printout of confirmation as shown in Figures.
Note that the status of the Bid Document will be changed as Submitted, once user click on the final
submission button.
Copyright 2007
Strictly private and confi dential
Copyright 2007
Strictly private and confi dential
Opening event
Vendors can view the opening event sitting at their own places using internet connection. The Bid
Document will be moved to Opened / Awarded section once it is opened by the tendering authority
(as shown in figure). If the vendor is not disqualified then the status will be shown as In the Race (as
shown in figure).
Copyright 2007
Strictly private and confi dential
Copyright 2007
Strictly private and confi dential
INTEGRITY PACT
Between
And
Preamble
The Principal intends to award, under laid down organization procedures, contract/s
for
The Principal values full compliance with all relevant laws and
regulations, and the principles of economic use of resources, and of fairness and
transparency in its relations with its Bidder/s, Contractor/s and Supplier/s.
In order to achieve these goals, the Principal cooperates with the renowned
international Non-Governmental Organisation "Transparency International" (TI).
Following TI's national and international experience, the Principal will appoint an
Independent External Monitor (IEM) who will monitor the tender process and the
execution of the contract for compliance with the principles mentioned above.
Accordingly, the Principal has appointed Mr. Janki Ballabh and Mr. T. S.
Krishnamurthy as IEM with the following address:-
1) The Principal commits itself to take all measures necessary to prevent corruption
and to observe the following principles:
Page 1 of 6
b) The Principal will, during the tender process, treat all Bidders with equity and
reason. The Principal will, in particular, before and during the tender process,
provide to all Bidders the same information and will not provide to any Bidder
confidential / additional information through which the Bidder could obtain an
advantage in relation to the tender process or the contract execution.
c) The Principal will exclude from the process all known prejudiced persons.
2) If the Principal obtains information on the conduct of any of its employees which is
a criminal offence under the relevant Anti-Corruption Laws of India, or if there be a
substantive suspicion in this regard, the Principal will inform its Vigilance Office
and in addition can initiate disciplinary actions.
a) The Bidder / Contractor/Supplier will not, directly or through any other person
or firm, offer, promise or give to any of the Principal's employees involved in
the tender process or the execution of the contract or to any third person, any
material or immaterial benefit which he/she is not legally entitled to, in order to
obtain in exchange, any advantage of any kind whatsoever during the tender
process or during the execution of the contract.
b) The Bidder / Contractor/Supplier will not enter with other Bidders into any
undisclosed agreement or understanding, whether formal or informal. This
applies in particular to prices, specifications, certifications, subsidiary
contracts, submission or non-submission of bids or any other actions to
restrict competitiveness or to introduce cartelisation in the bidding process.
c) The Bidder / Contractor/Supplier will not commit any offence under the
relevant Anti-Corruption Laws of India; further the Bidder / Contractor/Supplier
will not use improperly, for purposes of competition or personal gain, or pass
on to others, any information or document provided by the Principal as part of
the business relationship, regarding plans, technical proposals and business
details, including information contained or transmitted electronically.
d) The Bidder / Contractor/Supplier will, when presenting his bid, disclose any
and all payments he has made, is committed to, or intends to make to agents,
brokers or any other intermediaries in connection with the award of the
contract.
Page 2 of 6
3) The Bidder accepts and undertakes to respect and uphold the Principal's
absolute right to resort to and impose such exclusion and further accepts and
undertakes not to challenge or question such exclusion on any ground, including
the lack of any hearing before the decision to resort to such exclusion is taken.
This undertaking is given freely and after obtaining independent legal advice.
4) If the Bidder / Contractor/Supplier can prove that he has restored / recouped the
damage caused by him and has installed a suitable corruption prevention system,
the Principal may revoke the exclusion prematurely.
1) If the Principal has disqualified the Bidder from the tender process prior to the
award according to Section 3, the Principal is entitled to demand and recover
from the Bidder liquidated damages equivalent to Earnest Money Deposit/Bid
Security.
Page 3 of 6
1) The Bidder declares that no previous transgression occurred in the last 3 years
with any other Company in any country conforming to the TI approach or with any
other Public Sector Enterprise in India that could justify his exclusion from the
tender process.
2) The Principal will enter into agreements with identical conditions as this one with
all Bidders, Contractors/Suppliers and Subcontractors.
3) The Principal will disqualify from the tender process all Bidders who do not sign
this Pact or violate its provisions.
Page 4 of 6
2) The Monitor is not subject to instructions by the representatives of the parties and
performs his functions neutrally and independently. He reports to the Chairperson
of the Board of the Principal.
3) The Bidder/Contractor/Supplier accepts that the Monitor has the right to access
without restriction to all Project documentation of the Principal including that
provided by the Bidder/Contractor/Supplier. The Bidder/Contractor/Supplier will
also grant the Monitor, upon his request and demonstration of a valid interest,
unrestricted and unconditional access to this project documentation. The same is
applicable to Subcontractors. The Monitor is under contractual obligation to treat
the information and documents of the Bidder/Contractor/Supplier/Subcontractor
with confidentially.
4) The Principal will provide to the Monitor sufficient information about all meetings
among the parties related to the Project provided such meetings could have an
impact on the contractual relations between the Principal and the
Bidder/Contractor/Supplier. The parties offer to the Monitor the option to
participate in such meetings.
6) The Monitor will submit a written report to the Chairperson of the Board of the
Principal within 8 to 10 weeks from the date of reference or intimation to him by
the 'Principal' and, should the occasion arise, submit proposals for correcting
problematic situations.
Page 5 of 6
This Pact begins when both parties have legally signed it. It expires for the
Contractor/Supplier 12 months after the last payment under the respective contract,
and for all other Bidders 6 months after the contract has been awarded.
If any claim is made / lodged during this time, the same shall be binding and
continue to be valid despite the lapse of this pact as specified above, unless it is
discharged / determined by Chairperson of the Principal.
4) Should one or several provisions of this agreement turn out to be invalid, the
remainder of this agreement remains valid. In this case, the parties will strive to
come to an agreement to their original intentions.
..
For the Principal For the Bidder/Contractor/Supplier
Place Witness 1
(Signature/Name/Address)
Witness 2:
Date --------------- (Signature/Name/Address)
Page 6 of 6
Till further advice, Shri Brahm Dutt shall be the External Independent
Monitor. The details are as under:
We (Name) .. (Constitution) ..
(Address) (hereinafter referred to as the Bank which expression shall,
unless repugnant to the context or meaning thereof, include its successors, administrators,
representatives and assigns) do hereby guarantee and undertake to pay the Company
without protest or demur any and all moneys payable by the supplier by reason of any
beach by the said supplier of any of the terms or conditions of the said Purchase Order, to
the extent of Rs. . (Rupees . only) till the said advance is adjusted
as aforesaid at any time upto
The amount stated by the Company in any demand, claim or notice, as liable to be paid to
the Company by the supplier, with reference to the above mentioned advance payment
under the said purchase order, shall, as between the Bank and the Company, for the
purpose of these presents, be conclusive of the amount payable by the Bank to the
Company hereunder, notwithstanding any dispute or disputes has been raised by the
Seller and are pending before any arbitration, Tribunal or Court.
The Bank further undertakes not to revoke this guarantee during its currency without the
previous consent of the Company.
The Bank also agrees that the Company shall be entitled to enforce this guarantee,
notwithstanding any other security or guarantee that it may have in relation to the
suppliers liability for the said advance.
Notwithstanding anything said above, our liability under this guarantee is restricted to Rs.
.. (Rupees . only). Our guarantee shall remain in force until
. Unless a claim or demand in writing is made against us under this guarantee
before the expiry of .. months from the aforesaid date, i.e. before be relieved and
discharged from all liabilities thereunder.
Yours faithfully,
LIST OF APPLICABLE
SPECIFICATIONS & STANDARDS
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 134 of 395
LIST OF APPLICABLE DOCUMENT No.
SPECIFICATIONS & A307-16-46-LL-6210
STANDARDS Rev. A
Page 2 of 4
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 135 of 395
LIST OF APPLICABLE DOCUMENT No.
SPECIFICATIONS & A307-16-46-LL-6210
STANDARDS Rev. A
Page 3 of 4
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 136 of 395
LIST OF APPLICABLE DOCUMENT No.
SPECIFICATIONS & A307-16-46-LL-6210
STANDARDS Rev. A
Page 4 of 4
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 137 of 395
DOCUMENT No.
INSTRUCTIONS TO BIDDERS A307-16-46-TR-6210
Rev. A
Page 1 of 9
INSTRUCTIONS TO BIDDERS
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
INSTRUCTIONS TO BIDDERS
1. Bidder to note that no correspondence shall be entered into or entertained after the bid
submission.
2. Bidder shall furnish quotations only for those items, for which he is approved by EIL and
which he can supply strictly as per MR specifications.
3. No technical details of any nature shall be included in the offer. If the offer contains any
technical deviations or clarifications or stipulates any technical specifications (even if in
line with the MR requirements), the offer is liable for rejection.
4. The submission of prices by the bidder shall be construed to mean that he has
confirmed compliance with all technical specifications of the corresponding item(s).
B) It is understood that-
a) The quoted price includes for the HOLDS details of which are indicated on the Drg.
b) The weights indicated on EIL Engineering Drgs. do not form the basis for offer, since
these are approximations only.
c) Spares as included in clause no.2.3 of Doc. No. A307-16-46-SS-6210 are included in
the quoted price.
Technical Instructions
1. The shape of dished end/toricone, profile of conical reducer, knuckle radius, cone angle
and overall height shall be as per engineering drawing. Minimum thickness of shell, cone
and dished end shall be achieved taking into account thinning and scaling etc.
2. Dished ends and hot formed pressure parts shall have 10% or 2mm (whichever is
higher) allowance for scaling and thinning, in order to achieve minimum thickness
specified on the drawing.
b. For low temperature equipment and hot formed parts, number of production
coupons and the tests thereon shall be as per requisition.
4. Post weld heat treatment and all non destructive testing like radiography, ultrasonic
testing, magnetic particle/dye penetrant examination etc. shall be conducted as per
requisition.
5. Transportation of equipment to site shall be in a single piece with all internals in installed
condition.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
7. Pickling and passivation of internal / external surfaces of stainless steel/monel clad and
internal / external surface of SS / Monel internals shall be carried out as per ASTM A-
380 / Job Specification # A307-IC-16-46-SP-01.
8. For IBR vessels complete design of equipment as per IBR, approval of drawings,
documents, stagewise inspection and final certification of the equipment by Inspectorate
of Boilers shall be included in Bidders scope.
10. The main equipment shall not be subcontracted, however the bought out items/
components can be sub-ordered or sub-contracted to EIL approved vendors/sub-
contractors only.
11. Mist Eliminator for item no. R-V-104 shall be procured from one of the following EIL
approved vendors:
(i) Continental Profiles Ltd., Faridabad.
(ii) Evergreen Technologies Pvt. Ltd., Mumbai
(iii) Haver Standard India Pvt. Ltd., Mumbai
(iv) Koch Chemical Tec. Group India Pvt. Ltd., Mumbai
(v) Munters Euroform GMBH, Germany
(vi) Pace Engg. Industries Pvt. Ltd., Mumbai
12. Fabricator to supply template for checking the orientation of anchor bolts on foundation
and to ensure matching of base plate that is drilled in advance. The schedule of supply
of template at site shall be 8 weeks from LOI.
13. Gaskets used for hydrotesting of equipment shall be of the same specification as service
gaskets and the fabricator shall supply new gaskets for manholes and nozzles with blind
/companion flanges apart from spares. Gaskets used for hydrotest shall not be used for
actual hook up.
14. While transporting completed equipment, fabricator shall provide suitable type and no. of
supports so that no deformation of any part of the equipment takes place.
15. Fabricator shall exercise utmost care during loading/unloading of equipment so that no
damage to any part of the equipment occurs. Suitable type and no. of supports shall be
provided for supporting the equipment.
16. Equipment(s) having length more than 20 meters and / or forming Gross Vehicle
Weight (weight of equipment(s) & weight of vehicle clubbed together) more than 49
Metric Tones shall be transported on Hydraulic axles only with compliance to all
statutory norms of authorities concerned.
Fabricator /transporters to check the requirements as per latest guidelines issued by
ministry of surface transport before shipping the equipment.
17. For consignments, a GPS tracking system should be installed to monitor movement of
consignment if the equipment(s) / equipment sections meets any of the below criteria:
a) Overall diameter (dimension) inclusive of nozzle projection exceeds 5.5 meters.
b) Length more than 25 meter.
c) Weight over 100 Metric Tones.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
18. Fabricator to note that quoted price shall include following weights for Piping clips and
Structural Clips. Any increase / decrease in weight shall be settled as per document
A307-16-46-UR-6210.
19. Erection weight given in equipment data sheet is approximate. Vendor shall calculate the
actual equipment weight and furnish calculation. Erection weight furnished in vendor
drawing shall be based on fabricators calculation. Calculation of Centre of Gravity (C.G.)
of the equipment shall also be done by vendor and marked on the equipment & in the
fabrication GA drawing.
20. When spot radiography is specified the extent of radiography defined in Clause
5.4.2 of EIL specification 6-12-0001 Rev. 5 shall be replaced as follows:
21. All production welding shall be examined by RT. In case vendor want to perform UT by
TOFD technique in lieu of RT the same is acceptable subject to the following:
a) Thickness of plate is greater than 38mm.
b) With Code Case 2235, Automated UT incorporating TOFD and pulse echo probes or
TOFD and Phased Array mounted on the same chassis that automatically traverses
along the joints to be inspected and displaying both results simultaneously on a
single screen may be considered in lieu of RT.
c) Calibration block of similar material/thickness shall be used. Calibration block shall
have suitable notches to simulate longitudinal as well as transverse cracks on
outside and inside surface. Setup should be capable of detecting defects on outside
as well as inside while scanning from one surface only.
d) The system that is proposed to be deployed in lieu of radiography shall be submitted
along with the track record prior to use for EIL review. The vendor shall demonstrate
successfully the capability of AUT machine and the defects evaluation in the same
screen during the site visit of EIL inspector/EIL representative.
22. Design of Johnson screen (or equivalent) at inlet of dryers shall be done by
Vendor based on Johnson screen supplier recommendation. Johnson screen (or
equivalent) shall be procured from the following Vendors:
a) Euroslot, France
b) Euroslot KDSS India Pvt Ltd, India (with Design & Drawing vetting and guarantee by
M/s Euroslot KDSS, France)
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
23. Mechanical Design of Vee Wire Johnson Screen & its supports shall be carried out
considering load due to catalyst, support balls and differential pressure (p), etc. as
specified in Process datasheet.
24. In order to facilitate Video conferencing for management review and helmet camera
for shop floor view, following shall be taken care by the vendor :
Vendor could share the same information of manufacturer like plan vs. actual
progress of the equipment/ system at the OEMs site with the BPCL / EIL.
General Instructions
1. All materials including those used for internals shall be procured with stage-wise
inspection. Stagewise and final inspection of equipments and its components shall be
carried out by following:
a) For Foreign Vendors: Stagewise & final inspection of the equipment including all
components and internals shall be carried out by third party inspection agency.
Quoted price shall include for the same.
b) For indigenous Vendors: EIL shall be inspection agency for equipments and its
indigenous components.
Incase internals/forging/plates etc. are procured from abroad, the inspection shall be
carried out by third party inspection agency. Quoted price for TPI of internals /
forgings / plates etc. shall include for the same.
c) For acceptable third party inspection agencies (TPIA), refer commercial documents.
Fabrication shall not commence before their approval except as noted at Sl.No. 2 & 3.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
2. Raw material procurement may proceed prior to approval of vendor drawings on the
basis of Purchase Requisition. However for plates & nozzles where there is no Hold in
size, thickness, etc, material procurement shall be initiated by successful vendor based
on MR drawings immediately after placement of order.
3. Shell rolling/welding and dished - head fabrication shall commence without awaiting
fabrication drawing approval.
Inspection shall be carried out in accordance with Purchase Requisition documents till
approved fabrication drawings are available.
4. Material for shell, dished ends and skirt shall be considered as major raw material
wherever identification of major raw material is one of the payment milestones.
5. Purchase requisition shall be issued within two weeks of Fax of intent (FOI). Final nozzle
sizes (without any holds) shall be issued alongwith purchase requisition or latest within
two months of Fax of intent (FOI).
6. Nozzle orientation of the equipment shall be issued latest by mid of contractual delivery
period reckoned from date of issue of Fax of Intent (FOI).
7. Pipe support/structural clip details shall be issued latest by three months before
contractual delivery date.
8. Minimum course width shall be 1 metre. Maximum no. of longitudinal seams shall be as
follows:
( a) vessels upto 2 metre diameter : 1 seam
( b) vessels from 2 metre upto 4 metre dia. : 2 seam
( c) vessels from 4 metre upto 6 metre dia. : 3 seam
In any case, distance between two longitudinal seams shall not be less than 3 meter.
9. If any discrepancy is found during design and fabrication stages, the fabricator shall
inform EIL immediately and shall obtain necessary clarification/approval before
proceeding with that portion of the job any further.
EIL's review of fabricator's drawings and documents must not be considered as a check
and shall not relieve the fabricator of his responsibilities to supply equipment as per
requisition. Fabricator shall remain responsible for conflicts between his
drawings/documents and EIL drawings/documents.
10. English language and metric units shall be used in all documents. Drawings shall be
prepared in prescribed sizes as standardized by bureau of Indian standards (BIS) and
shall be preferably in the sizes such as 210 x 297, 297 x 420, 420 x 597, 597 x 841, 841
x 1189 mm.
11. All fabricator's drawings submitted to EIL shall be based on purchase requisition and
shall bear reference number and revision of the corresponding EIL drawings. In addition,
it shall indicate item number, client's name, project name, fabricator's name, purchase
order number, purchase requisition number, drawing number, revision number etc. all in
the lower right hand corner. All revisions shall be clearly marked by encircling with
revision marks.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
13. Vendor shall submit a list of those drawings, which are to be submitted for review
to EIL along with the submission dates for each drawing within 15 days of
placement of FOI. Vendor shall strictly adhere to this drawing submission
schedule. Updated vendor drawing / document submission schedule shall be
forwarded along with each submission.
14. All drawings shall be thoroughly checked and duly signed by fabricator. Unchecked
drawings and drawings without revisions clearly marked shall be returned without
review. Successive review of the same fabricator's drawing shall apply only to EIL's
latest data sheet/comments on the previous revision. Drawings and documents returned
to fabricator for revision shall be resubmitted preferably within ten days of receipt.
15. Dimensions of all flanges shall be as per ANSI B16.5 for nozzle sizes 24"NB and below
and as per ANSI B16.47 Series B for sizes greater than 24"NB unless otherwise stated.
Stage-I
- General arrangement drawing indicating design data, fabricated equipment's
weight, general notes, nozzle schedule, detail of shell, heads, skirt/supporting
arrangement, main weld seams, nozzle orientation plan, cutting layout (in case of
free issue material) etc.
- Bill of material for each item showing part size, quantity, material specification,
scope of supply and weight etc.
Stage-II
- Detail of internals such as tray, tray support ring, support beam, inlet weir and
bolting bar.
- Detail of external clips for ladder, platform, pipe support, insulation, fire proofing,
pipe davit, lifting trunnion, tailing lugs, lifting lugs etc.
- Bill of material for each item showing part size, quantity, material specification,
scope of supply and weight etc.
- In case of owner's free issue plate material, fabricator shall submit plate cutting
diagram for EIL's approval.
17. After receipt of order, fabricator shall submit to EIL, the planning of fabrication which
shall indicate the details and scheduled date of:
- Sub orders.
- Purchase of materials such as plates, pipes, forged flanges, bolting, gaskets, etc.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
- Start of fabrication of dished ends and shell, welding of shell and heads.
18. All drawings shall be drawn in AUTOCAD R-14 or above.No hand drawn drawings shall
be accepted. All residual calculations shall be computerized.
19. Documents and letters shall be furnished in electronic format. The software used shall
be as follows.
20. In case of owner's free issue plate material, fabricator shall tabulate each plate detail as
per following table:
Fabricator shall be allowed 2% burnout losses against the material consumed in case of
pressure vessels and 1% in case of storage tanks and spheres unless otherwise specified. In
general purchase conditions.all offcuts of width 800mm and perimeter 2400mm in carbon
steel materials and 150mm width and perimeter 1500mm in stainless steel materials shall be
returned to owner, unless otherwise specified. Returnable offcuts shall have original plate
markings transferred and duly stamped by inspector. All other non returnable scrap shall be
sold by fabricator on the basis of owner's instructions and approval.
21. Words fabricator, vendor, contractor appearing any where in the MR/Specifications/
Standards etc. shall be read as bidder.
22. Bidder to note that interference of nozzles with circumferential seams is not acceptable.
Vendor to take suitable care to avoid fouling of external/internal attachments with shell
seams.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
23. Vendor shall note that the vendor drawing for the following standard components (as
applicable) shall not be reviewed by EIL. It shall be solely vendor's responsibility to
ensure the correctness of these drawings as per EIL Standards and Drawings. If any
discrepancy / mistake is found at a later date the vendor shall rectify the same at his
time and cost.
However all these above listed drawing shall be submitted in a separate drawing for
information to EIL ensuring adherence to all the respective EIL Standards and Drawings.
Clarifications (if any) shall be obtained by Vendor from EIL before fabrication.
24. Standard Inspection and test plans are attached with requisition for guidance. Vendor
shall submit inspection test plans for the approval of visiting inspection engineer.
Inspection shall take care of all the requirements of specifications. Inspection engineer
has the authority to modify the plan depending on the criticality of the item.
However in event of conflict it shall be the duty of the Vendor to bring it to EILs
attention for resolution and resolve it before proceeding with the manufacture.
EILs comments shall be final and binding on vendor without any cost and
delivery implications.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
SCOPE OF SUPPLY
Page
Format No. 147 of 395
EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
DOCUMENT No.
SCOPE OF SUPPLY A307-16-46-SS-6210
Rev. A
Page 2 of 5
SCOPE OF SUPPLY
1. Owner
[ ] Shell
[ ] Skirt
[ ] Manhole neck, nozzle neck 300 NB and above in carbon steel and 125 NB and
above in stainless steel
[ ] Reinforcement pad
[ ] Wrapper plate
[ ] Internal piping
[ ] Insulation support
[ ] Lifting lugs
[ ] Baffle
[ ] Demister support
[ ] Pipe fitting
[ ] Gasket
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 148 of 395
DOCUMENT No.
SCOPE OF SUPPLY A307-16-46-SS-6210
Rev. A
Page 3 of 5
[ ] Brick lining
[ ] Refractory lining
[ ] Internal Packing
[X] Thermowells
2. VENDOR
[X] Shell
[X] Manhole neck, nozzle neck 300 NB and above in carbon steel and 125 NB and
above in stainless steel & 200 NB and above in clad steel
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 149 of 395
DOCUMENT No.
SCOPE OF SUPPLY A307-16-46-SS-6210
Rev. A
Page 4 of 5
[] Tray Support Ring/ Packing support ring/Support Angles/ Inlet Weir/Bolting Bar/Seal
Pan/ Tray Downcomer welded to the equipment.
[] Wear Plate
2.2 Structural steel section and plate conforming to IS:226/IS:2062 Gr.B/ SA-283 Gr.C for
[ ] Shell
[ ] Internals
[ ] Flat cover
[ ] Manway flange/cover
[X] Tailing lug and Stiffening Block/Beam in skirt portion
2.3 [X] Forged flanges / matching blind flange / Reducing flange wherever shown.
[X] Studs/bolts and nuts for manway / handholes / internal flanges / nozzles with blind
flange / shell flange / reducing flange, including jack bolts for manways and reducing
flanges
[X] Gasket for manway / internal flange/shell flange/ nozzles shown with blind flanges
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 150 of 395
DOCUMENT No.
SCOPE OF SUPPLY A307-16-46-SS-6210
Rev. A
Page 5 of 5
[] Demister / mist eliminator with grid and bolting of MOC SS304 (Refer spec. 3-35)
including supports (as per 3-264)
[] Wire Mesh
[X] Seamless nozzle necks 250 NB & below in Carbon Steel, 100NB & below in
Stainless Steel & 150 NB & below for weld overlayed nozzle
[X] All internals with MOC as SS-304/316 for IF-V-101A/B & IF-V-107
[ ] Spray nozzle
[X] All other metallic and non-metallic parts, consumables and gases not covered under
1 and 2 but required to complete fabricated equipments including inspection, testing
and supply of equipments as per this requisition
[X] Spares 10% of fasteners (min 2 nos. in each size) and two sets of gaskets for each
nozzle shown with blind flange / reducing flange.
[X] Spares (for demister / mist eliminator) - 10% (min. 4 nos. of each size/type) extra
fasteners (bolts, nuts, clamps, spacers etc.) as required for holding the demister.
[X] Template for foundation for each of the item nos:- IFP-V-101A & IFP-V-101B
[X] Vee wire Johnson Screen at Inlet; Floating Screen; Internal plug for Manhole/Solid
Sample Connection; retaining arrangement alongwith Fibre plug for Unloading
nozzle; Thermowell / Moisture/ Sample probe connection alongwith supports etc. as
specified in datasheets.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 151 of 395
DOCUMENT No.
UNIT RATES FOR
ADDITION/DELETION A307-16-46-UR-6210
Rev. A
Page 1 of 5
UNIT RATES
FOR
ADDITION/ DELETION
Page
Format No. 152 of 395
EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
DOCUMENT No.
UNIT RATES FOR
ADDITION/DELETION A307-16-46-UR-6210
Rev. A
Page 2 of 5
1. Offer shall contain the sheets given below & the subsequent sheets for addition / deletion of
nozzles duly filled in, else offer will be rejected. Please note that the same EIL sheets as
given below shall be filled in and enclosed in the offer. Bidder shall not enclose his own
sheets.
2. It is understood that
a) The quoted price includes for the HOLDS details of which are indicated on
respective equipment Engineering Drawing.
b) The weights indicated on EIL Engineering Drawings do not form the basis for offer,
since these are approximations only.
c) Spares as included in clause no. 2.3 in Scope of Supply (Doc. No. A307-16-46-SS-
6210) are considered for in the quoted price.
- SA-516 Gr. 70
- SA-516 Gr. 60
- 100 NB Sch.160
- 150 NB Sch.80
- 200 NB Sch.80
- 200 NB Sch.160
- 200 NB Sch. XXS
- 300 NB Sch.160
- 400 NB Sch.160
iv) Tray / Tray support ring/bolting bar,
seal pan support, Tray Downcomer
& their Support per kg.basis.
- SA-516 Gr. 70
- SA-516 Gr. 60
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 153 of 395
DOCUMENT No.
UNIT RATES FOR
ADDITION/DELETION A307-16-46-UR-6210
Rev. A
Page 3 of 5
- IS : 2062 Gr. B
- SA-516 Gr. 70
- SA-516 Gr. 60
- SA 106 Gr. B
- IS-2062 Gr.B
- SA-283 Gr.C
- SA-106 Gr.B
- SA-516 Gr.70
- SA-516 Gr. 60
- SA-106 Gr.B
- SA-516 Gr.60
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 154 of 395
DOCUMENT No.
UNIT RATES FOR
ADDITION/DELETION A307-16-46-UR-6210
Rev. A
Page 4 of 5
- SA 105
- SA 516 Gr. 70
- SA 516 Gr. 60
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 155 of 395
DOCUMENT No.
UNIT RATES FOR
ADDITION/DELETION A307-16-46-UR-6210
Rev. A
Page 5 of 5
TABLE-1(A)
SCHEDULE OF RATES FOR ADDITION/DELETION OF NOZZLES
SL.NO. NOMINAL SIZE WITHOUT BLIND WITH BLIND WITHOUT BLIND WITH BLIND WITHOUT WITH BLIND REMARKS
NB FLANGE FLANGE FLANGE FLANGE BLIND FLANGE FLANGE
1 25
2 40
3 50
4 80
5 100
6 150
7 200
8 250
9 300
10 350
11 400
12 450
13 500
14 600
15 700
16 750
17 800
18 850
19 900
NOTES :-
1. MATERIAL SPECIFICATION FOR NOZZLE COMPONENTS SUCH AS NOZZLE NECK, FLANGE, REINFORCEMENT PAD, NOZZLE STIFFENER,
STUDS, NUTS AND GASKETS SHALL BE AS PER ENGINEERING DRAWING. NOZZLE REINFORCEMENT AND PROJECTION DETAIL SHALL BE
AS PER EIL STANDARD NO.7-12-0013.
2. SCOPE OF SUPPLY OF NOZZLE COMPONENTS SHALL BE AS PER MATERIAL REQUISITION.
3. THE RATES QUOTED SHALL INCLUDE SUPPLY OF NOZZLE NECK, FLANGE, STIFFENER, STUDS, NUTS AND GASKETS (WHEN SUPPLIED WITH
BLIND FLANGE) AND ASSOCIATED FABRICATION AND TESTING.
4. PRICES INDICATED ABOVE SHALL BE IRRESPECTIVE OF NOZZLE THICKNESS.NO EXTRA CLAIM ON THIS ACCOUNT WILL BE ENTERTAINED
AT A LATER DATE.
5. THE SCHEDULE OF RATES EXCLUDES COST OF REINFORCEMENT PAD
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights reserved
Page 156 of 395
Document No.
VENDOR DATA REQUIREMENTS A307-0IF-16-46-VDR-6210
FOR Rev. A
VESSELS Page 1 of 4
The following drawings/documents marked " " shall be furnished by the bidder.
