Beruflich Dokumente
Kultur Dokumente
1. GENERAL INFORMAYION :
4. ELECTRICAL TESTS:
4.1. MEASUREMENT TEST:
R 1A
Y 1A
B 1A
4.2.2. OVERLOAD PROTECTION STAGE Ib> OPERATING TIME TEST (INVERSE DMT):
4.3.1. OVERLOAD PROTECTION STAGE Ia> OPERATING TIME TEST (DEFINITE TIME):
DROP OFF/
PHASE SET CURRENT PICKUP (A) DROP OFF (A) LIMITS
PICKUP RATIO
R 0.4 In < 1.1
Y 0.4 In < 1.1
B 0.4 In < 1.1
30.0
4.5. NEUTRAL UNBALANCE CURRENT (NUB) PICKUP & DROP OFF TSET: