Sie sind auf Seite 1von 2

First Article Inspection Report

Part No.: Rev: P.O.#:


Desc.: Inspector:
Supplier: Date:
Only parts that fully comply with all specifications listed on the drawing should be submitted for First Article Approval.
Insure Microscan's Workmanship Manual (04-000010) has been reviewed and this First Article complies with relevant.
Under no circumstances can a first article package be submitted with any missing or non-conforming attributes without
written approval from Microscan's Supplier Quality Engineer. This approval must be attached to the package.

I acknowledge that I have read and adhered to Microscan's First Article Procedure and the above mention part is fully compliant to
the drawing and the appropriate process documentation is attached.

__________________________________________
Supplier Quality Represenative Date
Reason for First Article

New Part Tooling Modification New Supplier

New Tooling Other - Explain in Comments Process Change

Fit and Function Approval

Comments:

Approved Disapproved

____________________________________________
Manufacturing Engineer Date
Supplier Process Document Review Approval

Comments:

First Article Approval

Approved Disapproved

____________________________________
Quality Engineer Date

Document Number:05-000064-01
Page 1 of 2
Rev: E
First Article Inspection Report

Part No.: Revision: P.O.#: 0


Desc.: Inspector:
Supplier: Date:
Dwg. Pass/
Zone Print Spec. Tolerance Supplier Actual Microscan Actual Fail Comments:

Document Number:05-000064-01
Page 2 of 2
Rev: E