POST ORDER
S. WITH WITH
N DESCRIPTION FOR FOR DATA REMARKS
BID
O. REVIEW RECORD BOOK
(FINAL)
1. RADIOGRAPHIC EXAMINATION REPORTS Vendor to store these
for 5 years.
WITH FILMS @.
2. CODE CERTIFICATES (INCLUDING Documents shall be
INSPECTION CERTIFICATE, HYDROSTATIC submitted within 1
TEST CERTIFICATE, LOCAL CODE week after final
REQUIREMENTS, RUBBING OF CODE inspection.
@.
STAMP AND NAME PLATE ETC.)
3. MATERIAL TEST CERTIFICATES Documents shall be
submitted within 1
week after final
inspection.
@.
4. DESTRUCTIVE AND NON-DESTRUCTIVE Documents shall be
submitted within 5 to 8
TEST REPORTS weeks of issue of PR.
@.
5. PACKING AND FORWARDING
INSTRUCTIONS
6. WELDING PROCEDURES AND Documents shall be
submitted within 5 to 8
QUALIFICATION TEST REPORTS weeks of issue of PR.
@.
7. INSPECTION AND TESTING PLAN Documents shall be
submitted within 5 to 8
weeks of issue of PR.
@.
8. GENERAL ARRANGEMENT DRAWING
INDICATING DESIGN DATA FABRICATED Documents shall be
EQUIPMENT WEIGHT, GENERAL NOTES, submitted within 3 to 5
NOZZLE SCHEDULE, DETAIL OF SHELL, weeks of issue of PR.
HEADS, SUPPORTING ARRANGEMENT, Plate cutting layout is
not to be submitted.
MAIN WELD SEAMS, NOZZLE ORIENTATION
PLAN, CUTTING LAYOUT ETC.
9. DETAIL OF NOZZLES, MANHOLES, Documents shall be
submitted within 3 to 5
ACCESSORIES ETC weeks of issue of PR.
10. DETAILS OF DEMISTER. Documents shall be
submitted within 3 to 5
weeks of issue of PR.
11. DETAILS OF PACKING SUPPORT, Documents shall be
DEMISTER SUPPORTS, GRATINGS, AND submitted within 3 to 5
GRATING SUPPORTS. weeks of issue of PR.
POST ORDER
S. WITH WITH
N DESCRIPTION FOR FOR DATA REMARKS
BID
O. REVIEW RECORD BOOK
(FINAL)
14. DETAIL OF INSULATION, FIRE PROOFING Documents shall be
submitted highlighting
areas of discrepency
or fouling, etc.within 10
to 15 weeks of issue of
PR.
15. DETAIL OF PIPE DAVIT Documents shall be
submitted highlighting
areas of discrepency
or fouling, etc. within
10 to 15 weeks of
issue of PR.
16. DETAIL OF LIFTING LUG,TRUNION AND Documents shall be
submitted highlighting
TAILING LUG ETC. areas of discrepency
or fouling, etc. within
10 to 15 weeks of
issue of PR.
17. SHELL DEVELOPMENT DRAWINGS Documents shall be
submitted highlighting
INCORPORATING ALL ATTACHMENTS AND areas of discrepency
WELD SEAMS or fouling, etc. within 3
to 5 weeks of issue of
PR.
18. CERTIFIED 'AS BUILT' DRAWINGS Documents approved
by inspector shall be
INCORPORATING ACTUAL DIMENSIONS submitted within 2
AND MATERIAL USED, DULY CERTIFIED BY weeks after dispatch of
THE INSPECTOR equipment.
@.
19. DATA FOLDER AS PER SPECIFICATION Documents approved
by inspector shall be
submitted within 2
weeks after dispatch of
equipment.
@.
20. HEAT TREATMENT PROCEDURE AND TIME Documents shall be
submitted within 1
TEMPERATURE CHARTS week after final
inspection.
@.
POST ORDER
S. WITH WITH
N DESCRIPTION FOR FOR DATA REMARKS
BID
O. REVIEW RECORD BOOK
(FINAL)
1. Template Drawings for each equipment Documents shall be
submitted within 3 to 5
weeks of issue of PR.
2. Assembly & Installation Details Documents shall be
submitted within 12 to
16 weeks of issue of
PR. Documents shall
be approved by EIL
before shipment.
3. Erection drawings including weights, C.G. & Documents shall be
submitted within 1
slinging facilities, etc. week after final
inspection.
Documents shall be
approved by EIL
before shipment.
Notes :
1. Bill of material for each item shall essentially include part size, quantity, material specification & weight etc.
2. "TICK" denotes applicability
3. Post order, drawing / document review shall commence only after approval of Document Control Index (DCI).
4. All post order documents shall be submitted / approved through EIL eDMS portal
5. Final documentation shall be submitted in hard copy (Six prints) and soft ( two CDs/DVDs ) in addition to
submission through EIL eDMS.
6. Refer - 6-78-0001: Specification for quality management system from Bidders.
7. Refer - 6-78-0003: Specification for documentation requirement from Suppliers.
8. Post order- The schedule of drawing / data submission shall be mutually agreed between EIL & the bidder /
contractor / supplier during finalization of Document Control Index (DCI).
9. "@" indicates submission of documents to Inspection Agency.
10. Bill of Material shall form part of the respective drawing.
NOZZLES AND CONNECTIONS uksty o duSD'ku GENERAL NOTES (tujy uksV~l SPECIFICATIONS LisflfQds'kUl DESIGN DATA fMtkbu MkVk
MARK QTY
NOM. DIA
SCH./THK.
FLANGES PROJECTIO PAD W
SERVICE
UNLESS STATED OTHER WISE X DENOTES APPLICABLITY CODE ASME SEC.VIII DIV.-1 (2010) + ADDENDA 2011
(INCH) CLASS TYPE FACING N NOTE-4 xT 1 ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE STATED. X GENERAL SPEC. FOR PRESSURE VESSELS 6-12-0001 WORKING PRESSURE (kg/cm2g) REFER TABLE-1
ekdZ DokfUVVh
ukfeuy 'kMwy o
Dykl VkbZi Qsflx izksts'ku iSaM lfoZl 2 ALL ANCHOR BOLT HOLES TO STRADDLE N/S CENTRE LINE. X SUPP. SPEC. FOR CS VESSELS 6-12-0002 DESIGN PRESSURE (kg/cm g)
2
INT. REFER TABLE-1 EXT. -
Mka;k bap fFkduSl 3 NORTH DIRECTION WHEREVER SHOWN IS WITH RESPECT TO PLAN VIEW. X STD. SPEC. FOR BQCS PLATE 6-12-0011 WORKING TEMPERATURE
0
( C) REFER TABLE-1
1 1 14
20
300 WN RF
SEE 175
INLET (NOTE-18)
4 (A) FOR NOZZLES ON SHELL PROJECTIONS ARE REFERRED FROM VESSEL CENTER LINE X STD. SPEC. FOR STRUCTRAL QUALITY PLATES 6-12-0014 DESIGN TEMPERATURE 0
( C) REFER TABLE-1
THK. DRG. XT TO FLANGE CONTACT FACE.
X STD. SPEC. FOR SS PLATES 6-12-0020 MDMT (0C) (-)21
20 SEE 4 (B) FOR NOZZLES ON HEAD PROJECTIONS ARE REFERRED FROM HEAD T.L TO FLANGE JOB SPEC. FOR SURFACE PREPARATION & PROTECTIVE CORROSION ALLLOWANCE (MM) 3
4 1 14
THK.
300 WN RF
DRG.
- OUTLET (NOTE-17) CONTACT FACE. X COATING D
A307-000-06-42-PLS-01
TYPE OF HEAD TORISPHERICAL
5 THE INDICATED THICKNESS IS THE MINIMUM ACCEPTABLE AFTER CONSTRUCTION. JOINT EFFICIENCY SHELL 1 HEAD 1
8 1 2 160 300 WN RF 1500 - UTILITY + BF D
RADIOGRAPHY SHELL FULL HEAD FULL
SEE 6 FLANGE GASKET FACE SHALL HAVE 125 AARH FINISH.
STANDARDS LVS.MMZl POST WELD HEAT TREATMENT YES (AS PER CODE) (NOTE-21)
9 1 2 160 300 WN RF - VENT
DRG. 7 DIMENSIONS OF FLANGES FOR NOZZLES UPTO 600NB SHALL BE AS PER ASME B16.5 X VESSEL TOLERANCES 7-12-0001 HEAT TREATMENT HEAD-AS PER SPEC.
20 SEE 300 MANHOLE + REDUCING FLG. + UNLESS SPECIFIED OTHERWISE. SUPPORT FOR HORIZONTAL VESSEL 7-12-0002 OPERATING MEDIUM -
25A 1 24 300 WN RF
THK. DRG. XT BOLTING (NOTE-17) 8 ID OF WELD NECK FLANGES SHALL MATCH WITH CORRESPONDING ID OF NOZZLE WOODEN PILLOWS FOR SADDLE SUPPORT 7-12-0003 SP. GRAVITY 0.4827 @38 C #
0
25B 1 24
20
300 WN RF 1660
300 MANHOLE + BF + DAVIT + PIPE. X SKIRT BASE DETAILS 7-12-0004 WIND SPECIFICATION IS:875
THK. XT PLUG (NOTE-10 & 27) 9 NOZZLE 50NB & BELOW SHALL BE STIFFENED WITH 2 NOS. 40x6 THK. FLATS 900 X SKIRT OPENING DETAILS 7-12-0005 EARTH QUAKE SPECIFICATION IS: 1893 + SITE SPECTRA
SEE 160 UNLOAD + BF + SPOOL PIECE APART. ANGLE LEG SUPPORT 7-12-0006 CAPACITY (M3) 71
C 27A 1 8 80 300 WN RF
DRG. XT (NOTE-20 & 27) 10 LOCATION OF MANWAY 25B IS TO ALLOW DUMPING OF BED INTO AN ENCLOSED PIPE LEG SUPPORT 7-12-0007 PAINTING/CLEANING AS PER SPEC. (NOTE-13)
SEE 160 UNLOAD + BF + SPOOL PIECE MOBILE CONTAINER. VENDOR TO PROVIDE INTERNAL PLUG (6 THK. MIN.OF INSULATION THICKNESS (mm) (BY OTHERS) 75 (IH) X HOT COLD
BRACKET SUPPORT FOR VERTICAL VESSEL
27B 1 8 80 300 WN RF SS304/316) FOR NOZZLE 25B TO PREVENT CATALYST LEAKAGE AS PER FIG.-4 OF
C DRG. XT (NOTE-20 & 27) THE PDS. MANHOLE WITH HINGED COVER 7-12-0009 FIRE PROOFING (BY OTHERS) 50 mm YES NO
30
2
2 I/D
- 300 LWN RF 1500 - THERMOWELLS (NOTE-16) X MANHOLE WITH DAVIT 7-12-0010 HYDROSTATIC TEST (kg/cm2g) HORIZONTAL VERTICAL (AT TOP)
A-B (HOLD) 11 ALL NOZZLES FABRICATED FROM PLATE SHALL BE 100% RADIOGRAPHED. X LADDER RUNGS FOR MANHOLE/DEMISTER 7-12-0011 PRESSURE (NEW & COLD) 50.18
2 12 ALL REMOVABLE INTERNALS SHALL BE SIZED SO AS TO PASS THROUGH THE RETAINING PLATE 7-12-0012 INSPECTION BY EIL CIB LLOYDS
38 1 160 300 WN RF 1500 - MOISTURE PROBE (NOTE-15)
(HOLD) NEAREST MANHOLE EASILY.
X NOZZLE REINFORCEMENT AND PROJECTION 7-12-0013
LT1/ 2 13 D PAINTING: SURFACE PREPARATION, SHOP PRIMER AS PER A307-000-06-42-PLS-01. PAD NOZZLES FOR VESSELS 7-12-0014 # REGENERATION GAS DENSITY 0.0034 @290C.
2 160 300 WN RF 1500 - LEVEL TRANSMITTER (DP)
LT4 (HOLD) D 14 VESSEL SHALL BE SUBJECTED TO NITROGEN DRY OUT CONDITIONS OF 4.0 Kg/cm2g X STANDARD BOLT HOLE ORIENTATION 7-12-0015
SP1/ 2 AND AMBIENT. ALLOY LINER DETAILS 7-12-0016
2 160 300 WN RF 1500 - STAND PIPE
SP4 (HOLD) D 15 VENDOR TO PROVIDE MOISTURE PROBE ALONGWITH MESH AS PER FIG.-2 & SIGHT GLASSES FOR PRESSURE VESSELS 7-12-0017
SKV RESPECTIVE NOTES ON SHT.-5 OF THE PDS.
INTERNAL FLANGES 7-12-0018 MATERIAL OF CONSTRUCTION eSfVfj;y vkQ dUlVD'ku)
4 4 AS PER EIL STD. - SKIRT VENT (AS PER ASME / IS OR EQUIVALENT)
1-4 16 VENDOR TO PROVIDE THERMOCOUPLE PROBE ALONGWITH SUPPORTING VORTEX BREAKERS 7-12-0019
500 250 ARRANGEMENT AS PER FIG.-3 & RESPECTIVE NOTES ON SHT.-5 OF THE PDS. 7-12-0020 SHELL SA 516 GR.70
INLET DEFLECTOR BAFFLE
AO 1 AS PER EIL STD. ACCESS OPENING
mm XT 17 VENDOR TO PROVIDE INSIDE DETAIL FOR NOZZLE-4 AS PER FIG.-1 OF SHT.-4 OF SUPPORT RING AND BOLTING BAR 7-12-0021 REINFORCEMENT PAD SA 516 GR.70
THE PDS. 7-12-0022 HEADS SA 516 GR.70
SUPPORT RING SIZES FOR PACKED TOWERS
18 VENDOR TO PROVIDE JOHNSON SCREEN AS PER FIG.-5 OF PDS. X PIPE DAVIT 7-12-0023 SHELL FLANGES -
19 VENDOR TO PROVIDE FLOATING SCREEN AS PER NOTE-9 ON SHT.-2 OF THE OF X LIFTING LUG TOP HEAD TYPE 7-12-0024 NOZZLE FLANGES / LWN SA 105
PDS.
X FIRE PROOFING AND INSULATION SUPPORTS 7-12-0025 NOZZLE NECK UPTO 250 NB SA 106 GR. B
20 VENDOR TO PROVIDE RETAINING ARRANGEMENT (10 THK. MIN.) ALONG WITH X EARTHING LUG 7-12-0026 NOZZLE NECK ABOVE 250 NB SA 516 GR.70
FIBRE PLUG AS PER DETAIL GIVEN IN FIG.-5 OF THE PDS. X NAME PLATE 7-12-0027 PIPE FITTINGS SA 234 GR.WPB
21 COMPLETE VESSEL INCLUDING SKIRT SHALL BE STRESS RELIEVED. HARDNESS OF X MANUFACTURER NAME PLATE 7-12-0028 GASKET EXTERNAL SPIRAL WOUND WITH SS 316L METAL WINDING & GRAFOIL FILLER WITH CS
OUTER RING AS PER ASME B16.20
ALL MATERIALS, WELDS AND HAZ AFTER PWHT SHALL BE LIMITED TO 200 BHN.
X BRACKET FOR NAME PLATE 7-12-0029
NAME PLATE FOR SMALL EQUIPMENT 7-12-0030 GASKET INTERNAL -
22 ALL BUTT WELDS IN THE PRESSURE PARTS SHALL BE 100% RADIOGRAPHED. DETAILS OF FORGED NOZZLES 7-12-0031 EXTERNAL STUDS/BOLTS/NUTS SA 193 GR.B7 / SA 194 GR.2H
23 SKIRT TO DISH HEAD JOINT SHALL BE ULTRASONICALLY TESTED (UT). SUPPORTS FOR INTERNAL FEED PIPE 7-12-0032 INTERNAL STUDS/BOLTS/NUTS SS 304
24 ALL THE BUTT WELDS SHALL BE GROUND FLUSH AND SMOOTH. HOT INSULATION SUPPORT FOR HORIZONTAL VESSEL 7-12-0033 SKIRT/ SUPPORT SA 516 GR.70 / IS 2062 GR.B
25 ALL THE FILLET WELDS SHALL BE FULL PENETRATION WELDS, SMOOTH WITH PIPE DAVIT SUPPORT FOR COLD INS. VESSELS 7-12-0034 SKIRT/ SUPPORT BASE IS 2062 GR.B
`T' DENOTES CORRESPONDING NOMINAL THICKNESS OF SHELL/DISH END. SUITABLE RADIUS. INTERNAL PARTS (WELDED) SS 304 / SS 316
TYP. DETAILS OF WIRE MESH DEMISTER SUPPORTS 7-12-0036
26 ALL THE WELDS SHALL BE MP/PT EXAMINED AFTER HYDROTEST. S.R NOZZLE NECK 7-12-0037 INTERNAL PARTS (BOLTED) SS 304 / SS 316
27 ORIENTATION SHOULD ALLOW ACCESS TO UNLOADING AREA AROUND VESSELS. CLIPS & ATTACHMENTS (EXTERNAL) SA 516 GR.70
28 ALL REQUIREMENTS OF PDS SHALL BE COMPLIED BY VENDOR (FATIGUE ANALYSIS WRAPPER PLATE -
OF VESSEL IS NOT IN VENDOR'S SCOPE). DEMISTER/GRID -
PAD FOR EXTERNAL ATTACHMENT SA 516 GR.70
TABLE-1
OPERATING PRESSURE NORMAL 26.8
REFERENCE DRAWINGSjsQjsUl MkbZx
(Kg/cm2g) MAXIMUM 28.5 NOZZLE ORIENTATIONS
REGENERATION NORMAL 4.9 LADDERS/PLATFORM CLEATS NOT APPLICABLE
PRESSURE (Kg/cm2g) MAXIMUM 8.6 PIPE SUPPORT CLEATS NOT APPLICABLE
DESIGN PRESSURE PROCESS 38.6 TRAY SUPPORT AND BOLTING BARS NOT APPLICABLE
(Kg/cm2g) REGENERATION 9.9 DEMISTER DATA SHEET NOT APPLICABLE
JOB NO: UNIT NO: DESIGN DATA fMtkbu MkVk DRAWING NUMBER
ENGINEERS INDIA LIMITED dk;Z l[;k A307
;fuV l[;k FCC-IFP
D 19.09.2013 REVISED AS MARKED NS RRS/VIVEK TK MkbZx uEcj REV
NEW DELHI CLIENT :
DykbZV BPCL , KOCHI REFINERY
C 16.09.2013 REVISED AS MARKED NS RRS/VIVEK TK PP MIX DRYERS ih ih feDl Mk;lZ A307-IF-16-46-DS-3901 D
B 22.03.2013 REVISED & ISSUED FOR BIDS/ENGG. NS RRS/VIVEK TK
bathfu;lZ bafM;k fyfeVsM PLANT : A 11.03.2013 ISSUED FOR BIDS/ENGG. NS RRS/VIVEK TK
Hkkjr ljdkj dk midze IykaV IREP, KOCHI
REV DATE REVISION BY CHECKED APPROVED
ITEM NO. IFP-V-101 A/B vAbVe uEcj vAb,Qih&oh&101 ,@ch SHEET 1 OF 2
FORMAT NO.3-1646-0113 REV.2 (20.09.2011) A3-420 X 297
NOZZLES AND CONNECTIONS uksty o duSD'ku GENERAL NOTES (tujy uksV~l SPECIFICATIONS LisflfQds'kUl DESIGN DATA fMtkbu MkVk
MARK QTY
NOM. DIA
SCH./THK.
FLANGES PROJECTIO PAD W
SERVICE
UNLESS STATED OTHER WISE X DENOTES APPLICABLITY CODE ASME SEC.VIII DIV.-1 (2010) + ADDENDA 2011
(INCH) CLASS TYPE FACING N NOTE-4 xT 1 ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE STATED. X GENERAL SPEC. FOR PRESSURE VESSELS 6-12-0001 WORKING PRESSURE (kg/cm2g) REFER TABLE-1 (NOTE-14)
ekdZ DokfUVVh
ukfeuy 'kMwy o
Dykl VkbZi Qsflx izksts'ku iSaM lfoZl 2 ALL ANCHOR BOLT HOLES TO STRADDLE N/S CENTRE LINE. X SUPP. SPEC. FOR CS VESSELS 6-12-0002 DESIGN PRESSURE
2
(kg/cm g) INT: 40 EXT: -
Mka;k bap fFkduSl 3 NORTH DIRECTION WHEREVER SHOWN IS WITH RESPECT TO PLAN VIEW. X STD. SPEC. FOR BQCS PLATE 6-12-0011 WORKING TEMPERATURE
0
( C) REFER TABLE-1 (NOTE-14)
1 1 8 80 300 WN RF
SEE 110
INLET (NOTE-18)
4 (A) FOR NOZZLES ON SHELL PROJECTIONS ARE REFERRED FROM VESSEL CENTER LINE X STD. SPEC. FOR STRUCTRAL QUALITY PLATES 6-12-0014 DESIGN TEMPERATURE 0
( C) MIN./MAX. (-)21/70
DRG. XT TO FLANGE CONTACT FACE.
X STD. SPEC. FOR SS PLATES 6-12-0020 MDMT (0C) (-)21
SEE 4 (B) FOR NOZZLES ON HEAD PROJECTIONS ARE REFERRED FROM HEAD T.L TO FLANGE JOB SPEC. FOR SURFACE PREPARATION & PROTECTIVE CORROSION ALLLOWANCE (MM) 3
4 1 8 80 300 WN RF
DRG.
- LIQUID OUT (NOTE-16) CONTACT FACE. X COATING D
A307-000-06-42-PLS-01
TYPE OF HEAD TORISPHERICAL
5 THE INDICATED THICKNESS IS THE MINIMUM ACCEPTABLE AFTER CONSTRUCTION. JOINT EFFICIENCY SHELL 1 HEAD 1
8 1 2 160 300 WN RF 1450 - UTILITY + BF D
RADIOGRAPHY SHELL FULL HEAD FULL
SEE 6 FLANGE GASKET FACE SHALL HAVE 125 AARH FINISH.
STANDARDS LVS.MMZl POST WELD HEAT TREATMENT YES (AS PER CODE) (NOTE-22)
9 1 2 160 300 WN RF - VENT
DRG. 7 DIMENSIONS OF FLANGES FOR NOZZLES UPTO 600NB SHALL BE AS PER ASME B16.5 X VESSEL TOLERANCES 7-12-0001 HEAT TREATMENT HEAD-AS PER SPEC.
12 LIQUID SAMPLE (NOTE-15 & UNLESS SPECIFIED OTHERWISE. OPERATING MEDIUM -
2 SUPPORT FOR HORIZONTAL VESSEL 7-12-0002
C 2 160 300 WN RF 1450 -
A-B (HOLD) 24) 8 ID OF WELD NECK FLANGES SHALL MATCH WITH CORRESPONDING ID OF NOZZLE WOODEN PILLOWS FOR SADDLE SUPPORT 7-12-0003 SP. GRAVITY 0.4785 @40 C
0
25A 1 24
20
300 WN RF
SEE 300 MANHOLE + REDUCING FLG. + PIPE. X SKIRT BASE DETAILS 7-12-0004 WIND SPECIFICATION IS:875
THK. DRG. XT BOLTING (NOTE-16) 9 NOZZLE 50NB & BELOW SHALL BE STIFFENED WITH 2 NOS. 40x6 THK. FLATS 900 X SKIRT OPENING DETAILS 7-12-0005 EARTH QUAKE SPECIFICATION IS: 1893 + SITE SPECTRA
20 300 MANHOLE + BF + DAVIT APART. ANGLE LEG SUPPORT 7-12-0006 CAPACITY (M3) 37
25B 1 24 300 WN RF 1600
THK. XT (NOTE-10) + PLUG 10 LOCATION OF MANWAY 25B IS TO ALLOW DUMPING OF BED INTO AN ENCLOSED PIPE LEG SUPPORT 7-12-0007 PAINTING/CLEANING AS PER SPEC. (NOTE-13) C
26 110 SOLID SAMPLE (NOTE-24 & 25) MOBILE CONTAINER. VENDOR TO PROVIDE INTERNAL PLUG (6 THK. MIN. OF INSULATION THICKNESS (mm) (BY OTHERS) HOT
8 BRACKET SUPPORT FOR VERTICAL VESSEL 7-12-0008 - X COLD
2 80 300 WN RF 1500 SS304/316) FOR NOZZLE 25B TO PREVENT CATALYST LEAKAGE AS PER FIG.-5 OF
A-B (HOLD) XT + PLUG THE PDS. MANHOLE WITH HINGED COVER 7-12-0009 FIRE PROOFING (BY OTHERS) 50 mm YES NO
27A 1 8 80 300 WN RF
SEE 160 DUMP CONNECTION + BF + X MANHOLE WITH DAVIT 7-12-0010 HYDROSTATIC TEST (kg/cm2g) HORIZONTAL VERTICAL (AT TOP)
C DRG. XT SPOOL PIECE (NOTE-19) 11 ALL NOZZLES FABRICATED FROM PLATE SHALL BE 100% RADIOGRAPHED. X LADDER RUNGS FOR MANHOLE/DEMISTER 7-12-0011 PRESSURE (NEW & COLD) 52
SEE 160 DUMP CONNECTION + BF + 12 ALL REMOVABLE INTERNALS SHALL BE SIZED SO AS TO PASS THROUGH THE RETAINING PLATE 7-12-0012 INSPECTION BY EIL CIB LLOYDS
27B 1 8 80 300 WN RF
C DRG. XT SPOOL PIECE (NOTE-19) NEAREST MANHOLE EASILY.
X NOZZLE REINFORCEMENT AND PROJECTION 7-12-0013
30 2 I/D 13 PAINTING: SURFACE PREPARATION, SHOP PRIMER AS PER PAINTING SPEC. A307- PAD NOZZLES FOR VESSELS 7-12-0014
6 - 300 LWN RF 1450 - THERMOWELLS (NOTE-20 & 23)
A-F (HOLD) D 000-06-42-PLS-01. X STANDARD BOLT HOLE ORIENTATION 7-12-0015
SKV 14 ALLOY LINER DETAILS 7-12-0016
4 4 AS PER EIL STD. - SKIRT VENT TABLE-1
1-4 SIGHT GLASSES FOR PRESSURE VESSELS 7-12-0017
500 250 OPERATING PRESSURE NORMAL 2O.O INTERNAL FLANGES 7-12-0018 MATERIAL OF CONSTRUCTION eSfVfj;y vkQ dUlVD'ku)
AO 1 AS PER EIL STD. ACCESS OPENING (Kg/cm2g) (AS PER ASME / IS OR EQUIVALENT)
mm XT MAXIMUM 21.8 VORTEX BREAKERS 7-12-0019
O
NORMAL 40 INLET DEFLECTOR BAFFLE 7-12-0020 SHELL SA 516 GR.70
OPERATING TEMP. ( C)
MAX./MIN. 51/33 SUPPORT RING AND BOLTING BAR 7-12-0021 REINFORCEMENT PAD SA 516 GR.70
X SUPPORT RING SIZES FOR PACKED TOWERS 7-12-0022 HEADS SA 516 GR.70
15 VENDOR TO PROVIDE LIQUID SAMPLE PROBE DETAIL ALONGWITH SUPPORTING X PIPE DAVIT 7-12-0023 SHELL FLANGES -
ARRANGEMENT AS PER FIG.-3 OF THE PDS.
X LIFTING LUG TOP HEAD TYPE 7-12-0024 NOZZLE FLANGES / LWN SA 105
16 VENDOR TO PROVIDE INSIDE DETAIL FOR NOZZLE-4 AS PER FIG.-1 OF THE PDS. X FIRE PROOFING AND INSULATION SUPPORTS 7-12-0025 NOZZLE NECK UPTO 250 NB SA 106 GR. B
17 VENDOR TO PROVIDE FLOATING SCREEN AS PER THE PDS. X NAME PLATE 7-12-0027 PIPE FITTINGS SA 234 GR.WPB
18 VENDOR TO PROVIDE JHONSON SCREEN AS PER FIG.-5 SHT.-7 OF THE PDS. X MANUFACTURER NAME PLATE 7-12-0028 GASKET EXTERNAL SPIRAL WOUND WITH SS 316L METAL WINDING & GRAFOIL FILLER WITH CS
OUTER RING AS PER ASME B16.20
X BRACKET FOR NAME PLATE 7-12-0029
19 VENDOR TO PROVIDE RETAINING ARRANGEMENT (10 THK. MIN.) ALONG WITH NAME PLATE FOR SMALL EQUIPMENT 7-12-0030 GASKET INTERNAL -
FIBRE PLUG AS PER DETAIL GIVEN IN FIG.-5 SHT.-7 OF THE PDS. DETAILS OF FORGED NOZZLES 7-12-0031 EXTERNAL STUDS/BOLTS/NUTS SA 193 GR.B7 / SA 194 GR.2H
20 FOR RELATIVE ORIENTATION OF THERMOWELL NOZZLES REFER FIG.7 OF THE PDS. SUPPORTS FOR INTERNAL FEED PIPE (FOR GUIDANCE) 7-12-0032 INTERNAL STUDS/BOLTS/NUTS SS 304
`T' DENOTES CORRESPONDING NOMINAL THICKNESS OF SHELL/DISH END/SKIRT.
