Project : Avic Mixed Development Project

BM GR
RFA Grade of Total
S/no Date Location of Concrete Plant
no concrete Volume(m3)
30 50sc 50 30 50sc

1 06.06.2015 Tower crane Base TC1 Informex 40 68 B 0


2 21.06.2015 2-3/A-B columns,walls sanready mix 50 SCC 15 B 0
3 22.06.2015 2-3 C-D columns & walls sanready mix 50 SCC 7 B 0
4 23.06.2015 TC2 base Informex 40 49 B 0
5 28.06.2015 5/A,7/A & 9/A columns sanready mix 50 SCC 8 B 0
6 01.07.2015 retaining wall B1 to 3 sanready mix 35 SCC 19.5 B 0
7 03.07.2015 Column 10-13/A, 12/B & 14/B sanready mix 50 SCC 8 B 0
8 04.07.2015 retaining wall 5-10 sanready mix 35 SCC 15 B 0
9 09.07.2015 5/B column sanready mix 50 scc 5 B 0
10 09.07.2015 retaining wall (C-D) Informex 50 5 B 0
11 09.07.2015 retaining wall (C-D) Informex 30 4 B 0
12 10.07.2015 column top (A-B1/ 1-5) Informex 50 4 B 0
13 10.07.2015 GF slab (A-B1/ 1-5) Informex 30 56 B 0
14 14.07.2015 Zone B-base slab Informex 40 484.5 B 0
14A 17.07.2015 BF lift wall & beam 61 sanready mix 50 scc 7 B 0
15 17.07.2015 10B Column -basement 60 sanready mix 50 scc 6 B 0
16 17.07.2015 GF Column head (5-10/A1-B1) 59 informex 50 14 B 0
17 17.07.2015 GF beam & slab (5-10/A1-B1) 62 informex 30 105 B 0
18 18.07.2015 Lift Core (7-9) B to GF 61 sanready mix 50 scc 11.5 B 0
20.07.2015 Column C1 area B Informex 40 16 B 0
19 21.07.2015 GF column 2-9/A -2/B 74 sanready mix 50 scc 9 B 0
19A 21.07.2015 GF column 2-9/A -2/B 74 Informex 50 2 B 0
20 21.07.2015 GF ramp beam & slab 73 Informex 30 88 B 0
1 22.07.2015 Micro pile -North side 82 Access 25 4 B 0
2 23.07.2015 Micro pile -North side 78 Access 25 3.5 B 0
21 24.07.2015 2/(A-B1 )column & beam 3.7m level 84 sanready mix 50 scc 6 B 0
3 25.07.2015 Micro pile -North side Access 25 4 B 0
4 24.07.2015 Micro pile -North side Access 25 4 B 0
22 29.7.2015 GF 2-10/A-B1 Column & Lift wall sanready mix 50 scc 63.5 B 0
23 29.7.2015 L1 (2-10)/A-B1 beam & slab , Informex 30 102 B 0
5 30.07.2015 Micro pile -North side Access 25 5 B 0
6 02.08.2015 Micro pile -North side Access 25 6.25 B 0
24 05.08.2015 BF to GF -23-32/A columns sanready mix 50 scc 15 B 0
25 05.08.2015 GF 23-32 /A & outer wall Informex 30 108 B 0
7 06.08.2015 Micro pile -North side Access 25 9 B 0
26 06.08.2015 L1 7-9/B-B1 lift wall & 10B column sanready mix 50 scc 16.5 B 0
27 06.08.2015 L2 5-10/B-B1 beam and slab informex 30 14 B 0
28 07.08.2015 column-2A/2B (2-9) L2 sanready mix 50 scc 16 B 0
29 07.08.2015 L2 2-10/B-B1 beam informex 30 16 B 0
8 08.08.2015 Micro pile -North side Access 25 8 B 0
9 09.08.2015 Micro pile -North side Access 25 5 B 0
30 11.08.2015 L2 floor 3-5 /B column sanready mix 50 scc 10.5 B 0
10 11.08.2015 Micro pile -North side Access 25 6.5 B 0
11 12.08.2015 Micro pile -North side Access 25 6.5 B 0
31 13.08.2015 Steel jacketing column 5/c and 10/c sanready mix 50 scc 9.5 B 0
12 13.08.2015 Micro pile -North side Access 25 8.75 B 0
13 14.08.2015 Micro pile -North side Access 25 3 B 0
14 15.08.2015 Micro pile -North side Access 25 11 B 0
15 20.08.2015 Micro pile -North side Access 25 6 B 0
32 21.08.2015 L2 floor 2-10/A-B1 column and lift wall sanready mix 50 scc 76.5 B 0
33 21.08.2015 Podium floor 2-10/A-B1 beam and slab sanready mix 30 136.5 B 0
36 22.08.2015 basement floor grid 16-21/A column sanready mix 50 scc 10 B 0
35 22.08.2015 GF 10-23/A1 -B ,Outer wall beam and slab sanken 30 95 B 0
38 24.08.2015 Basement floor grid 2-3/B1-D wall & column sanready mix 50 scc 6 B 0
39 24.08.2015 GF 1-5/B-D beam & slab sanready mix 30 58.5 B 0
40 26.08.2015 Basement 5-10/B1-D column & lift wall sanready mix 50 scc 75 B 0
41 27.08.2015 basement 5-10/B1-slab sanken 30 64 B 0
42 01.09.2015 Basement 29-32/B-D column and wall sanready mix 50 scc 31 B 0
43 02.09.2015 GF 29-32/B-D slab,beam sanready mix 30 110.5 B 0
44 02.09.2015 do sanken 30 11.5 B 0
45 04.09.2015 basement 12-13/B-D column & wall san ready mix 50 scc 13 B 0
46 04.09.2015 basement 12-13/B-D column & wall Informex 50 13 B 0
47 05.09.2015 Ground 10-16/B-D beam & slab sanken 30 80 B 0
48 06.09.2015 basement 23A-29/B-C -new beam Informex 50 23 B 0
49 09.09.2015 GF 16-21 /B-D ,wall,column sanready mix 50 37 B 0
09.09.2015 ceb cable trench cover slab Informex 30 2 B 0
50 10.09.2015 GF 16-23/B-D slab sanready mix 30 84.5 B 0
51 13.09.2015 CEB room False slab sanready mix 30 30 B 0
15.09.2015 Cover slab -Cable trench sanken 30 5 B 0
52 15.09.2015 Column & w1 wall -(B1-D)/(1-5) GF to L1 sanready mix 50 scc 37.5 B 0

