Item No Description Unit Quantity
Riyal)
1 General
Project Site
Provision of one office with two rooms, all required furniture, computer
(1No), internet Wi-Fi, mobile phone, Personal protective equipments
including hard hat, high vest jacket & Safety shoes for two people , printer
cum scanner with cartridges, stationery, pantry facility, toilet facility, drinking
water facility including maintenance. Covered car parking facility for
D Engineer's vehicle ( 3 nos) months 16
E Covered Car Parking facility for Engineer's vehicle (3 Nos) LS
CARRIED TO SUMMARY
CARRIED TO SUMMARY
C Maintenance of progress report including daily , weekly & monthly reports ( 2 months 16
Contractor's temporary works and services
Provision, erection, relocation, maintenance and removal of project
D signboard ( Aluminium, 1 Nos) LS
Connections LS
CARRIED TO SUMMARY
SUMMARY
Page-1-1
Page-1-2
Page-1-3
LABOUR
The Tenderer is to enter hereunder the individual rates for labour for skilled
and unskilled workmen and gangers employed on Dayworks at the
discretion of the Engineer. These rates shall be firm (fixed price) and
charged at the actual hour worked at the direction of the Engineer and the
rates shall include for all supervision charges, time keeping expenses,
insurance, the use and maintenance of small tools, appliances and small
plant, extended use of standing scaffolding an plant, overtime, time lost due
to inclement weather, reduced productivity during Ramdan, recruitment
costs in respect of imported labour including transportation to and from
country of origin and all other associated cost of providing for food for
imported labour (Note: the costs of and maintaining living, messing and
sanitary accommodation for imported workmen to be included in
Preliminaries.)and all other incentive payments, public and other holidays
with pay, sickness benefits and all other costs arising out of staturoty and
other requirements in respect of the employment of labour, workmen's
compensation insurance in accordance with Clause 24 (2) of the Conditions
of Contract, travelling time and all establisment of charges and profit.
CARRIED TO SUMMARY
LABOUR (Cont'd)
A Gangers Hrs 25
B Labourers Hrs 25
C Scaffolders Hrs 25
D Steel fixers Hrs 25
E Carpenters Hrs 25
F Masons Hrs 25
G Painter Hrs 25
H Heavy equipment operator Hrs 25
J Electricians/Plumbers Hrs 25
K Drivers Hrs 25
CARRIED TO SUMMARY
PLANT
Payment for working plant shall be for the actual hour worked only. No
allowance for standing time will be allowed. Rates for plant shall include for
the use of the plant inclusive of all fuel and consumable stores, depreciation,
servicing, overhauls repairs and replacements, all other charges related to
the plant including haulage to and from the site and all establishment
charges and profit, but exclusive of driver and attendants who shall be paid
for as laid down in the Labour Schedule.
CARRIED TO SUMMARY
SUMMARY
Page-2-1
Page-2-2
Page-2-3
Page-2-4
ROAD WORKS
NOTES:-
CARRIED TO SUMMARY
BITUMINOUS PAVEMENT
Bituminous Materials for Prime and Tack Coats
Bituminous Prime Coat (1.2 kg/sq.m)
CARRIED TO SUMMARY
ROAD WORKS (Cont'd)
SLOPE PROTECTION AND STABILIZATION
Riprap
A Mortared stone riprap (D50 = 200 mm), 300 mm Thick m3 120
B Loose stone riprap (D50 = 350 mm), 300 mm Thick m3 60
CARRIED TO SUMMARY
TRAFFIC SIGNS AND ROAD MARKINGS
Traffic Signs
A 135, Minor Road on Left sign Nos 8
B 136, Minor Road on Right Sign Nos 7
C 202 , Stop Sign Nos 8
D 151, Sharp deviation to left sign Nos 4
E 152, Stop Head sign Nos 4
F 226,(60) Maximum Speed as limit shown sign Nos 16
G 224, No overtaking by all vehicles sign Nos 20
H 113, Speed Hump Nos 4
J Direction Sign (DS) Nos 5
K Provision for Priority Sign at access road-1 (main road junction) LS 1
Road Markings (Only Access road )
Traffic lines continuous or broken for both white and yellow (mechanical
L applied) m2 2,000
CARRIED TO SUMMARY
ROAD WORKS
SUMMARY
Page-3-1
Page-3-2
Page-3-3
Page-3-4
Page-3-5
Page-3-6
Page-3-7
Chain link fence height up to 2.m including 3 string 12 SWG double strand
A barbed wire and 2 coils spiraled in opposite direction placed over extension
arms. Main Post , intermediate post, struts ,etc complete to the satisfaction
of the Engineer all as per approved shop drawing. lin.m 54,172
Foundation Works
Fill excavations with selected, graded and hard excavated material Plain
D poured OPC concrete grade C15 m3 3,757
E 100 mm Thick blinding concrete below post foundation m3 928
F 75 mm Thick blinding concrete below block wall & strut foundation m3 1,023
Reinforced poured vibrated OPC concrete grade C35 as specified
G Foundation for Post m3 8,531
H Foundation for Strut m3 683
CARRIED TO SUMMARY
D m2 14,788
Waterproofing System
Damp proof membrane, approved 1000 gauge polythene vapour barrier laid
under blinding concrete including with 100 mm minimum sized laps sealed m2 22,941
E with an approved polythene tape.
Prepare and apply 2 coats of bituminous paint to sides of all substructure m2 112,243
F concrete & block masonry surfaces contacted with soil.
CARRIED TO SUMMARY
The tenderer is to detail below any additional items with quantities and rates
not included in this Section but mentioned in the Tender Documents or
required for completion of the lump sum tender price. Should the tenderer
fail to insert any items here, it is deemed that the lump sum price for the
Tender includes all relevant items and no subsequent claim for any
additional payments shall be entertained.
A
B
C
D
CARRIED TO SUMMARY
Page-4-1
Page-4-2
Page-4-3
MISCELLANEOUS WORKS
WHEEL DIP
UTILITY PROTECTION
250 mm Dia, 2 way ,8 m long concrete ( Grade C-35) utility protection slab
including formwork, reinforcement and other requirement as per drawing & Nos 40
B specification
100 mm Dia, 2 way ,8 m long concrete ( Grade C-35) utility protection slab
C including formwork, reinforcement and other requirement as per drawing & Nos 40
specification
CARRIED TO SUMMARY
ADDITIONAL ITEMS
The tenderer is to detail below any additional items with quantities and rates
not included in this Section but mentioned in the Tender Documents or
required for completion of the lump sum tender price. Should the tenderer
fail to insert any items here, it is deemed that the lump sum price for the
Tender includes all relevant items and no subsequent claim for any
additional payments shall be entertained.
A
B
C
D
CARRIED TO SUMMARY
MISCELLANEOUS WORK
SUMMARY
Page-5-1
Page-5-2
Amount
R.O.
R.O. (Words) Omani Bz (Words) Omani
Bz (Omani Baiza) (Number) Bz (Number)
Omani Riyal Riyal Baiza
5 -MISCELLANEOUS WORKS
NA