HOT INSULATION SUPPORT FOR HORIZONTAL VESSEL 7-12-0033 SKIRT/ SUPPORT SA 516 GR.70 / IS 2062 GR.B
2
21 VESSEL SHALL BE SUBJECTED TO NITROGEN DRY OUT CONDITIONS OF 4.0 Kg/cm g PIPE DAVIT SUPPORT FOR COLD INS. VESSELS 7-12-0034 SKIRT/ SUPPORT BASE IS 2062 GR.B
AND AMBIENT. TYP. DETAILS OF WIRE MESH DEMISTER SUPPORTS 7-12-0036 INTERNAL PARTS (WELDED) SS 304 / SS 316
22 COMPLETE VESSEL INCLUDING SKIRT SHALL BE STRESS RELIEVED. HARDNESS OF S.R NOZZLE NECK 7-12-0037 INTERNAL PARTS (BOLTED) SS 304 / SS 316
ALL MATERIALS, WELDS AND HAZ AFTER PWHT SHALL BE LIMITED TO 200 BHN. CLIPS & ATTACHMENTS (EXTERNAL) SA 516 GR.70
WRAPPER PLATE -
23 VENDOR TO PROVIDE THERMOCOUPLE PROBE ALONGWITH SUPPORTING DEMISTER/GRID -
ARRANGEMENT AS PER FIG.-4 & RESPECTIVE NOTES ON SHT.-5 & SHT.-2 OF PDS. PAD FOR EXTERNAL ATTACHMENT SA 516 GR.70
24 LIQUID SAMPLE AND SOLID SAMPLE SHALL BE AT SAME ELEVATION. LIFTING LUG SA 516 GR.70
25 VENDOR TO PROVIDE INTERNAL PLUG (6 THK. MIN.) AS PER FIG.-5 OF THE PDS. TAILING LUG IS 2062 GR.B
FLOATING SCREEN SS 304 / SS 316
JOB NO: UNIT NO: DESIGN DATA fMtkbu MkVk DRAWING NUMBER
ENGINEERS INDIA LIMITED dk;Z l[;k A307
;fuV l[;k FCC-IFP
D 19.09.2013 REVISED AS MARKED NS RRS/VIVEK TK MkbZx uEcj REV
NEW DELHI CLIENT :
DykbZV BPCL , KOCHI REFINERY
C 16.09.2013 REVISED AS MARKED NS RRS/VIVEK TK ARSINE REMOVAL BED vjlkbZu fjeqoy csM A307-IF-16-46-DS-3907 D
B 22.03.2013 REVISED & ISSUED FOR BIDS/ENGG. NS RRS/VIVEK TK
bathfu;lZ bafM;k fyfeVsM PLANT : A 11.03.2013 ISSUED FOR BIDS/ENGG. NS RRS/VIVEK TK
Hkkjr ljdkj dk midze IykaV IREP, KOCHI
REV DATE REVISION BY CHECKED APPROVED
ITEM NO. IFP-V-107 vAbVe uEcj vAb,Qih&oh&107 SHEET 1 OF 2
FORMAT NO.3-1646-0113 REV.2 (20.09.2011) A3-420 X 297
19
20 9350 mm
21 4A MOL SIEVE 1/16"
22 MAIN BED
PROCESS OPERATION
23 UPWARDS
SEE FIG. 4
24 CL
25B 30B
25 MIN. 300 mm
26
27 300 mm 34B 32B 8
MIN.
28
29 BOTTOM BED SUPPORT
30 27A SEE FIG. 5
31
SEE FIG. 5
32
33 30
27B 1
34
35
ALL DIMENSIONS IN mm
36
37 OPERATING NORMAL 26.8 NOZZLES MARK NO. SIZE IN. QTY. REMARKS
38 PRESSURE (kg/cm g) MAXIMUM 28.5 INLET 1 14 1 0
39 REGENERATION NORMAL 4.9 OUTLET 4 14 1 0
40 PRESSURE (kg/cm g) MAXIMUM 8.6 UTILITY 8 2 1 0
41 OPERATING NORMAL 38.0 VENT 9 2 1 0
42 TEMPERATURE (C) MAX / MIN 45 / 33 0 0 0 0 0
43 REGENERATION NORMAL 290.0 MANHOLE 25A/B 24 2 0
44 TEMPERATURE (C) MAX / MIN 300/38 UNLOAD 27 A/B 8 2 0
45 LIQUID DENSITY @ 38.0 C kg/m 482.7 THERMOWELL 30A/B 2 2 NOTE 14 1
46 REGEN GAS DENSITY @ 290 C kg/m 3.4 MOISTURE PROBE 38 2 1 NOTE 14 1
47 FULL VACUUM DESIGN NO LEVEL TRANS 32 A/B 2 2 NOTE 11,14 1
48 EMERG VAC. kg/cm a @ C NO LEVEL GAUGE 34 A/B 2 2 NOTE 11,14 1
49 PROCESS REQ'D INSULATION HOT YES 75 mm MATERIAL OF CONSTRUCTION SA 516 Gr. 70 1
50 REMARKS: CORROSION ALLOWANCE 3.0 mm
51 1) SEE PAGE 2 FOR NOTES
52 2) 0
53 3) 0
54 4)
REVISION 0
DATE 25-Oct-2012
BY/REVIEWED/QC DJH / LJC
FLUID SYSTEMS
BOX HAS BEEN CHECKED TO DENOTE NO CHANGES TO THIS SHEET THIS REVISION [ ]
1 02.02.13 PD IB MSM
Page 165 of 395
Rev Date By Chk App
BOX HAS BEEN CHECKED TO DENOTE NO CHANGES TO THIS SHEET THIS REVISION [ ]
1 02.02.13 PD IB MSM
Page 167 of 395
Rev Date By Chk App
BOX HAS BEEN CHECKED TO DENOTE NO CHANGES TO THIS SHEET THIS REVISION [ ]
1 02.02.13 PD IB MSM
Page 169 of 395
Rev Date By Chk App
BOX HAS BEEN CHECKED TO DENOTE NO CHANGES TO THIS SHEET THIS REVISION [x]
BOX HAS BEEN CHECKED TO DENOTE NO CHANGES TO THIS SHEET THIS REVISION [x]
BOX HAS BEEN CHECKED TO DENOTE NO CHANGES TO THIS SHEET THIS REVISION [x]
19 (BASF R3-12)
20
21 30 F 30 E SEE FIG. 3
22
23 12B 26B SEE FIG. 5
25B
24 MIN 1750
25 SEE FIG. 5 BTM SUPPORT BED SEE FIG 6 8
26 300 mm
27 MIN.
28
29
30 27A SUPPORT BALLS
31
32
30 1
33
27B
34
35 SEE FIG 6 ALL DIMENSIONS IN mm
36
37 OPERATING NORMAL 20.0 NOZZLES MARK NO. SIZE IN. QTY. REMARKS
38 PRESSURE (kg/cm g) MAXIMUM 21.8 INLET 1 8 1 0
39 REGENERATION NORMAL N/A LIQUID OUT 4 8 1 0
40 PRESSURE (kg/cm g) MAXIMUM N/A UTILITY 8 2 1 0
41 OPERATING NORMAL 40.0 VENT 9 2 1 0
42 TEMPERATURE (C) MAX / MIN 51 / 33 LIQUID SAMPLE 12A/B 2 2 NOTE-13,14 1
43 REGENERATION NORMAL N/A MANHOLES 25A/B 24 2 0
44 TEMPERATURE (C) MAX / MIN N/A SOLID SAMPLE 26A/B 8 2 NOTE-13,14 1
45 LIQUID DENSITY @ 40.0 C kg/m 478.5 DUMP CONNECTION 27A/B 8 2 0
46 REGEN GAS DENSITY @ N/A C kg/m N/A THERMOWELL 30A-F 2 6 NOTE-14 1
47 FULL VACUUM DESIGN NO 0
48 EMERG VAC. kg/cm a @ C NO 0 0 0 0 0
49 PROCESS REQ'D INSULATION NO MATERIAL OF CONSTRUCTION SA 516 Gr. 70
50 CORROSION ALLOWANCE 3.0 mm
51
52 REMARKS:
53 1) SEE PAGE 2 OF 8 FOR REMARKS.
54
REVISION 0
DATE 26-Oct-12
BY/REVIEWED/QC DJH/LJC
FLUID SYSTEMS SD
BOX HAS BEEN CHECKED TO DENOTE NO CHANGES TO THIS SHEET THIS REVISION [ ]
21 = 120o
E
22
23 500
24 30 B
25
26 30 E
27
28
29
30 2500 mm ID
31
32
TOP SUPPORT BED
33
34
30 A 30 B
35
36
1300 mm
37
38 CATALYST
FLOW
39 30 C 30 D (BASF R3-12)
40
41 1300 mm
mm0025
42
43 30 E 30 F
44
45
46 1300 mm
47
48
49 BTM SUPPORT BED
50
51
52
53 ALL DIMENSIONS IN mm
54
REVISION 0
DATE 26-Oct-12
BOX HAS BEEN CHECKED TO DENOTE NO CHANGES TO THIS SHEET THIS REVISION [ ]
CLIENT : BPCL KR
PROJECT : IREP
Rev.
Date Purpose Prepared by Reviewed by Approved by
No
Abbreviations:
AS : Alloy Steel
CS : Carbon Steel
DFT : Dry Film Thickness
DM : De-mineralized
GI : Galvanized Iron
ID : Internal Diameter
IRN : Inspection Release Note
LTCS : Low Temperature Carbon Steel
MS : Mild Steel
NB : Nominal Bore
OD : Outside Diameter
RCC : Reinforced Cement Concrete
SS : Stainless Steel
WFT : Wet Film Thickness
CONTENTS
1.0 General. 4
2.0 Scope 4
3.0 Reference Codes & Standards.... 6
4.0 Equipment 7
5.0 Surface Preparation, Shop Primer,Coating Application & Repair and Documentation.. 7
6.0 Paint Materials.. 16
7.0 Coating Systems... 21
8.0 Coating System for Gratings, Rolling & Stationery Ladders, Spiral Stairways and
Hand Rails in All Location... 23
9.0 Coating System for Offsite Area (Inland Plants). 24
10.0 Coating System For Unit Areas as well as DM, CPP, Cooling Tower of Inland Plants
and for All Areas (Unit, Offsite, DM, CPP, etc.) of Coastal Plants. 25
11.0 Coating System for Effluent Treatment Plant (ETP)... 27
12.0 External Coating Systems for Uninsulated Carbon Steel and Low Alloy Steel Storage
Tanks (For All Plant Locations, Coastal or Inland) - All Process Units & Off-Sites . 28
13.0 Internal Coating Systems for Carbon Steel and Low Alloy Storage Tanks - All
Process Units & Off-Sites 30
14.0 Coating Systems for External Side of Underground Carbon Steel Plant Piping and
Underground Vessels... 32
15.0 Coating Under Insulation (Coastal Or Inland Plants). All Units Areas & Off-Sites 33
16.0 Coating System for Carbon Steel Components of Coolers / Condensers (Internal
Protection) for Fresh Water Service. 34
17.0 Coating System (Internal Protection) for Galvanized or Non Ferrous or Stainless
Steel/ Duplex Stainless Steel Components of Coolers/ Condensers for Fresh Water
Service.......................................................................................................................... 35
18.0 Storage.. 35
19.0 Paint colour code for piping and equipment ... 35
20.0 Identification of Vessels, Piping etc. 41
21.0 Painting for Civil Defence Requirements 41
22.0 Quality Control, Inspection and Testing.. 42
23.0 Guarantee. 45
24.0 Qualification Criteria of Painting Contractor/Sub-Contractor. 45
25.0 Qualification/Acceptance Criteria for Paint Coating System... 45
26.0 Method of Sampling & Dispatch for Laboratory Testing 48
1.0 GENERAL
1.1 This technical specifications shall be applicable for the work covered by the contract, and
without prejudice to the provisions of various international codes of practice, standard
specifications etc. It is understood that contractor shall carry out the work in all respects with
the best quality of materials and workmanship and in accordance with the best engineering
practice and instructions of Engineer-In-Charge.
1.2 Wherever it is stated in the specification that a specific material is to be supplied or a specific
work is to be done, it shall be deemed that the same shall be supplied or carried out by the
contractor.
Any deviation from this standard without written deviation permit from appropriate
authority will result in rejection of job.
1.3 This specification covers the requirement for protective coating for new construction.
2.0 SCOPE
2.1 Scope of work covered in the specification shall include, without being limited to the
following.
2.1.1 This specification defines the requirements for surface preparation, selection and application
of primers and paints on external surfaces of equipment, vessels, machinery, piping, ducts,
steel structures, external & internal protection of storage tanks for all services and chimneys
if any. The items listed in the heading of tables of paint systems is indicative only, however,
the contractor is fully responsible for carrying out all the necessary painting, coating and
lining on external and internal surfaces as per the tender requirement.
2.2.1 The following surfaces and materials shall require shop, pre-erection and field painting:
All uninsulated Carbon Steel & Alloy Steel equipments like vessels, Columns, storage
Tanks, Exchangers if any, parts of boilers etc.
All uninsulated carbon steel and low alloy plant and related piping, fittings and valves
(including painting of identification marks), furnace ducts and stacks.
All insulated parts of vessels, boilers, chimneys, stacks, piping and steam piping and if
any other insulated items present.
All structural steel work, pipe, structural steel supports, walkways, handrails, ladders,
platforms etc.
Flare lines, external surfaces of MS chimney with or without refractory lining and
internal surfaces of MS chimney without refractory lining. (If present)
Supply of all primers, paints and all other materials required for painting (other than
Owner supplied materials)
Painting under insulation for carbon steel, alloy steel and stainless steel as specified.
Repair work of damaged pre-erection/ fabrication and shop primer and weld joints in the
field/site before and after erection as required.
All CS Piping, equipments, storage tanks and internal surfaces of RCC tanks in ETP
plant.
Quality control, testing and inspection during all stages of work (surface preparation,
application of coating and testing of furnished coating).
2.2.2 The following surfaces and materials shall not require painting in general. However, if there
is any specific requirement by the owner, the same shall be painted as per the relevant
specifications:
2.3 Documents
2.3.1 The contractor shall perform the work in accordance with the following documents issued to
him for execution of work.
2.4 Unless otherwise instructed, final paint coating (i.e., application of field primer,
wherever required, intermediate and top coats) on pre-erection/ shop primed
equipments shall be applied at site, only after all welding, testing on systems are
completed as well as after completion of steam purging wherever required .
2.5 Changes and deviations required for any specific job due to clients requirement or otherwise
shall be referred to EIL for deviation permit.
3.1 Without prejudice to the provision of Clause 1.1 above and the detailed specifications of the
contract, latest editions of the following codes and standards are applicable for the work
covered by this contract.
The latest editions of any of the following standards shall be followed for surface
preparation:
3.2.1 ISO 8501-1 / SIS-05 59 00: ISO standard for Preparation of steel substrates before
application of paints and related products. This standard contains photographs of the various
standards on four different degrees of rusted steel and as such is preferable for inspection
purpose by the Engineer-In-Charge.
3.2.2 Steel Structures Painting Council, U.S.A. (Surface Preparation Specifications (SSPC-SP).
3.2.4 Various International Standards equivalent to Swedish Standard for surface preparations are
given in Table-I.
3.3 The contractor shall arrange, at his own cost, to keep a set of latest edition of above standards
and codes at site.
3.4 The paint manufacturer's instructions shall be followed as far as practicable at all times for
best results. Particular attention shall be paid to the following:
b. Surface preparation prior to painting shall be followed as per Table 8.0 to 16.0 of
this standard shall be followed.
4.0 EQUIPMENT
4.1 All tools, brushes, rollers, spray guns, blast material, hand power tools for cleaning and all
equipments, scaffolding materials, shot & grit blasting equipments & air compressors etc.
required to be used shall be suitable for the work and all in good order and shall be arranged
by the contractor at site and in sufficient quantity. The manufacturers test certificates / data
sheets for all the above items shall be reviewed by Engineer-in-charge at site before start of
work.
4.2 Mechanical mixer shall be used for paint mixing operations in case of two pack systems
except that the Engineer-In-Charge may allow the hand mixing of small quantities at his
discretion in case of specific requirement for touch up work only.
5.1 General
5.1.1 In order to achieve the maximum durability, one or more of following methods of surface
preparation shall be followed, depending on condition of surface to be painted and as
instructed by Engineer-In-Charge. Adhesion of the paint film to surface depends largely on
the degree of cleanliness of the metal surface. Proper surface preparation contributes more to
the success of the paint protective system.
5.1.2 Mill scale, rust, rust scale and foreign matter shall be removed fully to ensure that a clean and
dry surface is obtained. Unless otherwise specified, surface preparation shall be done as per
provisions of relevant tables given elsewhere in this specification. The minimum acceptable
standard, in case of thermally sprayed metal coatings, in case of mechanical or power tool
cleaning it shall be St. 3 or equivalent. In case of blast cleaning it shall be Sa 2-1/2 as per
Swedish Standard SIS-055900 (latest edition) or SSPC-SP or ISO 8501-01.Blast cleaning
shall be Sa 3 as per Swedish Standard in case thermally sprayed metal coatings.
Before surface preparation by blast cleaning, the surface shall be degreased by aromatic
solvent to remove all grease, oil etc.
5.1.3 Irrespective of whether external or internal surface to be coated, blast cleaning shall not be
performed where dust can contaminate surfaces undergoing such cleaning or during humid
weather conditions having humidity exceed 85%. In case of internal coating of storage tanks,
dehumidifier shall be used, to control humidity level below 60%. Dehumidifier should
depress the dew point of air in the enclosed space, sufficient enough so as to maintain it 3C
below the metal substrate temperature during centre period of blasting and coating
application. During the interval time between application of primer coat and subsequent
intermediate and top coats or between blast cleaning completion and start of application of
primer coat, dehumidifier unit should be in continuous operation to ensure that no
condensation occurs on substrate.
Dehumidifier should be able to maintain grain drop (moisture removal) at the rate of 25
grains per pound of air per hour. Dehumidifier should have capacity of at least 2 air changes
per hour of the enclosed space. All necessary psychometric data should be collected by
contractor for the given site conditions before starting operation of dehumidifier to ensure
that desired values of dew point, moisture content in enclosed scope is achieved.
Dehumidification to be maintained round the clock for surface preparation and painting till
the total coating application is over.
Dehumidifier shall not be stopped under any condition till the entire blasted surface is primed
to the satisfaction of the technical representative of the paint manufacturer interested with
quality assurance for the work. In case the dehumidifier breaks down in middle of the job, the
same shall be replaced at the risk and the cost of the contractor and the entire unfinished
work shall be repeated.
5.1.4 The Engineer in-charge shall have the right to disallow usage of dehumidifier if the
performance is not meeting the specified requirements. Under such circumstances the
contractor shall remove the equipment and replace the same with another equipment to
provide satisfactory results without any additional cost to the owner.
5.1.5 Irrespective of the method of surface preparation, the first coat of primer must be applied by
airless spray/ air assisted conventional spray if recommended by the paint manufacturer on
dry surface. This should be done immediately and in any case within 4 hours of cleaning of
surface. However, at times of unfavorable weather conditions, the Engineer-In-Charge shall
have the liberty to control the time period, at his sole discretion and/or to insist on re-
cleaning, as may be required, before primer application is taken up. In general, during
unfavorable weather conditions, blasting and painting shall be avoided as far as practicable.
5.1.6 The external surface of R.C.C. chimney to be painted shall be dry and clean. Any loose
particle of sand, cement, aggregate etc. shall be removed by scrubbing with soft wire brush.
Acid etching with 10-15% HCL solution for about 15 minutes shall be carried and surface
must be thoroughly washed with water to remove acid & loose particles and then dried
completely before application of paint.
The surfaces shall be blast cleaned using one of the abrasives like angular chilled cast iron or
steel grit, copper slag or Nickel slag, A12O3 particles at pressure of 7kg/cm2 at an appropriate
distance and angle depending of nozzle size maintaining constant velocity and pressure.
Chilled cast iron or steel shall be in the form of shot or grit of size in the range of G16 G42
conforming to SSPC AB1 and S250 grade size of steel shots (maximum) to obtain a desired
surface profile of 35-50 microns trough to peak. For all other abrasives, size shall be in the
range of G16 G24. The combination of steel grits and shots shall be normally in the ratio of
3:1. The quality of abrasives shall be free from contaminants and impurities and shall meet
the requirements of SSPC AB1. Compressed air shall be free from moisture and oil. The
blasting nozzles should be venturi style with tungsten carbide or boron carbide as the
materials for liners. Nozzles orifice may vary from 3/16 to . On completion of blasting
operation, the blasted surface shall be clean and free from any scale or rust and must show a
grey white metallic luster. Primer/first coat of paint shall be applied within 4 hours of surface
preparation. Blast cleaning shall not be done outdoors in bad weather without adequate
protection or when there is dew on the metal, which is to be cleaned. Surface profile shall be
uniform to provide good key to the paint adhesion (i.e. 35 to 50 microns). If possible
vacuum collector shall be installed for collecting the abrasives and recycling.
Power tool cleaning shall be done by mechanical striking tools, chipping hammers, grinding
wheels or rotating steel wire- brushes. Excessive burnish of surface shall be avoided as it can
reduce paint adhesion. On completion of cleaning, the detached rust mill scale etc. shall be
removed by clean rags and /or washed by water or steam and thoroughly dried with
compressed air jet before application of paint.
For equipments on which application of total protective coating (Primer + Intermediate + top
coat) is carried out at shop, compatibility of finish coat with primer should be checked with
paint manufacturer. If the shop coat is in satisfactory condition showing no major defect upon
arrival at site, the shop coat shall not be removed.
5.4 Shop coated equipments (coated with Primer & finishing coat) should not be repainted unless
paint is damaged. Repair shall be carried out as per Table 7.2 of paint systems depending
upon compatibility of paint.
5.5 Shop primed equipment and surfaces will only be 'spot cleaned' in damaged areas by means
of power tool brush cleaning or hand tool cleaning and then spot primed before applying one
coat of field primer unless otherwise specified. If shop primer is not compatible with field
primer then shop coated primer should be completely removed before application of selected
paint system for particular environment.
5.6 For Package units/equipment, shop primer should be as per the paint system given in this
specification. However, manufacturers standard can be followed after review.
As mentioned in section 2.4, all coating application at field (field primer, intermediate and
top coat) on equipments, structures, piping, etc, shall be carried out only after its erection and
all welding, testing, steam purging (wherever carried out) have been completed.
All paint coatings shall be applied by airless spray excepting at the following special
cases where application can be carried out by brush subject to suitability of the
application of the paint product by brush.
- Spot repair
- Stripe coating on edges
- Small bore parts not suitable for spray application.
Irregular surfaces such as sharp edges, welds, small brackets, and interstices may stripe
coated to ensure specified DFT is achieved. Paint manufacturer recommendation
should be followed before deciding for brush application.
5.7.1 Surface shall not be coated in rain, wind or in environment where injurious airborne elements
exists, when the steel surface temperature is less than 5oF above dew point when the relative
humidity is greater than 85% or when the temperature is below 40oF and when the
ambient/substrate temp is below the paint manufacturers recommended temperature of
application and curing. De-humidifier equipment shall be used to control RH and Dew point.
The paint application shall not be done when the wind speed exceeds 20km per hour.
5.7.2 Blast cleaned surface shall be coated with one complete application of primer as soon as
practicable but in no case later than 4 hrs the same day.
5.7.3 To the maximum extent practicable, each coat of material shall be applied as a continuous
film uniform thickness free of probes. Any spots or areas missed in application shall be
recoated and permitted to dry before the next coat is applied. Applied paint should have the
desired wet film thickness.
5.7.4 Each coat shall be in proper state of cure or dryness before the application of succeeding
coat. Material shall be considered dry for recoating when an additional coat can be applied
without the development of any detrimental film irregularities, such as lifting or loss of
adhesion of the under coat. Manufacturer instruction shall be followed for inter coat interval.
5.7.5 When the successive coat of the same colour have been specified, alternate coat shall be
tinted, when practical, sufficiently to produce enough contrast to indicate complete coverage
of the surface. The tinting material shall be compatible with the material and not detrimental
to its service life and shall be recommended by the original paint manufacturer.
5.7.6 Airless spray application shall be in accordance with the following procedure: as per steel
structure paint Manual Vol.1 & Vol.2 by SSPC, USA, Air less spray relies on hydraulic
pressure rather than air atomization to produce the desired spray. An air compressor or
electric motor is sued to operate a pump to produce pressures of 1000 to 6000 psi. paint is
delivered to the spray gun at this pressure through a single hose within the gun, a single paint
stream is divided into separate streams, which are forced through a small orifice resulting in
automization of paint without the use of air. This results in more rapid coverage with less
over spray. Airless spray usually is faster, cleaner, more economical and easier to use than
conventional air spray.
Airless spray equipment is mounted on wheels, and paint is aspirated in a hose that sucks
paint from any container, including drums. The unit shall have in built agitator that keep the
paint uniformly mixed during the spraying. The unit shall consist of in built strainer. Usually
very small quantity of thinning is required before spray. In case of high build epoxy coating
(two pack). 30:1 pump ratio and 0.020-0.023 tip size will provide a good spray pattern.
Ideally fluid hoses should not be less than 3/8 ID and not longer than 50 ft to obtain
optimum results.
a. Brushes shall be of a style and quality that will enable proper application of paint.
b. Round or oval brushes are most suitable for rivets, bolts, irregular surface, and
rough or pitted steel. Wide flat brushes are suitable for large flat areas, but they
shall not have width over five inches.
5.7.8 For each coat the painter should know the WFT corresponding to the specified DFT and
standardize the paint application technique to achieve the desired WFT. This has to be
ensured in the qualification trial.
5.8.1 No coat shall be applied until the preceding coat has dried. The material shall be considered
dry for re-coating when another coat can be applied without the development of any film
irregularities such as lifting or loss of adhesion of undercoats. Drying time of the applied coat
should not exceed maximum specified for it as a first coat; if it exceeds the paint material has
possibly deteriorated or maxing is faulty.
5.8.2 No paint shall be force dried under conditions which will cause chalking, wrinkling,
blistering formation of pores, or detrimentally affect the conditions of the paint.
5.8.3 No drier shall be added to paint on the job unless specifically called for in the manufacturers
specification for the paint.
5.8.4 Paint shall be protected from rain, condensation, contamination, snow and freezing until dry
to the fullest extent practicable.
5.9.1 Where pre erection shop primer has been damaged at isolated localized spots during handling
and transportation, or after erection / welding, the repair of damaged coating of pre-erection /
pre-fabrication or shop primer shall be done as given below and as per the Table 7.2 of this
specification.
5.9.2 Repair of damaged inorganic zinc silicate pre-erection / pre-fabrication or shop primer
(F9) after erection / welding in the design temperature of -90oC to 400oC and damaged
silicone aluminium (F-12) pre-erection / pre-fabrication or shop primer after erection /
welding for design temperature range of 401 550 C.
Surface Preparation: Quickly remove the primer from damaged area by mechanical scraping
and emery paper conforming to SSPC-SP-3 to expose the white metal. Blast clean the
surface, if possible. Feather the primed surface over the intact adjacent surface surrounding
the damaged area by emery paper.
Primer coating: One coat of F-9 shall be applied wherever damage was observed on pre-
erection / pre fabrication or shop primer of inorganic zinc silicate coating (F-9). Similarly
one coat of F-12 shall be applied wherever damage observed on pre-erection / pre-
fabrication shop primer of silicone aluminium (F-12).
5.9.3 Wherever if damaged areas are found extensive and spread over large areas, then entire pre-
erection / pre-fabrication or shop primer shall be removed by blasting to achieve SSPC-SP-
10 then entire blasted surface shall be primed again with F-9 or F-12 as applicable for the
intended design temp. (See note under table 7.2).
5.10.1 Shop priming/pre-erection priming with F9 or F12 shall be done only on blasted surface
(SSPC-SP-10)
5.10.2 Shop priming / pre-erection priming with F9 or F12 shall be done only with airless spray.
The paint system to be applied for a specific job shall be arrived at sequentially as given
below:
- Identify the environment from area classification details and chose the appropriate table.
- Identify the specific field paint system and surface preparation requirement from the above
identified table and temperature range.
- Identify the shop priming requirement from Table 7.1 based on compatibility of the above
paint system.
- Identify the need of repair of shop primer and execute as per Table 7.2.
5.11.1 A written quality plan with procedure for qualification trials and for the actual work
including test and inspection plan & procedure for approval before start of work.
5.11.2 Daily progress report with details of weather conditions, particular of applications, no of
coats and type of materials applied, anomalies, progress of work versus program.
5.11.3 Results of measurement of temperatures relative humidity, surface profile, film thickness,
holiday detection, adhesion tests with signature of appropriate authority.
5.11.4 Particulars of surface preparation and paint application during trials and during the work.
The coating applicator must maintain a job record consisting of all the information as per
5.11.2 -5.11.7 above as well as the approved procedure of work (5.11.1 above). The job
record consisting of information as required in accordance to 5.11.2 5.11.7 shall be entered
on daily basis and should be daily signed by Engineer-in-charge.
VARIOUS INTERNATIONAL
Sl. STANDARDS (EQUIVALENT)
DESCRIPTION REMARKS
No. ISO 8501-1/ SSPC-SP, NACE,
SIS-05 59 00 USA USA
Manual or hand tool
cleaning
VARIOUS INTERNATIONAL
Sl. STANDARDS (EQUIVALENT)
DESCRIPTION REMARKS
No. ISO 8501-1/ SSPC-SP, NACE,
SIS-05 59 00 USA USA
Commercial Blast For steel required to
be painted with
Blast cleaning until at least conventional paints
two-third of each element of for exposure to
3.3 SA 2 SSPC-SP-6 NO.3
surface area is free of all mildly corrosive
visible residues with desired atmosphere for longer
surface profile. life of the paint
systems.
Brush-off Blast
Paint manufacturers shall furnish the characteristics of all paints materials on original printed
literature, along with the test certificate for all specified characteristics given in this
specification. All the paint materials shall be of first quality and conform to the following
general characteristics as per the tables 6.1, 6.2, 6.3 and 6.4.
