Sie sind auf Seite 1von 7

RELACION FINAL DE CUNETAS EJECUTADAS TIPO "I"

(Metrado de Inspeccion de obra)


TRAMO I
UBICACIN LONGITUD
IZQUIERDA DERECHA (M)
ITEM PROG. INICIAL PROG.FINAL
1 01+710.00 02+678.40 D 968.40
2 01+710.00 02+679.10 I 969.10
3 02+745.50 02+951.10 I 205.60
4 02+745.50 02+960.00 D 214.50
5 02+962.20 03+030.80 D 68.60
6 03+014.60 04+099.60 I 1,085.00
7 03+934.50 04+092.00 D 157.50
8 04+094.40 04+230.30 D 135.90
9 04+100.70 04+144.70 I 44.00
10 04+409.00 05+020.00 I 611.00
11 04+363.90 04+397.70 D 33.80
12 04+400.30 05+450.70 D 1,050.40
13 05+470.00 05+630.00 I 160.00
14 05+605.00 06+013.40 D 408.40
15 06+018.70 06+544.10 I D 1,050.80
16 06+546.60 07+075.20 I 528.60
17 06+546.60 07+087.30 D 540.70
18 07+080.00 07+329.70 I 249.70
19 07+329.70 07+449.40 I 119.70
20 07+449.40 07+660.00 I 210.60
21 07+676.00 07+736.00 D 60.00
22 07+798.00 07+906.30 I D 216.60
23 08+300.00 08+348.80 I D 97.60
24 08+354.50 08+410.00 D 55.50
25 08+354.50 08+612.80 I 258.30
26 08+535.60 08+611.00 D 75.40
27 08+615.70 08+683.30 I 67.60
28 08+691.20 08+939.20 D 248.00
29 08+694.20 08+939.20 I 245.00
30 08+944.60 10+085.40 I 1,140.80
31 08+944.60 09+170.50 D 225.90
32 09+191.00 09+860.00 D 669.00
33 10+087.00 10+633.00 D 546.00
34 10+086.40 10+633.00 I 546.60
35 10+637.10 10+741.80 I 104.70
36 10+637.10 10+740.00 D 102.90
37 10+744.80 10+942.10 I D 394.60
38 11+846.60 11+938.70 I 92.10
39 11+855.00 11+938.70 D 83.70
40 11+938.70 12+040.00 D 101.30
41 11+938.70 12+085.60 I 146.90
42 12+173.40 12+290.00 D 116.60
43 12+170.90 12+293.80 I 122.90
44 12+291.50 12+368.00 D 76.50
45 12+294.70 12+421.90 I 127.20
46 12+423.20 12+820.00 I 396.80
47 12+424.40 12+820.00 D 395.60
48 13+112.00 13+292.10 I 180.10
49 13+200.00 13+235.90 D 35.90
50 13+326.50 13+987.80 I 661.30
51 13+319.50 13+339.00 D 19.50
52 13+943.70 14+549.00 D 605.30
53 14+551.00 15+137.20 D 586.20
54 15+154.10 15+515.80 I 361.70
17,976.40

