Beruflich Dokumente
Kultur Dokumente
54
36
92
06 13 ABB Voices
14 37 ABB Ability
38 67 Protection and safety
68 81 Universal connections
70
82 97 Control and productivity
2 ABB REVI EW
84
Electric driven gas compressor
control
Readership survey
16
Leading the way
to wireless automation
70
Transforming acceleration:
MFT for CERN
60
03| 2017 3
05 Editorial
ABB Voices
08 Interview: ABB AbilityTM
13 Cyber security from the ground up
ABB Ability
99 16 Leading the way to wireless automation
20 Predictive notification adds value
26 Project execution in automation
30 Automating engineering data exchange
36 Data matters in mines
Protection and safety
40 Circuit monitoring system
76 47
54
Power protection with PCS120 MV UPS
Protection at sea with Emax 2
and Ekip Link
Shore-to-ship power
60 Emax 2 microgrid breaker solution
Universal connections
70 Transforming acceleration:
MFT for CERN
Emax 2 with Ekip Link
76 Shore-to-ship power
in DP vessels
Control and productivity
84 Electric driven gas compressor control
92 A flexible and easy scheduling tool
Buzzword demistifier
98 Blockchain
54 99
99
Imprint
Readership survey
4 ABB REVI EW E DITORIAL
E DI TO R I AL
ABB AbilityTM
Dear Reader,
You will probably have noticed that the present
issue of ABB Review is bulkier than usual. Our lead
topic, ABB Ability, is so vital that it merits an
extended edition. ABB Ability enables significant
gains in uptime, speed, yield, safety and security.
The ecosystem includes an open-platform, solu-
tions both from ABB and third party partners,
integrated with an increasing range of digitalized
products from ABB and others. This issue of ABB
Review has several tangible examples illustrating
the platform.
Bazmi Husain
Chief Technology Officer
6 ABB REVI EW ABB VOIC E S
ABB
Voices
03| 2017 7
10
8 ABB REVI EW ABB VOIC E S
A B B VO I CE S
01 ABBs Collaboration
Table provides real time
access to process data.
This is just one example
of the many ways in
which ABB Ability makes
data actionable.
03| 2017 ABB ABILITY IS CHANGING THE WAY WE DO BUSINESS 9
aggregated and analyzed to be made available AR What sort of parameters would such higher-level
to managers, for example in the form of reports. control loops deal with?
What was often still missing was ABB Abilitys
means to take decisions based on that data in a GJ The type of control decisions being supported
direct manner. This is what in ABB we call closing here can range from optimizing maintenance
he loop 1. cycles to supporting higher-level management
GJ
10 ABB REVI EW ABB VOIC E S
This opening is occurring in both directions as not Another example could be in discrete manufactur-
only do managers see current data, but decisions ing: Managers might see that the delivery of a vital
can flow back and be implemented immediately. component has been disrupted upstream. Rather
This is the integration of IT (information technology) than running a downstream process at full force
and OT (operational technology). until a component unexpectedly runs out, this
process be scheduled differently to mitigate the
One example is the charging of an electric car. disturbance. The delay can be bridged by shifting
Obviously, the car and the charger need to talk to production to a different product for example.
one another, for example for purposes of billing Similarly, if a disturbance further downstream is
detected, there may be more meaningful ways to
use a given resource than manufacturing parts
that cannot be consumed.
Just as devices within the same
system exchange information, AR In the past, manufacturers sought to lock in cus-
tomers and lock out competitors by creating pro-
clouds will exchange information prietary standards. More recently, interoperability
regardless of manufacturer or has become the prevalent policy. ABB supports
standards such as IEC 61850 (for substation com-
architecture. munication) assuring interoperability of devices
from different manufacturers. The age of propri-
the electricity, but also to ensure the battery is etary solutions on a system level is largely history.
charged with the appropriate voltage and current But what about the cloud level? Will we see history
and that the device disconnects when the battery repeat itself with manufacturers attempting to
is fully charged. This is the basic functionality of lock out competition?
such a system. But moving beyond that, it also
makes sense for the charger to talk to the grid.
For example, the charging rate can be temporarily
reduced if insufficient power is available and there
are other consumers with higher priority.
03
AR
AR
03| 2017 ABB ABILITY IS CHANGING THE WAY WE DO BUSINESS 11
02
GJ On the contrary. Rather than chasing a bigger AR The examples discussed previously pertain to
share of todays automation pie, we need to look data being shared within a customer organization.
at the vast potential there is for growing the pie. What about data being shared with ABB?
Just as devices within the same system exchange GJ ABB can analyze data and predict failure modes,
information, clouds will exchange information advising customers about maintenance, or
regardless of manufacturer or architecture. We can depending on the arrangement in place, taking
thus talk of the intercloud in which entire clouds action. In a way, it could be interpreted that ABB
exchange information and collaborate 4. is hurting its own business by doing this. If better
maintenance is extending the life of, for example,
a motor, we may be missing out on the opportu
ABBs offering and market
presence will shift away from
selling equipment and towards
selling services.
03 Smart sensors
monitor the health of low
voltage motors.
12 ABB REVI EW ABB VOIC E S
AR So the more data a customer chooses to share, GJ What we need here is a sort of Bill of Rights. Just
the more the customer also stands to benefit. as the original Bill of Rights is about restricing
But wont the increased reliance on the cloud also a governments ability to take adverse actions
make customers vulnerable? against its citizens, the IoT Data Bill of Rights will
codify fundamental rights concerning data.
GJ That is a very important question. We can already
observe that more and more robots have cameras, ABB has already produced a first draft of such a
for example Yumi. As a next step we will probably document and is presently seeking input from cus-
also see microphones becoming widespread, tomers on it. It is important to us that this docu-
both to respond to human commands but also to ment will not be drafted by lawyers but will remain
in a form that is easy to understand by all. The bill
will form a fundamental understanding between
ABB and its customers, and will be at the heart of
The IoT Data Bill of Rights all dealings between ABB and its customers.
will codify fundamental rights
Important elements of this bill include:
concerning data. What data does ABB gather from its customers.
Why does ABB need it.
increase the overall sensory awareness of robots. How does ABB secure it (via technology and
Access to these devices can pretty much provide policy).
eyes and ears into otherwise restricted areas of a How do customers benefit from these
factory. A customer might see trade secrets at risk, practices.
and also proprietary information such as produc- What ABB will do with somebodys data if they
tion data. Let us take for example a manufacturer choose to stop being a customer.
of high-end sports cars. A robot on that production
line can provide an accurate measure of the number In format and concept, the IoT Data Bill of Rights
of any given model that has being produced. If such could draw inspiration from such things as the US
data should, whether through malice or by accident, governments highly effective Airline Passengers
fall into the hands of a competitor, they might gain Bill of Rights, which protects airline passengers
an unfair market advantage. from long waits on the tarmac, hidden fees, being
kept in the dark about reasons for delays, no access
AR So there is a conflict here between the advantages a to water or lavatories, and bag-check fees for lug-
customer can gain from sharing data, and the risks gage that ends up lost, among other guarantees.
the customer is exposed to from sharing that data.
We look forward to discussing this with customers.
A B B VO I CE S
I recently joined ABB as the Chief Security Officer. When it comes to critical infrastructure, attackers
In this role, I oversee the security of all products, work at it from all angles for many months or years.
services and information systems. My background The recent attacks on the Ukrainian power network
is in computer programming and Im pleased to be are a tangible reminder of both the priority and
bringing nearly 30 years of security and analytics preemptive design that must be given to cyber
experience to ABB. security to prevent future attacks on industry.
Satish Gannu Through these last few months, I have noticed that
ABB Industrial Automation
the threat landscape is subject to greater fluctu-
San Jose, US
ation and it is becoming more vital to secure the
ABB is taking the defense-
cybersecurity@ch.abb.com
industrial world. The three big reasons for these in-depth approach to security.
challenges have been the evolving nature of threat
actors, increased exposure of security vulnerabili-
ties and integration of information technology (IT) What is being learned from attacks is that security
and operational technology (OT). In addition, his- is no longer just about protecting the perimeter.
torically, our industries havent given great thought Because that is no longer enough, at ABB we are
to securing the protocols. As an industry this is taking the defense-in-depth approach to security.
becoming more essential and efforts to achieve All products, services, cloud deployment and even
this must and are being made. our suppliers need to meet minimum cybersecurity
requirements. Our Ability platform is built with
We all know the adage that security is only as strong security from the ground up.
as the weakest link and recent attacks prove this
again and again. Hence, security has to be looked Future ABB Review articles will be going into greater
at holistically which also includes physical security. details on ABBs approach to cyber security. l
14 ABB REVI EW ABB ABILIT Y
ABB 36
Ability
20
03| 2017 15
26
16
16 ABB REVI EW ABB ABILIT Y
A B B AB I L I T Y
01
Johan kerberg Factories around the world have been wired for
Principal Scientist,
Adj. Professor
automated controls since the 1970s (digital com-
ABB Corporate Research munication was introduced in 2000s), enabled
Vsters, Sweden
in large part by standardized communication
johan.akerberg@ protocols, called fieldbuses, that allow for access
se.abb.com
to large scale production systems. Somehow, the
Tilo Merlin promises of fieldbuses, such as easy and reliable
Manager New-Technologies
ABB Germany
deployment, use, maintenance, and issue diagno-
ses have not paid off, as still many installations
tilo.merlin@de.abb.com
run on analog 4..20mA technology, even with
Stefan Bollmeyer smart sensors and actors.
R&D Technology Manager
ABB Germany
Since wireless devices are around us everywhere,
stefan.bollmeyer@
de.abb.com
why not use radio communication technology
to bypass shortcomings resulting of any wired
installations, such as the effort of planning and
installing cables, shielding and grounding issues
to prevent EMC problems, the lack of flexibility
in layout, and complexity in engineering?
03| 2017 LE ADING THE WAY TO WIRE LE SS AU TOMAT ION 17
Transitioning to that future will be a challenge, The wired vs. wireless challenge
01 The Iggesund Mill
(Image courtesy of mostly because of the use of competing standards The ABB team tasked with the research project
Holmen, photo by Rolf
for wireless field devices that were introduced knew that the current wireless standards
Andersson, Bildbolaget)
in the late 2000s (mainly for monitoring appli- presented many performance characteristics
that needed to be challenged when addressing
control applications:
Industrial wireless sensor networks have been around One area of differentiation is in the standards for TDMA
for a number of years. Three standards dominate the slot lengths (variable or fixed). Another is frequency
automation market: Wireless HART, ISA 100.11a and hopping, as WirelessHART uses a fixed channel hopping
WIA-PA. The Wireless HART standard, released in 2008, table, but ISA 100.11a and WIA-PA have multiple channel
currently has the largest installed base, and all three hopping tables including the one used by WirelessHART.
are based on the same underlying 802.15.4 technology.
The main applications for these standards are for From a topology perspective, they all use mesh
process monitoring, but they can also be used to networks, but WIA-PA uses distributed cluster heads
deliver sensor measurements for slow and non-critical that differentiate from the other two standards. When
process control. it comes to routing of packets, WirelessHART and
ISA 100.11a use graph routing and source routing.
There are many similarities among the three standards, WIA-PA uses a slightly different strategy due to the use
but also some key differences. All three standards rely of cluster heads, namely a mesh start routing approach
on the underlying physical layer of IEEE 802.15.4 that since the field devices are organized in clusters. The
provides 250kbit/s on 15 globally allowed channels in real differences emerge in node addressing. ISA 100.11a
the ISM band, for instance. uses IP addressing, and the others use their own
proprietary solutions.
Responsiveness. Some of the most obvious limi Delineation. Another important characteristic that
tations of the current standards are the lack of is missing in the current wireless standards is the
support for actuators and use of fail-safe states. ability to distinguish between real-time data and
For instance, having a TDMA layer instead of a best-effort data. Device configuration data has
CSMA doesnt guarantee predictable and consist- to be end-to-end acknowledged before real-time
ent error detection on system level. In the same communication can be used for control; otherwise,
dangerous situations can occur since there are
no guarantees that the information transmitted
can be trusted or is properly scaled. One the other
Any wireless network should hand, real-time data for control loops may be out-
dated when queued together with best effort data.
self-heal without dropping None of the current wireless standards provides
packets, as the current redundant real-time functionality as the fieldbuses do.