53/54 15.09.2015 level 1 -(1-5)/(B1-D) slab & beams sanken 30 103 B 0


55 17.09.2015 cable trench grid 9-21/A1 base slab sanreday mix 30 9 B 0
56 17.09.2015 CEB room north and esat RCC wall sanreday mix 35 3 B 0
57 21.09.2015 cable trench grid 31a-32 sanken 30 B 0
58 23.09.2015 cable trench grid 9-21 walls sanken 30 12 B 0
59/60 24.09.2015 T2 -Basement walls ,columns sanken 50 scc 145 B 0
61/62 25.09.2015 GF 23A -29 slab & beam sanken 30 94 B 0
64 28.09.2015 cable trench 21-32 side wall sanken 30 9 B 0
65 29.09.20125 GF column (7-10) /B1-D lift wall sanken 50 scc 65 B 0
66 29.09.2015 L1 floor 7-10/B1-D beam and slab sanken 30 55 B 0
67 30.09.2015 L1 floor 2-5/C-D column sanken 50 SCC 14 B 0
67 01.10.2015 cable trench grid 21-27 sanken 30 6 B 0 6
68 01.10.2015 GF 10-13/A-D column and wall sanken 50 scc 50 B 0 50
69/70 02.10.2015 L1 Grid 10-13/A-D slab and beam sanken 30 85 B 0
NA Not available B 0
72 04.10.2015 cable trench wall -CEB (21-27) informex 30 9 B 0 9
73 05.10.2015 Gf Grid 23-27 /A-D column sanken 50 scc 20 B 0 20
74 05.10.2015 L1 2-3/B1 W1 wall sanken 50 scc 15 B 0
75 05.10.2015 L2 2-3 / C-D slab and beam sanken 30 30 B 0
76 08.10.2015 GF stircase Gf to L1 -T1 informex 30 6 B 0 6
77 09.10.2015 L1 Grid 12--13/A-D column ,CEB cover slab sanken 50 scc 5 B 0
78 10.10.2015 L2 grid (10-13) d/C columns sanken 50 scc 11 B 0
79 10.10.2015 L1 19-21/ A-D columns and wall sanken 50 scc 41.5 B 0
80 11.10.2015 L1 ,16-19/ A-D , columns sanken 50 scc 15 B 0
81/82 11.10.2015 L1 (A-D/19-21) slab and beam sanken 30 115 B 0
83 12.10.2015 L1 to L2 (12-13/B1 ) column and wall sanken 50 scc 14.5 B 0
85 14.10.2015 lift wall L1 to L2 ,T1 (2-9) B1 sanken 50 scc 60 B 0
85 13.10.2015 Cable trench cover slab informex 30 3 B 0 3
86 15.10.2015 L2 Grid (5-10/B-D) slab and beam access 30 55 B 0
88 16.10.2015 L2 to podium grid 2-3/C-D column sanken 50 scc 10 B 0
89 17.10.2015 CABLE TRENCH (7-12 ) base slab sanken 30 2 B 0 2
90 19.10.2015 Cable trench side wall (7-9) access 30 4 B 0 4
91 19.10.2015 L2 (12-13 )/B-D W1 walls and columns Sanken 50 NC 13 B 0
92/93 20.10.2015 L2 (10-16) /(B-D) slab and beam Access 30 70 B 0
97 22.10.2015 L1 to L2 --W1 wall and column sanken 50 scc 16.5 B 0
96 21.10.2015 L2 to podium W1 wall sanken 50 scc 10 B 0
96/97 23.10.2015 GF to L1 T2 lift walls & L1 beams (21-27) sanken 50 scc 101 B 0 101
98/99 23.10.2015 L1 (21-27 / A-D ) access 30 80 B 0
100 26.10.2015 L1 to L2 staircase Tower 1 sanken 30 9 B 0
101 26.10.2015 L2 to Podium 10/C & 5-10/D sanken 50 scc 18 B 0
102 28.10.2015 podium 2-5/B1-D column head sanken 50 NC 8 B 0
103 28.10.2015 Podium 2-5/B1-D beam and slab access 30 55 B 0
104A 30.10.2015 L1 to L2 (B1-D)/(19-21) column and wall sanken 50 scc 9 B 0
104B 30.10.2015 L1 to L2 (B1-D)/(19-21) column and wall sanken 50 NC 11 B 0
105 31.10.2015 L2 (16-23)/B-D) slab and beam access 30 65 B 0
106 01.11.2015 L2 to Podium (12-13 )/B-D W1 walls and columns sanken 50 scc 26.5 B 0
107 04.11.2015 cable trench and staircase T2 access 30 5 B 0 5
108 05.11.2015 L1Grid 16-23A columns sanken 50 scc 13 B 0
109 06.11.2015 L2 (16-24)/A beam sanken 30 7.5 B 0
110 06.11.2015 L2 (12-13) columns sanken 50 scc 5.5 B 0
111/112 07.11.2015 L2 ,5/(C-D) columns and wall sanken 50 scc 77 B 0
113/114 08.11.2015 podium level (5-10/(B-D) access 30 90 B 0
B 0
B 0
Rejected
GR L-01 L-02 L-03 L-04 Casted Cube Nos Concreting time Volumn