PAINT MATERIALS
PAINT MATERIALS
Sl.
DESCRIPTION F-2 F-3 F-6A/B F-6C F-7
No
Acrylic Chlorinated High build coal
Epoxy-High Build Solvent less
1 Technical name Polyurethane rubber based tar epoxy
coating epoxy coating
finish paint finish paint coating.
Single pack F-6A Two-pack
Two pack, Two pack
plasticised Aromatic amine
cured with polyamide
Two-pack chlorinated cured epoxy resin
Amine cured epoxy
aliphatic rubber based medium suitably
Type and Adduct; resin blended
2 isocynate medium with pigmented.
composition catalyzed with coaltar
cured acrylic chemical and F-6B: polyamide
epoxy resin medium,
finish paint. weather cured epoxy resin
suitably suitably
resistant medium suitably
pigmented pigmented
pigments. pigmented
3 Volume Solids % 40 3 382 603 991 653
DFT (Dry Film
4 thickness) per coat in 30-40 30-40 100-125 200-500 100-125
microns
Theoritical covering
5 capacity in 11-15 11-15 5-6 2-3 5.2-6.5
M2/coat/litre
Weight per liter in
6 1.150.03 1.150.03 1.420.03 1.400.03 1.400.03
kgs/litre
7 Touch dry at 30oC 30 minutes 30 minutes. 3 hrs. 3 hrs. 4 hrs.
Hard dry at 30oC
16 hrs
(max) 48 hrs
8 hrs
8 Full cure at 30oC (for 8 hrs 16 hrs
5 days
immersion/ high 5 days
temperature service)
Over-coating interval Min.12 hrs. Min.: Min.: Overnight Min.: 8 hrs. Min.: 24 hrs
9
at 30 oC Overnight Max.: 5 days Max.: 48 hrs. Max.: 5 days.
Pot life (approx.) at
6-8 hrs. Not
10 30oC for two 4-6 hrs 30 minutes 4-6 hrs.
applicable
component paints
Temperature 120oC(Dry
o o
Resistance 80 C 60 C service), 125oC
80oC
11 (minimum) Dry service Immersion 50oC Immersion
Dry service
min service (Immersion service
service)
PAINT MATERIALS
Sl.
DESCRIPTION F-8 F-9 F-11 F-12
No
Self priming type Heat resistant
Heat resistant
surface tolerant synthetic medium
silicone
high build epoxy Inorganic zinc based two pack
1 Technical name Aluminium paint
coating (complete silicate coating Aluminium paint
suitable upto
rust control suitable upto
500oC dry temp.
coating). 250oC dry temp.
A two pack air
Two pack epoxy drying self curing
resin based solvent based
Heat resistant
suitable inorganic zinc Single pack
synthetic medium
pigmented and silicate coating with silicone resin
based two pack
2 Type & composition capable of minimum 80% zinc based medium
Aluminium paint
adhering to content on dry film. with Aluminium
suitable upto
manually The final cure of flakes.
250oC.
prepared surface the dry film shall
and old coating. pass the MEK rub
test.
3 Volume Solids % 783 603 380.03 202
DFT (Dry Film
4 thickness) per coat in 100-125 65-75 15-20 15-20
microns
Theoritical covering
5 capacity in M2/coat/ 6.0-7.2 8-9 10-12 8-10
litre
Weight per liter in
6 1.410.03 2.30.03 0.950.03 1.000.03
kgs/litre
Touch dry at 30oC
7 3 hrs. 30 minutes. 3 hrs. 30 minutes.
(maximum)
Hard dry at 30oC
(maximum) 24 hrs 12 12 hrs 24 hrs
8 Full cure 30oC (for
immersion /high 5days NA NA NA
temperature service)
Min.: 12 hrs.at 20oC
9 Over-coating interval Min.: 10 hrs Min. 24 hrs Min.: 24 hrs
& 50 % RH
o
Pot life at 30 C for two
10 90 minutes. 4-6 hrs. Not applicable Not applicable
component paints
o o o
Temperature 80 C 400 C 250 C 500oC
11
Resistance (minimum) Dry service Dry service Dry service Dry service
PAINT MATERIALS
Sl.
DESCRIPTION F-14 F-15 F-16 F-17
No
Ambient temperature
curing Poly Siloxane
Two-component Two component
coating/High build
Epoxy phenolic solvent free type
cold applied inorganic
coating cured with high build epoxy
copolymer based
Polyamine cured Polyamine adduct phenolic/novalac
1 Technical name aluminium coating
coal tar epoxy hardner system epoxy phenolic
suitable for under
(primer + coating cured with
insulation coating of
intermediate coat Polyamine adduct
CS and SS piping for
+ finish paint) hardner system
high temperature
service.
Two pack ambient Two component
Specially
temperature curing Amercoat 738 from solvent free type
formulated
epoxy phenolic PPG Protective & high build epoxy
polyamine cured
coating system Marine Coatings or phenolic/novalac
2 Type & composition coal tar epoxy
suitable for Intertherm 751 CSA of epoxy phenolic
suitable for
application under International (Akzo coating cured with
application under
insulation of Nobel). Note: 6 Polyamine adduct
insulation
CS/SS piping hardner system
3 Volume Solids % 703 703 602 98-100
DFT (Dry Film
4 thickness) per coat in 100-125 75-100 75-100 125- 150
microns
Theoritical covering
5 capacity in M2/coat/ 5-8 4-5 7.0- 9.0 6.5 - 8
litre
Weight per liter in
6 1.450.03 1.650.03 1.3 1.7
kgs/litre (mix paint)
Touch dry at 30oC
7 4 hrs 3 hrs 1 hr 2 hrs
(maximum)
Hard dry at 30oC
(maximum) 24 hrs 24 hrs 16 hrs 24 hrs
8 Full cure 30oC (for
immersion /high 168 hrs (7 days) 168 hrs (7 days) - 168 hrs (7 days)
temp. service)
Over-coating interval Min. 6 hrs Min. 36 hrs Min.16 hrs Min. 16 hrs
9
Max.5 days Max.21 days Max. Not applicable Max.21 days
Pot life at 30oC for
10 two component 4 hrs 4-6 hrs 1 hr 1 hr
paints
Temperature a) upto 400 C for C.
Resistance o o Steel & S. Steel for
-45 C to 150 C
-45oC to 125oC Intertherm 751 CSA
under insulation & -45oC to 150oC for
11 under insulation b) upto 480 C for C.
immersion immersion service
And immersion Steel & upto 600 C
(Note: 5)
for S. Steel for
Amercoat 738
2. All primers and finish coats should be cold cured and air drying unless otherwise
specified.
3. All paints shall be applied in accordance with manufacturer's instructions for surface
preparation, intervals, curing and application. The surface preparation, quality and
workmanship should be ensured. In case of conflict between this specification and
manufacturers recommendation, the same shall be clarified through EIL SMMS
department.
4. Technical data sheets for all paints shall be supplied at the time of submission of
quotations.
5. F-15: Two-component Epoxy phenolic coating cured with Polyamine adduct hardner
system (primer + intermediate coat + finish paint) suitable upto 225C (Intertherm 228
from M/s Akzo Nobel Coatings India Pvt Ltd. Bangalore). For all other companies, the
temperature resistance shall be a maximum of 150C.
6. F-16: Ambient temperature curing epoxy poly siloxane Coating or high build cold
applied inorganic co-polymer based aluminium coating.
Amercoat 738 from PPG Protective & Marine coatings. Mumbai, is suitable up to
480oC for CS surfaces and 600oC for SS surfaces.
Intertherm 751 from Akzo Nobel Coatings India Pvt Ltd. Bangalore, Inorganic co-
polymer cold applied Aluminium spray coating is suitable upto 400oC of CS & SS
surfaces.
The coating system should be selected based on the Plant location as given below:
- For all unit areas including DM, CPP and Cooling Tower: Table 10.0 to be
followed
- For offsite area, as well as all unit area including DM, CPP, Cooling Tower:
Table 10.0 to be followed
c) For external surface of above ground tanks, table 12.0 to be followed for all
locations (Inland or coastal)
Notes:
2. Primers & Finish paints covered in Tables 8.0 to 17.0 are listed in Table 7.1.
TABLE 7.1: LIST OF PRIMERS & FINISH COATS COVERED IN TABLE NOS. 8 to 18.0
PRIMERS
P-2 Chlorinated rubber zinc Phosphate Primer
P-4 Etch Primer/Wash Primer
P-6 Two component Epoxy Zinc Phosphate Primer cured with polyamine hardener
Single pack, cold galvanizing compounds containing minimum 92% electrolytic zinc in dry film.
P-7
make ZINGA, LOCKTITE (of HENKEL) or ZRC
Total DFT
Sl. Surface
Design Temp. in oC Coating System in Microns Remarks
No. Preparation
(min.)
NOTES:
1 The application and repair of pre-erection/pre-fabrication or Shop Primer given in above tables
shall be done for all the items to be painted. In case the damages of primer are severe and spread
over large area, entire primer shall be removed by blasting to achieve SSPC-SP-10 and surfaces
to be primed again with F-9 or F-12 as applicable.
Design
Sl. Total DFT
Temp. in Coating System
No. o in Microns (min.)
C
Hot Dip Galvanizing to 80-85 microns (600-610
80 microns of finish coat
gm/m2)as per IS 4759, 2629, 4736, 2633 +
8.1 Up to 60 (excluding the thickness of
1 coat of P-6 @ 40 DFT/coat + 1 coat of F-2 @ 40
galvanizing )
microns DFT/coat
NOTES:
2 Repair of the damaged area of galvanized coatings due to welding during erection shall be
carried out as per recommended practice IS 11759 using cold galvanizing spray process.
Organic Paint systems are not acceptable for repair.
3 After repair of damaged galvanized coating by Cold Galvanized, the repaired area shall be top
coated with paint system as given in Table 8.0 above (i.e., 1 coat of P-6 @ 40 DFT/coat + 1
coat of F-2 @ 40 DFT/coat).
* Flare line within unit or offsite areas shall be coated as per Clause 10.3 of Table 10.0, but
having finish coat of 2 coats of F-12.
NOTES:
1 The list of items given in the heading of the above table is not exhaustive. There may be more
items for a particular contract where these specifications are used. The Contractor is fully
responsible for completing painting including prefabrication primer for all the items supplied
and fabricated through his scope of work as per tender document.
2 If the Pre-erection/Pre-fabrication & Shop Primer has already been completed, the same shall not
be repeated again in the field. In case the damages of primer are severe and spread over large
areas, the engineer-in-charge may decide & advise re-blasting and priming again. Repair of pre-
fabrication/pre-erection primer, if required, shall be done as per Table 7.2.
3 In case of Paint systems as per Sl. Nos. 9.5 and 9.6, the color bands shall be applied over the
Aluminum paint as per the Color coding requirement for specific service of piping given in
Clause 19.0.
4 All coating system including surface preparation, primer, and finish coat for piping shall be done
at field only.
TABLE 10.0 COATING SYSTEM FOR UNIT AREAS AS WELL AS DM, CPP,
COOLING TOWER OF INLAND PLANTS AND FOR ALL AREAS (UNIT,
OFFSITE, DM, CPP, etc.) OF COASTAL PLANTS
SSPC-SP-10; a) No over-
10.1 -90 to -15 1coat of F-9 @ None None 65-75 coating to be
65-75 DFT/coat done on
F-9 as it will
2 coats of F-6A lead to mud
@ 100 cracking.
DFT/coat + 1
SSPC-SP-10; 1 coat of P-6
coat of F-2 @ b) F-12 shall
10.2 -14 to 80 1coat of F-9 @ @ 40 345-355
40 DFT/coat; be ambient
65-75 DFT/coat DFT/coat
(2x100 + 40= temperature
240) curing type
c) Finish coat
including
2 coats of F-12 primer
SSPC-SP-10; @ 20 compatible
10.3 81 to 400 1coat of F-9 @ None DFT/coat 105-115 with finish
65-75 DFT/coat 2x20=40 coat (i.e. field
primer) shall
be applied at
site only.
Finish
2 coats of F-12 coating is not
SSPC-SP-10; permitted at
@ 20
10.4 401 to 550 1coat of F-12 @ None 60 equipment
DFT/coat;
20 DFT/coat manufacture
(2x20=40)
shop.
NOTES:
1. The list of items given in the heading of the above table is not exhaustive. There may be more
items for a particular contract where these specifications are used. The Contractor is fully
responsible for completing painting including prefabrication primer for all the items supplied
and fabricated through his scope of work as per tender document.
2. If the Pre-erection/Pre-fabrication & Shop Primer has already been completed, the same shall not
be repeated again in the field. In case the damages of primer are severe and spread over large
areas, the engineer-in-charge may decide & advise re-blasting and priming again. Repair of pre-
fabrication/pre-erection primer, if required, shall be done as per Table 7.2.
3. For external surface of MS chimney with or without refractory lining and for internal surface
without refractory lining, paint system as per 10.3 above shall be followed.
4. For external surface of RCC Chimney, 2 coats of F-6 @ 100 DFT/coat to obtain total DFT of
200 shall be applied after proper surface preparation as per guidelines in 5.1.6.
5. In case of paint systems as per Sl. Nos. 10.3 and 10.4, the colour bands shall be applied over the
Aluminum paint as per the Color coding requirement for specific service of piping given in
Clause 19.0.
6. All coating system including surface preparation, primer, finish coat for piping shall be done at
site/field only.
NOTES
1. The paint /coating manufacturers shall provide their Quality control test certificate of coating
materials (F-6A) for immersion service of the exposed effluent given in 11.2.
Total
Surface Coating system (Field)
DFT
Sl. Design Temp. Preparation (see note 1 below) in Remarks
No. in oC (Field)
Microns
Primer Finish Coat (min.)
All external surfaces of shell, wind girders, appurtenances, roof tops of all above ground tank including top
12.1
side of external and internal floating roof and associated external structural works.
F-6 should
2 coats of F-6A @
1coat of F-9 @ 65-75 be suitable
100 DFT /coat + 1
SSPC-SP-10 DFT/coat + 1coat of P-6 for
12.1.1 -14 to 80 coat of F-2 @ 40 345-355
@ 40 DFT/ coat ; occasional
DFT/ coat;
water
immersion
12.2 External surfaces of bottom plate (soil side) for all storage tanks.
F-7 should
be suitable
for
SSPC-SP-10 1 coat of F-9 @ 3 coats of F-7@ 100 immersion
12.2.1 -14 to 80 365-375
65-75 DFT/ coat DFT/coat (3x100=300) service of
the
products
given
1 coat of F-15 primer @
80 DFT/ coat + 1 coat
SSPC-SP-10 1 coat of F-15 finish
12.2.2 81 to 150 of F-15 intermediate 240 -
coat @ 80 DFT/ coat
coat @ 80 DFT/coat ;
(80+80=160)
1 coat of F-16 @ 125 1 coat of F-16 @ 125
12.2.3 151 to 550 SSPC-SP-10 250 -
DFT /coat DFT /coat
12.3 For underside of the bottom plate (in case tank is not lifted during PWHT) (see Note 2c)
For CS Products
SSPC SP-6 from
Commercial JOTUN or
HI-TEMP
Blast 2 coats of inert
-180 to 650 1 coat of inert polymeric coatings or
12.3.1 polymeric matrix 350-400
For SS matrix coating @ 125 SK
coating @ 125
SSPC SP-1 FORMULA
with non- TIONS are
chloride recommend
solvent ed.
NOTES
1. All paint coating application including primer for tankage shall be carried out at field after
erection and completion of all welding.
TABLE 13.0 INTERNAL COATING SYSTEMS FOR CARBON STEEL AND LOW ALLOY
STORAGE TANKS
NOTES
1. All paint coating application including primer shall be carried out after erection and completion
of all welding work at site.
2. F-6A should be suitable and resistant for immersion service for the respective Hydrocarbons.
3. This system can be used where maximum operating temperature is below 150oC and design
temperature is upto 200oC. Cases of operating temperature > 150oC are not covered in this spec,
such cases shall be covered in the job specifications.
4 F-6 A shall be suitable for drinking water service and should have competent authority
certification.
For CS
SSPC SP-6 Products from
Commercial Blast JOTUN or HI-
1 coat of inert 2 coats of inert
-180 to Zero TEMP coatings or
15.3.1 polymeric matrix polymeric matrix 350-400
For SS SK
coating @ 125 coating @ 125
SSPC SP-1 with FORMULATIONS
non-chloride are recommended.
solvent
If the piping &
equipments are
already erected
then surface shall
SSPC-SP-10
be prepared by
(15-25 surface 1 coat of F-15 1 coat of F-15
cleaning with
15.3.2 0 to 125 profile) intermediate coat finish coat@ 80 240
emery paper and
1 coat of F-15@ @80 DFT/coat DFT/coat; wash/flush with
80 DFT/coat
chloride free DM
water followed by
wiping with
organic solvent
SSPC-SP-10 Not recommended
1 coat of F-16 @
15.3.3 126 to 400 1 coat of F-16 @ None 250 for operating
125 DFT/coat
125 DFT/coat temperature
NOTES
18.0 STORAGE
18.1 All paints and painting materials shall be stored only in rooms to be arranged by contractor
and approved by Engineer-in-charge for the purpose. All necessary precautions shall be
taken to prevent fire. The storage building shall preferably be separate from adjacent
building. A signboard bearing the word PAINT STORAGE NO NAKED LIGHT
HIGHLY INFLAMABLE shall be clearly displayed outside. Manufacturers
recommendation shall be followed for storage of paint materials.
1 This specification covers the requirement of colour scheme for the identification of the
contents of the pipelines carrying fluids, storage tanks and equipment in refineries. The
following colour coding system has been made based on BPCL-KR input document.
19.1 Identification
The system of colour coding consists of a ground colour and secondary colour bands
superimposed over the ground colour. The ground colour identifies the basic nature of the
service and secondary colour band over the ground colour distinguishes the particular service.
The ground colour shall be applied over the entire length of the un-insulated pipes. For
insulated lines ground colour shall be provided as per specified length and interval to identify
the basic nature of service and secondary colour bands to be painted on these specified length
to identify the particular service. Above colour code is applicable for both unit and offsite
pipelines.
The following ground colour designation for identification of basis classification of various
important services shall be followed.
Secondary colours: The narrow bands presenting the secondary colour which identifies the
specific service may be applied by painting or preferably by use of adhesive plastic tapes of
the specific colour.
The following specifications of colour bands shall be followed for identifying the piping
contents, size and location of bands & letters. The bandwidth and size of letters in legends will
depend to some extent upon the pipe diameter. Either white or black letters are selected to
provide maximum contrast to the band colour. Bands usually are 100 mm wide and regardless
of band width, are spaced 50 mm apart when two bands are employed.
Contrast shall be provided between color field and legend for readability. Use of letters
standard style, in sizes, 1/2inch (13mm) and larger, is recommended. See above table for
specific size recommendations. For identification of materials in pipes of less than inch
(19mm) in diameter, and for valve and fitting identification, the use of permanently legible tag
is recommended.
In addition, ground colour as per specified length should be provided on insulated piping for
easy identification of nature of fluid, on which the colour bands should be painted for
identification of each service. The length of the ground colour should be 3 times the width of
normal bands or 2 meters, whichever is suitable depending on the length of the pipe.
Arrows shall be used to indicate direction of flow. Where flow can be in both directions,
arrows in both directions shall be displayed.
Positive identification of the contents of a piping system shall be by lettered legend, giving the
name of the contents in full or abbreviated form. Contents shall be identified by a legend with
sufficient additional details such as temperature, pressure, etc as are necessary to identify the
hazard. Legends shall be brief, informative, pointed and simple of greatest effectiveness.
Legends shall be applied close to valves or flanges and adjacent to changes in direction,
branches and where pipes pass through walls or floors, where it enters and emerges from road,
culvert and walkway overpasses, unit battery limits and at every 50m intervals on straight pipe
runs sufficient for identification. Identification may be accomplished by stencilling, the use of
tape, or markers. In any situation, the number and location of identification markers shall be
based on the particular piping system.
The letters will be in black on pipes painted with light shade colours and white on pipes
painted with dark shade colours to give good contrast.
Only writing of service name shall be done on stainless steel lines. Precautions should be taken
while painting by using low chloride content painting to avoid any damage to the stainless
steel pipes. It is preferable to use adhesive plastic tapes to protect stainless steel pipes.
Visibility:
Attention shall be given to visibility with reference to pipe markings. Where pipelines are
located above or below the normal line of vision, the lettering shall be placed below or above
the horizontal centreline of the pipe.
Size of letters stencilled / written for equipment shall be as given below:
In addition, the contents of the pipe and/or direction of flow may be further indicated by
arrows and legend. If a hazard is involved it must be identified clearly by legend.
Colour bands: The location and size of bands, as recommended, when used, shall be
applied to the pipe.
For alloy steel / stainless steel pipes and fittings in stores / fabrication yard, colour band
(Minimum wide) should be applied along the complete length of pipe, bends / tees, side-
covered surface (on thickness) of flanges as well as valves as per the metallurgy.
When the piping layout creates or occurs in a limited area of inaccessibility or of extreme
complexity, such segments of layouts may require substitute techniques shall be limited to
such segments and shall not deviate from the concept of identification as defined above.
The specification for application of the complete Piping identification colour code, including
base and bands colours, are presented in the below table.
11 Crude Sweet 1 Light brown ground colour with 1 yellow band in centre
12 Crude Sour 1 Light brown ground colour with 1 orange band in centre
13 VGO / HCU Feed 1 Oxide red ground colour with 1 steel grey band in centre
14 OHCU Bottom / FCCU Feed 1 Oxide red ground colour with 2 steel grey band in centre
6. GRATING GALVANSIED
8. HAND RAILINGS
- HANDRAIL, MIDDLE RAIL, TOE PLATE SIGNAL RED
- VERTICAL POST BLACK
20.1 Equipment number shall be stencilled in black or white on each vessel, column, equipment &
machinery (insulated or uninsulated) after painting. Line number in black or white shall be
stencilled on all the pipe lines of more than one location as directed by Engineer-In-Charge;
Size of letter printed shall be as below:
21.1 Following items shall be painted for camouflaging if required by the client.
a. All Columns
b. All tanks in Offsites
c. Large Vessels
d. Spheres
21.2 Two coats of selected finishing paint as per defense requirement shall be applied in a
particular pattern as per 20.3 and as per the instructions of Engineer-In-Charge.
21.3.1 Disruptive painting for camouflaging shall be done in three colours in the ratio of 5:3:2 (all
matte finish).
21.3.4 The patches should be continuous where two surfaces meet at an angle.
22.1 All painting materials including primers and thinners brought to site by contractor for
application shall be procured directly from manufactures as per specifications and shall be
accompanied by manufacturer's test certificates. Paint formulations without certificates are
not acceptable (see section 24.0).
22.2 The contractor must produce Test Certificate from Pre Qualified Paint Manufacturer for
various tests as detailed out in section 25.1 of this document, for each batch & for each
category of product. The Engineer-in-Charge shall have the right to test wet samples of paint
from each batch at random for verifying quality of paint supplied. Contractor shall arrange to
have such tests, when called for by Engineer-in-Charge, performed at his cost any one of the
independent laboratories listed in the 25.1 of this document.
Samples for the test will be drawn at random in presence Engineer-in-Charge or his
representations. Following tests to be carried out if called for by Engineer-in-Charge:
- Specific Gravity
- % solids by weight (% zinc content in case of inorganic or organic zinc primer)
- Drying time (touch dry & full curing)
- Adhesion
- Flexibility
- Hardness
- Storage stability (pot life)
Test methods for above tests shall be as per relevant ASTM or ISO Standard.
22.3 The painting work shall be subject to inspection by Engineer-In-Charge at all times. In
particular, following stage-wise inspection will be performed and contractor shall offer the
work for inspection and approval of every stage before proceeding with the next stage. The
record of inspection shall be maintained in the registers. Stages of inspection are as follows:
- Test for absence oil & grease after degreasing before blasting as per procedure given in
sec 6.7 of Annexure-I of this specification (specification for thermally sprayed
Aluminium Coating).
- Tests for surface finish of blasted surface shall be done by visual inspection using SSPC-
VIS1. Clear cellophane tape test as per ISO 8502-3 shall be used to confirm absence of
dust on blasted surface. Checks shall be done on each component atleast once per 200 m2
of blasted surface and minimum of 3 checks per shift.
- Test for presence of soluble salt as per method ISO 8502-9. Maximum allowable salt
content shall be considered 20 mg/m2 (2 mg/cm2). Checks shall be done on each
component atleast once per 200 m2 of blasted surface and minimum of 3 checks per shift.
In case salt exceeds specified limit, the contaminated surface shall be cleaned by method
as per Annexure-C of IS 12944-4 (water cleaning). After cleaning surface shall be
retested for salt after drying.
- Blast profile measurement This shall be done as described in sec 6.2 of Annexure-I of
this specification (Specification for thermally sprayed Aluminium).
- Test for blasting Media and Blasting air- this shall be done as described in sec 6.6 of
Annexure-I of this specification (Specification for thermally sprayed Aluminium).
In addition to above, record should include type of shop primer already applied on equipment
e.g. zinc silicate, or zinc rich epoxy, or zinc phosphate.
Any defect noticed during the various stages of inspection shall be rectified by the contractor
to the entire satisfaction of Engineer-In-Charge before proceeding further. Irrespective of the
inspection, repair and approval at intermediate stages of work, contractor shall be responsible
for making good any defects found during final inspection/guarantee period/defect liability
period as defined in general condition of contract. Dry film thickness (DFT) shall be checked
and recorded after application of each coat and extra coat of paint should be applied to make-
up the DFT specified without any extra cost to owner, the extra coat should have prior
approval of Engineer-in-charge.
After surface preparation, the primer should be applied to cover the crevices, corners, sharp
edges etc. in the presence of inspector nominated by Engineer-In-Charge.
22.5 The shades of successive coats should be slightly different in colour in order to ensure
application of individual coats, the thickness of each coat and complete coverage should be
checked as per provision of this specification. This should be approved by Engineer-In-
Charge before application of successive coats.
22.6 The contractor shall provide standard thickness measurement instrument with appropriate
range(s) for measuring.
Dry film thickness of each coat, surface profile gauge for checking of surface profile in case
of sand blasting. Holiday detectors and pinhole detector and protector whenever required for
checking in case of immersion conditions.
22.7 Prior to application of paints on surfaces of chimneys, the thickness of the individual coat
shall be checked by application of each coat of same paint on M.S.test panel. The thickness of
paint on test panels shall be determined by using gauge such as 'Elkometer'. The thickness of
each coat shall be checked as per provision of this specification. This shall be approved by
Engineer-In-Charge before application of paints on surface of chimney.
22.8 At the discretion of Engineer-In-Charge, the paint manufacturer must provide the expert
technical service at site as and when required. This service should be free of cost and without
any obligation to the owner, as it would be in the interest of the manufacturer to ensure that
both surface preparation and application are carried out as per their recommendations. The
contractor is responsible to arrange the same.
1) Coating DFT measurement shall be as per ISO 2808. Type II electromagnetic gauges
should be used for ferrous substrates. DFT gauge calibration, number of measurement
shall be as per SSPC-DA 2. Measured DFT shall be within + 10% of the dry film
thickness, specified in the specifications.
2) Adhesion of the primer to the steel substrate and intercoat adhesion of the subsequent
coat(s) after curing for at least a week after application of the topcoat shall be examined by
a knife test in accordance with ASTM D 6677. For the knife test, if the rating is better than
8, the adhesion is considered acceptable. The adhesion is destructive and tested areas shall
be repaired afterward using the spot repair procedure. Alternatively, the applicator may
perform the adhesion test on a steel coupon coated using the same surface preparation and
coating application procedure as the work piece. Adhesion testing shall be carried out for
each component at least once per 200 m2 (2000 ft2) of coated surface.
3) Holiday testing shall be conducted in accordance with NACE SP 0188. For immersion
services, 100% of coated area shall be inspected for holidays. For atmospheric exposure,
10% of coated area which must include weld seams, corners and edges to be holiday
tested. Voltage at which test is to be carried out will depend upon DFT of coating being
tested and shall be as per NACE SP 0188. Any holiday is unacceptable and should be
marked and repaired immediately.
22.10 The contractor shall arrange for spot checking of paint materials for Specific gravity, glow
time (ford cup) and spreading rate.
A final inspection shall be conducted prior to the acceptance of the work. The coating
contractor and the facility owner shall both be present and they shall sign an agreed inspection
report. Such reports shall include:
General
- Names of the coating contractor and the responsible personnel
- Dates when work was performed
Coating Materials
- Information on coating materials being applied
- Condition of coating materials received
Environmental Conditions
- Weather and ambient conditions
- Coating periods
Surface Preparation
- Condition of surface before preparation
- Tools and methods used to prepare surface
- Condition of surface after preparation
Coating Application
- Equipment used
- Mixing procedure prior to application
- Coating application techniques used
Testing
- Type and calibration of inspection instruments used
- Type of quality control tests performed, and results
23.0 GUARANTEE
23.1 The contractor shall guarantee that the chemical and physical properties of paint materials used
are in accordance with the specifications contained herein/to be provided during execution of
work.
Painting contractor who is awarded any job for EIL, Projects under this standard must have
necessary equipments, machinery, tools and tackles for surface preparation, paint application
and inspection. The contractor mush have qualified, trained and experienced surface
preparator, paint applicator, inspector and supervisors. The contractor supervisor, inspector,
surface preparator and paint applicator must be conversant with the standards referred in this
specification.