The field trial phase was designed to be very Temperature control. From a safety perspective, the
short; it lasted little more than six weeks. ABB most challenging control loop is the temperature
collaborated with its partner to design test criteria controller since it injects high pressure steam into
that helped ensure the accuracy of the results the boiler. From a control perspective it is the least
while minimizing interference with the plants challenging control loop.
operation; for instance, operators were not noti-
Latencies. The average latencies for real-time and
non real-time traffic showed that, when similar
transmission and retransmission strategies as
Also missing in the current the wired fieldbuses were used, the latencies of
wireless standards is the ability the delivered real-time packets were small and
had minimal variations.
to distinguish between real-time
data and best-effort data. Packet loss. During the measurements, only single
occasional packet losses occurred, and the failsafe
mechanisms were not triggered by three consec-
fied when data were being transmitted wirelessly,
utive packet losses. Only three real-time packets
so the data from the historian server provided an
were lost during an eight hour measurement period,
objective comparison between wired/wireless per-
which is comparable to current fieldbuses.
formance, instead of relying on the gut reactions
of humans to the novel technology in their plant.
One final assessment from the feasibility study
was to ask the operators if they could see any differ-
Specific technical details tracked in the test illus-
ence either in the control performance or the final
trate any trade-offs between TDMA slot length,
quality of the material from the batch process. After
transmission rate, and level of redundancy, along
carefully studying the data from the historian, they
with an overall expression of availability (e.g. the
concluded that they couldnt.
number of communications failures) and end-
to-end latency.
The transition to wireless
The ABB feasibility study indicated that, with a
The setup involved three wireless control loops
carefully designed wireless protocol stack, it is
(temperature, flow, and pressure) utilizing three
possible to use a standard IEEE 802.15.4 radio
wireless instruments and actuators, connected to
transceiver, a real-time operating system and a
System 800xA via a Profinet IO-enabled gateway.
stack designed for control applications to control
The control loops are executed in ABBs AC800M
a small part of a production plant. Perhaps more
Controller at a 250ms period. The production system
important is the finding that it is possible to
operated in batch/sequence mode, feeding infor
achieve performance levels up to par with P ROFIBUS
mation to ABBs system for full integration (thereby
or o
ther modern fieldbuses.
keeping the operator environment unchanged).
A B B AB I L I T Y
Value-based predic-
tive notification
improves production
and performance
ABBs technology-enabled services use predictive notification in a value-
based service strategy for industrial producers. Predictive notification
with the right people in the right place protects and enhances production,
equipment availability, process performance and product quality.
Dave Biros Notifications are ubiquitous. Our smart phones Historical perspective on predictive strategies
ABB Industrial Automation
Service receive notifications from apps informing us ABB recognizes that proactive service strategies
Westerville, United States about appointments, software updates or even with predictive notifications would be valuable
dave.biros@us.abb.com stock performances. We clearly think that notifica- to producers. Not only can failure be avoided
tions make our lives better. Why then are notifi- and equipment maintenance improved, but the
Kevin Starr
ABB Oil, Gas and Chemicals cations not used routinely to improve industrial addition of a value-based predictive notification
Westerville, United States processes? The answer is because notifications tell program also improves industrial processes.
Kevin.starr@us.abb.com us what has already happened. In an industrial set- ABB experts have evaluated the problems with
ting, that could be a costly equipment failure. What predictive strategies in the past.
Patrik Boo
ABB Industrial Automation if we could accurately predict what will happen,
Service and send notification with enough time to act to Indicative strategies developed in the 1950s and
Houston, United States
avoid negative events, and exploit positive ones? 60s are still used today, such as when bolt-on
patrik.boo@us.abb.com machinery and software measure properties
on-line to enable more and better products to be
produced faster.
ABB has 137 expert service engi-
neers utilizing advanced digital The earliest predictive control algorithms were
developed during the 1970s and 1980s, setting
services to bring over $60 million the stage for software to eliminate the need for
in value to its customers. physical measurements. The resulting capabilities
translate to a level of sophistication and sensitivity
impractical for use beyond academia.
ABB has 137 expert service engineers utilizing
advanced digital services to bring over $60 million
A practical, yet expensive, predictive method,
in value to its customers. ABBs experts evaluate
condition monitoring, developed in the 1980s
predictive notification, identify problems and
and 90s, detects impending equipment failures
develop predictive maintenance programs based
and notifies personnel to act. This is, however,
on value to deliver optimal advanced services in
expensive to deploy.
real-life industrial settings 1.
03| 2017 ARTIC LE TITLE 21
01
Nowadays, industrial producers contract with For service strategies to be successful, expertise
01 The right people
receive and act on companies to regularly come on-site, make meas- must be maintained.
predictive notification. urements and ensure that mechanics operate
within set ranges. Although cost-effective, this A final roadblock to predictive notification is the
02 Criticality ranking. strategy does not eliminate catastrophic failures, reluctance to use remote-enabled technologies
which occur between service visits. in industrial settings. Producers, fearing that
A
Unit shutdown, immediate penalty cost. someone could induce failure, are hesitant to allow
Regulatory non-compliance.
Equipment damage over $ 100,000.
remote connection to process control systems.
Improvements in secure communications and
Personal injury.
Definite loss of production. cyber security safeguards reduce apprehension,
B
Probable penalty cost or personnel injury. yet industrial producers remain reluctant.
Equipment damage > $ 10,000 and < $ 100,000.
No effect on production.
Minimal
Repair costs < $ 1,000.
02
22 ABB REVI EW ABB ABILIT Y
High return
Engineering efficiency
Incident identification
Low return
Predictive notification
Focused implementation
on equipment
Focused implementation on
production processes
03
and categorize discrete events ABBs assessment shows that providing a predic-
to produce patterns that predict tive notification to personnel, with a recommended
action, results in an action taken. The beauty of
failures. implementing these service strategies together is
that the response will likely produce a high value.
Focused implementation on the process: The aim is
to optimize production, quality, or cost to produce
results. The value derives from using services to
identify improvement opportunities, and assigning
the right skill to deliver services to improve perfor-
mance. The value can be complex to deliver, yet has
a high return. This is the hardest value to achieve,
and is realized by a smaller population of producers.
04
24 ABB REVI EW ABB ABILIT Y
Case study
A plant in the United States manufactures prod-
ucts for food and beverage consumption, relying
on quality. The plant uses quality control systems
(QCSs) to operate machines and advanced digital
services for early detection of potential QCS
issues. Predictive notifications are provided to
help the plant identify and mitigate problems that
could cost millions of dollars in lost production.
Application
The digital services utilized by this plant auto-
matically gather and analyze data from the QCS,
present views of KPIs that help identify variables
that impede productivity, and provide recom- 05
1. 2. 3. 4. 5. 6.
Acknowledge that Utilize best-in-class Involve an expert Using the technology Create an action plan Set up predictive
equipment or process technology to cost- to review findings and the technician, on how to address notification rules with
issues can be avoided effectively identify, ensure you are on agree on actionable the categorized and the technology
or exploited with categorize and the right track items prioritized actions
advanced services prioritize issues
Value creation
Value
06
03| 2017 PRE DIC TIV E NOTIFIC ATION ADDS VALU E 25
06 A well-designed uled downtime of more than $100,000. The plant notifications. For many, this knowledge can be
predictive notification continued to have high equipment availability, found among OEMs.
program that focuses
on high-value actions. stable processes and good quality. Agree on actionable items using the technology
and technician. Once the best available technology
07 Rules established and the most value-added KPIs are chosen, agree
for the predictive on actions to take when parameters are exceeded.
notification program. Digital services that use predic- Producers should collaborate with those who will
Reference
tive notification are the most take actions to ensure commonalities.
Create an action plan to ensure the agreed-upon
[1] Biros, D., Are you
on track? How Predictive
effective form of delivering actions can be taken quickly and efficiently when
Notification keeps
production on track, advanced expertise in todays parameters are exceeded and a predictive noti-
ABB White Paper, p. 18, fication has been sent. Determine who will act;
2015. production environments. what will be done; where will it be done; where
are the tools and/or parts; when will the action
Preparing a predictive program occur. The action will be taken.
ABB established a technology-enabled predictive Set up predictive notification rules. Use the
notification stepwise program to successfully deliv- analyses, issues and processes, and KPIs, and
er advanced services that improve equipment avail- establish thresholds that will drive the action 7.
ability, plant performance and product quality 6:
Agree that equipment or process issues can be Digital services are the most effective form of
avoided or exploited accurately and cost-effec delivering advanced expertise in todays production
tively with digital services. No value can be environments. Predictive notification of impending
achieved if a producer does not believe prob- issues provides producers with the primary value
lems can be mitigated through digital services. opportunity to improve equipment availability,
Use best-in-class technology to effectively iden- process performance and product quality. None
tify, categorize and prioritize issues. Suppliers theless, even the best digital services and predictive
have different capabilities and specializations notification are only meaningful if the right people
such as equipment areas, production or busi- in the right place receive the notifications and act.
ness processes, and industry equipment. Pro- Only then can digital services and predictive
ducers must identify suppliers who can provide notifications truly make lives better. l
the best technology and applications for the
plants equipment and business processes.
2. 5.
Issue addressed by Corrective action
service person taken by service
1. 3. 4. 6. 7. 8.
Equipment or process Technology monitors Rule exceeded, Technology monitors Technology monitors Rule exceeded,
with issues equipment and/or notification sent equipment and/or equipment and/or notification sent
process process process
Risk
07
26 ABB REVI EW ABB ABILIT Y
A B B AB I L I T Y
Alicia Dubay
ABB Industrial Automation,
Control Technologies
Austin, United States
Alicia.Dubay@us.abb.com
01
03| 2017 AU TOMATION PROJE C T E XE CU TION 27
02 Project flow
02a
old and new.
Software Commissioning /
FAT
configuration startup
Time
02b
For many years, controller-centric DCS architec- For companies that run many concurrent, large
tures have been used in automation projects. capital investment projects each of which may
However, a controller-centric approach ties the involve dozens of subcontractors and vendors
multichannel I/O modules to a particular process the cumulative cost of overruns and schedule
controller, thus creating dependencies between delays can be significant. For this reason, these
project tasks, which complicates late changes. companies have long partnered with automation
This aspect is known to be a primary cause of providers to combine information stored in data-
project cost overrun and schedule delay and is the bases and spreadsheets with smart instrumenta-
reason why automation tasks are on the critical tion and devices, digital fieldbus technologies and
path in many capital projects. Ethernet-based I/O solutions to enable control
systems to self-configure and validate, test, and
provide documentation automatically. Adopting
such an approach promotes the decoupling of
Select IO is a single-channel project inter-dependencies and thus facilitates
I/O system for both process and parallel execution. Parallel execution with multiple
work streams provides a more flexible environ-
safety applications that com- ment that better handles change. In particular,
municates with the system via a I/O commissioning can be done in parallel with
the application engineering 2.
redundant industrial Ethernet
I/O network. System 800xAs Select IO to the rescue
To expedite the commissioning of I/O in parallel
with other project engineering tasks and thus
ABBs new I/O solution and corresponding engi
reduce the impact of hardwired signal changes,
neering software for the ABB AbilityTM System
ABB developed an extension to the System 800xA
800xA platform will make overbudget or late auto-
family of I/O solutions called Select IO. Select IO is
mation projects a thing of the past 1.
a single-channel I/O system for both process and
safety applications that communicates with the
Freeze over
system via a redundant industrial Ethernet I/O net-
Traditionally, most industrial technical projects
work 3. A redundant network has the characteris-
feature a design freeze at a relatively early stage.
tic that it is not tied to one particular controller.
After this point, automation engineers can finalize
their design, order the required hardware such
as controllers, I/O, etc. and start application pro-
gramming. Changes made after the design freeze
often result in rework and the later the changes are
made, the higher is the rework cost and the higher
is the chance of a schedule delay.
28 ABB REVI EW ABB ABILIT Y
the SCM that matches the I/O type. Then a field smart and non-smart field equipment can be
04 Select IO signal condi- kit comprising a controller and laptop with functionally checked in the field in parallel
tioning module
System 800xA engineering tools is connec- with the application engineering being done
ted to the Ethernet I/O field communications back at one of ABBs project centers. Using
05 Select IO speeds and
simplifies automation interface (FCI). The Select IO is automatically System 800xAs documentation manager loop
projects, leading to suc- scanned and configured using data from the check templates, field testing and verification
cessful project outcomes.
I/O list, including signal name, and supplemen- documentation is created and stored.
ted with HART configuration data that resides 3. Connect: Once functionally checked, the I/O
within the field instrument. A test configura structure can be imported into the product
tion is also automatically created based on application, which was engineered using the
the I/O type detected to help with functional same signal names as the I/O configuration.
