Beruflich Dokumente
Kultur Dokumente
32.74 4.00
20.44 12.30
F.F.L.
+58.40
F.F.L.
+58.40
TOWER SLIDE'S
GARDEN
S.L.S.
RUN OUT CONCRETE BASE
1.65
+62.80
E
2.70
6.00
F.F.L.
+58.40
F
TOWER SLIDE'S
1.65
N.L.L.
+58.20
1.44
+62.80
F.F.L.
1.04
+58.40
G
23.00
18.00
6.00
1.04
1.04
1.44
S.L.S.
N.L.L. +62.80
+58.20
UP
1.65
+59.96 DECK
H
2.70
6.00
A
J UP
1.65
DECK
+58.54
GARDEN
RUN OUT CONCRETE BASE
F.F.L.
+58.40
F.F.L. B
+58.40
E
PLAN VIEW
ISOMETRIC VIEW
2 1
F.F.L.
+62.80
4.40
1.- ALL DIMENSIONS AND LEVELS ARE IN METERS
2.- ALL LEVELS OF SLIDES SUPPORT ARE
F.F.L.
REFERENCED AT +58.40
+58.40 F.F.L.
N.L.L. 3.- SEE DRAWINGS C2647-05-OC-01
+58.40
+58.20 LOCATION OF FOUNDATIONS FOR SLIDES
4.- LEVELS OF AREA REFERRED TO FINISHED FLOOR LEVEL +58.40
5.- STRUCTURE PROCESS TAKES A HOT
CONCRETE SUMP PIT GALVANIZED BY IMMERSION
SECTION VIEW