TRAMO II
UBICACIN LONGITUD
IZQUIERDA DERECHA (M)
ITEM PROG. INICIAL PROG.FINAL
1 00+024.60 00+389.80 D 365.20
2 00+024.60 00+380.00 I 355.40
3 00+393.30 00+452.60 D 59.30
4 00+460.00 00+879.50 I 419.50
5 00+470.00 00+879.50 D 409.50
6 00+947.00 01+408.70 I D 461.70
7 00+947.00 01+411.30 D 464.30
8 01+425.00 01+796.50 D 371.50
9 01+793.30 02+046.70 I 253.40
10 01+854.00 02+042.80 D 188.80
11 02+050.10 02+208.30 I 158.20
12 02+048.70 02+286.80 D 238.10
13 02+209.00 02+284.40 I 75.40
14 02+291.40 02+446.40 D 155.00
15 02+481.00 02+868.00 D 387.00
16 02+627.80 02+868.00 I 240.20
17 02+871.80 03+038.90 D 167.10
18 03+041.00 03+335.50 I D 589.00
5,358.60
TRAMO III
UBICACIN LONGITUD
IZQUIERDA DERECHA (M)
ITEM PROG. INICIAL PROG.FINAL
1 00+000.00 00+649.70 I D 1,299.40
2 00+689.90 00+793.20 D 103.30
3 00+801.00 00+870.50 D 69.50
4 00+871.50 01+080.70 D 209.20
5 00+928.60 01+134.70 I 206.10
6 01+136.30 02+070.00 I 933.70
7 01+819.40 02+070.00 D 250.60
8 02+071.80 02+544.00 I 472.20
9 02+547.60 02+869.60 D 322.00
10 02+552.00 02+868.30 I 316.30
11 02+924.00 03+339.30 D 415.30
12 03+007.70 03+242.00 I 234.30
13 03+342.00 03+576.20 D 234.20
14 03+582.30 03+895.30 D 313.00
15 03+818.60 03+836.70 I 18.10
16 03+842.10 03+895.30 I 53.20
17 03+897.20 03+930.50 I D 66.60
18 03+934.60 04+020.00 I 85.40
19 03+932.00 04+020.00 D 88.00
20 04+021.10 04+066.20 I 45.10
21 04+075.50 04+329.20 D 253.70
22 04+330.90 04+664.50 D 333.60
23 04+648.50 04+663.50 D 15.00
24 04+713.80 04+780.00 I 66.20
25 04+707.30 04+780.00 D 72.70
26 04+800.00 05+164.70 D 364.70
27 05+166.40 05+370.00 D 203.60
28 05+378.00 05+594.30 I 216.30
28 muro de contencion 28.50
7,261.30

RELACION FINAL DE CUNETAS EJECUTADAS TIPO "I"


ITEM UBICACIN LONGITUD (M)

1 TRAMO I 17976.4
2 TRAMO II 5358.6
3 TRAMO III 7261.3
TOTAL 30596.3
1000
RELACION FINAL DE CUNETAS EJECUTADAS TIPO "I"
(Metrado de Inspeccion de obra)
TRAMO I
UBICACIN LONGITUD
IZQUIERDA DERECHA (M)
ITEM PROG. INICIAL PROG.FINAL
1 01+710.00 02+678.40 D 968.40
2 01+710.00 02+679.10 I 969.10
3 02+745.50 02+951.10 I 205.60
4 02+745.50 02+960.00 D 214.50
5 02+962.20 03+030.80 D 68.60
6 03+014.60 04+099.60 I 1,085.00
7 03+934.50 04+092.00 D 157.50
8 04+094.40 04+230.30 D 135.90
9 04+100.70 04+144.70 I 44.00
10 04+415.00 05+020.00 I 605.00
11 04+363.90 04+397.70 D 33.80
12 04+400.30 05+452.00 D 1,051.70
13 05+470.00 05+603.00 I 133.00
14 05+605.00 05+713.00 I 108.00
15 05+714.00 05+779.50 I 65.50
16 05+780.50 06+013.40 I 232.90
17 06+018.70 06+544.10 I D 1,050.80
18 06+546.60 07+076.50 I 529.90
19 06+546.60 07+087.30 D 540.70
20 07+080.00 07+329.70 I 249.70
21 07+449.40 07+660.00 I 210.60
22 07+676.00 07+736.00 D 60.00
23 07+798.00 07+906.30 I D 216.60
24 08+300.00 08+348.80 D 48.80
25 08+300.00 08+353.50 I 53.50
26 08+354.50 08+410.00 D 55.50
27 08+354.50 08+612.80 I 258.30
28 08+535.60 08+612.80 D 77.20
29 08+615.70 08+683.30 I 67.60
30 08+691.20 08+939.20 D 248.00
31 08+694.20 08+939.20 I 245.00
32 08+944.60 10+085.40 I 1,140.80
33 08+944.60 09+170.50 D 225.90
34 09+191.00 09+860.00 D 669.00
35 10+087.00 10+633.00 D 546.00
36 10+086.40 10+633.00 I 546.60
37 10+637.10 10+741.80 I 104.70
38 10+637.10 10+740.00 D 102.90
39 10+744.80 10+992.10 I D 494.60
40 11+000.00 11+500.00 I D 1,000.00
41 11+932.00 12+085.00 I 153.00
42 11+930.00 12+040.00 D 110.00
43 12+173.40 12+290.00 D 116.60
44 12+170.90 12+293.80 I 122.90
45 12+291.50 12+368.00 D 76.50
46 12+294.70 12+421.90 I 127.20
47 12+423.20 12+820.00 I 396.80
48 12+424.40 12+820.00 D 395.60
49 13+112.00 13+292.10 I 180.10
50 13+200.00 13+235.90 D 35.90
51 13+326.50 14+007.00 I 680.50
52 13+319.50 13+339.00 D 19.50
53 13+943.70 14+549.00 D 605.30
54 14+551.00 15+155.00 D 604.00
55 15+140.00 15+515.80 I 375.80
18,820.90