Upon bringing the I/O configuration into the
product system, the signals are soft marshal-
led automatically no mapping is required.
When I/O is made available on an Any conflicts or missing I/O allocations are
reported via the signal overview display and/or
Ethernet network, all the control- the Ethernet I/O Wizard and quickly corrected.
lers can access it. Therefore, the The system is now ready for commissioning.
I/O can be marshalled digitally, The steps above are performed in the field while
instead of physically. the application code is being configured and
checked by simulating hardware at ABBs or the
system integrators premises. Select IO and
loop checks. For example, if there is an AI-type
System 800xAs engineering tools promote the
SCM connected to a HART transmitter, then the
decoupling of tasks and allow two independent
I/O wizard will automatically detect this, con
teams to work in parallel and bound together with
figure the I/O structure and create a temporary
precision and efficiency. The impact of changes
AI control module for testing purposes.
during the project and commissioning time can
thus be significantly reduced. Overall, Select IO,
aided by System 800xAs engineering tools, helps
meet the ultimate objective, which is to remove
automation from the critical path of capital pro-
jects. With this solution, there are fewer surprises,
fewer change orders, earlier commissioning of
projects and happier owner-operators 5. l
04 05
30 ABB REVI EW ABB ABILIT Y
A B B AB I L I T Y
Collaboration Manager
automates engineering
data exchange
ABBs Collaboration Manager (CM) automates engineering
data exchange between tools from different vendors. In
addition, CM provides change calculation, history tracking,
versioning, consistency calculations, consistency visualization
and a project manager cockpit.
Engineering is teamwork and a fundamental This lack of a systematic and guided data
aspect of teamwork is information exchange. exchange including difference handling and
However, whereas engineers can exchange ideas consistency checks motivated ABB to invent
perfectly well, when it comes to data exchange Collaboration Manager (CM). ABBs high-voltage
between engineering tools, things can become DC (HVDC) business in Sweden has introduced CM
tricky. Tool suites with a common database sound into workflows and is thereby creating significant
promising but bind customers to one vendor. cost savings and quality improvements.
Prerna Bihani And the best engineering tools are from different
ABB Power Grids,
Grid Integration vendors. Further, each engineering tool is locally
Ludvika, Sweden optimized according to its individual purpose but
is not designed to interact with other tools.
The handover of engineering
prerna.bihani@se.abb.com
data from tool to tool today is
In short, the handover of engineering data from
tool to tool is a tedious, time-consuming and
a tedious, time-consuming and
error-prone task, with a large manual element to error-prone task, with a large
it commonly involving printed diagrams, hand-
written papers or, in the best case, Excel or PDF
manual element to it.
files. In every data exchange scenario, the project
progress stalls during data exchange and in many The idea of CM
cases, already-engineered data is lost or has to ABB developed the CM concept to provide engi-
Rainer Drath
Former ABB senior be recreated. A seamless data exchange remains neers with a guided data exchange between tools
principal scientist elusive and often inadequate, homemade solutions from different vendors [15]. CM provides function-
rainer.drath@ are created to fill the vacuum. ality that an Excel file simply cannot: Change cal-
hs-pforzheim.de culation, history tracking, versioning, consistency
calculation, consistency visualization and a project
manager cockpit.
03| 2017 AU TOMATING E NGINE E RING DATA E XC HANG E 31
01
Intermediate software
Lisa
Emily Robot
PLC
02
For the engineer, CM delivers a transparent way CM and HVDC business meets innovation
to exchange data with other engineers while Since 1954, ABB has pioneered HVDC technology
offering continuous information about the state that provides reliable and efficient electrical power
of inconsistency between their engineering transmission over long distances with minimum
tool data and the receivers. The data exchange losses. ABB has since been awarded over 110HVDC
is initiated by the engineers themselves, which projects with a total capacity of more than
emphasizes the responsibility of the engineers 120,000MW around half the global installed base.
and allows spontaneous data exchange between
arbitrary pairs of engineering tools.
For the project manager, CM conceptually pro-
vides all information about the current state of
An important property of CM is
data inconsistency across the overall project, its simplicity: The data exchange
highlighting points for attention.
For the software developer and hosting organiz-
is based on files stored on shared
ation, CM delivers a means to minimize effort in folders on a common network or
importer/exporter development.
in the cloud.
The vast majority of these data transfers is CM is the perfect solution to this HVDC project
02 Early CM prototype
illustrating the basic currently performed on paper an error-prone pro- data exchange conundrum. With CM and its basis
concept. cess that requires several man-years of effort each in AutomationML a neutral XML-based data
year. Combined with multiple iterations, lack of format designed specifically for exchanging
03 CM workflow. change management, lead-time delays and essen-
tially duplicate scenarios across other engineering
departments, costs can quickly rise.
ABBs HVDC business has
Several improvement efforts were initiated in- introduced CM into workflows
cluding a project on dataflows to understand the
complexity of data transfers in engineering stud-
and is thereby creating signifi-
ies. The need for automatic data exchange with cant cost savings and quality
change management became increasingly appar-
ent, and a number of desired functionalities were
improvements.
identified for a data exchange software. Partial
attempts were made with an internal Excel-based ngineering data simple and effective auto
e
data exchange tool. However, use of Excel preclud- matic data transfer between the heterogeneous
ed proper change management and data could engineering tools and effective change manage-
only be exchanged between Excel workbooks. ment is made possible.
Emily Lisa
PLC Robot
ABB
Sends file
Manual import
Active: import and use
Automatic import
03
34 ABB REVI EW ABB ABILIT Y
CM for HVDC: Digitalizing data exchange for A new digital data approval process enables an
04 The Project Cockpit
example of status over- improved quality and efficiency Approver to confirm data quality. Multiple
view with nine project New features were added to the CM research Approvers can be assigned to a particular data
engineers, six tools.
prototype as part of its customization for set, which is subsequently marked approved
ABB HVDC projects: if confirmed by all Approvers, otherwise it is
05 Receivers view in the
CM after one-click data rejected. Furthermore, versioning is linked
import. to approval status for easy identification
of data quality.
CM is characterized by a simple Mapping technology via AutomationML allows
software architecture without for source tool parameters to be mapped to cor-
responding destination tool parameters via pre-
databases, client-servers or SOA. defined tool classes that are read by exporters
and importers during operation. The benefits
The Project Cockpit presents an overview of are twofold: Only data relevant to each receiver
the current status of data transfers across an is selected for transfer at the senders end and
entire project. It includes a consistency status receivers can import data with a single click and
snapshot in a color-coded, sender-receiver mat- without manually performing the mapping 5.
rix. Individual cells flag a receivers synchroniza- This works without having a common semantic
tion status with regard to corresponding sender standard, a key property of AutomationML.
data 4. The Project Cockpit allows project
managers to view status updates and easily
identify potential problem areas for resolution.
CM automatically archives all
exchanged files and provides
comparison functionality to
observe and visualize all changes
over time.
04
03| 2017 AU TOMATING E NGINE E RING DATA E XC HANG E 35
CM has hitherto been used to develop plugins Data can now be exchanged automatically
References
[1] R. Drath, M. Barth, for six core HVDC engineering tools across multi- between senders and receivers with a few s imple
Beherrschung von Seman- ple platforms: Main Circuit Toolbox, Harmonic mouse clicks and without waiting for paper
tikvielfalt mit Automa-
tionML. In atp 12/2012, Analysis Program, the insulation coordination reports to be issued. CM promises significant
Oldenbourg Verlag, 2012. program ISO Light, the harmonic voltage sources cost savings and quality improvements for
[2] R. Drath, M. Barth, calculation tool CTL Harmonics, transient simula- HVDC workflows.
Concept for managing tion software PSCAD and an Excel requirements
multiple semantics with
AutomationML. Accepted specification tool. With minimum effort required CM provides automatic data transfers across
paper for the Proceedings multiple tool platforms it tracks changes and
of the IEEE Conference on
Emerging Technologies defines data responsibilities, introduces a digital
and Factory Automation data approval process, provides versioning of
(ETFA), 2012, Krakow. The Project Cockpit presents data including history and introduces messaging
[3] R. Drath, M. Barth,
Concept for interopera
an overview of the current status for data objects. The Project Cockpit provides a
comprehensive overview of the project-wide state
bility between independ-
ent engineering tools
of data transfers across an of data inconsistency across all participating tools.
of heterogeneous disci-
plines. In Proceedings entire project. The end result is shorter lead times, early cross-
of the IEEE International checks and data reports that are ready earlier for
Conference on Emerging
Technologies and Factory submission to customers.
for AutomationML programming [4], the bulk of
Automation (ETFA), Tou-
louse, September 2011. the development effort was spent on preparing
Especially interesting is that data exchange
the engineering tools to meet basic data exchange
[4] R. Drath, Lets talk between tools happens without semantic stand-
AutomationML What is requirements. For each tool integration, an aver-
the effort of Automa- ardization. Nevertheless, CM paves the way
age of five weeks was spent on tool preparation
tionML programming? In towards a gradual standardization of data via
Proceedings of the IEEE and one week on plugin development. These six
Conference on Emerging an evolutionary framework. l
Technologies and Factory
tools exchange thousands of parameter values and
Automation (ETFA), Sep- comprise a major portion of data transfers in the
tember 2012.
System Design department. Extensions to other
[5] M. Barth, et al., Eval- ABB HVDC activities are planned.
uation of the openness
of automation tools
for interoperability in
engineering tool chains.
In Proceedings of the IEEE
Conference on Emerging
Technologies and Factory
Automation (ETFA),
September 2012.
05
36 ABB REVI EW
A B B AB I L I T Y
Data matters
in mines
ABBs mining customers are benefitting
from improved processes and operations
thanks to ABB AbilityTM.
ABB has launched a program
to improve reliability and perfor-
Eduardo Gallestey
mance of mining applications
Refurbished ASEA mine
Venkat Nadipuram
ABB Process Automation using the ABB AbilityTM Platform. hoist in Sudbury, Ontario,
Canada.
Dttwil, Switzerland
eduardo.gallestey@
ABB is a key player in the electrification and auto-
ch.abb.com
venkat.nadipuram@ mation of the minerals industry. The companys
ch.abb.com
portfolio includes products and services for grind-
ing, and for hoist and material handling, including
components such as cyclo-converters, variable
speed drives, motors, gearboxes and application-
specific software.
03| 2017 DATA MAT TE RS IN MINE S 37
ABB has launched a program to improve reliability An integral part of the concept is the creation of
and performance of mining applications using the collaboration centers from which ABB will serve
ABB AbilityTM Platform. The program will further- customers using specialists, ensuring the fastest
more enable improved remote operations and possible response and access to the companys
the support and deployment of advanced process global expertise.
control to help operators push their assets to
their limits. The expected results are
lower OPEX
To achieve this, the company will use big-data increased productivity and energy efficiency at
related analytical methods to develop models that affordable costs
can predict system failures and improve perfor- improved ROI by extending equipment lifetime
mance utilizing data such as: and reducing life cycle costs l
high frequency electrical data
process data from mineral processes in the
context of reliability, performance and quality,
typically from grinding, conveyors and hoist
applications
38 ABB REVI EW
Protectio
47
and safet
60
03| 2017 39
n
requires a deep understanding
of how systems operate, and
thereby how their functions
can be protected. ABB designs
its equipment on the basis of
this expertise and supports
a sea of applications ranging
from ships to microgrids.
y
40 Circuit monitoring system
47 Multi-megawatt power protection
at medium voltage
54 Ekip Link logiczone discrimination
protection system
60 ABBs Emax 2 protects, monitors
and manages microgrids
54
40 ABB REVI EW PROTE C TION AND SAFE T Y
P R OTE C TI O N AN D S AFE T Y
Circuit monitoring
system
ABBs new ultracompact and high-performance multichannel
circuit monitoring system (CMS) enables the operators of large
and complex power installations to monitor, visualize, log and
report electrical parameters such as current, power, energy and
distortion in every branch.
Pawe Ludowski With energy costs and awareness of carbon foot- previous CMS-600 product with the new CMS-700
Piotr Ryba
Jerzy Wsacz print both rising, operators of installations with control unit and new sensor types that allow moni-
ABB Corporate Research large and complex power infrastructures such as toring not only of current but also of other elec-
Krakow, Poland
data centers, airports, hospitals and banks need trical parameters such as power, energy, or total
pawel.ludowski@pl.abb.com a fine-grained knowledge of how power is being harmonic distortion (THD), both on the three-
piotr.ryba@pl.abb.com
jerzy.wasacz@pl.abb.com used in every branch of their network. This goal phase mains input as well as on each branch. New
can be achieved with ABBs new CMS a family of key features include visualization via a Web user
Harm deRoo
Nico Ninov ultracompact and high-performance multichannel interface, data logging, automatic reporting and
Fabian Maier measurement devices 1. Ethernet communication.
ABB Low Voltage Products
Schaffhausen, Switzerland
The CMS consists of a control unit and sensors. The CMS-700 has been developed specifically to
harm.deroo@ch.abb.com
nico.ninov@ch.abb.com The individual components of the system are easy meet the requirements of critical power appli-
fabian.maier@ch.abb.com to install in control and distribution cabinets and cations, such as data centers. However, the CMS
can be retrofitted to existing installations. During is eminently suited to other energy monitoring
applications for example, identification of savings
potentials in structures like office buildings.
01
42 ABB REVI EW PROTE C TION AND SAFE T Y
1 2 3 4
5 Ethernet Flash 6
Processor
8
Cortex-A8
11
Energy Meter
12 13 14 15 16 17 18 19
02
03| 2017 C IRCU IT MONITORING SYSTE M 43
03
The CFD simulations allowed the identification of The robustness of the hardware design was also
02 Hardware block
schematic. hot spots and the assessment of enclosure design confirmed by EMC tests performed according to
taking heat dissipation into account 6. The International Electrotechnical Commission (IEC)
04
44 ABB REVI EW PROTE C TION AND SAFE T Y
05
Temperature Temperature
Volume Rendering 1 Plano 1
111.57 111.57
105.31 105.31
99.06 99.06
92.80 92.80
86.55 86.55
80.29 80.29
74.04 74.04
67.78 67.78
61.53 61.53
55.27 55.27
48.02 48.02
42.76 42.76
36.51 36.51
30.25 30.25
24.00 24.00
(C) (C)
06
03| 2017 C IRCU IT MONITORING SYSTE M 45
06 Results from the CFD separated into back-end code and front-end code.
simulations tempera- The back-end code is the middle layer between the
ture distribution outside
and inside enclosure. Web user interface and the hardware. It allows for
device configuration, measurements, data acqui-
07 Comparison of results
from CFD simulations
with PT100 temperature
measurements.
Measurements from CMM
07a CFD simulation
predicts hot spots on sensors are displayed as a short
the undersides of the Configuration
eight surface-mounted history chart with online values The devices website displays measurements and
components on the PCB
with the AC/DC converter,
energy monitoring circuit
that can be read from a table. provides multilanguage configuration.
and external Modbus.
Measurements from CMM sensors are displayed
07b PT100 measurement sition and transmission of the data by SNMP and
along line 1 reflects the as a short history chart with online values that
Modbus protocols. The front-end software is the
temperature profile seen can be read from a table. The device stores all
in the simulation (left- Web user interface, which is written in JavaScript
most component). measured data. Hence, there is an interface to
using an Angular.js framework. The entire HTTP
read out historical data (which can be exported
transmission between the CMS-700 and the Web
as .csv files). The same features are available for
browser is encrypted by Secure Sockets Layer
mains energy quality measurements (voltage,
(SSL) technology.
current, THD, power factor, and active, reactive
and apparent power). The CMS-700 calculates
energy consumption on the mains and on branch-
es monitored by CMM sensors. These can be
displayed in separate views.
Temperature
64.99
82.04
59.08
56.12
53.17
50.21
47.25
44.30
41.34
38.39
35.43
32.47
29.52
26.56
3.61
(C)
07a 07b
46 ABB REVI EW PROTE C TION AND SAFE T Y
New sensors
08 Open-core sensor.
Sensors are standardized into 18 or 25mm widths Applications and first customers
and can measure harmonics as well as AC, DC or The CMS-700 was developed specifically for criti-
09 Solid-core sensor.
true RMS (TRMS) currents up to 160A (TRMS). cal power applications, as found in, for example,
a data center. In a data center in Ireland, 20 control
As each sensor is equipped with its own micro units were installed to monitor the current and
processor for processing the signal, the measure- energy in each phase and 730 branches. The cus-
ment data is transmitted digitally to the control tomer can see the total energy consumption and
unit via the bus interface. This minimizes the that of each branch or server. The CMS also high-
cabling required in the distribution cabinet and lights any power irregularities. Other critical power
maximizes measured-value transmission relia users are, for example, airports, hospitals, the
bility. Disturbances of the type experienced by telecoms industry and banks. Recently, a bank in
analog data are eliminated. Brazil installed 90 control units and 8,000 sensors
to monitor and visualize their energy consumption.
But the control unit is not only used for critical
As each sensor is equipped power it can also be used for visualizing the
with its own microprocessor energy usage of each consumer: One of ABBs cus-
tomers integrated the CMS-700 into a production
for p
rocessing the signal, the line to help analyze the costs of each product. l
measurement data is transmitted
digitally to the control unit via
the bus interface.
08 09
03| 2017 POWE R PROTE C TION AT MV WITH ZISC 47
P R OTE C TI O N AN D S AFE T Y
Multi-megawatt
power protection at
medium voltage
2017 marks the introduction of ABBs revolutionary ZISC technology
a next generation of medium voltage (MV) uninterruptible power supply
(UPS) based on the PCS120 converter platform 1. The high-performance,
flexible system expands ABBs MV UPS Portfolio, supplying critical load
industries with high-quality power, reliability and efficiency.
The rapid rise of digital data and digital-based expansion ranges from customer-driven technol-
device use in the technology sector over the last ogies such as the internet of things and personal
decade is transforming modern business and smart devices to big data driven analytics, and
society. The need for real-time, reliable data and data-dependent businesses such as financial insti-
digital device penetration is unprecedented. The tutions and governmental security agencies.
Eduardo Soares 01
ABB Electrification
Products, Power
Conditioning
Napier, New Zealand
eduardo.soares@
nz.abb.com
48 ABB REVI EW PROTE C TION AND SAFE T Y
Propelling this drive for transformation is the Data centers strive to lower costs and pass on
development of extensive infrastructure and ever- savings to their customers. Benchmarking stand-
increasing investments in electronics manufactur- ards such as PUE (power usage effectiveness) and
ing facilities and enormous data centers. These operating costs analyses are the primary tools
facilities have been highly impacted by economies used by clients to determine which data center
of scale, pushing single locations to grow even should receive contracts [1]. Because these high
larger such as hyper-scale data centers with a cor- tech facilities are characterized by enormous
respondingly higher power demand often well power demands placed on a single location, the
into the tens of megawatts. absolute requirement of maximum reliability and
optimum efficiency is paramount to keep these
critical load industries competitive.
Data centers have been highly Data gathered from data center research [2], for
impacted by economies of scale, example, specify that the overall downtime cost
for a power supply interruption is around $5,600
pushing single locations to grow per minute. With power interruptions lasting on
even larger with a corresponding- average 90 minutes, the cost of a single downtime
event can be well over half a million dollars. Clearly,
ly higher power demand often financial losses of this magnitude are undesirable.
well into the tens of megawatts. To mitigate the possibility of such incidents, criti-
cal load industries require extremely reliable power
supply as well as robust power distribution and
These large-scale facilities rely on a power supply
power protection designs.
quality much greater than a utility can provide,
as dollar losses for downtime in these critical
facilities are simply not tolerable. This is valid not
only for data centers and semi-conductor facto-
ries, but also other critical load industries such
as pharmaceutical, chemical, and the food &
beverage sectors.
Bypass breaker
PCS120
Power converters
MV UPS system
Energy
storage
02
03| 2017 POWE R PROTE C TION AT MV WITH ZISC 49
01 A ABBs PCS120
MV UPS.
Energy flow
Conditioning
ous power. Reactive power
Imbalance
Harmonics
03
An additional technical challenge is to provide a ABB prides itself on being able to find optimal
flexible solution which reconciles the above men- product solutions for its customers power needs.
tioned needs for an ultra-reliable system design By creating the PCS120 MV UPS, which is compat-
with the cost cutting requirements for enhanced ible with a variety of configurations especially the
tested fault-tolerant ring bus configuration, ABB
does just that.
Energy flow
Input voltage Output voltage
04
The power distribution systems overall reliability Following the successful operation of the first
benefits greatly from being operated at medium units, ABB was immediately challenged by custom-
voltage because less infrastructure equipment er demand to provide other possible MV power
such as switchgears are required. Studies also protection solutions. ABB took up the gauntlet to
show that the individual reliability of medium meet customers needs. This meant developing an
voltage devices are significantly greater than the approach to include multiple voltage levels for
reliability of their LV counterparts [3]. even larger amounts of power and the ability
of continuous power conditioning in lieu of the
industry standard standby topology.
ABBs ZISC topology backed by ABBs 134-year history of innovation at the fore-
the PCS120 converter technology front of technology development, provided the
framework for ABB engineers to react rapidly.
achieves efficiencies of up to ABBs answer was to create a new ground-break-
98 percent, significantly better ing medium voltage UPS design, the ZISC (Imped-
ance Isolated Static Conversion) architecture, to
than the segment incumbent satisfy clients requirements.
rotary UPS system.
PCS120 MV UPS and the ZISC architecture
The ZISC architecture introduced in 2017 is a new
ABBs MV Power Protection portfolio
topology for the static medium voltage power
To address the need for MV power protection,
protection market. The ZISC architecture is based
ABB introduced the PCS100 MV UPS in 2014.
on an isolating line reactor coupled with the new
This product solution with a single conversion
high performance ABB PCS120 power convert-
topology is scalable up to 6MVA and voltages up
ers 2. By continuously controlling the voltage
to 6.6kV. As a result of its efficiency the product
angle across the reactor, the inverters are able to
has been quickly established in the market.
control the real and reactive power from the utility
to the load, without cycling the energy storage.
03| 2017 POWE R PROTE C TION AT MV WITH ZISC 51
At the same time the PCS120 converters are con- 4 This robust design concept thereby results in
04 PCS120 MV UPS in
independent mode with tinuously conditioning and filtering any utility dis- reliable power protection as well as continuous
seamless transition of
turbances like harmonics and voltage imbalances voltage conditioning, thus providing the load with
the load from the utility
to the energy storage prime power supply at all times.
supply.
ABBs ZISC topology backed by the PCS120 con-
05 The PCS120 converter From a hardware perspective, the verter technology achieves efficiencies of up to
platform with 6 power
modules per cabinet and PCS 120 MV converter platform 98 percent, significantly better than the segment
built-in system redun-
incumbent rotary UPS system.
dancies. modular approach allows unpar-
alleled serviceability and redun- Everything should be made as simple as possible,
but not simpler. Albert Einstein
dancy, while maximizing uptime. The beauty of the ZISC design lies in its duet of
simplicity and robustness. The only equipment
thereby providing reactive current support to the kept at medium voltage are the isolating line
critical loads. 3 This operating mode is known reactor and the coupling transformer. This enables
as power conditioning mode. In case the utility the ZISC technology to be easily adapted to
power is no longer available, the PCS120 MV UPS multiple voltage levels and power requirements.
opens its input breaker and seamlessly transfers Paralleling is also easily performed, achieving
the load to the energy storage, operating now in power ratings in the range of over 40MVA under
independent mode. different configurations.
05
52 ABB REVI EW PROTE C TION AND SAFE T Y
By having the power conversion and energy stor- From a hardware perspective, the modular ap-
age at low voltage ABB customers maintain the proach of the design allows unparalleled service-
familiar LV experience characterized by func- ability and redundancy, while maximizing uptime.
tionality, maintainability and, most significantly, For instance, in the unlikely event of a module
the modularity of a low voltage system like the failure, the system isolates the module and contin-
PCS120 converter platform. ues to run with marginally reduced output power
capability. At the same time, the smart control
The PCS120 converter platform delivers a notification of the event to the super
The PCS120 converter platform, was one of the visory system so that maintenance technicians can
major facilitators of the ZISC technology. Defined schedule the next site visit at their convenience.
by double the power density of its predecessor, Automatic smart firmware management tools and
the PCS100, the PCS120 relies on the same mod- a new slide-in modular design ensure customers
ular approach. The PCS120 converter platform that the product has excellent maintainability as
is ABBs answer to innovative design in power well as painless spare part management.
electronics. 5
With its many years on the fore-
front of technology development,
that drove ABBs insight towards
a new ground-breaking medium
voltage UPS design, the ZISC
architecture.
