Sie sind auf Seite 1von 1

1 2 3 4 5 6 7 8

100m

5m
C2A H0D
FRESH WATER
7130-WF-1816-C2A-12"-N 7130-WF-1666-H0D-12"-N

BU-2200G AV-9415
4785 5100-25J-010

10" BU-2200G AV-9410

6" BU-2200G AV-9411

6" BU-2200G AV-9413

5150-WF-1959-T2H-8"-N
8" BU-2200G AV-9412

8" BU-2200G AV-9414


C2A NOTE 1 ELECTROWINNING STORAGE

4m
TANK T-59
T2H 3

LO
A

LO

LO

LO

LO

BU-2200G
LO
T2L T2K T2K T2L T2L T2H T2H T2K T2K T2H T2H T2K T2H T2K T2H T2H T2K

3m
T2K T2H NOTE 2
FRESH WATER 5150-WF-1820-T2L-36"-N 5150-WF-1922-T2K-36"-N 5150-WF-1923-T2L-36"-N 5150-WF-1924-T2H-36"-N 5150-WF-1925-T2K-36"-N 5150-WF-1926-T2H-36"-N 5150-WF-1927-T2K-36"-N T2K 5150-WF-1928-T2H-36"-N 5150-WF-1929-T2K-36"-N 5150-WF-1821-T2H-36"-N
50m

5392 5100-25J-006
PUMP STATION NO. 4B PHASE 2 PHASE 1

2m
3

DRAIN
BU-2200G AV-9418

AV-9417

8" BU-2200G AV-9416


H0D C2A C2A T2H

5150-WF-1936-T2H-10"-N

5150-WF-1935-T2H-8"-N
FRESH WATER 7130-WF-1669-H0D-12"-N 7130-WF-1669-H0D-12"-N 7130-WF-1817-C2A-12"-N
5384 5100-25J-010

6" GA-2200

1m
12"x8" BU-2200G
ELECTROWINNING STORAGE BU-2200G

LO

LO

LO
TANK T-59 NOTE 1
AV-9419
T2H

8" BU-2200G
3 T2K T2H 3 T2H T2K T2K T2H T2H

0
T2H T2K
0

T2K T2H T2H T2K T2K T2H

LO

1:50
5150-WF-1933-T2K-36"-N T2K T2K
1:1000

5150-WF-1941-T2K-36"-N 5150-WF-1940-T2H-36"-N 5150-WF-1939-T2K-36"-N 5150-WF-1938-T2H-36"-N 2 5150-WF-1932-T2H-36"-N 5150-WF-1930-T2K-36"-N

3m
3
B
50m

4" GA-2200
5150-WF-2027-T1M-6"-N

5150-WF-2028-T1M-6"-N

4" GA-2200
AV-9420

AV-9421

AV-9422

AV-9423

AV-9424
DRAIN DRAIN AV-9425
40m

DRAIN

2m
5150-WF-1948-T2K-36"-N

BU-2100G

BU-2100G
8" BU-2200G

8" BU-2200G

8" BU-2100G

6" BU-2100G

DRAIN
3" GA-2200

4" GA-2200
LO

LO

LO

LO
LO

LO
T2K T2H T2H T2K T2K T2H T2H T2K T2K T2H T2H T2K T2K T2H T2H T2K BY CIVIL BY PIPING
NOTE 2 T2K T1M T1M H0C T1M H0C C1A
H0C H0C H0C H0C T1M
30m

CS 3
5150-WF-1942-T2H-36"-N 5150-WF-1944-T2K-36"-N 5150-WF-1945-T2H-36"-N 5150-WF-1946-T2K-36"-N 5150-WF-1949-T2H-36"-N 5150-WF-2026-T2K-36"-N 5150-WF-1066-T1M-36"-N 3 H0C 5150-WF-1950-H0C-36"-N HDPE CS HDPE
C1A 5150-WF-1640-C1A-36"-N FRESH WATER
5383 5100-25J-013