TRAMO II
UBICACIN LONGITUD
IZQUIERDA DERECHA (M)
ITEM PROG. INICIAL PROG.FINAL
1 00+024.60 00+389.80 D 365.20
2 00+024.60 00+380.00 I 355.40
3 00+393.30 00+452.60 D 59.30
4 00+460.00 00+879.50 I 419.50
5 00+470.00 00+879.50 D 409.50
6 00+947.00 01+408.70 I D 461.70
7 00+947.00 01+411.30 D 464.30
8 01+425.00 01+796.50 D 371.50
9 01+793.30 02+046.70 I 253.40
10 01+854.00 02+042.80 D 188.80
11 02+050.10 02+208.30 I 158.20
12 02+048.70 02+286.80 D 238.10
13 02+209.00 02+284.40 I 75.40
14 02+291.40 02+446.40 D 155.00
15 02+481.00 02+868.00 D 387.00
16 02+627.80 02+868.00 I 240.20
17 02+871.80 03+038.90 D 167.10
18 03+041.00 03+335.50 I D 589.00
5,358.60
TRAMO III
UBICACIN LONGITUD
IZQUIERDA DERECHA (M)
ITEM PROG. INICIAL PROG.FINAL
1 00+000.00 00+649.70 I D 1,299.40
2 00+689.90 00+793.20 D 103.30
3 00+801.00 00+870.50 D 69.50
4 00+871.50 01+080.70 D 209.20
5 00+928.60 01+134.70 I 206.10
6 01+136.30 02+070.00 I 933.70
7 01+819.40 02+070.00 D 250.60
8 02+071.80 02+544.00 I 472.20
9 02+547.60 02+869.60 D 322.00
10 02+552.00 02+868.30 I 316.30
11 02+924.00 03+339.30 D 415.30
12 03+007.70 03+242.00 I 234.30
13 03+342.00 03+576.20 D 234.20
14 03+582.30 03+895.30 D 313.00
15 03+818.60 03+836.70 I 18.10
16 03+842.10 03+895.30 I 53.20
17 03+897.20 03+930.50 I D 66.60
18 03+934.60 04+020.00 I 85.40
19 03+932.00 04+020.00 D 88.00
20 04+021.10 04+066.20 I 45.10
21 04+075.50 04+329.20 D 253.70
22 04+330.90 04+664.50 D 333.60
23 04+713.80 04+780.00 I 66.20
24 04+707.30 04+780.00 D 72.70
25 04+800.00 05+164.70 D 364.70
26 05+166.40 05+370.00 D 203.60
27 05+378.00 05+594.30 I 216.30
28 muro de contencion 28.50
7,274.80

RELACION FINAL DE CUNETAS EJECUTADAS TIPO "I"


ITEM UBICACIN LONGITUD (M)

1 TRAMO I 18,820.90
2 TRAMO II 5,358.60
3 TRAMO III 7,274.80
a TOTAL 31,454.30 Ejecutado
RELACION FINAL DE CUNETAS EJECUTADAS TIPO "I"

ITEM UBICACIN LONGITUD (M)


1 TRAMO I 18,820.90
2 TRAMO II 5,358.60
3 TRAMO III 7,274.80
TOTAL 31,454.30