06
03| 2017 POWE R PROTE C TION AT MV WITH ZISC 53
References
[1] M. Stansberry, Uptime The One ABB solution offers medium voltage
Institute Data Center
Industry Survey 2015. The beauty of the ZISC design power protection customers a one-stop-shop
Uptime Institute, 2015.
with an array of excellent products as exemplified
lies in its duet of simplicity and by the ZISC architecture and PCS120 MV UPS
[2] Emerson Network
Power, Understanding
the Cost of Data Center
robustness. The only equipment as well as the previously described services.
Thereby following the ABB philosophy of meeting
Downtime: An Analysis of
the Financial Impact on kept at medium voltage are the customer demands in a rapidly developing and
Infrastructure Vulnerabili-
ty, White Paper, 2011. isolating line reactor and the competitive market. l
[3] CCG Facilities Inte- coupling transformer.
gration Incorporated,
Medium Voltage Elec-
trical Systems for Data
Centers., 15 Sept. 2012. as ABBs own digital protection relays. The digital
IEC61850 integration between the PCS120 MV UPS
and the switchgear provides added reliability with
distributed control capabilities. The comprehen-
sive in-house package is designed for a seamless
connection to the ABB Ability platform.
54 ABB REVI EW PROTE C TION AND SAFE T Y
P R OTE C TI O N AN D S AFE T Y
Antonio Fidigatti Any seagoing vessel is subject to forces from DP components and levels
Borje Axelsson
Carlo Collotta wind, waves and currents. Dynamic positioning is A DP system has three main elements:
ABB Electrification the ability to maintain a vessels position auto- Power system. Everything that is needed to
Products Division
Bergamo, Italy matically in the face of these forces of nature by supply the DP system with electrical power,
using its propulsion system. DP vessels come in including generators, switchboards, electrical
Antonio.fidigatti@
it.abb.com many shapes and sizes rock dumpers, diving or distribution systems (cabling and cable routing)
borje.axelsson@ ROV support vessels, pipe layers, crane ships, drill and power management.
se.abb.com
carlo.collotta@ ships, offshore support vessels, etc. 1. Thruster system. All components and systems
it.abb.com necessary to supply the DP system with thrust
force and direction. The thruster system inclu-
des thrusters with drive units and electronic
Dynamic positioning is the ability and manual thruster controls.
to maintain a vessels position DP control system. All DP control components
and systems (including software) necessary to
automatically, using its propulsion dynamically position the vessel, consisting of
system. a computer and joystick controller (for manual
backup), position reference (using satellites),
DP sensor system and operator panels.
What these vessels all have in common is the need
for exact stationkeeping: They must maintain their
Not all DP vessels are the same in terms of redun-
position and heading precisely even in the rough-
dancy. IMO (International Maritime Organization)
est seas or strongest tides.
rules define three basic redundancy levels for
DP vessels:
Class 1 (DP1). No redundancy required.
Class 2 (DP2). Redundancy to make the system
tolerant to a single fault. Loss of position should
not occur from a single fault of an active compo-
nent nor system such as generators, thrusters,
switchboards, remote controlled valves, etc., but
may occur after failure of a static component
such as cable, pipe, manual valve, etc.
03| 2017 PROTECTION AT SEA WITH EMA X 2 AND EKIP LINK 55
Class 3 (DP3). In addition to Class 2 require- The performance required from a DP vessel neces-
01 Marine vessels often
have to maintain a very ments, the redundant systems shall be physi- sitates an electrical power system with the highest
exact position and cally separated. Equipment must withstand availability and flexibility. But the restricted space
heading.
fire or flood in any one compartment without available, the reliability issues raised by the com-
the system failing. Loss of position should not plex power system and the hostile marine environ-
occur from any single failure including a com- ment make this task challenging. Fault manage-
pletely burnt out fire subdivision or a flooded ment is, therefore, a critical aspect of DP vessel
watertight compartment [1] 2. operation and must effectively do the following:
Isolate the faulty component or system before
the failure propagates from one system to
another.
A DP vessels electrical power Guarantee a disconnection strategy for a faulty
system must have the highest system based on detection of fault direction.
Guarantee flexible and redundant power protec-
reliability and flexibility, which is tion systems.
a challenge given the restricted Provide self-monitoring to limit hidden failures.
01
56 ABB REVI EW PROTE C TION AND SAFE T Y
DP class notation
02
Closed bus tie operation Emissions are reduced too. Closed bus tie oper-
Marine power systems are typically of the isolated ation is, therefore, desirable and it is possible to
type, with four to eight generators and the overall design fault-tolerant systems for closed bus tie
power system split into two, three or four sections. and closed ring operation. This approach to fault
The power bus of each section is connected to the management is possible thanks to the circuit
others by a bus tie, which utilizes a circuit breaker. breaker inside the closed ring system 3.
When closed, this interconnection makes the power
system flexible (any generator then being able to Emax 2 and Ekip Link modules
provide power to any consumer, eg, thrusters). Emax 2 is more than a circuit breaker as tradition-
ally defined: Compactness and the high reliability
that results from pretesting makes Emax 2 highly
suitable for applications in marine vessels. Emax 2
An efficient way to handle electri- is an innovative all-in-one concept. In fact, it is the
cal faults is zone selectivity, which first intelligent circuit breaker designed to protect,
connect and optimize low-voltage microgrid
allows rapid fault isolation without applications. Accessories (modules) are added to
users, other than those directly the breaker to achieve all the additional functions
needed. One such basic accessory is the electronic
affected, seeing any effect. trip unit or protection relay. Ekip Hi Touch or Ekip
G Hi Touch are examples of such units, in which
Closed bus tie operation allows the vessel to run a dual set of protection settings delivers the flexi
with a few engines at high power rather than bility to change the system configuration.
operating all engines at low power. This mode of
operation significantly reduces operating costs
(eg, fuel consumption is cut by around 3 to 5 per-
cent) and maintenance costs (30 percent lower).
03
Closed bus-tie
03| 2017 PROTECTION AT SEA WITH EMA X 2 AND EKIP LINK 57
02 DP classifications
have worldwide
commonalities.
Note: The equivalent
to IMO DP class is
approximate because of
differences between the
various classifications,
local exemptions, etc.
Emax 2
circuit breaker
Ekip Link
module
04
DP applications require other signaling and this All circuit breakers can intercommunicate using
additional flexibility is achieved through program- only one Ekip Link connected to the main switch
mable contacts. via Ethernet. If more than two breakers are in-
volved in the selectivity chain, an Ethernet switch
can be used to handle the signals pertaining to the
different Ekip Link units 5.
Directional protection is useful in
closed ring systems with several Using the ABB communication protocol,
Ekip Link can:
generators where it is essential to Create complex logic selectivity without using
define the direction of the power complex wiring.
Provide redundancy, using both Ekip Link bus
flow that supplies the fault. and standard wiring.
Provide diagnostics (configurable) to test the
Ekip Link, the ABB communication module for wiring selectivity.
low-voltage circuit breakers, handles communica-
tion between circuit breakers using an internal ABB
proprietary bus 4.
58 ABB REVI EW PROTE C TION AND SAFE T Y
Ethernet link
05
Logic-zone discrimination with Emax 2 equipped Behind this scheme lies a logic that defines which
with Ekip Link breakers should and should not trip in certain
A major element of DP vessel power system design situations. With Emax 2, the blocking signal can
is protection against electrical faults. One very be realized by traditional hardwiring or by bus
efficient method of handling faults is logic-zone communication using Ekip Link. It is also possible
selectivity (or discrimination), which allows rapid to use both in parallel (redundancy).
fault isolation without users other than those
directly involved seeing any effect. Directional protection
Directional protection is useful in ring- and grid-
This approach can accurately isolate the fault type systems with several power sources (genera-
branch by quickly opening adjacent circuit break- tors) where it is essential to define the direction
er(s), and reduce the transitory fault time and of the power flow that supplies the fault. ABBs
electrical stresses. Emax 2 is the first low-voltage circuit breaker with
fully integrated directional protection and zone-
directional selectivity functions.
Connecting with Ekip Link With the Emax 2 and Ekip Link approach, tripping
05 Every trip unit (protec-
tion relay) is connected to With the Ekip Link connection, all the circuit break- using logic-zone selectivity with high precision and
an Ekip Link module and ers involved in logic-zone selectivity are connected reliability takes 100ms.
thence to a main switch.
through an Ethernet-based proprietary bus. This
approach eliminates the traditional hardwired Positioning for the future
06 The principally impact-
ed breaker can block other twisted-pair cabling that previously made installa- The Emax 2 air circuit breaker equipped with
breakers from tripping, tion, commissioning and testing difficult 7. Ekip Link forms the basis of a unique solution
when appropriate.
for low-voltage logic-zone discrimination that
07 Ethernet-based connec-
has been designed to meet the most demanding
requirements of reliability, flexibility and efficiency
tion eliminates fault-prone
twisted-pair cabling.
The use of a proprietary bus in DP vessels with closed bus ties. This solution is
guarantees very fast and predict- easy to install, commission and test.
Reference
[1] Ian C. Giddings, able communication that is inde- The Emax 2 and Ekip Link techniques described
IMO Guidelines for
Vessels with Dynamic
Positioning Systems.
pendent of traffic on other buses. here can also be applied to other microgrid appli-
Available: http:// cations or complex power systems for example,
dynamic-positioning.com/ data centers where zone selectivity can provide
proceedings/dp2013/ The Ekip Link modules must be installed in all
quality_giddings_pp.pdf major benefits. l
circuit breakers. During the setup process, ABBs
Ekip Connect software is used to configure the
trip units logic-zone selectivity options ie, define
which signals will be received and which will be
transmitted to the next circuit breaker; establish
the nodes in the system; and determine the
IPaddress of each actor. Here, a node is a defined
group of circuit breakers, one of which is nomi
nated as the unit reference and in which logic-
zone selectivity options are configured using
Ekip Connect. The actors are the remaining
breakers in the group.
Blocking
A
signal
Bus- tie
Breaker Breaker
system 1 system 2 Factory pre-tested
Increased reliability
B Reduced time & costs
Bus- tie
Fault
06 07
60 ABB REVI EW PROTE C TION AND SAFE T Y
P R OTE C TI O N AN D S AFE T Y
Emax 2 is the first circuit breaker
with embedded programmable
logic able to manage automatic
transfer switch function.
ABB Emax 2
Emax 2 is the first intelligent circuit breaker
intended for LV microgrids. In just one product,
Emax 2 provides advanced protection, full connec-
tivity and logic capabilities as well as load, gen-
eration and storage management. Emax 2 is the
all-in-one innovation designed to protect, connect
and optimize LV microgrid applications.
Protection
The circuit breaker can fully protect loads and
generators. For example, the connection of a
generator to an LV microgrid or a medium-voltage
(MV) network through a transformer adds specific
protection requirements such as machine protec-
tion and synchronism between generators and
grid. For these, and other requirements, Emax 2
generator protection trip units offer a wide range
of new protection functions and paralleling checks.
01
62 ABB REVI EW PROTE C TION AND SAFE T Y
02
03| 2017 E MA X 2 MIC ROGRID BRE AKE R SOLU TION 63
Connectivity Management
01 Emax 2, all-in-one
innovation. The network analyzer embedded in the Emax 2 Fast load shedding can support the islanding of
understands power quality and a wide set of the microgrid during the transition from on-grid to
02 Ekip Connect 3 electrical measurements. System integration is off-grid or the steady state. Emax 2, using its rate
commissioning tool. guaranteed by full connectivity via communication of change of frequency (ROCOF) function, discon-
protocols such as IEC 61850, Modbus TCP, Modbus nects loads only when an emergency imbalance
RTU, Ethernet IP, Profibus, ProfiNet, DeviceNet, condition arises 4. Emax 2 realizes the load shed-
Ekip Link and openADR. Ekip View and Ekip Control ding logic using digital contacts embedded in the
Panel microScada are also available. breaker or installed externally in DIN rail modules.
Fabio Monachesi
Lets use the Ekip Connect
web-page picture (Ilaria
has the source file).