Paint Coating manufacture meeting the following requirements shall be considered for supply
of their products. Contractor is advised to select coating manufacturer. Only after obtaining
prequalification from EIL for the manufacturer based on following requirements. Even those
manufacturers, whose names are appearing elsewhere in the tender document, under the list of
EILs Recommended or Approved Vendors, will also be required to meet the following
prequalification requirements.
- Manufacturer should have been in continuous business of paint coating formulation and
manufacturer for at least past 5 years.
- Coating manufacturer should have supplied at least 10000 litre of an individual product
to hydrocarbon processing industry or offshore platform.
- The manufacturers manufacturing procedure & QA/QC system shall meet ISO 9001
requirements and preferably should posses ISO 14000 certificate.
- The Quality control set up should be manned by qualified paint technologists whose bio
data should be sent along with quality control organization chart.
- Pre-Qualification Testing:
Manufacturer should have got his products tested at least one time in last 3 years at a
reputed independent laboratory for the following test items. Test certificates which are
more than 3 years old will not be considered.
1) An infrared scan (fingerprint), for Part A and B, each component as per ASTM
D 2621
2) Specific gravity of Base and curing agent (Ref. ISO 2811)
3) Ash content (ASTM D1650), volatile and non-volatile matters (ISO 3251) of each
component
The identification shall be carried out on the batch, which is used for the Pre-
qualification testing. Pre-qualification of the products shall be carried out at an
independent laboratory.
Test shall be carried out at any one of the following laboratories and tests to be witnessed &
certified by third party inspection agency (TUV, BV, DNV).
IICT, Hyderabad
HBTI, Kanpur
DMSRDE, Kanpur
BIS Laboratories
UICT, Matunga, Mumbai
RITES, Kolkata
PDIL, Sindri
NTH, Kolkata
Contractor along with delivery of paint material has to furnish following information from
paint manufacturer to EIL for acceptance/approval of products.
Along with delivery to site of the paint products from pre-qualified coating manufacturer.
Contractor has to produce test certificate from paint manufacturer for each batch and for
each category of product for the following test items. Test to be witnessed & certified
by third party inspection agency. All test results must mention clearly the batch no. and
category of product tested. Tests to be conducted for following properties:
b) Product information sheet/ technical data sheet for each category of product.
26.1 Samples of coating materials should be submitted to the Govt. laboratory in sealed containers
with batch no. and test certificate on regular format of manufacturers testing laboratory. The
sampling shall be certified and sealed by a certifying agency.
26.2 All test panels should be prepared by Govt. testing agency coloured photographs of test
panels should be taken before and after the test and should be enclosed along with test report.
Sample batch no. and manufacturers test certificate should be enclosed along with the
report. Test report must contain details of observation and rusting if any, as per the testing
code.
26.3 Manufacturers should intimate the company, details of sample submitted for testing, name of
Govt. testing agency, date, contact personnel of the govt. testing agency. At the end of the
test the manufacturer should submit the test reports to the company for approval.
26.4 Coating systems for panel test shall be decided after discussion with EIL.
I
151fRiseA ENGINEERS FOR POSITIVE MATERIAL
si at efaleg INI NA LIMITED
/A nul na. Lnden.,), IDENTIFICATION (PMI) AT
6 - 81 - 0001 Rev. 2
SUPPLIER'S WORKS Page I of 8
covingii 4
c 1T
STANDARD SPECIFICATION
FOR
POSITIVE MATERIAL
IDENTIFICATION
(PMI)
AT SUPPLIER'S WORKS
40D ., 15,
2 20.10.11 REVISED AND RE-ISSUED AKC DM
Abbreviations:
CONTENTS
1.0 SCOPE 4
2.0 REFERENCE DOCUMENTS 4
3.0 DEFINITIONS 4
4.0 PMI EXAMINATION 5
5.0 ACCEPTABLE METHODS FOR PMI 5
6.0 EXTENT OF PMI EXAMINATION 6
7.0 RECORDING AND DOCUMENTATION 7
8.0 MARKING 7
1.0 SCOPE
1.1 This specification applies to the requirements for Positive Material Identification (PMI) to be
performed at the Supplier's works on Metallic Materials procured either directly by the
Owner/EIL/ LSTK contractor or indirectly through the sub-Suppliers.
1.2 Any post order deviation from this specification must be approved by Owner/EIL in the
Deviation/ Waiver Permit format (No. 5-0000-0180-F1) enclosed with Material Requisition.
1.3 This specification covers the procedures and methodology to be adopted to assure that the
chemical composition of the material is consistent with the material specifications as specified
in purchase documents using 'Alloy Analyzer' at the time of final inspection before dispatch.
1.4 The scope of this specification shall include but shall not be limited to Positive Material
Identification (PMI) to be performed on Materials listed below:
1.5 All grades of material supplies including Stainless Steels shall be liable for PMI test at site. In
case of any defective materials being found at site, the Supplier shall be responsible to effect
replacement of such defective materials at project site without any delays to the satisfaction of
EIL site RCM (Resident Construction Manager).
2.1 API Recommended Practice 578 (First Edition, May 1999) - Material Verification Program for
New and Existing Alloy Piping Systems.
3.0 DEFINITIONS
3.1 Supplier: Any Supplier or Manufacturer on whom an order is placed for the supply of referred
items. This definition shall also include any sub-Supplier or manufacturer on whom a sub-order
is placed by the Supplier.
3.2 Inspection Lot: A group of items offered for inspection covered under same size, Heat and
Heat treatment lot.
3.3 Alloy Material: Any metallic material (including welding filler materials) that contains
alloying elements such as chromium, nickel, molybdenum or vanadium, which are intentionally
added to enhance mechanical or physical properties and/or corrosion resistance.
4.1 The Supplier shall submit a procedure of PMI to comply with the requirements of this
Specification Approval of PMI Procedure shall be obtained from Owner/EIL/TPIA prior to
commencing manufacture/ inspection of product.
4.2 PMI examination of materials is independent of any certification, markings or colour coding
that may exist and is aimed at verifying that the alloy used are as per specified grades.
4.3 The Supplier shall identify all incoming alloy materials and maintain full traceability of all alloy
materials, including all off-cuts. Transfer of identification marks shall be undertaken prior to
cutting to ensure maintenance of identification on off-cuts.
4.4 The Supplier shall ensure that all alloy materials are segregated and stored in separately
identified locations to prevent the mix up of materials of different alloy specifications or alloy
material with carbon steel. Non ferro-magnetic materials shall be segregated at all times from
ferro-magnetic materials.
5.1 The method used for PMI examination shall provide a quantitative determination of the alloying
elements like chromium, nickel, molybdenum or vanadium in Alloy Steel items.
5.2 Instruments or methods used for PMI examination shall be able to provide quantitative,
recordable, elemental composition results for positive identification of alloying elements
present.
5.3 The acceptable instruments for alloy analyzer shall be either "Portable X-Ray fluorescence" or
"Optical Emission" type each capable of verifying the percentage of alloy elements within
specified range.
5.4 Chemical spot testing, magnets, alloy sorters and other methods using eddy current or
triboelectric testing methods are not acceptable for PMI examination.
5.5 The PMI instrument used shall have the sensitivity to detect the alloying elements in the
specified range.
5.6 All PMI instruments shall have been serviced within a 6 month period of the time of use to
verify the suitability of batteries, sources etc., and the data of the last service shall be stated on
the PMI Report Form (Sample enclosed).
5.7 Each analyzer must be calibrated according to the manufacturer's specification at the beginning
and end of each shift. Instrument must be checked against known standard for each alloy type
to be inspected during the shift.
5.8 Certified samples, with full traceability, of a known alloy materials shall be available for use as
a random spot check on the instrument calibration.
5.9 The surfaces to be examined shall be prepared by light grinding or abrasive paper and solvent
cleaner. Evidence of Arc burn resulting from examination shall be removed by light grinding or
abrasive paper. No permanent marks, which are injurious to the usage of product in service, are
acceptable.
5.10 Alloy Steel ring type joint Gaskets shall be inspected by using portable X-Ray fluorescence
instrument.
5.11 Testing shall be done as per the procedures outlined by the manufactures of alloy analyzer
being used. Modification of these procedures if any must be approved by Owner/EIL.
5.12 The persons performing PMI shall demonstrate their capabilities to the satisfaction of
Owner/EIL/TPIA visiting engineer. If the Supplier has qualified operator on their rolls, he may
perform the examination. Otherwise PMI examination shall be sub-contracted to an independent
testing agency approved by EIL.
5.13 Whenever material is identified as not meeting requirements by the visiting engineer a rejection
note shall be issued.
Following sampling plans shall be applicable for PMI examination of various items.
Note:
For Welded Pipes and Fittings, PMI shall be performed on Base Metal as well as
weldments.
Whenever any sample drawn to PMI test on the basis of percentage selection in B & C
above, fails to meet specification requirements, 100% of items of lot shall be tested for
PMI.
The results of PMI examination shall be recorded in a Report Format as enclosed with this
specification.
8.0 MARKING
8.1 All alloy materials tested by PMI shall be identified using either of the following methods by
indicating "PMI OK"
Material Specification/Grade
Element Cr Mo Ni V
Specified Range
Actual observations
Instrument Type / ID
kVilIP
t'
Convenor Chairman
Rev. Prepared Checked Standards Committee Standards Bureau
Date Purpose
No. by by
Approved by
Abbreviations:
Members:
1.0 SCOPE
This Inspection and test plan covers the minimum testing requirements of Pressure vessels/ Columns carbon steel
SCOPE OF INSPECTION
SL QUANTUM
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
1.0 Procedures
SCOPE OF INSPECTION
SL QUANTUM
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
SCOPE OF INSPECTION
SL QUANTUM
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Inspection
Test coupon as applicable 100% H H W
report
Visual & dimensional (min.
100% Inspection
thickness, profile, ovality etc ) H H H
report
inspection
100% Batch test
3.5 Welding consumable Chemical & mechanical properties W R R
certificates
Visual & dimensional inspection,
Inspection
weld edge, root gap, offset, 100% - W
Weld edge preparation & set check list
3.6 alignment, cleanliness etc
up of pressure parts
NDT of weld edges as applicable
for cracks, laminations or 100% NDT Reports - W R
segregations
Intermediate inspection of Inspection
3.7 Visual/ inter pass temperature 100% - W -
welds report
4.0 Final inspection
Visual and dimensional Visual/ dimensions, completeness
inspection (internals & of assembly and weld visual for Inspection
4.1 100% - H H
externals) including welds reinforcement, undercuts, Surface report
(before PWHT as applicable) defects, etc.
SCOPE OF INSPECTION
SL QUANTUM
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Each Inspection
4.2 PMI (AS/SS components) Chemical check W R
component report
5.0 Painting
SCOPE OF INSPECTION
SL QUANTUM
STAGE/ ACTIVITY CHARACTERISTICS RECORD SUB
NO. OF CHECK SUPPLIER EIL/TPIA
SUPPLIER
Visual inspection (after surface
preparation and final painting for Inspection
5.1 Final painting 100% - H
workmanship, uniformity) DFT report
check
6.0 Documentation and IC
Legend: H- Hold (Do not proceed without approval), P-Perform, RW - Random Witness (As specified or 10% ( min.1 no. of each size and type of Bulk item)),
R-Review, W-Witness (Give due notice, work may proceed after scheduled date).
1. This document describes the generic test requirements. Any additional test or Inspection scope if specified in contract documents shall also be
applicable.
(Unless otherwise agreed upon)
2. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred there in /Job Specification /Approved Documents.
L-
O
U-
r
REF. PLANE
ir4
SPECIAL NOTES
CUMULATIVE TOLERANCES ON CONSECUTIVE DIMENSIONS SHALL BE LIMITED BY OVERALL DIMENSIONAL TOLERANCES.
ALL TOLERANCES ARE FROM REFERENCE PLANE UNLESS OTHERWISE INDICATED.
INTERFERENCE BETWEEN INTERNAL AND EXTERNAL PARTS OR ANY RESTRICTION TO THE INTENDED FUNCTION OF ANY
PART SHALL BE KEPT IN VIEW WHERE TOLERANCES ARE CUMULATIVE.
SPECIFIC TOLERANCES FOR ANY PART SHOWN ON EIL DRAWING SHALL BE GIVEN PREFERENCE TO THOSE GIVEN
IN THIS STANDARD.
UNUSUALLY LARGE OR COMPLEX VESSELS MAY BE EXECUTED AS PER FABRICATOR'S STANDARD WHEN THE TOLERANCES
AS SHOWN ARE UNREASONABLE. IN SUCH INSTANCES FABRICATOR'S TOLERANCES & UMITS MUST BE SUBMITTED
FOR APPROVAL.
E. VESSEL UPTO AND INCLUDING 750 mm NOMINAL DIAMETER SHALL HAVE CARTRIDGE TYPE TRAY. FOLLOWING
TOLERANCES ON DIAMETER SHALL APPLY THROUGHOUT ITS LENGTH.
VESSEL NOMINAL DIAMETER TOLERANCE
500 mm AND UNDER VESSEL I.D. + 1 mm
501 mm TO 750 mm VESSEL I.D. 3 mm A
TYPE - A
IUD 1000
1200
950
1100
700
800
330
375
820
960
B
B
12.3
19.4
85
130
HOLE FOR 1400 1250 900 465 1150 B 19.7 140
SLIDING SUPPORT
1600 1450 1000 370 1300 C 23.3 165
1800 1600 1100 410 1450 C 39.1 260
D/18 2000 1750 1200 445 1600 C 43.5 290
O 9R
2200 1950 1300 495 1800 D 49.1 295
i 110 111 2400 2150 1450 545 2000 D 53.5 390
ki iii
__.
..1 2600 2300 1550 585 2150 D 52.9 440
11 1
Li Li
N- II It
1 0
2800
3000
2500
2670
1650
1750
620
670
2300
2500
E
E
52.7
64.9
475
600
I- EARTHING 3200 2800 1850 710 2600 E 63.8 620
I 250
L
26 0 HOLES FOR 3400 3000 1950 760 2800 E 64.9 630
30 M 20 BOLTS
111111 3600 3200 2050 830 3000 E 60.5 725
TYPE - B
DUD ,
3800
4000
3350
3550
2150
2250
845
895
3150
3300
E
E
61.0
60.6
745
820
HOLE FOR
SLIDING SUPPORT
TYPE t1 t2 L3 t3
D/18 A 10 10 170 12
B 10 12 250 12
110 C 12 16 300 16
D 16 20 350 20
2-60 VENT
HOLE (TYP.) E 20 20 400 20
(REF. NOTE-5)
I L 1 I L1 I Li 140
EARTHING
I 250
L2
I 30 0 HOLES FOR
30 M 24 BOLTS
PARALLEL TO VESSEL
TYPE - C. D. E AXIS (TYP)
HOLE FOR
SLIDING SUPPORT
NOTES
ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
VESSEL DIAMETER 'D' REFERS TO THE OUTER DIAMETER OF THE SHELL.
FOR INTERMEDIATE DIAMETERS TAKE THE IMMEDIATE NEAREST DIAMETER SUPPORT.
WELDING SHALL BE DONE ALL AROUND AND SHALL BE CONTINUOUS FILLET WELD. WELD SIZE SHALL
BE 6 mm FOR VESSELS UPTO 1400 mm DIA. AND 8 mm FOR VESSELS ABOVE 1400 mm DIA.
PROVIDE 2 NO. 60 VENT HOLES IN SADDLE WRAPPER PLATE. THESE HOLES SHALL BE PROVIDED DIAGONALLY
OPPOSITE AND BE LEFT UNPLUGED AND SHALL BE FILLED WITH HARD GREASE ONLY.
WHERE EARTHING LUG CANNOT BE PUT AT AN ELEVATION OF 400 mm ABOVE THE SADDLE BASE PLATE
IT SHALL BE LOCATED AS HIGH AS POSSIBLE.
EARTHING LUGS ARE NOT TO BE PAINTED OR GALVANIZED.
DETAIL, DIMENSIONS AND NOTES IN ENGINEERING DRAWING TAKE PRECEDENCE OVER THOSE SHOWN HERE.
MATERIALS SHALL BE AS PER ENGINEERING DRAWING.
EARTHING LUG SHALL BE AS PER STANDARD 7-12-0026
CHAIR CAP
NOTCH GUSSET TO WASHER WELD AT SITE
CLEAR WELD CONTINUOUS RING
NOTCH GUSSET TO
CLEAR WELD
EARTHING LUG
ir
// BOLT 0
+ 3mm
H 20
//
W
n A K
AK +V BOLT 0
-17
I-
II BOLT 0
+ 12mm
L + 12mm
(ALL DIMENSIONS AND DETAILS ARE
BCD BCD SAME AS SHOWN FOR TYPE-2
BCD EXCEPT CONTINUOUS RING)
BOLT 0 + 12mm
[WIDE SLOT RADIUS
+ 6mm
TYPE-1 TYPE-2 SLOT DETAIL TYPE-3
(SEE NOTE-6) (FOR CONTINUOUS RING ONLY)
NOTES
ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
BOLT CIRCLE DIAMETER ( BCD ), NUMBER AND SIZE OF THE BOLTS SHALL BE AS PER ENGINEERING DRAWING.
* 3. DIMENSIONS t1, t2, t3 AND 'I: ARE TO BE CHECKED IN EVERY CASE.
IN CASE OF ANY CONFLICT THE ENGINEERING DRAWING SHALL GOVERN.
NUMBER OF BOLTS USED IS TO BE A MULTIPLE OF 4 AND BOLTS SHALL STRADDLE VESSEL NORTHSOUTH
CENTRE LINE IN PLAN.
USE CONTINUOUS RING ( CHAIR CAP ) IF DISTANCE BETWEEN CONSECUTIVE BOLTS IS LESS THAN 400 mm.
CIRCULAR WASHER SHALL BE SHIPPED LOOSE AND WELDED AT SITE AFTER ANCHOR BOLTS ARE IN POSITION.
8. PREFERRED DIMENSION 'A'
EARTHING LUG SHALL BE LOCATED BETWEEN THE ANCHOR BOLTS AND SHALL BE AS PER STANDARD 7-12-0026.
WHEN THE ANCHOR CHAIR CAP IS NOT CONTINUOUS, THE BASE PLATE SHALL BE SUITABLY STIFFENED USING
REMOVABLE STRUCTURAL SECTIONS (BEAM/SPIDER) AT SITE DURING ERECTION.
t*/
6 30.06.2011 REAFFIRMED AND REISSUED AS STANDARD POREL RKT M/SC DM
5 08.09.2006 REAFFIRMED AND REISSUED AS STANDARD POREL DNN AKM VC
Rev. Prepared Checked Stds. Committee Stds. Bureau
Date Purpose Convenor Chairman
No. by by
Approved by
Page 335 of
Format No. 8-00-0001-F4 395
Rev.0 Copyright EIL - All rights reserved
.C110Eet/IINGNEEI6
dliturletuleGNIFINDIA
oimmumwommose
UMITED
(A Govt. of Indio Undertaking)
SKIRT OPENING DETAILS 7-12-0005 Rev. 5
Page 1 of 2
N
PAD ALL AROUND
SEE NOTE-7
SKIRT
INSIDE 100NB SCH. 40
40 PIPE VENI
SKIRT
EQUISPACED INSIDE
BASE PLATE
SKIRT
80x6THK. PLATE
INSIDE
cv II 2mm(TENTATIVE)
CHECK FOR PIPE
THERMAL EXPANSION.
MALLER OF tx+2
OR 14mm (FOR PIPE
SSEE NOTE-6)
OR INSULATED PIPE+10
SEE NOTE-10
2-120 HANDLE
3-50 PINS-15 LG
EQUISPACED
VIEWQ
VIEWP
NOTES (HOT TYPE VESSEL) (COLD TYPE VESSEL)
ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
ACCESS OPENING SHALL BE LOCATED BETWEEN ANCHOR BOLTS WHEREVER POSSIBLE.
ACCESS OPENING IS NOT TO BE BLOCKED BY BOTTOM HEAD.
SKIRT DIAMETER ACCESS OPENING DIA.(D) NO. OF ACCESS OPENING
UP TO 1000 400 1
OVER 1000 UPTO 1500 450 1
OVER 1500 UPTO 3000 500 1
OVER 3000 500 2
SKIRT DIAMETER NO. OF VENT HOLES
UP TO 1000 2
OVER 1000 UPTO 2000 3
OVER 2000 4
MINIMUM SIZE OF PIPE SLEEVE IS 150NB SCH 40. USE SCH 40 UPTO 250NB PIPE SLEEVE. FOR 300NB AND
ABOVE, PIPE SLEEVE SHALL BE FABRICATED FROM PLATE.
ALL OPENINGS 300 DIA. AND ABOVE SHALL BE PROVIDE WITH REINFORCEMENT PADS ON INNER SURFACE OF SKIRT.
IN CASE OF CONFUCT ENGINEERING DRAWING SHALL GOVERN.
IN FLARED SKIRT, OPENING DETAIL IS SAME AS THAT FOR CYLINDRICAL SKIRT.
WOODEN BLOCK SHALL BE FIXED TO SLEEVE WITH TWO NO. OF WOOD SCREWS.
ACCESS OPENING/PIPE OPENING/VENT SHALL BE OF SAME MATERIAL AS THAT OF SKIRT.
ALL FILLET WELDS SHALL BE 6 mm MINIMUM.
* 13. PROJECTION OF SLEEVE/NECK SHALL BE GREATEST OF (30+INSULATION THK.), (30+FIRE PROOFING) & 50mm.
14. CENTER LINE OF ACCESS OPENING SHALL BE 850 MM (MINIMUM) ABOVE BOTTOM BASE RING FOR ANCHOR
BOLTS OF SIZE M45 & BELOW AND 1100 MM (MINIMUM) FOR ANCHOR BOLTS OF SIZE ABOVE M45. IF ANCHOR
CHAIR HEIGHT IS MORE THAN THAT OF GIVEN IN STANDARD. LOCATION OF ACCESS OPENING SHALL BE ESTABLISHED
SUITABLY.
1
5 23.05.2011 REAFFIRMED AND REISSUED AS STANDARD POREL RKT
20 0 x 25 LG. SNAP
HEAD RIVET
1
1
6R 15
1NO. 60
DRAIN HOLE
DETAIL 'X'
TELL TALE HOLE
BUND
FLANGE
IM16
jk4j6;.11?l''-
6 30.06.2011 REAFFIRMED AND REISSUED AS STANDARD POREL KM/SC DM
5 11.09.2006 REAFFIRMED AND REISSUED AS STANDARD POREL DNN AKM VC
Rev. Prepared Checked Stds. Committee Stds. Bureau
Date Purpose Convenor Chairman
No. Page 338 of 395 by by
Approved by
Format No. 8-00-0001-F4 Rev.0 Copyright EIL - All rights reserved
Olar
STANDARD No.
ENGINEERS MANHOLE WITH DAVIT
geINIDIA LIAM 7-12-0010 Rev. 6
/A Govt. of India Undertaking)
Page 2 of 2
8
260 350
(320)
40R NP4,
10V
ti DETAIL OF HAND GRIP
HAND GRIP
141"
0
I
1N
N 20 0 x 25 LG. SNAP
250 HEAD RIVET
// PIPE 'A'
il \\
// \\
\\\
1/ \\ \ I I
/ \\ I I 0
II 1111 I I
30 VENT
\ 11 II
I I // ) 0
\\ // FR
\ \ s.\\
\\
\\
....--
1
1
//
ii
//
//
Y
------_ --------------
1 15
3N0.M16 SS JACK SCREWS
ON BOLT CIRCLE DIAMETER 1NO. 60 )
(SEE NOTE-3) DRAIN HOLE
DETAIL 'Y'
1 N0.-3mm NPT
TELL TALE HOLE
TOP OF DEMISTER
!6!;!.9.!VAtt;!..!..!!:!.!!..!:!..!!....!!:!:!..!:!
UM
DETAIL-X
HORIZONTAL VESSEL
V)
Z
7
CC TOP LADDER RUNGS EQUISPACED AT BOTH LEVELS O
o 2-NOS. FOR DIA. < 1000. 1=1
a"'
0
4-NOS. FOR 1000 < DIA. < 2000 I
cJ p) 1-
< 6-NOS. FOR 2000 < DIA. < 3000 0 W
I I
8-NOS. FOR DIA. > 3000
%.D
V) _j
HANDGRIP 175 175
350+1/2 MANHOL DIA. CU
MANHOLE
II
`1,
e) DETAIL-X
200
r DETAIL-X
F
175 175
HANDGRIP
NOTES
1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
A 2. VARIATION IN SPACING BETWEEN LADDER RUNGS IS PERMITTED
IN CASE OF INTERFERENCE WITH SOME NOZZLE OR INTERNALS.
HOWEVER THE SPACING OF RUNGS SHALL BE EQUAL.
SQUARE RODS MAY BE USED FOR HANDGRIP / LADDER RUNGS.
IF FABRICATED FROM PLATE THE EDGES ARE TO BE ROUNDED OFF.
MATERIAL SHALL BE AS PER ENGINEERING DRAWING.
ALL FILLET WELDS SHALL BE 6 mm MINIMUM.
ORIENTATION OF LADDER RUNGS SHALL BE SAME AS OF MANHOLE.
7. DIMENSIONS SHOWN IN BRACKETS ARE FOR STAINLESS STEEL MATERIAL. r
du
5 30.06.2011 REAFFIRMED AND REISSUED AS STANDARD POREL T AKM/SC DM
4 11.09.2006 REAFFIRMED AND REISSUED AS STANDARD POREL DNN AKM VC
Rev. Prepared Checked Stds. Committee Stds. Bureau
Date Purpose by
Convenor Chairman
No. by Approved by
Format No. 8-00-0001-F4
Page 340 Rev.0
of 395 Copyright EIL - All rights reserved
STANDARD No.
NOZZLE REINFORCEMENT
ENGN33IS
INDIA LIMITED 7-12-0013 Rev. 6
111111171,1111,11MIND (A Govt. of loft Undertaking) AND PROJECTION
Page 1 of 2
0
1
5-
1-30 NPT TELLTALE HOLE
(REFER NOTE-7)
O
NOTES
1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
2. IN CASE OF CONFLICT ENGINEERING DRAWING SHALL GOVERN.
C) 3. WIDTH IS MINIMUM AND SHALL BE CHECKED AGAINST CODE REQUIREMENT. CHECK REINFORCEMENT REQUIREMENT FOR
ALL EXTERNAL PIPING LOADING ALSO.
4. NOZZLE PROJECTIONS ARE BASED ON INSULATION THICKNESS EQUAL TO 75mm. FOR INSULATION THICKNESS
GREATER THAN 75mm, THE NOZZLE PROJECTION IS 'A' + [INSULATION THICKNESS(mm)-75].
5. PROJECTION 'A' FOR SELFREINFORCED NOZZLE SHALL BE BASED ON DESIGN OF REINFORCEMENT SUBJECT TO
MINIMUM REQUIREMENTS AS PER THIS STD.
6. EXTEND PAD LOCALLY FOR MANHOLE DAVIT SUPPORT, IF REQUIRED.
7. EXTERNAL REINFORCING PADS SHALL HAVE A MINIMUM OF 1 NO. TELLTALE HOLE EXCEPT THAT PADS FOR
NOZZLES GREATER THAN 10"NB(250NB) SHALL HAVE MINIMUM TWO NOS. TELLTALE HOLES AND NOZZLES IN
EXCESS OF 36"NB (900NB) SHALL HAVE 4 NOS. TELLTALE HOLES. PAD INSTALLED IN SECTIONS SHALL HAVE
ATLEAST ONE TELLTALE HOLE PER SECTION. TELLTALE HOLES ON REINFORCEMENT PADS SHALL BE
EQUALLY SPACED IN CIRCUMFERENTIAL DIRECTION OF PAD.
8. TELLTALE HOLE SHALL NOT BE PLUGGED AND SHALL BE FILLED WITH HARD GREASE ONLY, AFTER
HYDROTEST/PNEUMATIC TEST OF EQUIPMENT.
9. o) FOR COLUMNS & VERTICAL VESSELS, PROJECTION OF NOZZLE ON TOP HEAD SHALL BE 400mm MINIMUM FROM
OUTSIDE.
b) FOR HORIZONTAL VESSELS, PROJECTION OF NOZZLES ON TOP SIDE OF SHELL SHALL BE 300mm MINIMUM FROM
OUTSIDE.
10. PROJECTIONS ARE BASED ON ASME 816.5 FLANGES FOR UPTO AND INCLUDING 24"NB NOZZLES AND ASME 816.47
SERIES 'B' FLANGES FOR NOZZLE SIZES ABOVE 24"NB.
.1 1
Page 1 of 1
HORIZONTAL VESSEL
(ELEVATION)
q_
VERTICAL VESSEL
(PLAN)
NOTES
ANY DEVIATION FROM THIS ARRANGEMENT WILL BE INDICATED IN ENGINEERING DRAWING.
BOLT HOLES TO STRADDLE CENTRE LINES INDICATED ( BY q. ) ABOVE.
W
L_
r= ANGLE SIZE 'SI X IX TAPPED HOLE
o a- Z WITH M16 BOLT
In co
L. 0
N mw
ANGLE SIZE 'S'
DETAIL IN TOP BRACKET
SHT. 2 aq
TOP OF PLATFORM
I
HAND
RAILING
z
TAPPED HOLE 1
WITH M16 DOLT 8
PIPE cu
SIZE 'D' 1 DETAIL-70 0
DETAIL W
, TOP OF
I PLATFORM
1.--1)DAVIT SUPPORT
HAND RAILING
4Q N
(TYPE-1) (TYPE-2)
65
DEVIT FOR TOP DEVIT FOR SIDE TO SUIT
MOUNTED PLATFORM MOUNTED PLATFORM PIPE O/D.