50 30 50sc 50 30 50sc 50 30 50sc 50 30 50sc 50

1 2 3 4 1 28 20.00 3.00
1 2 3 4 29 42 16.00 18.30
1 2 3 4 43 49 15.00 17.00
1 2 3 4 50 70 15.45 19.30
1 2 3 4 71 77 17.15 19.00
1 2 3 4 78 91 9.00 17.20
1 2 3 4 92 99 15.40 16.50
1 2 3 4 100 106 19.15 3.20
1 2 3 4 107 113 19.30 21.30
1 2 3 4 114 120 21.35 22.30
1 2 3 4 121 127 0.15 2.00
1 2 3 4 128 134 10.00 11.45
1 2 3 4 135 155 13.20 17.30
1 2 3 4 156 (A-G) 165 (A-G) 23.14 16.00 7.00
1 2 3 4 166(a-G) 13.20 15.00
1 2 3 4 167 (A-G) 15.55 17.05
1 2 3 4 170 (A-G 17.30 1.45
1 2 3 4 168 (A-G) 169(A-G) 19.45 6.55 14.00
1 2 3 4 171 (A-G) 2.40 13.00
1 2 3 4 172 (A-G) 173(A-G) 11.00 18.00
1 2 3 4 175 (A-G) 22.40 4.15
1 2 3 4 1.40 2.25
1 2 3 4 176(A-G) 179(A-G) 23.00 6.00
1 2 3 4 access 1 (A to F) 13.05 14.30
1 2 3 4 access 2 (A-G) 15.40 17.25
1 2 3 4 180(A-G) 17.50 19.45
1 2 3 4 access 3 (A-G) 15.50 17.55
1 2 3 4 access 4 (A-G) 16.40 18.40
1 2 3 4 184 to 186 17.15 6.10
1 2 3 4 187 to 190 22.25 7.00
1 2 3 4 acccess 5 12.05 14.20
1 2 3 4 access 6 (A-G) 15.10 17.20
1 2 3 4 200 11.55 18.15
1 2 3 4 201 to 204 12.30 22.15
1 2 3 4 access 7 (A-G) 12.30 16.30
1 2 3 4 205 20.00 3.20
1 2 3 4 206 4.10 5.50 6.50
1 2 3 4 207 14.35 0.30 5.00
1 2 3 4 208 17.50 2.05
1 2 3 4 access 8 18.30 21.00
1 2 3 4 access 9 16.40 18.00
1 2 3 4 211 20.10 23.00
1 2 3 4 access 10 19.15 21.40
1 2 3 4 avic/mp/11 19.00 20.50
1 2 3 4 212 17.20 19.30
1 2 3 4 avic/mp/12 19.40 23.00
1 2 3 4 avic/mp/13 19.15 20.30
1 2 3 4 avic/mp/14 19.00 21.30
1 2 3 4 avic/mp/15 14.20 16.20
1 2 3 4 218,219,223 23.30 14.00
1 2 3 4 222,225,226,229 4.50 16.55 6.50
1 2 3 4 231 23.35 5.55
1 2 3 4 232 to 235 0.35 9.50
1 2 3 4 236 19.40 22.55
1 2 3 4 237 to 239 21.00 4.15
1 2 3 4 240 to 243 21.30 1.55 6.00
1 2 3 4 244 to 246 18.20 3.10
1 2 3 4 247 ,249 21.40 9.40