64 ABB REVI EW PROTE C TION AND SAFE T Y
From MV switchgear
HM1 HM2
From MV switchgear
From MV switchgear
Intertrip/Interlock
Intertrip/Interlock
Intertrip/Interlock
Intertrip/Interlock
To MV switchgear
To MV switchgear
Alarm Alarm
26 Trip Trip 26
Alarm Alarm
49 Trip Trip 49
71
Alarm Alarm
71
63 Trip Trip 63
Commands
1 1 11
MTS ATS
Manual Automatic
transfer changeover
A C B O OFF ON O
64 11 64
3 S4 S5 S3 S6 3
command
94reset
MTS
ATS
86TA 86TB
51G 5 25 25 51G/I
Reset
94A 94
Set
94B
51G/I 51G/I
27.1 27.2 3
51 51
27.1 ATS/MTS 27.2
51N 51N 3
86A 86
CB-A
27.B 27.B
CB-B
51
LOC REM ON Off 51N LOC REM ON Off
86C
3 3
50 27.A 27.A
51
03a
switchgear
switchgear
From MV
From MV
Commands
MTS ATS
Manual Automatic
transfer changeover
A C B OFF ON
1
S2 S3 S1 S4
emergency
command
MTS
ATS
CB-A CB-B
LOC REM
S43 S43
CB-C
415 V BUS BAR A S43 BUS BAR B
03b
03 Embedded ATS
Emax 2 has a patented integrated fast load-shed- Microgrid islanded
reduces the number of ding method that exploits the devices current and When the microgrid is in standalone mode, it
components required for
the transfer switching
voltage measurements to reduce the risk of such is possible to start up other resources, such as
logic. an event. In accordance with the microgrid power backup generators. As described above, Emax 2s
03a Typical setup.
consumption and frequency measurements, the embedded ATS logic manages the transfer from
adaptive load shedding quickly sheds less critical the main line to an emergency line to minimize
03b With embedded ATS.
loads to maintain power balance and avoid black- problems caused by faulty conditions in the public
outs. As it is possible to add or lose power sources network or MV grid. ABBs embedded ATS is a
after the islanding event eg, a backup gener- high-performance energy automation system
ator starting or an inverter with anti-islanding that is easy to install and program. The ATS takes
advantage of the new capabilities provided by the
Ekip Connect 3 commissioning software tool 2
and the Emax 2 to deliver a compact and reliable
The ABB AbilityTM Electrical solution 3. The embedded ATS solution is as com-
Distribution Control System is a pact as the Emax 2 because nothing needs to be
added apart from internal trip units and Ekip Link
cloud-based platform that can communication. If required, Ekip Synchrocheck
monitor and analyze the flow of modules can be installed to handle synchronism
during paralleling.
power within any facility.
49
The network analyzer embedded
Frequency (Hz)
48
in the Emax 2 understands power
47
quality and a wide set of electrical
measurements.
Microgrid reconnection
With load shedding The ability to resynchronize the microgrid with the
Without load shedding
grid when it is in a steady-state condition is one of
0 Emax 2s integral features.
0 0.5 1.0 1.5 2.0 2.5 3.0
Time (s)
Neither an external synchrocheck relay nor syn-
chronizing equipment is required for the parallel-
04a ing operation. Voltage sensors at the microgrid
side are integrated into the Emax 2 circuit breaker,
so only one single-phase transformer is needed
at the main grid side.
Main
grid
Using the Ekip Synchrocheck cartridge module,
Emax 2 monitors the most important reconnecting
parameters and adapts the microgrid voltage and
frequency to those of the grid. The secondary reg-
Gensets Renewables
ulation of the local generator controllers is realized
by Ekip Signaling contacts so that synchronization
G
can be reached. The circuit breaker automatically
EMAX 2, all-in-one
with load shedding recloses when it understands that the synchro-
nism is achieved using Ekip Synchrocheck together
with the integrated closing coil 5.
ATS
Microgrid grid-connected
Because any power peaks can mean higher bills,
and demand response applications need to control
the power flowing at the PCC, the Emax 2 has a
patented embedded power management algorithm
that performs a slow load and generator disconnec-
tion or power modulation. The algorithm is based
Not-priority loads Priority loads on the limit of the average power flow towards the
microgrid according to the power-handling capabil-
ities of the transformer, on the contractual power
04b
or on the signal received for demand response
strategies. For this last case, Emax 2 leverages
the openADR protocol to communicate with load
aggregators or utilities as a virtual end node.
03| 2017 E MA X 2 MIC ROGRID BRE AKE R SOLU TION 67
04 Load shedding
protects the microgrid
from a rapid frequency Cloud platform
drop. The plant remains
live and can work in
standalone mode with
priority loads always
supplied.
06 Synchro-reclosing
function enables
microgrid reconnection
to the main grid without
external synchronizer.
05
Emax 2 can help the microgrid manager in many As microgrids continue to proliferate, ABBs
other ways too. For example, the cloud-based Emax 2 intelligent circuit breaker will enable
platform, ABB Ability Electrical Distribution Control operators to lower their costs and increase their
System, allows authorized persons to monitor, op- capabilities. Protection, control, monitoring and
timize and control the microgrid from anywhere. All management can all be handled with a single
that is needed is a cartridge-type communication device to ensure microgrid loads and generators
module, the Ekip Com Hub, to be installed on the work in a controlled fashion, whether the micro
terminal box to establish the cloud connection 6. grid is connected to the grid or is operating
in a standalone mode. l
This cloud architecture has been developed to-
gether with Microsoft to enhance performance
and guarantee the highest reliability and security.
For the first time, intelligent circuit breakers can
provide extensive monitoring and management in
widespread LV networks.
50.00
Frequency (Hz)
49.75
49.50
49.25
Microgrid
49.00
Distribution grid
48.75
6 8 10 12 14 16 18 20 22 24
Time (s)
1.1
Voltage (p.u)
1.0
0.9
0.8 Microgrid
0.7 Distribution grid
0.6
6 8 10 12 14 16 18 20 22 24
76
Universal
connectio
03| 2017 69
ns
70 Bespoke MV MFT for a disCERNing
customer
76 Plugging in cruise liners and
container vessels
70
70 ABB REVI EW U NIV E RSAL CONNE C TIONS
U NI V E R S AL CON N E C T I ON S
MFT are transformers connected
to converters (DC/AC, AC/DC,
DC/DC) for weight/dimension
reduction purposes, compared
to a LFT solution.
Physical matters For that reason, MFTs are built with core and
01 CERN headquarters in
Geneva, Switzerland There are some key physical differences when conductor materials that are different from LFTs.
Photograph CERN. comparing LFT with MFT. Medium frequencies Both the magnetic flux and the number of turns
have consequences on the behavior of the ma- are inversely proportional to the frequency. Assum-
terials. The losses caused by the flux at medium ing a constant flux density, increasing the frequen-
frequency are much higher than for low frequency, cy enables a reduction of the core cross-section
which means that standard core materials cannot and of the number of turns in the windings. The
be used. To limit core losses, much thinner steel transformer size therefore reduces very signifi-
sheets (down to a couple of m thickness) or ferri- cantly when the frequency increases. Moreover,
the combination of reduced winding diameter and
lower number of turns drastically reduces the con-
ductor total length, hence the electrical resistance,
The combination of reduced which is the main reason why MFTs are much more
winding diameter and lower num- efficient than LFTs.
01
72 ABB REVI EW U NIV E RSAL CONNE C TIONS
I N TE RVI E W
Dr. Davide Aguglia AR Why did CERN start a project to replace the
existing transformers?
Closely involved in the MFT project
for the Proton Synchrotron DA The LHC needs to increase its luminosity: lumi
nosity being the number of particle collisions per
upgrade, Davide Aguglia talks to second. To achieve this objective, CERN is under-
ABB Review about the technical going a phase of consolidation and upgrade of
its accelerators complex, for which new power
challenges and the outcomes of converters for the PSs RF system are required for
the project. accelerating the particles. The MFTs being the core
sub-components of the new power converters.
Electrical Power Converter group, CERN
Geneva, Switzerland AR Can you summarize for our readers whats special
about the energy requirements for the PS?
In addition to consuming less raw material than One of the challenges that comes with offering
the equivalent power grid frequency transformer, a high insulation voltage, while also reducing the
while increasing efficiency, the reduced footprint size by several orders of magnitude, is linked to
of an MFT is another one of its key benefits 2. bushings. While standard high-voltage bushings
DA Well, this is clear for me. There are three specific DA A specific contract was created to meet the needs
demands that had to be met in one piece of of the project. Covering the risks associated with
equipment. And that didnt exist anywhere. To my such a challenging project for both parties led to a
knowledge, it still doesnt. As far as I know, this is more elaborate purchasing phase.
the first transformer ever to combine: high-voltage
insulation at 25kV, medium frequency at 20kHz ABBs size was certainly an advantage for myself
and power at 100kW. and all the technical people involved at CERN.
ABBs size meant that all phases of the project
In addition to this, the specification from CERN could be done within ABB. Nothing was subcon-
required the converters to be modular. So that they tracted and everything was done in-house. This
could also be used by CERN in the future and not made collaboration much quicker and easier and
just for the PS consolidation and upgrade. also meant that the division of responsibilities
was nice and clear and just between two parties.
AR The first converter has now been installed.
How are things going? AR What was the key ABB differentiator?
DA Five power converters have been ordered. That DA Great with ABB was the high expertise in the
means an order of 17 MFTs. Three for each convert- domain. What stood out for me was being
er and two spares. The prototype is in operation. received in Geneva by the ABB engineers,
It is still being analysed but it is behaving well. technicians and the R&D leader. For example, the
Three more converters are due to be put into technicians were included in the early discussions
operation this autumn. about design. It is a very technical project, and
being able to talk directly to the ABB engineers
AR ABB and CERN are both large organizations. and access their vast range of experience was
Do you think that created synergies or challenges definitely a highlight for me.
during the project?
AR Thats certainly lovely to hear. Thank you for time
and this interview.
74 ABB REVI EW U NIV E RSAL CONNE C TIONS
CERN
Founded in 1954, CERN sits astride the border be-
tween France and Switzerland, near Geneva. It uses
the worlds largest and most complex scientific
For this demanding application
ABB is the only supplier world-
wide, as of today, that is capable
of delivering such a product to
CERN.
02
03| 2017 ARTIC LE TITLE 75
converter. In addition, the power was being The ability to test the MFT under the final operat-
02 Medium-frequency
transformer. upgraded but the replacement MFT had to be no ing conditions guarantees optimal testing and
larger than the previous one, since it was being helps to make sure that the product fully meets
03 CERNs Proton installed in the existing space. the customers specifications. Installation and
Synchrotron where commissioning took place in the first half of 2017.
ABBs MFT is installed.
Photo CERN. The main specifications for the replacement MFTs For this demanding application, ABB is the only
consisted of: supplier worldwide, as of today, that is capable of
U NI V E R S AL CON N E C T I ON S
Plugging in cruise
liners and container
vessels
At berth, a large ship can consume up to 20MVA usually supplied
by its diesel engines. However, dockside air quality and noise are
coming under regulatory scrutiny. Pre-engineered solutions based on
ABBs ACS6000 medium-voltage converter family deliver compliant
and reliable shore-to-ship power with the highest power quality at an
optimized cost per MVA 12.
Often, when in port, ocean-going vessels gener- Supplying such power levels places high demands
ate electrical power using their diesel engines. on port electrical infrastructure both in terms
However, marine engines are not known for their of capital outlay, equipment complexity, running
environmental friendliness and dockside emissions costs and maintenance. Moreover, vessels can
and noise are increasingly subject to regulatory have a 50Hz or 60Hz onboard grid (the majority
scrutiny especially as ports are often located in use 60Hz), so the SFC must not only handle
sensitive marine environments or large, densely high p
ower levels but also adapt the local grid
Roberto Bernacchi populated cities. Indeed, of the top 10 environ frequency to that of each vessel.
ABB Power Grids,
Grid Integration mental priorities that the European Sea Ports
Sesto San Giovanni, Italy Organization (ESPO) has identified for major
ports to take into account, the first three places
roberto.bernacchi@
it.abb.com feature the management of air quality, energy
ABB launched a project to
efficiency and noise [1]. integrate the ABB ACS6000 SFC
Shore-to-ship power
medium-voltage drive platform
To reduce emissions when a ship is at berth, port into a range of pre-engineered,
authorities often provide a shore-to-ship power
link. However, ultralarge such as super-post-
high-end static frequency conver-
Panamax class container vessels can consume sion solutions.
as much as 7.5 MVA and large cruise ships 20MVA.
Ester Guidi If several large container vessels are connected
ABB Robotic and Motion, ABB ACS6000 SFC
Medium Voltage Drives at the same time, the quayside energy provision
To address this high-power-consumption vessel
Turgi, Switzerland can be considerable.
segment and with the aim of delivering state-of-
ester.guidi@ch.abb.com
the-art, shore-to-ship power for customers, ABB
launched a project to integrate the ABB ACS6000
modular medium-voltage drive product platform
into a range of pre-engineered, high-end static
frequency conversion solutions: the ACS6000 SFC.