8-180 HOLES
A (MAX) B CAPACITY PIPE SIZE ANGLE SIZE R1 R2 r t EQUISPACED
Cm) (rim) Ckgs.) D S
500 100NBxSCH.160 75x75x6 75 60 10 20
1000 1000 150NBxSCH.80 100x100x8 110 60 12 25 160 LOCKING
I'2
PIN
(Ci
500 150NBxSCH.80 100x100x8 110 60 10 20
2000 1000 200NBxSCH.80 150x150x10 140 60 12 25
0
0 LOCKING PLATE
:: 500 200NBxSCH.80 150x150x10 140 60 10 20
/.
3000 1000 200NBxSCH.160 150x150x12 140 60 12 25 DETAILX DETAILY
R1
D (NB) D1
100 120
150 175
POSITIONING 200 225
PLATE
DETAILZ (DAVIT EYE)
DETAILK
DETAILP
4---
6 31.08.2011 REAFFIRMED AND REISSUED AS STANDARD POREL KM / SC DM
5 12.10.2006 REAFFIRMED AND REISSUED AS STANDARD POREL RKG AKM VC
Rev. Prepared Checked Stds. Committee Stds. Bureau
Date Purpose Convenor Chairman
No. by
Approved by
Page 344 of
Format No. 8-00-0001-F4 395
Rev.0 Copyright EIL - All rights reserved
STANDARD No.
laNzieMENGINEF_RS
*Iges Of5legNW (AINDIA LIMITED PIPE DAVIT 7-12-0023 Rev. 6
Men Govt. of India Undertaking)
Page 2 of 3
EXTENSION ANGLE
DETAIL- -
CHAIN
(MIN. 350 LG.)
REF, LEVEL
ISMC 100
ELEVATION
50 (TYP)
PLATFORM (NOTE-8
N\
DETAIL Q
80
25NB SCH.80 INS. THK.
PIPE SLEEVE +300
030x10 THK.
PLAN (TOP BRACKET)
020 TURNING
12 THK.
REF. AXIS
in
170
17 60 15 25 10 20 17
to
2 CAPACITY KGS
NAME PLATE
NOTES
ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
NAME PLATE
MATERIAL STAINLESS STEEL 2mm THICK.
NAME PLATE IS TO BE TACK WELDED TO THE DAVIT PIPE.
THE LETTERS AND NUMBERS SHALL HAVE RAISED POLISHED FACE.
BACKGROUND SHALL BE BLACK.
DIMENSION 'A' SHALL BE SUCH THAT THE DAVIT EYE EXTENDS PREFERABLY BY 900 mm OUTSIDE PLATFORM.
REFER ENGINEERING DRAWING FOR DIMENSIONS A, B, C, E, CAPACITY OF DAVIT AND INSULATION THICKNESS.
THE DAVIT USED SHALL CLEAR HANDRAIL OF THE EQUIPMENT.
MATERIAL OF PIPE SHALL BE A-53 / IS:1978 OR EQUIVALENT AND STRUCTURAL PARTS SHALL BE IS:2062 GR.B
OR EQUIVALENT.
IN CASE OF CONFLICT ENGINEERING DRAWING SHALL GOVERN.
FOR THIN WALLED EQUIPMENT, DESIGNER SHALL ANALYSE THE STIFFNESS OF SHELL AT THE BRACKET LOCATIONS.
DETAIL DIMENSIONS AND NOTES IN ENGINEERING DRAWING TAKE PRECEDENCE OVER THOSE SHOWN HERE.
LOCKING PLATE (DETAIL Y), LOCKING PIN (DETAIL X) WITH CHAIN, POSITIONING PLATE (DETAIL K), DEFLECTOR
CONE (DETAILP) AND LOCKING SUPPORT CHANNEL (DETAIL Q) SHALL BE SUPPLIED LOOSE BY FABRICATOR AND
WELDED AT SITE BY MECHANICAL CONTRACTOR.
ALL FILLET WELDS SHALL BE 6 mm MINIMUM.
FOR LOW TEMPERATURE SERVICE, BRACKET DETAILS SHALL BE AS PER EIL STD. 7-12-0034
13. IN CASE DIMENSIONS 'B' IS BEYOND THIS STANDARD, IT IS RECOMMENDED TO INSTALL PIPE DAVIT
ON STRUCTURAL PLATFORM.
t-/
-1(j491Ak.
6 31.08.2011 REAFFIRMED AND REISSUED AS STANDARD POREL KT KM / SC
DM
SECTION XX
BOTTOM OF BRACE TO TOP OF LUG F 200 230 300 400 500 600
BOTTOM OF BRACE TO T.L OF HEAD E SEE NOTE 2
T.L. OF VESSEL TO BOTTOM OF LUG B 200 230 280 350 400 480
C 30 40 50 70 90 100
TOP OF LUG TO Q OF HOLE J 90 90 115 150 180 230
K 30 40 50 70 80 100
NO. OF LUGS 2 2 2 2 2 2
NOTES
1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
*2. DIMENSION 'E' IS TO BE DETERMINED BY THE SHAPE OF HEAD IN CONJUNCTION WITH DIMENSION 'K'.
DETAIL, DIMENSIONS AND NOTES GIVEN IN ENGINEERING DRAWING TAKE PRECEDENCE OVER THOSE SHOWN HERE.
FOR THIN WALLED EQUIPMENTS, DESIGNER SHALL ANALYSE THE STIFFENESS OF SHELL AT THE LIFTING LUG LOCATION.
IF PADS ARE USED ON STAINLESS STEEL EQUIPMENTS THE SIZE OF FILLET WELD BETWEEN SHELL AND STAINLESS
STEEL PAD SHALL BE ANALYSED.
MATERIAL SHALL BE COMPATIBLE WITH HEAD MATERIAL.
FOR INTERMEDIATE ERECTION WEIGHT, NEXT HIGHER SIZE OF LIFTING LUG SHALL BE USED.
LIFTING LUG SHALL BE MACHINED TO COVER OFFSET BETWEEN OUTER DIAMETERS OF SHELL AND HEAD.
N W.L o b
T.L
5 X COLD INSULATION
THICKNESS ( MIN 600MM)
a_
7
1=-J b
M12 SQUARE NUTS TACK WELD
ON INSIDE AND OUTSIDE OF PIPE G
SKIRT 111SUPPORT
SKIRT ON 450 TRIANGULAR PITCH
FOR FIRE PROOFING (SEE DETAIL-Y) ANGLE LEG
(REFER NOTE-8) SUPPORT
DETAILY
SECTION 'CC'
M6 X 25 LG G.I. BOLTS w 0
BETWEEN TWO CLEATS (TYP) w
AND NUTS. to z
AIR POCKET
6 THK. FLAT (FOR VESSEL TEMP.
10
ABOVE 400T)
3 THK.
ASBESTOS SHEET
10 THK. PLATE
VESSEL PART
tr.)
N
14 DIA. HOLE
(FOR M12 BOLT)
75 25
NOTES
ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
ALL EQUIPMENTS SHALL BE PROVIDED WITH TWO(2) EARTHING
LUGS, UNLESS OTHERWISE STATED.
3.(a) EARTHING LUGS SHALL BE LOCATED DIAMETRICALLY OPPOSITE ON
NORTHSOUTH CENTER LINE ON SKIRT SUPPORTED EQUIPMENTS,
ON ANY TWO(2) LEGS OF THREE(3) LEG SUPPORTED VERTICAL VESSEL,
ON DIAMETRICALLY OPPOSITE LEGS OF FOUR(4) LEG SUPPORTED
VERTICAL VESSEL AND ON EACH SADDLE OF HORIZOTAL VESSEL.
TWO(2) EATHING LUGS ARE TO BE LOCATED ON EACH SADDLE OF
HORIZONTAL VESSEL OF LENGTH GREATER THAN 20 METERS.
FOR SPHERE, TOTAL 4 NOS. OF EARTHING LUGS SHALL BE PROVIDED
PREFERABLY ON DIAMETRICALLY OPPOSITE AND EQUALLY SPACED LEGS.
(SPHERES ARE USUALLY PROVIDED WITH LEGS IN NUMBERS WHICH ARE
MULTIPLE OF 4 FOR THE SYMMETRY)
DO NOT WELD EARTHING LUG ON PRESSURE PART.
IN CASE OF CONFLICT ENGINEERING DRAWING SHALL GOVERN.
6. MATERIAL OF CONSTRUCTION SHALL BE CARBON STEEL.
"CE
co
1
6 .. z 1-
Li,
I- u_
<
1- Y 0 E
0
<
E
.1 csj
ce Zt
w
N m 1 L,_
o
w o
cc I _1
w 1 1
w Ww
I- 0 Y i
o T I- 0 v)
a
w 0 IX V)
tr) L.LI CO U)
La 0 w
_1 __I Ix _I
D o C.)
1
Li -4Z
1
cr)
E CD 6 C1
)
E < o LL.
Lo 1-- 1 o
Z a co w N Li,
_1 CD CO
w _J 1
w < _1 N _1
< 2 J _1
V) < 0 <
(/) I CC I
Z 0 V-) < (1)
0 Z 0
U) o Lu WW..
1-- Z
<
0 ,- n
W
w ix
0 CL
V 0_
m
E cr
Y L.L1 L.Li LO
(/) _1
_I C<C) <
2 1- 1 . 1L "i
MI < CO Z O Z
0
Z . CI ri 4 6 tO
/ 11. , ^
4.0 0
2/Vvt'4
KT
5 31.08.2011 REAFFIRMED AND REISSUED AS STANDARD POREL 44.4) AKM / SC DM
4 12.10.2006 REAFFIRMED AND REISSUED AS STANDARD POREL RKG AKM VC
STANDARD No.
15iffazle ENGINEERS
e...111E1f5teg INDIA LIMI TED MANUFACTURER NAME PLATE 7-12-0028 Rev. 5
(llETI FIUME 115r3911771) (A Govt. of Indio Undertaking)
Page 1 of 1
I-
fY
CO
)-
W
_1
m
1.5
L...; V)
C.) o
Q 0_
Li_
I-
o o Li
w Z I
=
La 5
Zi cc o_
0 Li)
a. = La
0
co
i a
M
7"
Z I-
La La
I- VI 1..J La.
I- IX 0
fi)IX C E
t,_ ix
-J N
taJ
in 0 0 a u.
i
W La 0
W 0
CZ CD I J
La I
i La
X - Lai La
1
I- -I
x
< I- 6 (n
'-
0
V)
0 0
w
< 0
ct)mw
Lai IX 0
-I ILI _i J
Z 0
= ix le
I-Li
ce
0 z
LL 4'1
0 I 1-
E m -1 le a) V)
E 0 m .()
4 " L.
Z
z ,, 1.-
< m
0
1 o
N W
V) __I co
,_ m
La le .. I
IX 0
Q 0 i I
< -J N _1
_1
_1 vi 4I 0 ..t
V1 m I cc Z
Z 0 in ..t v)
= ..:
v, Z o
Li) ce = Lai Z 1-61
Z Lai 0 I-
5 < I-
w
m
i ce
1- 0 0_
1
0 0_
5 L i
ICW
X
La La
2
Cl)-J
-J J () 4 < 2 Lu
ll- 41
I- < < CO Z IX Z
0
Z Csi Iii 4 ui (IS
,/0/49-4-1"/ 5/44-k
5 31.08.2011 REAFFIRMED AND REISSUED AS STANDARD POREL RKT AKM / SC DM
4 12.10.2006 REAFFIRMED AND REISSUED AS STANDARD POREL RKG AKM VC
0
J
V)
10 R
BRACKET
NAME PLATE
0
r-
4-
N
EIL NAME PLATE
o 0:
+
N
0
N
0
MANUFACTURER NAME PLATE
<TYP
2V
200
230
NOTES
I. ALL DIMENSIONS ARE IN inn UNLESS OTHERWISE STATED.
2, BRACKET MATERIAL SHALL BE SAME AS SHELL MATERIAL.
SEE
VESSEL DRG. 00
TYPEIA
100
VENT HOLE
(6+2xC.A.)
50 TO 75 THK. MIN. FLAT
AS PER
PIPE SIZE
I I ' 25 R
TYPE-1
INTERNAL FEED PIPE FOR HORIZONTAL VESSEL
SPARGER/FEED PIPE SUPPORT
NOTE TYPEIA IS APPLICABLE FOR LARGE THERMAL EXPANSION (AIR / GAS SERVICE)
(6+2xC.A.)
THK. MIN. FLAT
TYPE-2
INTERNAL SPLASH FEED PIPE FOR HORIZONTAL VESSEL
65
15 0 HOLE IN PIPE CLEAT (6+2xC.A.)
& 30 LONGx15 WIDE SLOTTED THK. MIN. FLAT
HOLE IN SHELL CLEAT
SUPPORT CLEAT
FOR VERTICAL VESSEL
TYPICAL DETAIL OF BOLTING CLEATS
3MM
CLEARANCE
REINFORCEMENT PAD
(NOTE-6)
TYPEA
(FOR PIPES UPTO 250NB)
TS
20 MIN. D (NB) 50
SHELL
11
II
REINFORCEMENT PAD L
(NOTE-6)
10 NF
0.5G
If)
TYPEB
(FOR PIPES ABOVE 250NB)
T
PIPE N.B. BOLT SIZE E F G
D CA=O CA=1.5 CA=3 CA=5 CA=7
50 80 M 12 6 10 12 16 20 60 40 60
NOTES
ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
IN CASE OF CONFLICT VESSEL ENGG. DRAWING SHALL GOVERN.
MATERIAL OF CLEATS SHALL BE AS PER VESSEL ENGG. DRAWING.
ALL FILLET WELDS TO BE ALL AROUND & SIZE OF WELDS ARE (6+1xC.A.) MINIMUM UNLESS OTHERWISE STATED.
ALL INTERNAL BOLTS SHALL BE MIN. M 12 SIZE AND OF STAINLESS STEEL WITH DOUBLE NUTS.
REINFORCING PAD SHALL BE LARGER BY 50mm ALL AROUND THAN BRACKET CLEATS. NO PAD IS REQUIRED FOR
VESSELS WITH WALL THICKNESS GREATER THAN 25mm.
)?./
4 31.08.2011 REAFFIRMED AND REISSUED AS STANDARD POREL K 4/KM / SC DM
MIST ELIMINATORS
28MAR12 Revised JAB RGP
1. GENERAL
1.1 Scope
a. This Standard Specification covers the general requirements for design, construction,
fabrication, and material of Mist Eliminators specified in UOP Project
Specifications.
1.2 References
Unless noted below, use the edition and addenda of each referenced document current on
the date of this Standard Specification. When a referenced document incorporates another
document, use the edition of that document required by the referenced document.
a. American Society for Testing and Materials (ASTM) A-478, Specification for
Chromium-Nickel Stainless and Heat-Resisting Steel Weaving and Knitting Wire.
b. ASTM B-164, Specification for Nickel-Copper Alloy Rod, Bar, and Wire.
2. DESIGN
2.1 General
a. Size, style, thickness, configuration, and materials are specified in UOP Project
Specification 301 Vessels.
MIST ELIMINATORS
28MAR12 Revised JAB RGP
c. Style G is a mesh blanket having a variable knitted density. The vapor inlet section
is the least dense and the outlet section the densest. Typical inlet/outlet knitted mesh
densities are 5 lb/ft3 (80.1) and 9 lb/ft3 (144.2). The vendor may propose variable
density blankets having slightly different knitted densities and wire diameters.
2.2 Construction
b. Mesh pads shall fit tightly into the pad containment system.
c. Mesh pad layers shall not be more than 9 inches (230 mm) thick. Where more than
one layer is required, joints shall be staggered.
a. The general arrangement of Mist Eliminator supports and grids shall be as specified
in UOP Project Specification 301 and the referenced UOP Standard Drawings.
b. Final details of Mist Eliminator supports and hold down grids shall be furnished by
the Mist Eliminator supplier.
c. The Mist Eliminator supplier shall furnish details of components attached to the
vessel to the vessel fabricator in time to permit installation without altering the
vessel fabrication schedule.
d. Each section of the mesh pad shall include a grid on each side.
e. Style G mesh pads shall be furnished with an inlet and an outlet rigid welded grid.
The outlet grid and blanket outlet zone of the Style G mesh pad shall be distinctly
marked Outlet.
The Mist Eliminator fabricator shall supply wire ties or other devices to fasten the Mist
Eliminator sections to the supports, attach the grids to their vessel supports, and where
multiple layer Mist Eliminators are necessary, to secure the layers together.
MIST ELIMINATORS
28MAR12 Revised JAB RGP
3. MATERIALS
Materials for metallic Mist Eliminators are specified in UOP Project Specification 301
Vessels. Type 304 or Type 316 mesh pads shall be in accordance with ASTM A-478.
Monel mesh pads shall be in accordance with ASTM B-164.
3.3 Supports
a. Supports welded to the vessel shall be the same material as the shell. Where the
shell is lined, supports welded to the lining shall be the same material as the lining.
b. Supports not welded to the shell (e.g. beams) shall be the same material as the Mist
Eliminator.
3.4 Grids
b. For non-metallic mesh pads, the grids shall be carbon steel, coated with the same
material as the mesh pad.
a. For metallic mesh pads the wire ties or other fastening devices shall be of the same
material as the Mist Eliminator.
b. For non-metallic mesh pads the wire ties or other fastening devices shall be carbon
steel coated with the same material as the mesh pad.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
1. TABLE OF CONTENTS
1. TABLE OF CONTENTS ........................................................................................................................ 1
2. GENERAL............................................................................................................................................... 2
2.1 Scope ............................................................................................................................................... 2
2.2 References ....................................................................................................................................... 2
2.3 Definitions....................................................................................................................................... 3
a. Hydrogen Service ............................................................................................................. 3
b. Wet Hydrogen Sulfide (H2S) Service ............................................................................... 3
c. Hydrofluoric Acid (HF) Service ....................................................................................... 4
d. Hydrofluoric Acid Service with Residual Element Control (HFRE) ............................... 4
e. Caustic (NaOH, KOH) ..................................................................................................... 4
f. Amine ............................................................................................................................... 4
g. Carbonate.......................................................................................................................... 4
h. Severe Cyclic Service ....................................................................................................... 4
3. DESIGN................................................................................................................................................... 5
3.1 General Requirements ..................................................................................................................... 5
3.2 Loading ........................................................................................................................................... 5
3.3 Shells and Heads ............................................................................................................................. 6
3.4 Vessel Supports ............................................................................................................................... 7
3.5 Non-Pressure Containing Components Welded to Pressure Containing Components ................... 7
3.6 Nozzles and Manways .................................................................................................................... 8
a. General ............................................................................................................................. 8
b. Flanges.............................................................................................................................. 8
c. Details ............................................................................................................................. 10
3.7 Special Considerations for Low Temperature, Elevated Temperature or Severe Cyclic Service . 11
4. MATERIALS ........................................................................................................................................ 11
4.1 General .......................................................................................................................................... 11
4.2 Shells, Heads, and Other Pressure Containing Components ......................................................... 13
4.3 Nozzles and Manways .................................................................................................................. 13
4.4 Vessel Supports and Exterior Attachments ................................................................................... 14
4.5 Internals, Internal Bolting, and Internal Supports ......................................................................... 14
4.6 Gaskets .......................................................................................................................................... 15
5. FABRICATION .................................................................................................................................... 16
5.1 Details ........................................................................................................................................... 16
5.2 Welding Processes and Electrodes ................................................................................................ 18
5.3 Postweld Heat Treatment .............................................................................................................. 20
5.4 Alloy Lining .................................................................................................................................. 21
a. General ........................................................................................................................... 21
b. Cladding ......................................................................................................................... 22
c. Weld Deposit Overlay .................................................................................................... 24
5.5 Tolerances ..................................................................................................................................... 25
6. NONDESTRUCTIVE EXAMINATION .............................................................................................. 27
6.1 Shells, Heads, and Nozzles ........................................................................................................... 27
6.2 Alloy Lining .................................................................................................................................. 28
7. TESTING............................................................................................................................................... 29
7.1 Testing Medium and Conditions ................................................................................................... 29
7.2 Procedure ...................................................................................................................................... 30
8. ADDITIONAL REQUIREMENTS FOR STORAGE SPHERES AND BULLETS............................. 31
8.1 General Requirements ................................................................................................................... 31
8.2 Capacity ........................................................................................................................................ 31
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
2. GENERAL
2.1 Scope
a. This Standard Specification covers the general requirements for design, materials,
fabrication, inspection, and testing of carbon and killed carbon steel fusion welded
pressure vessels.
b. Exceptions or variations shown in the UOP Project Specifications take precedence over
requirements shown herein.
2.2 References
Unless noted below, use the edition and addenda of each referenced document current on the
date of this Standard Specification. When a referenced document incorporates another
document, use the edition of that document required by the referenced document.
a. American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,
Section VIII, Division 1, Rules for the Construction of Pressure Vessels.
b. ASME Boiler and Pressure Vessel Code, Section I, Rules for the Construction of Power
Boilers.
c. ASME Boiler and Pressure Vessel Code, Section II, Materials, Part A, Ferrous Material
Specifications.
d. ASME SA-53, SA-105, SA-106, SA-234, SA-240, SA-263, SA-264, SA-265, SA-285,
SA-388, SA-435, SA-516, SA 578, SA-671, SA-672, SA-960, SA-961 and SB-127.
e. ASME Boiler and Pressure Vessel Code, Section II, Materials, Part C, Specifications
for Welding Rods, Electrodes, and Filler Materials, SFA-5.1, SFA-5.4, SFA-5.9,
SFA-5.11, SFA-5.14, SFA-5.17, SFA-5.18, and SFA-5.20.
f. ASME Boiler and Pressure Vessel Code, Section II, Materials, Part D, Properties.
h. ASME Boiler and Pressure Vessel Code, Section VIII, Division 2, Rules for the
Construction of Pressure Vessels Alternative Rules
i. ASME Boiler and Pressure Vessel Code, Section IX, Qualification Standard for
Welding and Brazing Procedures, Welders, Brazers, and Welding and Brazing
Operators
j. ASME Boiler and Pressure Vessel Code, Code Case 2235, Use of Ultrasonic
Examination in Lieu of Radiography, Section I and Section VIII, Divisions 1 and 2.
k. American Society for Testing and Materials (ASTM), A 36, A 53, A 106, A 240, A283,
A 285, A 913, A 992, E 165, and G 146
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
m. ASME B16.5, Pipe Flanges and Flanged Fittings NPS Through NPS 24.
n. ASME B 16.47, Large Diameter Steel Flanges NPS 26 Through NPS 60.
p. ASME B16.20, Metallic Gaskets for Pipe Flanges Ring-Joint, Spiral-Wound and
Jacketed.
q. American Welding Society (AWS) A4.2, Standard Procedures for Calibrating Magnetic
Instruments to Measure the Delta Ferrite Content of Austenitic and Duplex Ferritic-
Austenitic Stainless Steel Weld Metal.
2.3 Definitions
a. Hydrogen Service
(3) Vessels or parts of vessels (and exchangers, e.g., shell or tube side) in hydrogen
service are specified in the UOP Project Specifications
(2) Vessels or parts of vessels (and exchangers, e.g., shell or tube side) in wet
hydrogen sulfide (H2S) service are specified in the UOP Project Specifications.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
(2) Vessels or parts of vessels (and exchangers, e.g., shell or tube side) in
hydrofluoric acid (HF) service are specified in the UOP Project Specifications
(2) Vessels or parts of vessels (and exchangers, e.g. shell or tube side) in
Hydrofluoric Acid Service with Residual Element Control are specified in the
UOP Project specifications.
(1) Caustic service is defined as any service that contains one (1) weight percent or
more NaOH or KOH.
(2) Vessels or parts of vessels (and exchangers, e.g., shell or tube side) in caustic
service are specified in the UOP Project specifications.
f. Amine
(1) Amine service is defined as any service that contains two (2) weight percent or
more MEA, DEA, or other amine.
(2) Vessels or parts of vessels (and exchangers, e.g., shell or tube side) in amine
service are specified in the UOP Project specifications.
g. Carbonate
(1) Carbonate service is defined as any alkaline sour water service, typically
ammonia dominated.
(2) Vessels or parts of vessels (and exchangers, e.g., shell or tube side) in carbonate
service are specified in the UOP Project Specifications.
(1) Cyclic service as defined in ASME B31.3, Section 300.2. Cyclic service may
be mechanical, thermal, or a combination of both.
(2) Vessels in Severe Cyclic Service are specified in the UOP Project
Specifications
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
3. DESIGN
a. The design, materials, fabrication, inspection, and testing of pressure vessels shall
comply with the requirements of ASME Section VIII, Division 1 or, when specified in
the UOP Project Specifications, ASME Section I.
b. Allowable stresses for materials shall be in accordance with ASME Section II, Part D.
c. The vessel designer shall be responsible for the stress and thermal analysis of the vessel
and components.
d. The Contractor shall determine the need for and method(s) of performing any special
analyses above the minimum calculations required by the ASME Code.
g. The vessel nameplate shall be fabricated from stainless steel and shall be visible and
accessible at all times. If located in an insulated area, the nameplate shall be placed on
standoffs so that the insulation passes beneath it.
i. Vessels that will be buried or mounded shall be protected against external corrosion by
coatings, wraps, and/or cathodic protection.
3.2 Loading
a. The design temperature and pressure conditions specified on the UOP Project
Specifications are at the top of the vessel in its operating position. Pressures are gauge
pressures, which are relative to atmospheric pressure at sea level {approximately
15psia, 1.05 kg/cm2(a)}.
b. Where "delta P vessel (total)" is specified on the UOP Project Specification, this
pressure drop shall be combined with any static head and the specified design pressure
in order to determine the design pressure at the bottom of the vessel.
c. When design for external pressure is required, the minimum net external differential
pressure shall be full vacuum at sea level.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
d. Wind and earthquake loads and the applicable load combinations shall be determined in
accordance with the governing Code(s), standard(s), and data specified in the UOP
Project Specifications.
e. Vertical vessels shall be evaluated for vibration, including vortex shedding, due to wind
or other sources. Stress, deflection, and fatigue shall be evaluated when an analysis is
necessary.
f. Vessels and their supports shall be capable of supporting the vessel filled with water in
the erected position. The corroded (i.e., nominal thickness minus the corrosion
allowance) vessel shall be adequate for hydrotesting in the erected position.
g. The maximum deflection of trayed columns, other than under earthquake loading, shall
be no greater than the vessel height/200 (h/200), with a maximum deflection of one foot
(300 mm).
a. The design thickness shall not include any additional thickness provided as a corrosion
allowance nor any lining material applied for corrosion resistance, e.g., weld deposit
overlay or cladding.
b. The minimum design thickness, excluding corrosion allowance, shall be (D/1000) + 0.1
inches {(D/1000) + 2.54mm}, where D = nominal vessel inside diameter in inches
(mm).
c. The effects of external primary mechanical loads plus design pressure and the effects of
secondary stresses, such as those due to differential thermal expansion, shall be a part of
the design process, and the resulting combined stresses and deflections shall be
evaluated. It is the responsibility of the contractor to specify the governing load cases
and critical locations.
d. The knuckles of elliptical, torispherical, and toriconical heads and reducers, with a
special emphasis on those in large diameter, low pressure services, shall be designed to
prevent buckling under internal and external operating and pressure testing conditions.
e. Pressure containing weld seams shall not intersect nozzles or nozzle reinforcement.
f. Vacuum stiffening rings shall be installed on the exterior surface of the vessel, and shall
be insulated in a manner to maintain a temperature similar to that of the vessel shell.
Internal stiffening rings may be considered if they do not:
(5) collect fluids, create low flow areas, or promote corrosion or coke formation
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
b. Provide a minimum of 1/16 inch (1.6 mm) corrosion allowance on vessel supports.
c. Stresses due to differential thermal expansion and frictional forces due to sliding
supports shall be considered in the design.
d. Horizontal vessels shall be supported by two saddle supports fabricated to fit the
outside surface of the vessel within the applicable tolerances. Saddles shall extend over
a vessel arc of at least 120. Saddles shall not be placed over vessel girth welds. A
corrosion or wear plate shall be provided between the saddle and the vessel shell. The
corrosion or wear plate shall not be considered a part of the shell or the saddle for
design purposes. The plate shall extend at least 2 inches (50 mm) in all directions
beyond the saddle. The corners shall be rounded to a radius of at least 2 inches (50
mm). After removal of free moisture from between the shell and the plate, the plate
shall be continuously seal welded to the shell around the plates perimeter. At least one
1/4 inch NPS vent hole shall be provided in each plate section. Vent holes shall be
tapped for future plugging. Vent holes shall remain open until the completion of
pressure testing. The vent shall then be plugged with a material adequate for the
operating temperature but not be capable of retaining pressure.
e. Support legs shall be attached to the exterior surface of the vessel shell. The legs shall
extend far enough along the shell to prevent local buckling of the shell between or
above the legs. The legs shall extend a minimum of 6 inches (150mm) above the
bottom tangent line of the vessel.
f. Skirt vent holes shall be provided at the top of the space enclosed by the skirt after
application of fireproofing and vessel insulation. The vent holes shall be a minimum
diameter of 3 inches (75 mm), equally spaced, and a maximum of 6 feet (1800 mm)
apart. At least four vent holes are required. The vent holes shall be unobstructed at all
times.
g. Provide at least one access opening in skirts supporting vessels from below.
Load bearing welds attaching non-pressure containing parts to pressure containing parts shall be
designed using the same allowable stress basis for primary membrane tensile, compressive, and
shear stresses as required for pressure containing components of the same material.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
a. General
(1) Threaded fittings, unions, couplings, and tapped holes are not permitted.
