MEMO

Project: MMG Limited Las Bambas Copper Project


Attn: Marcelo Cabral (MMG), Jason Whittle (MMG), Alejandro De Barry (MMG)

Author: Phillip Soden Date: 26/09/14

Job No: 114001.06 ATCW Ref: 114001.06-M002

Subject: TSF Embankment Seepage Analysis

1 INTRODUCTION

This Memo summarises the results of a seepage analysis completed for the tailings retaining embankment at
the Las Bambas Copper Mine.

The embankment design comprises a geo-composite lined rockfill structure. It will be constructed in stages,
and has a final design crest elevation of RL 4150 m. The stage 1 starter embankment, with a design crest
elevation of RL 4020 m is currently under construction.

2 PARAMETERS

The permeability adopted for the various materials that make up the embankment and foundation system
are summarised in Table 1.

Table 1 Material Permeability


Material Permeability (m/s)
Embankment Liner 1x10-20
Embankment Rockfill 1x10-3
Embankment Foundation (grouted) 5x10-7
Embankment Foundation (un-grouted) 5x10-6
Stored Tailings 1x10-8

The embankment liner is considered to be practically impermeable for the purposes of the seepage analysis,
and the permeability of the embankment rock-fill materials was conservatively considered to be
homogenous in nature, with no variation in permeability between the various zones.

ATC Williams Pty Ltd


222 Beach Road (P.O. Box 5286) Mordialloc Vic 3195
T +61 3 8587 0900 F +61 3 8587 0901
melb@atcwilliams.com.au www.atcwilliams.com.au ABN 64 005 931 288
ATC Williams unites the companies of Australian Tailings Consultants and MPA Williams & Associates

K:\Projects\114\114001 Las Bambas Peru\06 Embankment Re-design\Correspondence\Out\114001.06-M002.docx


The embankment foundation comprises granite rock in various states of weathering, and includes an (up to)
50m deep grout curtain located directly beneath the upstream toe of the embankment. The permeability of
the un-grouted foundation was estimated from lugeon testing completed as part of the foundation grouting
work, while the permeability of the grout curtain was assumed to be equivalent to 5 lugeon units, which is
the acceptance criteria for foundation grouting.

As a physical tailings sample is not available for testing, we have conservatively estimated the tailings
permeability based on prior experience with tailings of a similar nature. In practice, a lower value may be
applicable depending on the degree of consolidation that occurs, and the final grind of the production
tailings.

3 ANALYSIS AND RESULTS

The seepage analysis was completed with the software Seep/w. The following embankment states were
considered:-

(i) Stage 1A (RL 3974m) water storage only.


A pond RL of RL 3973m was adopted for this scenario.
(ii) Stage 1 (RL 4020m) 50% full with tailings, water storage over.
A tailings RL of RL 3974m and a pond level of RL 4015m was adopted for this scenario.
(iii) Stage 6 (RL 4150m) filled with tailings up to maximum allowable level with pond over. The geometry
of this scenario is illustrated in Figure 1, together with the location of sections selected for analysis.
For this scenario, it was conservatively assumed that the tailings body is saturated at all locations.

For each of the embankment states, a number of embankment sections were analysed to represent the
variation in embankment height for each stage (the location of the sections is illustrated in Figure 1). A
weighted average seepage quantity was then estimated for each of the embankment states considered. The
analyses assume uniform foundation conditions, and as such, the effect of unidentified unconformities in
the foundation are excluded.

The results of the analysis are summarised in Table 2. As well as the calculated seepage rate, a suggested
design range is presented to account for unknown foundation conditions and potential non homogeneity.

Table 2 Summary Seepage Results

Suggested Range of Seepage Flows


Embankment State Estimated Seepage Rate
for Design Purposes
Stage 1A (RL 3974m) water
53.3 l/s 50 65 l/s
storage only
Stage 1 (RL 4020m) 50% full
7.4 l/s 5 15 l/s
with tailings
Stage 6 (RL 4150m) filled with
7.9 l/s 10 20 l/s
tailings

Representative output charts from Seep/w are provided in Figures 2 4, respectively, for each of the
embankment states assessed.