03| 2017 SHORE -TO-SHIP POWE R 77
01
02
On the vessel side, each inverter unit (INU) is be achieved. Moreover, when compared to a rotat-
connected to a separate winding of the output ing frequency converter, efficiency at partial load
transformer, with the load-side windings in series is close to the maximum, at over 97 percent, even
connection to form the desired load-side grid. down to a 30 percent loading factor.
This series connection, combined with phase shift-
ing of the individual windings in conjunction with ACS6000 SFC integration into the port grid takes
into account the most stringent requirements of
the global standard IEC/ISO/IEEE 80005-1 High
Voltage Shore Connection and the class rules for
The solutions ensure a reliable the vessel defined by the certification companies.
power supply of the highest As an example, the optimized pulse pattern used
to generate the sinusoidal waveform for the vessel
power quality to vessels in full is chosen such that the low-end harmonics up to
compliance with global standards the 50th are either eliminated or controlled to an
acceptable level. A custom RC or RLC filter is then
at an optimized cost per MVA. added to attenuate the remaining higher-order
harmonics (up to the 100th) to achieve total volt-
a special design filter, allows characteristic con- age harmonic distortion levels of below 4 percent.
verter harmonics to be greatly reduced. Standard The choice of frequency conversion platform is
ACS6000 SFC configurations are shown in 3. only the first step in delivering a reliable solution
When selecting the SFC, high importance was giv- to shore-to-ship power system to end-users.
en to its efficiency in order to minimize end-user
OPEX. The selection of the converter cooling meth-
od is of significance here: with a water-cooled SFC,
a conversion efficiency higher than 98 percent can
03| 2017 SHORE -TO-SHIP POWE R 79
COU LSU CBU INU INU WCU COU LSU LSU CBU INU INU INU WCU
xxxx xxxx
xxxx xxxx
03a 03b
02 ABBs ACS6000.
Several additional ship-specific aspects must be Downstream selectivity when selecting the
taken into consideration: short-circuit current capability of the converter
03 Standard ACS6000
System voltage for the ship supply: 6.6kV, or as well as overloading arising from onboard
SFC configurations. 11kV via a step-up transformer. The transfor- switching loads.
03a ACS6000 SFC Double
mer requires an off-load tap changer to switch
(up to 14 MVA). between these two voltage levels.
Synchronization and load sharing with the on-
03b ACS6000 SFC Triple
(up to 24 MVA). board diesel generator, particularly during the
The enhanced ACS6000 SFC plat-
transition immediately after vessel connection form chosen for this application
04 Converter system and to the shore-to-ship power facility.
delivery scope overview.
Any reverse power flow from the vessel to
has 12 variants covering the entire
shore should be managed through a dedicated range of power requirements.
braking resistor to avoid power feedback into
the port grid as this is not acceptable in some
Full electrical control and protection of the
national grid codes.
vessel and converter should be provided
Real-time power factor control (active and re-
through the arrangement of load-side and
active power management) should be achieved,
ship-side switchgear.
taking into account the different vessel grids.
Control hardware
braking resistor
Transformer
Transformer
Switchgear
Switchgear
To grid 1 To grid 2
DC link
04
80 ABB REVI EW U NIV E RSAL CONNE C TIONS
Grid network
Grid interface
point
Premagnetizing
circuit AUX
Transformer(s) Pre-
grid side charge
ACS6000 Mode:
rectifier(s) N/A
Vessel 1
interface
point
A1 B1
Mode:
ACS6000 Q/V
converter(s) P/T
Transformer(s) RA1
vessel side Optional GA1
preinsertion
Optional preinser- resistors
tion resistors
RB1
GB1
RC shunt
05a
Grid network
Grid interface Optional Optional
point Premagnet- ringbus
izing circuit
Premagnetizing
circuit AUX
RC shunt
05b
05 Pre-engineered
A multi-berth installation can have a lower overall grid is a critical ingredient: To maintain a success-
solutions allow smooth OPEX since a single frequency conversion substa- ful balance between demand and supply, the port
execution.
tion can be used to supply several vessels at the grid must be robust all the way from the incoming
05a Single-berth same time 5b. An additional assessment of the high-voltage (HV) substation down to the low-volt-
configuration.
specific load presented by a single vessel should age user 6. An HV substation upgrade or port
05b Multi-berth be performed to make sure that the substation grid repowering can accommodate the introduc-
configuration.
capabilities match the overall load, taking into tion into the port area of e-mobility consumers
account the premagnetization needs of the both on the blue side (electric or hybrid ferries)
06 Smart ports need a
lean and efficient grid
onshore transformer that ensures the galvanic and on the land side (electric vehicles) and facili-
integration that success- isolation between the vessels. tate the integration of renewable power sources
fully balances supply
and demand.
such as wind farms or photovoltaic plants.
06
82 ABB REVI EW
Control a
productiv
83
nd
larger one (or vice versa). ABB
has developed and imple-
ity
scheduling and processes.
84
84 ABB REVI EW CONTROL AND PRODU C TIV IT Y
CO N TR O L AND P RODU C T I VI T Y
sture.vandemoortel@
ch.abb.com
pieder.joerg@ch.abb.com
03| 2017 E LE C TRIC DRIV E N GAS COMPRE SSOR CONT ROL 85
In this article, EDCs are considered and how the Natural gas enters the gas compression process
availability and reliability of these machines can from the suction header, through the suction valve
be increased by automatic control, using both and scrubber to the inlet of the centrifugal com-
an advanced process protection system called pressor. Driven by the electric motor torque, the
Dynamic Time to Surge (DT2S), and an advanced gas is compressed in the centrifugal compressor
drive control system called model predictive
torque control (MPTC).
The focus of this work is on electrical grid dis-
The developed solution provides
turbances, resulting in a fast loss of drive torque, electric driven compressors with
which puts the gas compression process at risk
of a harmful phenomenon called surge.
better ride through capabilities
at lower risk compared to existing
Gas compression process
A typical industrial arrangement of an EDC is
protection schemes.
depicted in 1. The electrical system consists of an
LCI (load commutated inverter) with input trans- and discharged through the discharge valve to the
former, line and machine converters, synchronous discharge header before being cooled in the cooler.
motor and excitation system. The electrical system Two recycle paths are used to influence the com-
is connected to the gas compressor through a pressor operation by connecting the discharge of
flexible shaft with a gearbox that splits the shaft the compressor with its suction side. When a recy-
into a low-speed motor shaft and a high-speed cle valve is opened, it results in a lower resistance,
compressor shaft. and thus decreases the pressure ratio between
suction and discharge, and increases the flow
through the compressor. The opening of the cold
recycle valve can be changed continuously, albeit
rather slowly within the range of seconds, and is
86 ABB REVI EW CONTROL AND PRODU C TIV IT Y
Cold recycle
valve
Hot recycle
valve
Suction Scrubber
valve
Liquid TT
PT
FT
Compressor
DC shaft
Main circuit Motor shaft Gas Non-return
reactor compressor TT PT valve FT
breaker
Exciter
GCU GCU
01
used to change the operating conditions to protect ABBs Megadrive-LCI, depicted in 3, constitutes
the compressor from surge conditions. In contrast, a decades-long success story in the medium-volt-
the hot recycle valve can only be opened complete- age drive business. The reasons for its continuing
ly, yet within the range of hundreds of milliseconds, market success lie foremost in its proven robust-
and is used to trip the compression process for ness and efficiency, and its ability to handle very
protection reasons. high voltages and powers. Over the years, ABB has
produced the Megadrive-LCI in a power range from
The steady-state operation of a centrifugal com- a few to more than 100MW.
pressor is often represented by a compressor map,
which shows the relationship between compressor A sketch of such a variable-speed drive system is
head and flow. The compressor head describes the shown in the lower left corner of 1. On the line
amount of work applied to one unit of gas. side, the LCI is connected via a transformer to the
medium-voltage grid, and on the machine side to
The compressor head is related to the pressure the synchronous machine. The LCI itself comprises
rise between suction and discharge, however a line-side converter, an inductive DC link and a
the pressure rise produced by a given amount of machine-side converter, and thus belongs to the
compressor head varies with the density of the class of current source converters. The power
processed gas. As illustrated in 2, several operat- part of the Megadrive-LCI is based on thyristor
ing constraints need to be met during the opera- technology, which enables operation in high
tion of the machine. The most important one is the power applications.
surge limit. During surge, the compressor experi-
ences oscillating process conditions, and increased In motoring mode, the fixed-frequency AC power
vibration and temperature levels, which may result of the medium-voltage grid is first converted to
in increased wear or even failure of the equipment, DC power and subsequently to AC power of variable
and therefore have to be avoided as far as possible. frequency, which enables the efficient operation
of the synchronous machine at variable speeds.
ABBs Megadrive-LCI
The energy-intensive nature of gas compression
naturally leads to the choice of high-power solu-
tions for the variable-speed drives. A typical
configuration of the variable-speed drive system
comprises a synchronous machine fed by an LCI
such as ABBs Megadrive-LCI.
03| 2017 E LE C TRIC DRIV E N GAS COMPRE SSOR CONTROL 87
01 EDC industrial
Typical challenges In either case, the operation of the gas compressor
arrangement.
Gas processing plants are usually located at remote is stopped and a time-consuming restarting proce-
locations where grid conditions are prone to elec- dure needs to take place.
02 Centrifugal
compressor map. trical disturbances. Weather phenomena such as
winter storms, high winds and iced overhead lines Deciding about if and when to stop the gas com-
occasionally cause short impairments of the power pression process is a delicate question: Stopped
lines, resulting in a sudden reduction of the grid too early, the considerable financial consequences
voltage in one or more phases. Typically, the grid due to loss of production might be unnecessary.
voltage is affected over a time of 50 to 150ms. Stopped too late, the system enters surge, risking
Even if their duration is brief, the consequences of mechanical damage to the system.
these voltage dips can be severe.
The decision is even more challenging considering
Voltage dips constitute a major challenge to the the relatively slow response of the recycle valves.
control system of an LCI. Depending on the ability Even the fast response time of the hot recycle
of the control system to react to these disturbanc- valve amounts to a few hundred milliseconds and
es, the LCI might leave the area of safe operation, requires the opening decision to be made early
which causes the LCI to trip. A common phenome- enough. By the same token, a trip decision only
non is an overcurrent trip due to the inrush current becomes effective after a few hundred millisec-
at the return of the grid voltage. onds, leaving the compressor system unprotected
in the meantime.
A common industrial solution to these difficulties
is to interrupt the operation of the LCI until the grid
voltage has returned. For many applications, this is a
reasonable approach, however not for electric driven
gas compressors: Due to the sudden loss of drive
torque, the compressor quickly diverges towards
surge. Typically, the compression process is thus
tripped in the case of a voltage dip as a precaution
to avoid mechanical damage and wear.
1.0
Surge Surge Maximum
limit control line speed
0.8
Compressor head in a.u.
0.6
0. 4
0. 2
Minimum Choke
speed limit
0
0 0.2 0.4 0.6 0.8 1.0
02
88 ABB REVI EW CONTROL AND PRODU C TIV IT Y
03
In addition to the protection
algorithm, a monitoring system is
included in the DT2S solution.
03 ABBs Megadrive-LCI. In order to solve the problem of operating the EDC includes vibration measurements of compressor
safely but also maximizing the ride-through capa- and motor.