(2) The minimum nozzle size shall be 1 inch nominal pipe size (NPS) except that
for alloy lined nozzles the minimum size is 1-1/2 inch NPS
(3) When the inside diameters of nozzles and manways are specified, they shall be
considered as minimum. In lined areas, the specified inside diameter is the
inside diameter of the finished lining. Connections that receive equipment shall
be checked to insure that the inside diameter is large enough and the flanges
match.
(4) Flanges and bolts shall be analyzed to ensure that they are not overstressed
during gasket seating. Overstressing is more likely to occur when Class 300
and lower flanges are used with spiral wound or metal gaskets.
(6) Flanges shall not be located inside of vessel support skirts or other confined
areas.
(7) Nozzles and their reinforcement in heads shall be entirely contained within the
center 80 percent of the head unless a detailed analysis is performed to validate
the design considering all mechanical and thermal loadings.
b. Flanges
(1) Flange classes are specified in accordance with ASME B16.5 or ASME
B16.47, Series B. Flange classes listed in the UOP Project Specifications are
based upon design pressure and temperature conditions only, and do not
account for other loads. The final design of all flanges shall account for gasket
seating and external loads. Differential thermal expansion of dissimilar joints
and transient thermal conditions such as start-up/shutdown and operational
upset shall be accommodated.
(2) Class 150 flanges shall not be used for design temperatures over 700F
(370C).
(3) Class 300 flanges (minimum) shall be used for instrumentation pipe column
attachments to the vessel. This requirement does not apply to individual
transmitters or indicators mounted on pipe columns or directly connected to the
vessel.
(4) Slip-on flanges are not recommended for any service, and are only permitted
when in accordance with all of the following:
(a) The hydrogen partial pressure (design) does not exceed 50 psia {3.5 kg/cm2
(a)}.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
(c) Postweld heat treatment is not specified in the UOP Project or Standard
Specifications.
(5) Lap joint flanges shall not be used in hydrofluoric acid (HF), wet hydrogen
sulfide (H2S), or severe cyclic service
(6) The design of slip-on and lap joint flanges subjected to external loads due to
piping displacement shall consider the stress intensification factors (SIFs) from
ASME B31.3, Appendix D. The design for primary mechanical loads shall
limit the nominal stress in the neck of the flange to one-fourth (1/4) of the code
allowable stress at temperature unless a detailed analysis is performed.
(7) Flanges that are intended for use with spiral wound gaskets shall have a flange
surface finish of 125 microinch Ra minimum to 250 microinch Ra maximum.
Flanges intended for use with other gaskets shall have a flange surface finish
within the optimal range for the specified gasket. Finishes shall be judged by
visual comparison with surface finish roughness standards conforming to
ASME B46.1. Flange finishes shall be protected from damage during
fabrication, heat treatment, shipping, storage and installation.
(8) Ring joint flanges shall have a flat bottom groove with the intersection between
the bottom and the sides of the groove machined to a smooth 0.125 inch (3 mm)
minimum radius.
(9) Flanged thermowells and other connections joining dissimilar materials require
special consideration. The flange Class for both materials shall be determined
and the higher Class used for both flanges.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
(10) Flanges designated as special in the UOP Project Specifications and other
flanges that are not within the scope of ASME B16.5 or ASME B16.47 shall be
designed in accordance with ASME Section VIII, Division 1, Appendix 2 and
Appendix S. The bolt and gasket materials to be used in the design of these
flanges are as noted in the UOP Pipe Class specified for the connection. The
applicable UOP Pipe Class is that specified for the connected piping on the
UOP Piping and Instrument Diagram (P&ID). Where there is no connected
piping (e.g., a manway), use the miscellaneous connections Pipe Class specified
for the vessel on the UOP P&ID. As a minimum, the flange shall be designed
for use with spiral wound gaskets.
(11) The Contractor shall be responsible for the compatibility of all flanges mating
with piping, instruments, or equipment.
c. Details
(2) When the design pressure exceeds 1000 psig {70 kg/cm2(g)} or the shell
thickness exceeds 2 inches (50 mm), 4 inch NPS and greater nozzles shall
utilize an integrally reinforced forging in accordance with ASME Section VIII,
Division 1, Figure UW-16.1 (f-1), (f-2), (f-3), or (f-4). Nozzles smaller than 4
inch NPS shall be integrally reinforced.
(3) When the design temperature is within the materials creep range {above 700F
(370C)}, 4 inch NPS and larger nozzles shall utilize integrally reinforced
forgings in accordance with ASME Section VIII, Division 1, Figure UW-16.1
(f-1) or (f-4). Balanced reinforcement between the nozzle and the shell,
designed to minimize the creep strain concentrations at the junction, is
preferred. Nozzles smaller than 4 inch NPS shall be integrally reinforced.
(4) External reinforcing pads shall have a minimum of one 1/4 inch NPS vent hole.
Pads for nozzles greater than 16 inch NPS shall have a minimum of 2 vent
holes and pads for nozzles in excess of 36 inch NPS shall have a minimum of 4
vent holes. Pads installed in sections shall have at least one vent hole per
section. Vent holes shall be tapped for future plugging. Vent holes shall
remain open until the completion of pressure testing. The material used for
plugging shall be adequate for the operating temperature but shall not be
capable of retaining pressure.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
3.7 Special Considerations for Low Temperature, Elevated Temperature or Severe Cyclic
Service
For design temperatures of -20F (-29C) and lower or 700F (370C) and higher, or severe
cyclic services, the design details for nozzles, supports, and other attachments to the vessel
pressure containing components shall be free of high local stress concentrations, e.g., sharp
discontinuities, immediate changes of direction of a surface, notches, weld undercuts, etc.
Internal and external fillet welds shall be ground to a smooth and generous concave contour.
Notches, weld undercuts, etc. shall be removed.
4. MATERIALS
4.1 General
a. Pressure vessel materials shall be in accordance with ASME Section II, Part A. Non-
pressure parts may be in accordance with American Society for Testing and Materials
(ASTM) Specifications. ASME Specification numbers are prefixed by SA and the
corresponding ASTM Specification numbers are prefixed by A.
b. Low temperature services {per the applicable Minimum Design Metal Temperature
(MDMT)} may utilize materials pretested and certified for low temperature
applications. These materials are listed in ASME Section VIII, Division 1,
Table UG-84.3.
c. In wet hydrogen sulfide (H2S) service or hydrofluoric acid (HF) service all carbon steel
material shall be killed.
d. In hydrofluoric acid service with residual element control (HFRE), wetted pressure
containing parts (i.e., those exposed to the HF acid), and internals welded to a wetted
pressure containing part, shall meet the following requirements:
f. Each plate, forging, and other product form shall be legibly stamped or stenciled
showing specification number, grade, and class. When metal stamping is used it shall
be on the long edge of each component as it leaves the mill. Metal stamping on rolled
surfaces shall be done with a "low stress" stamp. Markings shall be protected from
erosion, wear, or other events that may render them unreadable.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
g. When the room temperature tensile strength of pressure containing components and
welds is not limited to a lower value by the applicable product specification, it shall not
exceed 100,000 psi (7030 kg/cm2).
i. When carbon steel is in the normalized and tempered or quenched and tempered
condition, the minimum tempering temperature shall be at least 25 F (14 C)
greater than the maximum postweld heat treatment temperature.
j. When the component thickness exceeds 2 inches (50mm), specimens for mechanical
testing shall be taken at the thickness (T).
k. When the actual postweld heat treatment temperature equals or exceeds 1200 F
(650 C) at any point or time, the affect of heat treatment on tensile strength shall be
determined by testing specimens from each heat of plate, pipe, and forgings {small
forgings may be tested on a lot basis as defined in ASME Section VIII, Division 1,
Section UG-84(e)(2)}, weldments representing each batch of welding consumables,
covered electrodes, and wire-flux combinations for each production welding process
and samples from each welding procedure and qualified welding position (per ASME
Section IX). Welded samples shall be made using the production base metal. The
specimens shall be subjected to the maximum heat treatment as defined in Paragraph
4.1.l. The results shall comply with the requirements of the subject material
specification.
l. When Charpy V-notch impact testing is required for a component or weld that will be
heat treated, test specimens shall be provided in both the minimum and maximum heat-
treated condition. Testing of welds shall include samples from weldments representing
each batch of welding consumables, covered electrodes, and wire-flux combinations for
each production welding process and samples from each welding procedure and
qualified welding position (per ASME Section IX). Welded samples shall be made
using the production base metal. The minimum heat treated condition means subjected
to the fewest heat treatment cycles and/or time-at-temperature anticipated for the
component. The maximum heat treated condition means subjected to the maximum
number of heat treatment cycles and/or time at temperature anticipated during
fabrication (including intermediate stress relief and multiple heat treatment exposures)
plus one additional heat treatment to simulate a future requirement
m. Plates and forgings over 2 inches (50 mm) thick or used for pressure containment in HF
acid, H2S, or hydrogen service shall be:
(1) Ultrasonically examined with 100% scanning in accordance with the following:
(a) Plates shall be examined before forming in accordance with ASME SA-435
including supplementary requirements S1.
(b) Forgings shall be examined in accordance with ASME SA-388 and ASME
Section VIII, Division 2, paragraph 3.3.4.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
(b) Formed plate surfaces to be welded, i.e., the weld bevel area, and a
minimum of 2 inches (50mm) of neighboring surfaces.
a. Shells may be fabricated from rolled plate, forgings, or pipe. Layered construction is
prohibited.
b. Carbon steel plate shall be ASME SA-285 Grade C. Other product forms shall be the
equivalent grade of carbon steel. Killed carbon steel may be substituted for carbon
steel.
c. Killed carbon steel plate shall be ASME SA-516. Other product forms shall be the
equivalent grade of killed carbon steel.
d. When the shell or head is internally lined or the thickness exceeds 2 inches (50 mm) a
calibration block for ultrasonic examination shall be provided. The block shall be in
accordance with ASME Section V, Article 5, and shall include a lining identical with
the vessel lining.
b. Material requirements:
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
c. Solid alloy nozzles are not recommended for any service and shall not be used at design
temperatures above 450F (230C).
f. Corrosion allowance for nozzles and manways shall be at least equal to that specified
for the vessel shell.
g. Bolting materials shall be as required by the UOP Pipe Class specified on the UOP
Piping and Instrument Diagram (P&ID). The applicable UOP Pipe Class is that
specified for the connected piping. When there is no connected piping (e.g., a
manway), use the miscellaneous connections Pipe Class specified for the vessel on the
UOP P&ID.
a. Material for rings, lugs, saddles, wear/corrosion plates, legs supporting vessels, and the
upper three feet of support skirts welded directly to the vessel or to reinforcing rings
welded to the vessel shall be the same material as the shell when the design temperature
is greater than 650F (340C). Otherwise, the material shall be ASTM A285 or A516.
b. External vacuum stiffening rings shall be the same material as the shell when the design
temperature is greater than 650F (340C). When the design temperature is 650F
(340C) or less the material shall be ASTM A36, A283, A 285, A516, A913, or A992.
Internal vacuum stiffening rings shall be the same material as the shell.
c. Base rings, reinforcement for skirt openings, saddle base plates, external lugs for
platforms, ladders, insulation supports, pipe supports and other non-pressure parts
welded to the vessel shall be ASTM A36, A283, A 285, A516, A913, or A992. Angles
and rods shall be ASTM A 36, A913, or A992.
d. External supports and attachments may be exposed to low ambient temperatures. The
effects of this exposure upon material selection, stress analysis, fabrication details, etc
shall be addressed.
a. The material for internals is specified on the UOP Project Specifications. When carbon
steel is specified, pipe shall be ASTM A 106 or A 53 type S and plate, bars, and shapes
shall be ASTM A 36, A 283, A 285, A516, A913 or A992.
b. Internal support rings, lugs, brackets, and other items welded to the shell shall be the
same material as the shell base metal in killed steel vessels, and ASTM A285 or A516
in carbon steel vessels. When hydrofluoric acid service with residual element control
(HFRE) is specified for the shell, internals welded directly to the shell shall comply
with the same requirements (see paragraph 4.1d.) In lined portions of the vessel they
shall be covered with alloy lining. When welded directly to the lining, they shall be an
alloy corresponding to the lining.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
c. Bolting for distributors, baffles, or other miscellaneous items, not furnished by the tray
supplier, shall be the same or similar alloy as the internals.
d. Drawings and instructions for fabrication and installation of tray and mesh blanket
supports attached to the vessel shall be furnished by the supplier of the vessel internals.
The vessel manufacturer shall fabricate and install the vessel attachments in accordance
with those instructions and the UOP Project and Standard Specifications and Drawings.
e. As an alternative to welding rings, lugs, and brackets to the shell, they may be formed
from weld build-up (using the same weld materials used for the vessel strength welds)
or integrally forged with the shell and covered with alloy lining where required. The
transition to the shell shall be machined to a smooth and generous concave contour
prior to the application of alloy lining (if required). The top surface of the completed
support rings (i.e., after the application of alloy lining, if required) shall be machined to
provide a smooth, flat surface. The welding procedure, inspection and examination of
weld build-ups shall be the same as required for the vessel strength welds.
4.6 Gaskets
a. Gaskets shall conform to the requirements of the UOP Pipe Class specified on the UOP
Piping and Instrument Diagram (P&ID). The applicable UOP Pipe Class is that
specified for the connected piping. Where there is no connected piping (e.g., a
manway), use the miscellaneous connections Pipe Class specified for the vessel on the
UOP P&ID.
b. Gaskets for use with raised face flanges shall be spiral wound per ASME B16.20 with a
non-asbestos filler material. In lined portions of the vessel, the winding material shall
be the same as the vessel lining. In unlined portions of the vessel, the winding material
shall be a minimum of Type 304 austenitic stainless steel. Gaskets shall include an
outer retainer ring. The outer ring may be carbon steel, protected against corrosion.
When the service temperature exceeds 850F (455C) the outer ring shall be Type 304
austenitic stainless steel. Gaskets for Class 300 and greater flanges, flanges over 24 inch
NPS, and gaskets in vacuum service shall have an inner retainer ring of the same
material as the windings. Gaskets with an inner retainer ring shall also be used between
flanges of different metallurgies with different coefficients of thermal expansion when
they operate at an elevated temperature. The contractor shall verify the adequacy of all
gaskets considering potential buckling of the outer or inner retaining ring(s) and the
windings.
c. The use of corrugated, double jacketed gaskets per ASME B16.20 may be considered
for large diameter openings (over NPS 24 inch), especially when the sealing surface is
vertical or when the surface to be sealed is not round (e.g., multi-pass exchanger
channel to shell closure gaskets).
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
5. FABRICATION
5.1 Details
a. Shell and head joints, including nozzle attachments, shall be Type (1), full penetration,
free of undercuts, double welded butt joints in accordance with ASME Section VIII,
Division 1, Section UW-3 and table UW-12. The initial root pass of double welded
groove joints, including root tack welds, shall be chipped, ground, and/or gouged to
sound metal on the reverse side before welding on that side. The back-chipped welds,
welding groove, and plate edges shall be magnetic particle or liquid penetrant examined
to ensure that all cracks, pinholes, laminations, porosity, and other defects have been
removed prior to welding on the reverse side. In cases where double welding is
impractical (e.g., the groove joint backside is not accessible for chipping or gouging and
welding) the root pass shall be made by the Gas Tungsten Arc Welding (GTAW).
b. Pressure containing welds shall remain accessible for visual and nondestructive
examination (e.g., radiography). Nozzles shall be located so that the nozzle, nozzle to
vessel weld, and nozzle reinforcement are at least 3 inches (75mm) from all pressure
containing shell and head welds. If intersecting or covering pressure containing welds
cannot be avoided, the nozzle shall be fully reinforced and low stress welding details
used (e.g., grind fillets to a smooth concave radius). Pressure containing welds beneath
reinforcement shall be ground smooth and flush with the shell surface. All pressure
containing welds shall be 100 percent radiographed after forming and nozzle
installation but before reinforcing pad installation to a minimum of 6 inches (150mm)
beyond the nozzle to vessel weld or the limits of the reinforcing pad.
c. Longitudinal and circumferential pressure containing welds shall not be located in tray
downcomers, behind permanent internals, or in other areas that prevent inspection from
the inside of the vessel. Circumferential welds shall have a clearance of at least one
inch (25mm) from tray support rings and welds and other circumferential attachments.
d. Nozzles shall penetrate through the shell, with the shell butt welded to the nozzle.
Nozzles and their reinforcement (except the outer circumference of reinforcing pads)
shall be attached to the vessel with full penetration welds. Connections at air cooler
header boxes may use a set on detail. Equipment nozzles meeting the following
criteria may also utilize a set-on detail:
(2) The thickness of the component (shell, head, nozzle neck, blind flange, etc) to
which the nozzle is attached exceeds 2 inches (50mm). This also applies to
nozzles welded to other nozzles.
(4) The nozzles are for instruments or another service without attached piping and
without significant imposed loads.
(5) The nozzles are not subject to significant cyclic (thermal or mechanical) or
fatigue loadings.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
(6) The base metal adjacent to the nozzle opening shall be thoroughly ultrasonic
and magnetic particle examined to ensure that there are no flaws (e.g.,
laminations).
(7) The nozzle to shell weld shall be full penetration with an external fillet ground
to a smooth, concave contour.
(8) The weld geometry shall permit full, non-destructive examination of the nozzle
to shell weld in both the shop and the field, after operation.
(9) When spot examination of the vessel welds is required, at least one randomly
selected set-on weld shall be included in the examination.
10. The nozzle to shell weld shall comply with the requirements for the other
pressure containing welds (e.g., double welded, back-gouged, no permanent
backing bars, etc).
e. Nozzles, manways, and handholes shall be cut flush with the inside surface of the shell
or head. When an internal projection is necessary, the internal projection shall not
interfere with the process, internals, or the installation of internals or other vessel
contents. The inside edge of nozzles, manways, and handholes shall be rounded.
f. When in hydrofluoric acid (HF) service, the periphery of all flanges shall be painted
with volatile organic compound (VOC) compliant hydrofluoric acid indicating paint
compatible with the base metal. See UOP Project Specification -801 for suggested
suppliers
g. Pressure containing shell, head, and radiographable nozzle welds shall be located,
designed, and ground to permit 100 percent on site radiographic examination.
h. Pressure containing welds, internal attachment locations, and the method of vessel
support attachment shall accommodate full on-site external ultrasonic angle beam
examination and visual inspection of head and shell welds with all internal equipment
in place. Welds shall be contoured to permit proper interpretation of ultrasonic
examination.
i. Internal support rings shall be continuously welded to the shell on the top and
intermittently welded on the bottom. Internal lugs and brackets shall be continuously
welded on the top and sides only. In hydrogen service all internal and external welds
shall be full penetration, free of undercuts, through the support side of the joint.
j. Lugs and rings for internal supports in lined portions of vessels may be welded directly
to the lining only if the vessel is lined with weld deposit overlay or integrally bonded
cladding meeting the requirements of ASME Section VIII, Division 1, Paragraphs
UCL-11 (a) and (c).
k. In hydrogen services all fillet welds (internal and external) to pressure containing
components shall be ground to a smooth and generous concave contour.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
l. When austenitic stainless steel support rings are joined to an austenitic stainless steel
lining and the operating temperature is greater than 700F (370C), circumferential
welds shall not be used. The rings shall continuously contact the lining and shall be
supported by vertical lugs welded to the lining.
m. Seams in supporting skirts shall be made with full penetration butt welds. Connections
between straight skirts and vessel heads shall be made with a smooth flat-faced weld.
The width of the weld shall be at least equal to the skirt thickness, and its height shall
be approximately twice its width. When the shell thickness at the skirt connection
exceeds 4 inches (100mm), the design temperature at the skirt to shell connection is
within the materials' creep range {above 700F (370C)}, or the skirt to shell junction is
subject to cyclic loading, the joint details shall be as specified on the UOP Project
Specification.
n. Details of flared skirts, lugs, and special vessel support systems are specified on the
UOP Project Specifications
b. Chemistry and mechanical properties of the deposited weld metal shall conform to the
ASME requirements for the base metal.
c. All welding consumables shall be of the low hydrogen type. They shall be stored in
accordance with the manufacturers requirements (e.g., remain in sealed packaging
prior to use, storage in warming ovens until use, etc). All materials shall be stored and
used in a manner that prevents exposure to moisture and inclusion of hydrogen in the
deposited weld. The surfaces to be welded shall be clean, dry and free of contaminants.
The weld procedure shall minimize hardenability and ensure that the weld meets all
required properties, including toughness and ductility.
d. In hydrofluoric acid service with residual element control (HFRE), the requirements of
the supplements specified in paragraph 4.1d. shall apply to the welding electrodes,
including those used to join internals directly to pressure containing components. In
addition, only in approved electrodes as listed in NACE SP0472, table 2 shall be used,
E60XX electrodes shall not be used and all welding consumables shall be of the low-
hydrogen type.
e. In wet hydrogen sulfide (H2S) service the following additional requirements apply to all
pressure containing welds and welds joining internals directly to a pressure containing
component:
(1) Only approved electrodes as listed in NACE SP0472, Table 2, shall be used
E60XX electrodes shall not be used and all welding consumables shall be of the
low hydrogen type.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
(2) The carbon equivalent, as defined in NACE SP0472, paragraph 2.3.4.1 shall be
a maximum of 0.43 weight percent.
(3) Vanadium (V) and niobium (Nb) {columbium (Cb)} shall not be added
intentionally. The vanadium content shall be less than or equal to 0.02 weight
percent and the maximum niobium (columbium) content shall be less than or
equal to 0.02 weight percent. The vanadium plus niobium (columbium) content
shall be less than or equal to 0.03 weight percent.
f. The Flux Cored Arc Welding (FCAW) process shall utilize an external shielding gas
and is not permitted for the root pass of joints made from one side. FCAW may be used
for the root pass of joints made from both sides only if it is completely removed prior to
welding from the reverse side.
g. The Gas Metal Arc Welding (GMAW) process in the short circuiting mode
(GMAW - S) may be used for the following applications only:
(2) Complete groove or fillet welds provided that the wall thickness of the thickest
portion of the joint does not exceed 1/4 inch (6 mm).
(3) Tack welds, temporary attachments, and other applications where the weld
made by this process is completely removed.
h. The Gas Metal Arc Welding process in the globular transfer mode (GMAW-G) shall
not be used.
i. The Gas Metal Arc Welding (GMAW) process in the spray transfer mode shall not be
used for the root pass.
j. Covered welding electrodes (i.e., shielded metal arc welding SMAW) for carbon steel
welding shall be of the low hydrogen coating type and shall be in accordance with
ASME Section II, Part C, SFA-5.1. Rod ovens, and other means as necessary, shall be
used to ensure that the rods remain dry.
(1) Mill certificates of the chemistry of each batch and lot used for production
welds are submitted to, and approved by, the owner.
(2) A PQR is performed for each batch and lot used for production welds.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
l. Bare electrodes for inert gas and submerged arc welding shall be in accordance with
ASME Section II, Part C, and the following electrode specifications:
m. Submerged Arc (SAW) production welds shall be made with the same flux and filler
wire combinations and of the same type and brand used for the Procedure Qualification
Record (PQR).
a. Welding directly to the base metal shall be completed prior to final postweld (PWHT)
heat treatment unless welding after heat treatment is specifically permitted by ASME
Section VIII Division 1. This exception is prohibited when PWHT is required by the
UOP Project specifications. All welding to alloy lining shall also be completed prior to
the final heat treatment unless a two layer weld overlay is used and the requirements of
Paragraph 5.4c.(1) are met.
b. PWHT shall be performed by placing the vessel into a furnace and heating uniformly.
Local PWHT is permitted only for circumferential weld seams and only when furnace
PWHT cannot be performed. Local PWHT shall comply with the following:
(1) The full circumferential band shall be uniformly heated and cooled.
(2) The soak band width shall be a minimum of the greatest width of the weld plus
either the thickness of the weld or 2 inches (50 mm), whichever is less, on each
side of the weld face.
(3) The heated band width shall be a minimum of the soak band width plus twice
(RT)1/2 on each side of the soak band.
(4) The gradient control band width shall be a minimum of twice (RT)1/2 on each
side of the soak band.
(5) R is defined as the inside radius of head, shell, or nozzle neck and T is defined
as the thickness of the weld.
c. Welded joints 1 1/2 inches (38mm) and greater in thickness that require post weld heat
treatment shall be heat treated immediately upon completion of welding. The joint shall
not be allowed to cool below 300F (150C) prior to heat treatment. Alternately, the
weld and adjacent metal may be heated to 600F (315C), wrapped with insulation, and
allowed to cool. Heat treatment may then be performed later.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
d. For welded joints less than 1 inches (38mm) in thickness that require postweld heat
treatment, the requirements of paragraph 5.3c. are preferred. Alternatively, the joint
may be permitted to cool prior to postweld heat treatment (PWHT) if the joint is 100
percent radiographed after completion of PWHT. If 100 percent radiography cannot be
performed, the provisions of paragraph 5.3c. are required.
e. Vessels in hydrofluoric (HF) acid, wet hydrogen sulfide (H2S), caustic (NaOH or
KOH), or amine service shall be postweld heat treated (PWHT) at a temperature of
1175F (635C) 25F (14C).
h. The alternate postweld heat treatment procedures permitted by ASME Section VIII,
Division 1, Table UCS-56.1 (i.e., a reduced hold temperature for a greater time) shall
not be used.
i. Thermocouples shall be located on the inside and outside of the vessel surface, and
placed to ensure that that all portions of the vessel are properly and uniformly heat
treated, without the presence of detrimental thermal gradients.
j. During heat treatment the vessel shall be supported and stiffened to prevent distortions.
m. When postweld heat treatment is required, one Brinell hardness reading shall be taken
on the inside (except in lined portions of the vessel) and on the outside of each shell
section, head, and nozzle, and each longitudinal, girth and nozzle weld. The readings
shall be taken after final postweld heat treatment. No reading shall exceed a value of
200 Brinell. Readings shall be taken with a portable hardness tester, calibrated at 200
Brinell.
5.4 Alloy Lining
a. General
(1) The term "Alloy Lining" is a general term that does not imply a specific
fabrication or manufacturing process.
(2) Alloy lining for shells and heads shall be integrally bonded cladding or weld
deposit overlay. The required alloy and thickness are specified on the UOP
Project Specifications.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
(4) Rings, lugs, brackets, and other attachments in the lined portion of the vessel
shall be weld deposit overlayed unless they are fabricated from an alloy
corresponding to the lining.
(5) Tubular liners are not acceptable in nozzles greater than 1 inch NPS or
nozzles of any size in HF acid service. Tubular liners may be used for smaller
nozzles. The liner shall be welded to the alloy facing at the flange end.
Attachment of the liner at the inside surface of the vessel shall be by an
expansion/contraction collar. When differential thermal expansion/contraction
between the liner and the nozzle is not a concern, the liner may be welded flush
with the vessels inside surface. The final details shall account for the
sustained, transient, thermal (expansion/contraction), and cyclic stresses due to
the operation of the vessel.
(6) In hydrogen service, nozzles with tubular liners welded on both ends shall be
vented with a 1/8 inch NPS hole, drilled from the outside of the nozzle to the
OD of the liner. The vent hole shall be tapped for future plugging with a
material adequate for the operating temperature but incapable of retaining the
operating pressure.
b. Cladding
(1) Integrally bonded clad plate shall be fabricated in accordance with SA-263 for
corrosion resistant chromium stainless steel cladding, SA-264 for chromium-
nickel stainless steel cladding, or SA-265 for nickel and nickel based cladding.
(2) The bond between the cladding and the base metal shall be tested by and
comply with the requirement of the shear strength test as described in the
applicable cladding specification.
(3) When integrally bonded clad plate is used, the lining shall be cut back at all
seams a minimum of 1/2 inch (13 mm) from the edge of the weld bevel to
permit welding of the base metal. Complete removal of the cladding shall be
verified before proceeding with welding of the base metal. The base metal
welding procedure shall ensure that the cladding bond is not damaged by
the welding and that cladding metallurgy is not incorporated into the
base metal weld. The weld metal shall be ground flush and fully covered with
the applicable weld deposit overlay per Paragraph 5.4b.(4). of this Standard
Specification. The weld deposit overlay shall be at least as thick as the
cladding but no greater than twice its thickness.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
(4) Welding in conjunction with a clad lining shall be done with covered electrodes
in accordance with ASME Section II, Part C and the following electrode
specifications:
Note: When inert gas shielded or submerged arc processes are used, stainless steel
welding shall be in accordance with ASME Section II, Part C, SFA-5.9, with
composition similar to those listed above. Nickel-Copper alloy (Monel)
welding shall be in accordance with ASME Section II, Part C, SFA-5.14 with a
composition similar to that noted above.
(5) ASME Section VIII, Division 1, Part UNF, Appendix NF, Paragraphs NF-7 and
NF-14 are mandatory for nonferrous types of cladding or weld overlay.
(6) Internals may be attached directly to the cladding if the stress at the attachment
under the design loads is less than one quarter of the allowable stress for the
lug, ring, or bracket material. Attachment shall be performed after postweld
heat treatment. The heat input of the internals attachment welding procedure
shall be such that the base metal is not affected by the heat and additional heat
treatment of the base metal after the attachment welding is not required.
Otherwise, the cladding shall be cut back at least inch (19mm) beyond the
toe of the attachment weld and the lug, ring, or bracket shall be attached
directly to the base metal. Complete removal of the cladding shall be verified
before proceeding with welding to the base metal. The attached material and
the attachment weld shall be the same alloy as the lining or the shell to which it
is directly welded. After attachment directly to the base metal, the exposed area
shall be completely covered with weld overlay as described in Paragraph
5.4b.(4). of this Standard Specification. The weld deposit overlay shall be at
least as thick as the cladding, but no greater than twice its thickness.