ATC Williams 114001.06-M002 | Page 2


It is evident that the critical cases for seepage are the early stages where the storage is used solely for
containment of water only. When tailings deposition commences, the tailings form a low permeability liner
on the base of the impoundment, resulting in suppression of the seepage rate. In the long term, seepage
rates are predicted to slightly increase with time as the overall depth (and hence hydraulic head) of
saturated tailings increases.

Phillip Soden
Principal Engineer
ATC WILLIAMS

Attachments:

Figure 1: Final (Stage 6) Embankment Geometry

Figures 2 4: Seep/w output charts

ATC Williams 114001.06-M002 | Page 3


Fi le Name: T SF Embankment Stg1A Full .gsz
Directory: K:\Proj ects\114\114001 Las Bambas Peru\06 Embankment Re design\Data and Cal cs\JD\Seepage Anal ysis\Run 2\
Name: Impervious
Model : Saturated Onl y
K Sat: 1e 020 m /sec
Ky'/Kx' Rati o: 1
Rotati on: 0
Name: Grouting
Volumetric Water Content: 0 m/m
4,000 M odel: Saturated Onl y Name: Embankm ent
Mv: 0 /kPa Model : Saturated Only
3,990 K Sat: 5e 007 m/sec
3,980 Ky'/Kx' Rati o: 1 K Sat: 0.0001 m/sec
Ky'/Kx' Rati o: 1

8.7568e 00
3,970 Rotati on: 0
3,960 Volumetric Water Content: 0 m /m Rotati on: 0

c
m/se
3,950 M v: 0 /kPa Volumetric Water Content: 0 m/m
5 m/sec
Elevation

3,940 Mv: 0 /kPa


Name: Foundation 005
3,930
564ec

Model : Saturated Onl y


8.3m/se

1.7012e 005 m/sec


3,920
K Sat: 5e 006 m /sec
0.00010486

3,910
3,900
Ky'/Kx' Rati o: 1
3,890 Rotati on: 0
3,880 Volumetric Water Content: 0 m/m
3,870 Mv: 0 /kPa
3,860
3,850
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950

Distance

MMG Limited
ATC Williams Pty Ltd
222 Beach Road LAS BAMBAS COPPER PROJECT
(P.O. Box 5286)
Mordialloc Vic 3195 EMBANKMENT RE DESIGN
AUSTRALIA
T +61 3 8587 0900 STAGE 1A WATER STORAGE ONLY
F +61 3 8587 0901
melbourne@atcwilliams.com.au
www.atcwilliams.com.au
Date: 18.08.14 Job No: 114001.06 FIGURE 2
K:\Projects\114\114001 Las Bambas Peru\06 Embankment Re design\Data and Calcs\JD\Seepage Analysis\Run 2\Seepage Analysis.xls Figure 1 (3)
Fi le Name: T SF Embankment Stg1 Ful l.gsz
Directory: K:\Proj ects\114\114001 Las Bambas Peru\06 Embankment Re desi gn\Data and Cal cs\JD\Seepage Anal ysis\Run 2\

4,080
Name: Impervious
Model : Saturated Onl y
K Sat: 1e 020 m/sec
4,060
Ky'/Kx' Rati o: 1
Name: T ail i ngs Rotati on: 0
4,040
Model : Saturated Onl y Volumetric Water Content: 0 m/m Name: Embankment
K Sat: 1e 008 m/sec Mv: 0 /kPa Model : Saturated Onl y
4,020
Ky'/Kx' Rati o: 1 K Sat: 0.001 m/sec
Rotati on: 0 Ky'/Kx' Rati o: 1
4,000 Volumetric Water Content: 0 m/m Rotati on: 0
Mv: 0 /kPa Volumetric Water Content: 0 m/m
Elevation