1m
H0C C2-5160-TK-740

5150-WF-1947-T2H-36"-N
H0C

GA-1155

GA-1155

GA-1155
20m

BU-2200G

5150-WF-1952-T1K-3"-N
T2H T1K

4" GA-2200

4" GA-2200
H0D
TP-7130-123 3

BU-1010G
T2H C2A
10m

BU-2200G
BY CIVIL

0
3 NOTE 1

AV-9443
T1D BY PIPING

GA-1155

1:33 1/3
DRAIN DRAIN
C
0

2" BA-2000
1:500

LO

DRAIN

2.5m
7130-WF-1679-H0D-12"-N FRESH WATER
20m

5388 5100-25J-011
C2-7130-TK-901

2m
15m

1.5m
5150-WF-1838-T1K-8"-N
FRESH WATER TO DUST CONTROL AND CONTRACTOR OFFICES
10m

1m
D
5m

0.5m
FRESH WATER
5150-WF-1678-T1K-8"-N
5390 5100-25J-011
POTABLE WATER TREATMENT
PLANT

0
K141
0

1:25
PHASE 1 BY OTHERS
BY CIVIL
1:200

7130-WF-1686-T1K-8"-N BATCH
PLANT

2m
10m

C2A T2J

7130-WF-1799-C2A-12"-N FRESH WATER


7130-WF-1805-T2J-12"-N

1.5m
5100-25J-011 5389
TEMPORARY PUMPING
STATION
AV-9441
E

1m
2" BA-2000
5m

LO

T1D H0D

7130-WF-1800-T1D-12"-N 7130-WF-1670-H0D-12"-N FRESH WATER

0.5m
4782 5100-25J-011
NOTES: TEMPORARY PUMPING
NOTE 1 1. TEMPORARY PIPING SPOOL TO BE REMOVED WHEN THE CONSTRUCTION WATER STATION
SYSTEM IS DECOMMISSIONED, A BLIND FLANGE SHALL BE INSTALLED IN THE MAIN
LINE BRANCH.
2. PADDLE BLIND TOBE INSTALLED DURING OPERATION OF CONSTRUCTION WATER HOLDS:
SYSTEM AND SHALL BE CHANGED TO A PADDLE SPACER WHEN THE FRESH WATER 1. DELETED. 3

0
SUPPLY SYSTEM BEGINS TO OPERATE. DESIGN OF PADDLE BLIND AND PADDLE SPACER
BY CONTRACTOR ACCORDING TO ASME CODE B16.48 ISSUED FOR DETAILED ENGINEERING PHASE ENGLISH LANGUAGE SHALL GOVERN
0

1:20
EMITIDO PARA INGENIERIA DE DETALLE LA LENGUA INGLESA TENDRA PRECEDENCIA
DESIGNED BY DRAWN BY
1:100

sociedad minera
DES. DES.
REV. DATE REVISION DESCRIPTION
CHK.
APPROVED REV. DATE REVISION DESCRIPTION
CHK.
APPROVED REFERENCE DRAWING No. REFERENCE DRAWINGS
G. CESPEDES A. REGNAULT TEMPORARY CONSTRUCTION EQUIP. & TOOLS
A
NOT USED
2 10-Mar-14 ISSUED FOR CONSTRUCTION DWG FOR COMBINED SQUAD CHECK
GC LT cerro verde s.a.a. CHECK DESIGN CHECK DRAWING
FRESH / CONSTRUCTION WATER
AREQUIPA - PERU V. UDUMAN
B NOT USED 3 20-Mar-14
RE-ISSUED FOR CONSTRUCTION GC LT LEAD ENGINEER APPROVAL DATE PIPING AND INSTRUMENTATION DIAGRAM
SES KFC CERRO VERDE PRODUCTION UNIT EXPANSION
NOTE USED
Cerro Verde L. TAMELIN 12/4/2013
SISTEMA DE AGUA FRESCA
F

C AREA MANAGER APPROVAL DATE


NOTICE: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE
3/20/2014 11:12:04 AM

ISSUED FOR DESIGN GC AJ PROPERTY OF FLUOR AND IS LENT TO THE BORROWER FOR THEIR N/A AGUA FRESCA / DE CONSTRUCCION
0 10-Dec-12 CONFIDENTIAL USE ONLY, AND IN CONSIDERATION OF THE LOAN OF THIS
BA FF ENGINEERING MANAGER APPROVAL DATE

CONTRACT NO.
RE-ISSUED FOR DESIGN (2013 ESTIMATE) GC AG DRAWING, THE BORROWER PROMISES AND AGREES TO RETURN IT UPON DIAGRAMA DE TUBERIAS E INSTRUMENTACION
0A 21-May-13 REQUEST AND AGREES THAT IT WILL NOT BE REPRODUCED, COPIED LENT K. MUNDY 12/5/2013
VU R
OR OTHERWISE DISPOSED OF DIRECTLY OR INDIRECTLY, NOR USED FOR CLIENT APPROVAL DATE SCALE DRAWING NUMBER REV.
GC LT
1H 04-Dec-13 ISSUED FOR COSNTRUCTION
VU KM
ANY OTHER PURPOSE OTHER THAN WHICH IT IS FURNISHED. J. VANDERBEEK 12/5/2013 NONE 240K-C2-5100-25J-018 3
MANUAL CHANGES MADE: YES NO DWG. FILE UPDATED: YES NO MODEL UPDATED: YES NO CAD FILE NAME: P:\0CAD\000\SPEM\** WBS: 7130
BA6CVA1.IGR
SAFETY SHARE: BE ALERT! DON'T GET HURT COMPARTAMOS LA SEGURIDAD: SIEMPRE ALERTA! NO SE LASTIME
Apr 2012

Das könnte Ihnen auch gefallen