1 2 3 4 248,250 to 251 22.50 12.50
1 2 3 4 252 9.42 12.58 5.00
1 2 3 4 253 (A-G ,H-J) 21.55 24.10
1 2 3 4 254 24.00 2.55
1 2 3 4 255 to 257 1.50 8.00 26.00
1 2 3 4 258 to 259 20.00 2.20
1 2 3 4 261, 261, I 21.00 2.30
1 2 3 4 260 21.10 22.10
1 2 3 4 262, I,II 2.50 7.45
1 2 3 4 263 I,ii 20.15 1.30
1 2 3 4 265 22.20 0.05
1 2 3 4 264,I,II 21.05 8.00
1 2 3 4 266,I,II 22.20 8.40
1 2 3 4 267 18.30 0.00
1 2 3 4 268 21.15 0.00
1 2 3 4 269 19.55 21.00
1 2 3 4 270 20.45 7.40
1 2 3 4 271 I to iv 17.30 13.00
1 2 3 4 273 I to ii 3.50 14.00
1 2 3 4 275 22.10 4.00
1 2 3 4 276 I,ii,iii 11.00 24.00 5.00
1 2 3 4 277i,ii 17.05 23.30
1 2 3 4 278 18.50 22.30
1 2 3 4 280 23.00 1.25
1 2 3 4 281 I,ii 21.50 8.25
1 85 2 3 4 282 I,ii 1.30 9.05
1 2 3 4
1 2 3 4 285 11.50 17.50
1 15 2 3 4 286 (A-J) 17.04 23.10
1 2 3 4 287 19.50 22.55
1 2 30 3 4 288 22.55 3.30
1 2 3 4 289 9.40 11.40
1 50 2 3 4 292(A-J) 12.30 15.50
1 2 11 3 4 295 14.10 17.05
1 41.5 2 3 4 296 11.28 4.10
1 15 2 3 4 297 4.20 9.35
1 115 2 3 4 298 3.00 10.25
1 14.5 2 3 4 300 12.00 19.10
1 60 2 3 4 305 23.45 10.15
1 2 3 4 302 18.00 19.30
1 2 55 3 4 306 7.10 10.15
1 2 10 3 4 308 19.20 23.45
1 2 3 4 309 21.30 22.20
1 2 3 4 310 21.30 3.00
1 2 13 3 4 311 23.45 2.20 2.00
1 2 70 3 4 312 (A-L) 2.37 7.00
1 16.5 2 3 4 317 1.40 6.35
1 2 10 3 4 316 21.10 1.00
1 2 3 4 318 12.40 5.00
1 80 2 3 4 319 23.00 8.30
1 9 2 3 4 321 21.30 5.10
1 2 18 3 4 320 13.40 1.40 5.00
1 2 3 8 4 324 21.20 21.50
1 2 3 55 4 325 22.05 2.00
1 9 2 3 4 326 22.28 23.35
1 11 2 3 4 327 23.45 4.10
1 2 65 3 4 328 0.35 5.10
1 2 26.5 3 4 331 16.40 4.00
1 2 3 4 334 19.18 22.10
1 13 2 3 4 335 19.05 0.30
1 2 7.5 3 4 338 1.00 4.00
1 2 5.5 3 4 340 20.20 21.50
1 2 77 3 4 341 21.00 9.45
1 2 3 90 4 342 4.55 12.30
1 2 3 4
1 2 3 4
7 Days strength
Ave.
Reason WF No 7 Days strength (N/mm2) Results