04 Automation system bilities during voltage dips, a new solution was By using the monitoring data, it is possible to:
architecture. Example
developed. This new solution is based on combin- confirm safe operation of the compressor
of how the developed
automation system for ing the electrical system information with the pro- during voltage dips
compressor protection
cess information and predicting the future evolu- support the setting of protection level by eg,
can be deployed on site.
tion of the process trajectory using a process evaluating vibrations during voltage dip events
model. Electrical and process measurements are track possible changes in compressor charac-
sampled at different sampling rates and fed to an teristic that might influence the protection
initialization routine. This routine determines the function settings.
initial process operating point and the expected
partial torque during the dip. This information is
fed to a model of the gas compression process that
PC
Historian
Electrical signals
LCI hardware
Trip signals
04
90 ABB REVI EW CONTROL AND PRODU C TIV IT Y
Model predictive torque control Apart from the ability to handle limits on opera-
Model predictive torque control (MPTC) is a newly tion variables such as the current, and thus avoid
developed control system for ABBs Megadrive-LCI. overcurrent trips, MPTC decides on the firing of
MPTC uses a control algorithm based on model the thyristors in a coordinated way, improving the
predictive control (MPC) that ensures the operation ability to reject disturbances and thus improving
of the drive during power and grid disturbances in the ability to ride through voltage dips.
order to provide the compressor with partial torque,
preventing the compressor from going into surge. More specifically, with MPTC the LCI is capable of
riding through voltage dips while providing partial
MPC is a control algorithm that has its roots in torque to the compression system. How much
the process industries and that has been in use in power can be provided depends on the type and
chemical plants and oil refineries since the 1980s. the depth of the voltage dip 6. With partial
In comparison with traditional control techniques, torque, the divergence into surge might be avoid-
MPC intelligently predicts the future behavior of ed entirely, or at least it will be delayed, allowing
the system to be controlled via a mathematical for a longer grace period for the grid voltage to
model and solves an optimization problem to com- return or for protective measures to be taken. Con-
pute the best control action with respect to given sequentially, safety and availability of the whole
criteria and limits of operations. compression system are increased by MPTC.
05
06
1.0
0.9
0.8
0.7
Drive power (pu)
0.6
0.5
0. 4
Symmetric dip
0.3 Two-phase dip
Single-phase dip
0. 2
Karst 2015-11-29
Kollsnes 2015-12-10
0.1
Kollsnes 2016-12-09
0
0 0.2 0.4 0.6 0.8 1.0
Grid voltage magnitude (pu)
03| 2017 E LE C TRIC DRIV E N GAS COMPRE SSOR CONTROL 91
1
05 ABBs AC 800PEC the (a) Symmetric voltage dip
embedded control board
used in the Megadrive-LCI. 0.5
Grid voltages ()
07 Example of a voltage 1
Drive torque ()
dip ride through.
References 0.5
[1] A. Cortinovis, M.Mer-
cangz, T.O. Stava, S. Van
de moortel, E. Lunde,
Dynamic Time to Surge 0
Computation for Electric
Drivern Gas Compressors (c) Safety margin estimate
during Voltage Dips,
11th IFAC Symposium on 250
Dynamics and Control
of Process Systems
T2S (ms)
Expert support is available to optimize the process A few large players dominate the market for
performance of your drive system. large medium-voltage drives. Price, obviously,
is an important factor for customers, but also
ABB provides consultation with leading drive system
experts to help you develop customized solutions to that the product can deliver high availability.
optimize your drive system assets. Start improving your The amount of gas exported is directly related
drive system here: to availability, and thus, the financial cost related
http://new.abb.com/drives/services/engineering-and- to downtime is significant. l
consulting/drive-system-consulting
92 ABB REVI EW CONTROL AND PRODU C TIV IT Y
CO N TR O L AND P RODU C T I VI T Y
An easy-to-use and
flexible scheduling
component
For many, production scheduling is still a complex and
exotic functionality that seldom finds its way onto the shop
floor. ABB has used the ISA-95 standard as a neutral data-
exchange platform upon which to base an easy-to-use and
flexible Gantt-chart scheduling technology. This technology
is available to businesses in the form of building blocks for
industry-specific products.
Iiro Harjunkoski Over the past two decades, there have been many However, with the ever-increasing availability of
Martin Hollender
Reinhard Bauer significant achievements in the development of data and a higher level of automation and electri-
Jens Doppelhamer scheduling models, methods and solutions. Nev- fication, production scheduling can no longer be
Subanatarajan Subbiah
ABB Corporate ertheless, an extremely important and still partly seen as an autonomous solution. Concepts such
Research Center unresolved technical challenge remains: How to as Internet-of-Things, smart grids, smart manu-
Ladenburg, Germany
facturing, Big Data, Industry 4.0 and software-as-
iiro.harjunkoski@ a-service (SaaS) as well as heightened emphasis
de.abb.com
on enterprise-wide optimization topics [1] increase
martin.hollender@
de.abb.com
A scheduling solution should be the pressure to connect to and interact with neigh-
reinhard.bauer
@de.abb.com closely connected to the produc- boring solutions and systems.
jens.doppelhamer@
de.abb.com tion environment in order to be In most industrial environments, a scheduling solu-
subanatarajan.subbiah
@de.abb.com able to automatically obtain all tion should be closely connected to the produc-
tion environment for instance, to a distributed
Werner Schmidt
Former ABB employee
the production and process data control system (DCS), manufacturing execution
necessary for scheduling. system (MES) or collaborative production man-
agement (CPM) system to automatically obtain
all the production and process data necessary
deploy these solutions efficiently in an industrial
for scheduling. A connection to the enterprise
context. A common approach is to connect plant
resource planning (ERP) system is often essential
experts and process owners with optimization
since production is usually triggered by customer
specialists to build a local solution. This approach
orders entered via an ERP interface. ERP systems
often results in strongly tailored implementations
are also used for procurement to ensure that the
that are normally not reusable and difficult to
appropriate material and resources are available
maintain due to their complexity. These restric-
when called for by the production plan.
tions inhibit wider distribution and lead to island-
ed software solutions.
03| 2017 A FLE XIBLE AND E ASY SC HE DU LING TOOL 93
Operations
schedule
Planning
Material
Control Recipe
(tracking) management
Personnel
Operations Operations Process
response definition segment
01
03| 2017 A FLE XIBLE AND E ASY SC HE DU LING TOOL 95
Dispatching
(eg, MES,
DCS)
Process
02
03
A novel feature of the prototype is its manual It is also possible to extend the prototype with
drag-and-drop functionality. Due to the fast additional algorithms, which can be implemented
algorithmic performance, it is possible to combine in any .net language.
the automatic algorithm with the manual drag-
and-drop functionality. Configuration
Configuration mainly involves the creation of the
The scheduling solution can operate in various required B2MML files 4. The use of a standard
modes ranging from a purely visual manual tool such as ISA-95 makes it easier to agree on a data
to a complex algorithmic solver. In the purely model and simplifies communication between
manual-driven mode, for instance, the decision systems from different vendors. Maintaining
logic is left fully to the operator without any repair generic data in an ISA-95 database is much easier
actions. Orders are moved using the drag-and- than collecting proprietary model data. Further,
drop functionality and a sanity check is performed ISA-95 has established itself as the standard
of choice for integration between ERP and the
manufacturing layer, and ever more professionals
are trained in B2MML.
The algorithm can take into
account all major equipment Ideally, the B2MML data would be used to model
the scheduling problem in an operator-friendly way
constraints, working hours and for instance, through tailored GUI elements and
standard limitations in energy, using familiar terminology.
adds to the technology and procedures available to Since scheduling is less worthy in a standalone
04 Example of a B2MML businesses as building blocks for industry-specific form, integration is the key to improvement. It is
file. The text in black
reflects the case-specific
products and has already been used in mining. The also important to align technology and business
data; ISA-95 standard heuristic approach is scalable and flexible, and, properly to ensure meaningful and valuable results.
tags are shown in red.
The natural home for a scheduling solution is
within a production management system, where
References
the short-term decisions are made and where the
[1] I.E. Grossmann, Chal-
lenges in the application
Information related to equipment, necessary process information is available. l
of mathematical pro-
gramming in the enter-
material, personnel, production
prise-wide optimization
of process industries, recipes and production targets
Theoretical Foundations
of Chemical Engineering, are included in the environment
48 (5), pp. 555573, 2014.
04
98 ABB REVI EW BU ZZ WORD DE MISTIFIE R
BU ZZ WO R D D E M I ST I FI E R
Blockchain
ABB Review is launching a new series seeking
to explain in a brief and simple way complex themes
relevant to technology. In the first of these articles,
the term blockchain is explained.
An entry is submitted
to the blockchain
01 Principle of blockchain.
b b b b b b
a a a
Computer submits Computers test consistency of entries All copies of blockchain are
entry to peers and approve addition of new block updated by adding new block.
Older blocks are not deleted as they
form basis of consistency checks
b b b
01
Imprint
Editorial Board Publisher Printer Disclaimer
ABB Review is published For a subscription, please Vorarlberger The information con- The companies of the ABB
Bazmi Husain by ABB Group R&D and contact your nearest Verlagsanstalt GmbH tained herein reflects Group do not make any
Chief Technology Officer Technology. ABB representative or 6850 Dornbirn/Austria the views of the authors warranty or guarantee,
Group R&D and Technology subscribe online at and is for informational or promise, expressed or
ABB Switzerland Ltd. www.abb.com/abbreview purposes only. Readers implied, concerning the
Adrienne Williams ABB Review Layout should not act upon the content or accuracy of the
Senior Sustainability Segelhofstrasse 1K Partial reprints or DAVILLA AG information contained views expressed herein.
Advisor CH-5405 Baden-Daettwil reproductions are Zurich/Switzerland herein without seeking
Switzerland permitted subject to professional advice. We ISSN: 1013-3119
Christoph Sieder abb.review@ch.abb.com full acknowledgement. make publications availa-
Head of Corporate Complete reprints require ble with the understand- http://www.abb.com/
Communications ABB Review is published the publishers written ing that the authors are abbreview
four times a year consent. not rendering technical
Reiner Schoenrock in English, French, or other professional
Technology and Innova- German and Spanish. Publisher and copyright advice or opinions on
tion Communications ABB Review is free of 2017 specific facts or matters
charge to those with an ABB Switzerland Ltd. and assume no liability
Roland Weiss interest in ABBs tech Baden/Switzerland whatsoever in connection
R&D Strategy Manager nology and objectives. with their use.
Group R&D and Technology
Andreas Moglestue
Chief Editor, ABB Review
andreas.moglestue@
ch.abb.com
Please visit Please note that when you register for this alert, you will
abb.com/ receive an email with a confirmation link. Please ensure that
abbreviewapp you have confirmed your registration.
Affix address label here
Next 04/2017
Making the transition
R E A D ER S H I P S URVE Y 2 017
Your opportunity
to review ABB Review
Because reader perception and satisfaction are important in charting the future
course of ABB Review, you are invited to take part in this short, 10 question, survey.
All participants will have the chance to win one of five bluetooth sound stations.
Your opinions matter to us and we thank you for your time. This survey is also
avaibable online at www.abb.com/abbreview.
Q2 Which of these categories describes your Q5 How do you receive your copy of ABB Review?
main area of interest? (choose only one answer)
(choose only one answer) Personal subscription (print)
Power generation Direct contact with ABB staff
Power transmission and distribution Borrowed from a library
Other utility Circulated at my company
Oil and gas Read it online (pdf)
Other energy Read the tablet/phone version
Mining and minerals Other
Pulp and paper
Food and beverage Q6 To help us to optimize our distribution channels,
Chemicals how would you prefer to receive your copy of
Other process manufacturing ABB Review? (choose only one answer)
Automotive manufacturing Personal subscription (print)
Other discrete manufacturing or handling Direct contact with ABB staff
Building automation Borrowed from a library
Other automation Circulated at my company
Marine Read it online (pdf)
Other transportation Read the tablet/phone version
Data Centers Other
Other
Q7 ABB Review is currently available in four
Q3 Which age category are you in? languages. If you could choose one additional
(choose only one answer) language for ABB Review, which would it be?
15-24 (choose only one answer)
25-34 Arabic
35-44 Italian
45-54 Chinese
55-64 Portuguese
65+ Russian
Answer declined Other (specify)
10 2 03|
ABB2017
R EVI EW RE ADE RSHIP
C HAPTE R 01 SU RV E Y 2017
Please complete
and return the
ABB Review form in a stamped
envelope
ABB Switzerland Ltd. to the address
shown by
Segelhofstrasse 1K 3 November 2017.
CH-5405 Baden-Daettwil
Switzerland
ABB Review launched a new look from Q10 How satisfied are you with the new
edition 1/2017. For the remaining layout/navigation of ABB Review?
questions, please only think about the (choose only one answer)
new look ABB Review. I find navigation very easy
I find navigation fairly easy
Q8 How satisfied are you with the level of Satisfied
technical content in ABB Review articles? I find navigation fairly difficult
(choose only one answer) I find navigation very difficult
Usually not technical enough
Sometimes not technical enough Any comments or feedback on how
Technical content is good ABB Review can be improved?
Sometimes too technical
Usually too technical
By providing your name and email address, you will be entered into a drawing for one of five bluetooth
sound stations. Your personal information will be used solely for improving ABB Review and for the prize
drawer. Your personal information will not be shared or published. We thank you for your feedback.
The results of this survey will be published in a future edition of ABB Review.