3,980
Mv: 0 /kPa

3,960

m/sec
7.1
163
e0

006
3,940
15
m/

2.2863e
Name: Grouting sec

Model : Saturated Onl y Name: Foundation

2.5325e 006 m/sec


3,920 Model : Saturated Onl y
K Sat: 5e 007 m/sec
K Sat: 5e 006 m/sec

2.5325e 006 m/sec


Ky'/Kx' Rati o: 1
3,900 Ky'/Kx' Rati o: 1
Rotati on: 0

3.6781e 007 m/sec


Rotati on: 0
Volumetric Water Content: 0 m/m
3,880
Mv: 0 /kPa Volumetric Water Content: 0 m/m
Mv: 0 /kPa
3,860
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950

Distance

MMG Limited
ATC Williams Pty Ltd
222 Beach Road LAS BAMBAS COPPER PROJECT
(P.O. Box 5286)
Mordialloc Vic 3195 EMBANKMENT RE DESIGN
AUSTRALIA
T +61 3 8587 0900 STAGE 1 TAILINGS AND WATER STORAGE
F +61 3 8587 0901
melbourne@atcwilliams.com.au
www.atcwilliams.com.au
Date: 18.08.14 Job No: 114001.06 FIGURE 3
K:\Projects\114\114001 Las Bambas Peru\06 Embankment Re design\Data and Calcs\JD\Seepage Analysis\Run 2\Seepage Analysis.xls Figure 2 (2)
File Name: TSF Embankment Stg6.gsz
Directory: K:\Projects \114\114001 Las Bambas Peru\06 Em bankment Re design\Data and Calcs \JD\Seepage Analys is \Run 2\

Nam e: Im pervious
Model: Saturated Only
K Sat: 1e 020 m /sec
4,210
Ky'/Kx' Ratio: 1
4,190 Rotation: 0
Volumetric Water Content: 0 m/m Nam e: Em bankm ent
4,170 Model: Saturated Only
Mv: 0 /kPa
4,150 K Sat: 0.001 m/s ec
Ky'/Kx' Ratio: 1
4,130 Name: Tailings Rotation: 0
Model: Saturated Only Volumetric Water Content: 0.4 m /m
4,110
K Sat: 1e 008 m/sec Mv: 0 /kPa
4,090 Ky'/Kx' Ratio: 1
Rotation: 0
4,070
Volumetric Water Content: 0 m /m
Mv: 0 /kPa
Elevation

4,050

4,030
Name: Foundation
4,010
Model: Saturated Only
K Sat: 5e 005 m/sec

ec
3,990

1.6653e 006 m/sec

m/s
Ky'/Kx' Ratio: 1

006
3,970
Rotation: 0

06e
3,950 Nam e: Grouting Volumetric Water Content: 0 m /m

1.58
Model: Saturated Only Mv: 0 /kPa
3,930
K Sat: 5e 007 m /sec 1.6
653
3,910 Ky'/Kx' Ratio: 1 e 006
m
Rotation: 0 /se
c
3,890
Volumetric Water Content: 0 m /m
3,870 Mv: 0 /kPa
3,850
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950

Distance

MMG Limited
ATC Williams Pty Ltd
222 Beach Road LAS BAMBAS COPPER PROJECT
(P.O. Box 5286)
Mordialloc Vic 3195 EMBANKMENT RE DESIGN
AUSTRALIA
T +61 3 8587 0900 STAGE 6 TAILINGS AND WATER STORAGE
F +61 3 8587 0901
melbourne@atcwilliams.com.au
www.atcwilliams.com.au
Date: 18.08.14 Job No: 114001.06 FIGURE 4
K:\Projects\114\114001 Las Bambas Peru\06 Embankment Re design\Data and Calcs\JD\Seepage Analysis\Run 2\Seepage Analysis.xls Figure 3 (2)

Das könnte Ihnen auch gefallen