157 35.0 37.5 32.0 34.8


157 41.5 41.0 40.5 41.0
157 30.5 32.5 34.5 32.5
199 39.5 42.5 43.0 41.7
199 /210 42.5 38.5 44.5 41.8
188 /211 41.5 45.5 42.0 43.0
188 43.0 41.5 42.5 42.3

low slump 34.0 35.0 34.0 39.0 38.0 39.0 36.5

added water and low slump


42.0 42.5 42.0 41.5 42.0 41.5 42.5 42.0 42.5
24.0 24.5 24.5 25.0 25.5 25.0
24.0 23.0 24.0

low slump
low slump

low slump

added water
low slump

low slump

rapid reduction in flow


low slump at last for additional concrete

Low slump 450mm

one bucket concrete ??


28 Days strength
Required
Required Ave Strength
WF No 28 Days strength (N/mm2)
70% Results

28.0 187 47.5 63.0 52.5 54.3 40.0


35.0 55.8 58.4 63.1 60.6 62.8 63.3 60.6 58.2 25.2 61.7 60.5 50.0
35.0 50.0
28.0 43.0 45.0 43.0 44.0 42.0 43.0 44.0 46.0 43.0 43.7 40.0
35.0 50.0
24.5 35.0
35.0 50.0
24.5 35.0
35.0 279 54.0 53.0 53.5 50.0
35.0 53.0 53.5 52.0 50.0
21.0 34.0 32.5 33.0 30.0
35.0 50.0
30.0
40.0
50.0
50.0
50.0
30.0
50.0
40.0
50.0
50.0
30.0
25.0
25.0
50.0
25.0
25.0
50.0
30.0
25.0
25.0
50.0
30.0
25.0