(7) Large nozzles and manways utilizing built-up construction may use integrally
bonded cladding for the nozzle neck if the nozzle neck is fabricated from rolled
plate.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
(1) Weld deposit overlay may be applied by a single or multi-pass procedure and
shall comply with the requirements of API RP 582 except as modified or
amended by the UOP Specifications. The first pass of multipass austenitic
stainless steel weld overlays shall be applied prior to postweld heat treatment
when it is required and shall be made with an electrode complying with the
requirements of Paragraph 5.4b.(4). The remaining passes shall be made with
an electrode of the required lining alloy. Where internals will be attached to the
lining, a two layer overlay shall be used; the second layer shall be applied after
completion of the final post weld heat treatment. When the second layer is
applied after postweld heat treatment, the thickness of the first layer and the
heat input of the second pass welding procedure shall be such that the base
metal is not affected by the heat and additional heat treatment of the base metal
after the second layer is not required.
(2) The ferrite content of austenitic stainless steel weld deposits shall be controlled
to a WRC (Welding Research Council) Ferrite Number (FN) of 3 (5 for Type
347) minimum to 8 maximum. With the owners approval and in
accordance with the provisions of API 582, paragraph 6.4.2.2a), the
lower limit for Type 347 may be reduced to an FN of 3 if the fabricator
demonstrates and documents successful in service use, without hot
cracking or failures, of welding consumables with an FN of 3 using the
proposed welding procedure, materials (including brand), and similar
base metal thickness. FN control shall be by reference to the DeLong
Constitution Diagram for stainless steel weld metals. The limit defined above
shall be confirmed by thoroughly checking the final deposits prior to postweld
heat treatment with a magnetic instrument calibrated in accordance with the
standard procedure defined in AWS A4.2. Readings shall be taken from at least
ten randomly selected locations on each shell course and head, and at least one
location from each nozzle girth weld, vessel seam overlayed separately (e.g.,
between clad sections), overlayed support ring, bracket, or lug, and strength
weld. At least 6 readings shall be taken at each location.
(3) Weld deposit overlay shall be applied circumferentially to the vessel and shall
be smooth with no notches or undercuts that would act as stress intensifiers. If
necessary, longitudinal application in nozzles up to 8 inch NPS is acceptable.
Flaws on the surface of the base metal that would interfere with bonding of the
overlay shall be removed by grinding.
(4) Whenever weld deposit overlay is present during vessel seam welding (e.g.,
longitudinal, circumferential, or nozzle), the overlay shall be cut back in
accordance with paragraph 5.4b.(3). Whenever weld deposit overlay is present
where internal attachments will be welded directly to the base metal, the
overlay shall be cut back in accordance with paragraph 5.4b.(6).
(5) The weld deposit overlay procedure shall be qualified on base metal of the
same composition as the vessel and thickness of at least one-half of the vessel
thickness or 2 inches (50 mm), whichever is less.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
(6) Nozzles and manways in alloy lined portions of vessels shall be alloy lined and
faced. The nozzle facing shall be made with a minimum of a two layer weld
deposit in accordance with Paragraph 5.4b.(4). The surface layer shall be weld
deposit of the same alloy as the vessel lining and shall be at least as thick as the
vessel lining when properly machined. The first pass shall be applied before
postweld heat treatment (PWHT) when it is required. When nozzles are lined
with ferritic Type 405 or 410S stainless steel, the facing weld deposit shall be
made with Type 309L welding electrode. For ring joint flanges with an
austenitic stainless steel overlay, the second pass shall be applied after
completion of PWHT. The thickness of the first pass and the heat input of the
second pass welding procedure shall be such that the base metal is not affected
by the heat and additional PWHT of the base metal is not required after the
second pass.
(7) When austenitic stainless steel weld deposit overlay is used in an elevated
operating temperature {over 700F (370C)} hydrogen service the fabricator
shall demonstrate that their procedures and materials provide immunity to
lining disbonding. Testing shall be per ASTM G 146. As a minimum, the tests
shall be representative of the actual operating conditions (e.g., hydrogen partial
pressure, materials and material thicknesses, temperatures, and heating/cooling
rates).
(8) Weld deposit overlay cracks and fissures, and volumetric defects that penetrate
through the overlay or are greater than 1/16 inch (1.6 mm) diameter shall be
removed. Repaired areas shall be 100% re-inspected by liquid penetrant.
(9) The weld deposit overlay of each overlayed shell section and head shall be
examined in at least two separate, randomly selected, locations to confirm the
required chemical analysis of the specified overlay material. Each manual weld
overlay, such as those on girth seams, nozzles, and flange facings, shall also be
examined in the same manner. After machining, analysis at a depth equal to the
specified overlay thickness from the surface exposed to the process
environment shall conform to the chemistry requirements (e.g., C, Cr, Ni, Nb
(Cb), Mo, V, Ti, and Cu as applicable) for the alloy specified on the UOP
Project Specifications. Where weld deposit overlay is applied by more than
one welder/welding operator and/or procedure, examination shall include at
least 2 samples of deposits made by each welder/welding operator for each
procedure.
5.5 Tolerances
a. Vertical vessels shall be checked for plumbness. The outside surface of the cylinder
shall not vary from a straight vertical line by more than 1/4 inch (6 mm) in any 20 feet
(6000 mm), nor more than 3/4 inch (19 mm) between any two points in the total length
of the vessel. The vertical reference line shall be perpendicular to the vessels cross
section. When the shell thickness is 4 inches (100 mm) or more the variation from a
straight line shall not exceed 1-1/4 inches (30 mm) between any two points in the total
length of the vessel.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
b. Horizontal vessels shall comply with the criteria of Paragraph 5.5a. of this Standard
Specification except that the reference line shall be horizontal and perpendicular to the
vessels cross section.
c. The maximum offset (misalignment) for longitudinal joints shall be 1/4 inch (6 mm)
and for circumferential joints, 1/2 inch (13 mm).
d. Vessels with internal trays or grids shall not vary more than plus or minus 1/2 percent
from the nominal diameter specified in the UOP Project Specifications, with a
maximum variation in diameter from nominal of 1/2 inch (13 mm). Vessels without
trays or grids shall not vary more than plus or minus 1 percent from the nominal
diameter specified in the UOP Project Specifications, with a maximum variation from
nominal diameter of 1 inch (25 mm).
e. The overall length of the vessel, not including the skirt, shall be within plus or minus
the greater of 1/2 inch (13 mm) or 1/64 inch (0.4 mm) per foot (300 mm) of length
specified in the UOP Project Specifications, up to a maximum of plus or minus 3/4 inch
(19 mm).
f. The length of skirt shall be within plus or minus 1/4 inch (6 mm) of the specified
length.
g. Nozzle elevations shall be within plus or minus 3/8 inch (10 mm) and orientations shall
be within plus or minus 1/4 inch (6 mm) of the specified location. The nozzle
projection shall be within plus or minus 1/8 inch (3 mm) of the specified value.
h. The maximum horizontal or vertical deflection of the machined faces of nozzles from
the design plane shall be 1/2 degree or 1/32 inch (0.8 mm), whichever is greater.
i. Manway elevation, orientation, and projection shall be within plus or minus 1/2 inch
(13 mm) from the specified values. Tilt shall be within plus or minus 1/4 inch (6 mm)
of perpendicular to the nozzle axis.
j. The maximum deviation of internal tray supports from a level (horizontal) reference
plane shall be plus or minus 3/8 inch (10 mm).
k. The maximum variation in spacing between supports for adjacent trays shall not exceed
1/16 inch (1.6 mm) per foot (300 mm), with a maximum of 1/8-inch (3 mm).
l. The maximum variance (distance between high and low points) in individual tray
supports with respect to the level plane shall be 0.3 percent of the nominal inside
diameter of the vessel, with a maximum of 1/4 inch (6 mm).
m. The tray support plane shall not vary more than 1 degree from normal to the vessel
centerline.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
6. NONDESTRUCTIVE EXAMINATION
b. When the design pressure exceeds 1000 psig {70 kg/cm2(g)} or the vessel is in HF acid
service, all pressure containing welds, including nozzle to vessel welds, shall be 100%
radiographed.
c. The use of ultrasonic examination (UT) in accordance with the provisions of ASME
Code Case 2235 in place of radiographic examination (RT) is permitted when
acceptable to the Owner, Contractor, Authorized (Code) Inspector (AI) and the
governing authorities.
d. When forming occurs after completion of welding, the specified radiography or other
nondestructive examination may occur after welding but prior to forming. If so, an
additional liquid penetrant or magnetic particle examination of all surfaces is required
after forming.
e. The specified radiography of welds may be performed before or after postweld heat
treatment (PWHT). If performed before PWHT, an additional radiographic or,
alternatively, ultrasonic examination shall be performed after PWHT.
g. When temporary attachments are removed, the area shall be ground flush with the
surrounding shell surface and liquid penetrant or magnetic particle examined.
h. When the design pressure exceeds 1000 psig {70 kg/cm2(g)} or the shell thickness
exceeds 2 inches (50mm), all welded joints in shells and heads, all nozzle joints, and all
repair welds shall be 100 percent ultrasonically examined after the final postweld heat
treatment.
i. When the shell thickness exceeds 2 inches (50mm) or a lining is present, ultrasonic
calibration shall utilize the calibration block provided with the vessel (see Paragraph
4.2d).
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
j. When the design pressure exceeds 1000 psig {70 kg/cm2(g)} or the shell thickness
exceeds 2 inches (50mm), magnetic particle examination shall be performed in
accordance with the following:
(2) Plate edges shall be examined for laminations and injurious flaws after
trimming and prior to welding. Laminations and injurious flaws shall be
removed by chipping or grinding and the plate re-examined.
(3) The initial root pass of double butt welds, including root tack welds, shall be
chipped, ground, and/or gouged to sound metal. The back-chipped welds,
welding groove, and plate edges shall be examined to ensure that all cracks, pin
holes, porosity, and other defects have been removed prior to commencing
welding on the second side.
(4) Root weld areas shall be examined before and after removal of defects.
(5) Attachments to the vessel, including nozzle and support attachment welds, shall
be examined.
b. In addition to the requirements of Paragraph 6.2a, when the hydrogen partial pressure
exceeds 50 psia {3.5 kg/cm2(a)}, the design temperature exceeds 600F (315C), and an
austenitic stainless steel weld deposit overlay is used, the overlay shall be 100 percent
ultrasonically examined for lack of bond. The examination shall occur after the final
postweld heat treatment and shall be from the outside. Examination shall be in
accordance with ASME Section II, Part A, SA-578. The acceptance level shall be S7.
Indications of a lack of bond shall be recorded and re-examined from the inside.
Indications of an unbonded area that exceed the acceptance criteria shall be repaired by
weld deposit overlay and re-examined.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
c. When integrally bonded cladding is used, a minimum of 10% of the clad surface,
including no less than 1 square foot (0.1 square meter) in each 10 square feet (1 square
meter) or fraction thereof, shall be ultrasonic examined from the exterior for lack of
bond after forming and before the final postweld heat treatment. Ultrasonic
examination shall be in accordance with ASME Section II, Part A, SA-578. The
acceptance level shall be S6. In areas where attachments are to be welded directly to
the cladding, the cladding within 2 inches (50mm) of the attachment weld shall be
100% ultrasonically examined from the inside. All unbonded areas where attachments
will be welded directly to the cladding and other areas that exceed the acceptance
criteria shall be repaired. Repairs shall be performed by weld deposit overlay in
accordance with Paragraph 5.4b.(4) of this Standard Specification. When repairs in
excess of 5 percent of the total examined area are required, the entire clad surface of the
vessel shall be 100 percent ultrasonic examined. Ultrasonic examination shall be in
accordance with ASME Section II, Part A, SA-578. The acceptance level shall be S7.
Repaired areas and weld deposit overlay at weld seams shall be 100% liquid penetrant
(PT) examined in accordance with ASTM E 165. At attachments, the final PT shall be
performed after final postweld heat treatment and pressure testing.
d. When the hydrogen partial pressure exceeds 50 psia {3.5 kg/cm2(a)}, the design
temperature exceeds 600F (315C), and an austenitic stainless steel cladding is used,
clad surfaces shall be 100 percent ultrasonically examined for lack of bond. The
examination shall occur from the outside after forming and before the final postweld
heat treatment. The ultrasonic examination shall be in accordance with ASME Section
II, Part A, SA-578. The acceptance level shall be S7. Suspected unbonded areas shall
be recorded and reexamined from the inside surface. Indications of unbonded areas that
cannot be encompassed within a 3-inch (75 mm) diameter circle shall be recorded,
repaired by weld deposit overlay in accordance with Paragraph 5.4b.(4) of this Standard
Specification, and re-examined. All unbonded areas within 2 inches (50mm) of where
attachments will be welded directly to the cladding shall also be repaired and
reexamined. In addition, the lining shall be spot ultrasonically examined in accordance
with Paragraph 6.2c. of this Standard Specification after final postweld heat treatment.
The acceptance level shall be S6. Repaired areas and weld deposit overlay at weld
seams shall be 100% liquid dye penetrant (PT) examined in accordance with ASTM E
165. At attachments, the final PT shall be performed after final postweld heat treatment
and pressure testing.
e. Alloy lining on support rings, lugs, and brackets shall be 100 percent ultrasonically
examined from the inside after final postweld heat treatment. Unbonded areas shall be
repaired and re-examined.
7. TESTING
a. Hydrostatic test methods shall be used for pressure testing. Pneumatic testing may be
used only when hydrostatic testing is not feasible and the owner, contractor, and
fabricator concur. When pneumatic testing is performed, appropriate safety measures
shall be taken, considering the danger presented by the stored energy of the compressed
gas.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
b. The minimum METAL temperature during pressure testing shall be at least 30F (17C)
above the brittle-ductile transition temperature of all pressure containing components at
the time of pressure testing. The brittle-ductile transition temperature shall be
determined by Charpy V-notch impact testing. If the required impact test data is not
available, the pressure test temperature shall be in accordance with either (1) or (2)
below.
(1) 30F (17C) above the minimum design metal temperature (MDMT) or the
temperature at which impact testing was performed, if lower than the MDMT.
(2) 30F (17C) above the temperature for which impact testing is not required for
any of the vessels components in accordance with ASME Section VIII,
Division 1, Figure UCS-66 (not the exemption temperatures listed for carbon
steels in ASME Section VIII, Division 1, Section UG-20).
c. The hydrostatic test medium shall be clean, fresh, potable water. The water used for
hydrostatic testing of austenitic stainless steel lined vessels shall have a chloride content
less than 50 ppm (parts per million). If the chloride content is greater than 50 ppm and
less than 250 ppm, a sufficient quantity of sodium nitrate shall be added to provide a
0.5% by weight sodium nitrate solution. Water with a chloride content of greater than
250 ppm shall not be used for hydrotesting vessels containing austenitic stainless steel.
Vessel(s) shall be thoroughly dried immediately after draining to prevent the possibility
of evaporation and concentration of chlorides. Heat drying is not permitted.
d. The temperature of the test water at all locations shall be at least 50F (10C) at all times
during hydrostatic testing. Other test mediums shall be at least 20F (11C) above their
freezing or, for pneumatic testing, dew point temperature.
7.2 Procedure
a. Pressure testing shall be performed after the completion of postweld heat treatment.
b. Pressure testing shall be completed before primers, paint, or other coatings are applied
d. The welds of welded attachments provided with vent holes (e.g., reinforcing pads, slip-
on flanges) shall be leak tested using 15psig {1 kg/cm2 (g)} pneumatic pressure and a
bubble forming solution prior to postweld heat treatment and final hydrostatic test.
e. Sleeve linings for nozzles shall be pneumatically leak tested as described in Paragraph
7.2d to prove the soundness of the welds. In lieu of this, the welds may be inspected by
liquid penetrant. Cracks and porosity shall be repaired and the liner re-tested and
inspected.
f. Test holes in sleeves shall not be seal welded until all trapped moisture is removed.
g. Horizontal vessels shall be supported only by their permanent saddles during hydrotest,
i.e., temporary supports are not permitted.
PRESSURE VESSELS
CARBON STEEL 27MAY11 Revised RGP RGP
h. The stress in any pressure containing component shall not exceed 90% of the materials
minimum yield strength multiplied by the applicable joint efficiency at any time during
pressure testing.
i. Vertical vessels that are to be pressure tested in the horizontal position shall be
supported so that local stresses in the shell do not exceed 90% of the minimum yield
strength of the material multiplied by the applicable joint efficiency at any time.
j. The procedure for filling the vessel shall prevent the formation of air pockets or
damage/dislocation of internals during liquid filling.
k. The temperature of the test medium and the vessel shall be equalized prior to the
commencement of pressure testing.
l. The vessel shall be drained and thoroughly dried immediately upon the completion of
pressure testing. The procedure for draining the test fluid shall prevent development of
vacuum pressure within the vessel or its internals. The procedure shall prevent damage
to or dislocation of the internals.
a. Storage spheres shall be supported so that the bottom is no less than 3 feet (1000 mm)
above finished grade.
b. A 24 inch manway shall be provided at the top and bottom of each sphere. Provide a
means to handle the blind flange.
c. Provide a minimum corrosion allowance of 1/16 inch (1.6mm) on all storage spheres
and bullets.
8.2 Capacity
a. The nominal capacities given in the UOP Project Specifications include allowances for
vapor space and inaccessible bottom space. No further allowance is required.
b. Spheres shall be strapped over their full height before being placed into service. A
gauge table shall be provided.
HORIZONTAL AND
24MAR11 REVISED TAS RGP
VERTICAL VESSELS
OPEN OPEN
D
B
1/2
(13)
0.7D 0.7D
(NOTE 4) (NOTE 4)
NOTE 3
2
R
NOTE 2
D
NOTE 3
R
STANDARD
(50)
WELDING TEE
2
NOTE 3
NOTES:
1. DETAILS, DIMENSIONS AND NOTES IN UOP PROJECT SPECIFICATION-VESSELS TAKE PRECEDENCE OVER THOSE SHOWN HEREON.
5. DIMENSIONS
PU SHOWN IN PARENTHESES ARE IN MILLIMETERS.
(INSIDE DIAMETER
Dp HORIZONTAL VESSELS 08MAY09 REAFFIRMED JAB RGP
VESSEL SHELL VESSEL SHELL
OF PIPE) (TOP) (TOP)
(150)
6
W (SLOT WIDTH)
(SEE NOTE 2)
Dv
OF VESSEL)
C VESSEL
(CLEARANCE)
VESSEL SHELL
OPEN END
C
4 1/2 (1 15) 0.25Dv 0.25Dv
1/4 (6) THICK
(150)
6
BLANK PLATE
1 1/2 1 1/2 1 1/2 1 1/2
W (SLOT WIDTH) (40) (40) (40) (40)
(SEE NOTE 4)
1 1/2 1 1/2 1 1/2
1/4 (6) THICK
VESSEL SHELL VESSEL SHELL (40) (40) (40) BLANK PLATE
(BOTTOM) (BOTTOM)
ELEVATION ELEVATION
Dp
C PIPE
TYPE A TYPE B SEE UOP PROJECT
) U-BOLT SPECIFICATION-
Dp 2 (DIMENSIONS ARE IN INCHES, SLOT L
W= C=0.25Dv-3 (DIMENSIONS ARE IN INCHES) E C VESSEL
S
Dv-12 WIDTH TOLERANCE IS PLUS OR MINUS 1/16 ) (INSIDE DIAMETER S PIPE VESSELS
E
C=0.25Dv-75 (DIMENSIONS ARE IN MILLIMETERS) V
2 OF PIPE) F SUPPORT
Dp (DIMENSIONS ARE IN MILLIMETERS, SLOT O
W= R
v
E
D
Dv-300 WIDTH TOLERANCE IS PLUS OR MINUS 2) SLOTS MUST T
E
M
FACE NEAREST
IA
D
HEAD OF VESSEL E
ID
S
1/2 (13) DIAMETER (IN
DRAIN HOLE
Dp VESSEL SHELL
(INSIDE DIAMETER VESSEL SHELL 2 (50) CLEAR
(TOP)
OF PIPE) (TOP) BETWEEN PLATE
AND SHELL
3 (75)
MAX
(150)
ELEVATION
6
W (SLOT 2(Dp2)
W= (ALL DIMENSIONS ARE IN INCHES)
WIDTH) Dv-17
(INSIDE DIAMETER OF VESSEL)
NOTES:
VESSEL SHELL 1. DETAILS, DIMENSIONS AND NOTES IN UOP PROJECT SPECIFICATION-VESSELS TAKE PRECEDENCE OVER THOSE SHOWN HEREON.
VESSEL SHELL
(BOTTOM)
2. FOR TYPES A AND C IF W (SLOT WIDTH) CALCULATES TO BE LESS THAN 3/16 (5), INTERMITTENT SLOTS OF A LARGER
(BOTTOM)
ELEVATION ELEVATION WIDTH SHOULD BE CONSIDERED TO PROVIDE THE SAME SLOT AREA.
TYPE C TYPE D
3. NOZZLE DESIGN AND ATTACHMENT TO BE IN ACCORDANCE WITH APPLICABLE VESSEL DESIGN CODE.
2(Dp2) (DIMENSIONS ARE IN INCHES, SLOT
W= 4. IF W (SLOT WIDTH) CALCULATES TO BE LESS THAN 3/16 (5), WIDER AND SHORTER SLOTS SHOULD BE CONSIDERED TO PROVIDE
Dv-12 WIDTH TOLERANCE IS PLUS OR MINUS 1/16 )
THE SAME SLOT AREA.
2(Dp2) (DIMENSIONS ARE IN MILLIMETERS, SLOT
W= 5. DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.
Dv-300 WIDTH TOLERANCE IS PLUS OR MINUS 2)
Page 391 of 395
Revision
Indication UOP LLC
25 East Algonquin Road
STANDARD DRAWING
R
Des Plaines, Illinois 60017-5017, USA
3-122-6
mi on.
ssi
8 (200) FOR 3
2D
DIAMETER
3- (19) X
2D FOUR WAY BAFFLE
pose what
120 APART *
orany pur
00)
D
4
D
1
*
(
n any mannerorused f
50)
75)
D
R
(
D
3
3 AND UNDER 4 THRU 8 10 AND OVER
oduced i
epr
UNLINED VESSELS
s orr
R
(NOTE 2)
her
8 (200) FOR 3
2D
DIAMETER
3- (19) X FOUR WAY BAFFLE
2D
(5) BARS 6 (150) FOR UNDER 3
SPACED AT DIAMETER
120 APART *
00)
D
*
4
D
1
LINING
(
LINING LINING
R R
50)
75)
t
oper
D
(
(
D
2
3
he pr
aland t
R (NOTE 3)
*WELD ON BACK SIDE
hi
n t
on i
NOTES:
i
mat
1. DETAILS, DIMENSIONS AND NOTES IN UOP PROJECT SPECIFICATION-VESSELS TAKE PRECEDENCE OVER THOSE SHOWN HEREON.
nfor
3. LINED VESSEL BAFFLE MATERIAL SHALL BE (5) PLATE. SAME MATERIAL AS NOZZLE LINING.
R
Not
THICKNESS + 2 (50)
GRID
TACKWELD NUT
TO BLANKET DECK
2 (50) X 3/8 (10) PLATE
1/2
(13)
SUPPORT RING
3/4 NOTE 9
SEE UOP PROJECT SEE UOP PROJECT
(19) SPECIFICATION-VESSELS
C SPECIFICATION-VESSELS
C
DETAIL A 1/4 (6) PLATE BLANKET DECK
GRID
MESH BLANKET
GRID
THICKNESS + 2 (50) 2 (50) X 3/8 (10) PLATE SUPPORT RING TOP OF
GRID
(FOR BLANKET DIAMETER LESS THAN 8-0 (2440)) GRID SUPPORT RING NOTE 9
DETAIL D
2 1/2 (65) X 3/8 (10) PLATE SUPPORT RING TACKWELD BOLT HEAD
NOTE 9 DETAIL E
(FOR BLANKET DIAMETER 8-0 (2440) 1/2 (12) VENT HOLE DETAIL C
TO BEAM FLANGE TYPE I
TO LESS THAN 15-0 (4570)) (LOCATION DETERMINED TOP OF L-SHAPE CLIPS
INSIDE OF (PARTIAL)
3 (75) X 3/8 (10) PLATE SUPPORT RING BY CONTRACTOR) (ONE-PIECE BLANKET)
VESSEL SHELL INTERMEDIATE
(FOR BLANKET DIAMETER 15-0 (4570) AND LARGER) TOP OF SUPPORT RING
TACKWELD BOLT SUPPORT MEMBER INTERMEDIATE SUPPORT MEMBER FOR SPANS
(SECTIONAL BLANKETS)
MAXIMUM SPAN GREATER THAN 6-0 (1830)
HEAD TO RING
6-0 (1830)
TIE WIRE
NOTE 9
3/4
2 (50) X 3/8 (10) PLATE
(19)
SUPPORT RING
4-2 (50) X 2 (50) X 1/4 (6)
L-SHAPE CLIPS X 2 (50) LONG
EQUALLY SPACED
PROVIDE HOLES
NOTES:
FOR TIE WIRES PROVIDE HOLES FOR TIE WIRES
1. DETAILS, DIMENSIONS AND NOTES IN UOP PROJECT SPECIFICATIONS TAKE PRECEDENCE OVER THOSE SHOWN HEREON.
3/4 (19) 3/4 (19) 2. OTHER SUPPORT SYSTEMS MAY BE USED IF THEY ARE AT LEAST EQUAL TO THE SUPPORT SYSTEM INDICATED HEREON
(TYPICAL)
IN OPEN AREA, SUPPORT ADEQUACY, AND EASE OF BLANKET INSTALLATION AND REMOVAL.
3. METALLURGY OF BLANKET SUPPORT SHALL MATCH VESSEL SHELL EXCEPT IN LINED PORTION OF VESSEL WHERE IT SHALL BE
2 (50) X 3/8 (10) PLATE SUPPORT RING 5. BOLTING METALLURGY SHALL MATCH MESH BLANKET METALLURGY.
(FOR BLANKET DIAMETER LESS THAN 8-0 (2440))
6. MESH BLANKET TO BE INSTALLED AND REMOVED THROUGH MANWAY ABOVE.
TIE WIRE 2 1/2 (65) X 3/8 (10) PLATE SUPPORT RING
7. MESH BLANKET TO BE INSTALLED AND REMOVED THROUGH MANWAY BELOW.
INSIDE OF (FOR BLANKET DIAMETER 8-0 (2440)
VESSEL SHELL TO LESS THAN 15-0 (4570)) 8. INTERMEDIATE SUPPORT MEMBER AND CONNECTION TO VESSEL SHELL SHALL BE BY MESH BLANKET SUPPLIER.
INTERMEDIATE
TIE WIRE 3 (75) X 3/8 (10) PLATE SUPPORT RING 9. SUPPORT RING SHALL BE CONTINUOUSLY WELDED ON THE TOP AND STITCH WELDED ON THE BOTTOM.
MAXIMUM SPAN SUPPORT MEMBER
(FOR BLANKET DIAMETER 15-0 (4570) AND LARGER)
6-0 (1830) 10. DIMENSIONS SHOWN IN PARENTHESES ARE IN MILLIMETERS.
DETAIL E DETAIL F
Page 393 of 395
Revision
Indication UOP LLC
25 East Algonquin Road
STANDARD DRAWING
R
Des Plaines, Illinois 60017-5017, USA
3-123-6
mi on.
ssi
2D
D
00)
D
4
1
(
50)
50)
75)
4 PIPE
2
3
D PIPE D PIPE
n any mannerorused f
(
(
(
SEE UOP SEE UOP SEE UOP
D
PROJECT PROJECT PROJECT
D
SPECIFICATION- SPECIFICATION- SPECIFICATION-
UNLINED VESSELS
s orr
(NOTE 2)
her
R
o ot
osed t
scl
2D
y of UOP LLC and mustnotbe di
FOUR WAY
8 (200) 2D BAFFLE
D
00)
D
4
1
(
50)
4 PIPE D PIPE
50)
75)
D PIPE
3
(
(
(
LINING LINING LINING
t
oper
R R
he pr
NOTES:
i
mat
1. DETAILS, DIMENSIONS AND NOTES IN UOP PROJECT SPECIFICATION-VESSELS TAKE PRECEDENCE OVER THOSE SHOWN HEREON.
nf
e:The i or
2. UNLINED VESSEL BAFFLE PLATES TO BE (6) KILLED CARBON STEEL. PIPE TO BE STANDARD WALL KILLED CARBON STEEL.
3. LINED VESSEL BAFFLE MATERIAL SHALL BE (5) PLATE. PIPE AND BAFFLE MATERIAL SAME AS NOZZLE LINING.
R
Not
2D
8
D
200)
2D
(
oduced i
8
epr
s orr
HALF OF 4 SCHEDULE 40
TYPE I
osed t
20
1
75D
75D 0.
(13)
(13)
t
oper
DIAMETER
DRAIN HOLE 2D
he pr
aland t
(6) PLATE
D
ALTERNATE WHEN
(00)
1
s documenti
1 (25)
D+4
(13)
DIAMETER
D
hi
DRAIN HOLE
n t
on i
NOTES:
nf
e:The i
1. DETAILS, DIMENSIONS AND NOTES IN UOP PROJECT SPECIFICATION-VESSELS TAKE PRECEDENCE OVER THOSE SHOWN HEREON.
Not