The trainee should give a brief and concise report of the task performed during the training and how it was
accomplished. This report should indicate the machineries, equipment, facilities, tools and materials used if any.
Day Accomplishment
Date: March 29 Orientation with Safety Officer, Audio Visual (AV)
1 Time In: 6:45 AM
Time Out: 4:16 PM Quality Control (QC/QA) Engineer and Site
Hours Accumulated: 8 hours Engineer/Supervisor
Date: March 30 Paperworks: Submittal Transmittal
2 Time In: 6:35 AM
Time Out:4:40 PM Technical: Review of Symetrix & Crestron Components
Hours Accumulated: 8 hours Specifications
Inspection/Monitoring: Proper Location of Speaker
wires and Volume Control cables w/ QC/QA Engineer
Date: March 31 Paperworks: Manpower Allocation for AV System at
3 Time In: 6:40 AM
Time Out:4:05 PM Level 3
Hours Accumulated: 8 hours Technical: Wiring installation at Lower Ground AV
Room
Inspection/Monitoring: Location of speaker cables at
Level 6 (Indoor) based on Layout
Date: April 1 Paperworks: None
4 Time In: 6:25 AM
Time Out: 4:02 PM Technical: Continuity testing at Level 1 Ground &
Hours Accumulated: 8 hours Mezzanine using digital multimeter, Radio Frequency
Operations Tutorial, AutoCAD 2014 Tutorial (2D)
Inspection/Monitoring: Manpower activities at Level 3
Date: April 2 Paperworks: None
5 Time In: 6:40 AM
Time Out: 4:00 PM Technical: AutoCAD
Hours Accumulated: 8 hours Inspection/Monitoring: Manpower activities at Level 3
Date: April 4 Paperworks: None
6 Time In: 7:03 AM
Time Out: 4:15 PM Technical: None
Hours Accumulated: 8 hours Inspection/Monitoring: Ceiling cut-out for speaker at
Lower Ground
Date: April 5 Paperworks: None
7 Time In: 6:46 AM
Time Out: 4:09 PM Technical: None
Hours Accumulated: 8 hours Inspection/Monitoring: Ceiling cut-out for speaker at
Lower Ground
Date: April 7 Paperworks: None
8 Time In: 6:46 AM
Time Out:4:03 PM Technical: None
Hours Accumulated: 8 hours Inspection/Monitoring: Manpower activities at Lower
Ground
Date: April 8 (Shangri-la The Fort) Brief Orientation with Project Manager (Audio Visual
9 Time In: 8:03 AM
Time Out: 5:30 PM and Dimming), Tracing of location of installed ceiling
Hours Accumulated: 8 hours speakers, Tagging of Wires at AV Room, Orientation
about Crestron Controls (Mixer, Projector & Motorized
Projector Lifter and Programming)
Date: April 11 (Shangri-la The Fort) Paperworks: List of type of wires used in Skirting,
11 Time In: 7:59 AM
Time Out: 5:15 PM Panels, Wall Control Panels and Floor Box Panels,
Hours Accumulated: 8 hours
Technical: : Troubleshooting of VGA Wires for projector,
Testing and Commissioning (TNC) at Grand Ballroom
Paperworks: None
Date: April 12 (Shangri-la The Fort)
12 Time In: 7:40 AM Technical: TNC at Grand Ballroom using Bright Sign
Time Out: 5:16 PM and Mic, DVD (Projector), Cable testing
Hours Accumulated: 8 hours
Date: April 13 Paperworks: None
13 Time In: 6:40 AM
Time Out: 4:03 PM Technical: Continuity testing at Level 1
Hours Accumulated: 8 hours Others: Orient new On-the-job trainees
Date: April 14 Paperworks:
14 Time In: 6:52 AM
Time Out: 4:07 PM Technical: Familiarize the schematic diagram of AV
Hours Accumulated: 8 hours System and floor plans
Inspection/Monitoring: Manpower activities at Level 1
Date: April 15 Paperworks: None
15 Time In: 6:59 AM
Time Out: 4:07 PM Technical: None
Hours Accumulated: 8 hours Inspection/Monitoring: Manpower activities at Level 6
Date: April 16 Paperworks: None
16 Time In: 6:59 AM
Time Out: 4:03 PM Technical: None
Hours Accumulated: 8 hours Inspection/Monitoring: Wiring Installation at Level 6
Date: April 19 Paperworks: Manpower Allocation for AV System
17 Time In: 6:59 AM
Time Out: 4:05 PM Technical: None
Hours Accumulated: 8 hours Inspection/Monitoring: Cable Pulling at Level 2
Date: April 20 Paperworks: Manpower Allocation
18 Time In: 6:58 AM
Time Out: 4:19 PM Technical: None
Hours Accumulated: 8 hours Inspection/Monitoring: Marking for Screen Projector
and Lifter at Level 5 Large Meeting Room
Date: April 21 Paperworks: Manpower Allocation
19 Time In: 6:53 AM
Time Out: 4:17 PM Technical: None
Hours Accumulated: 8 hours Inspection/Monitoring: Wiring installation and cable
pulling at Level 5, Wiring installation for Floor Box Panel
at Meeting Room Level 1
Date: April 22 Paperworks: Manpower Allocation
20 Time In: 7:00 AM
Time Out: 4:04 PM Technical: None
Hours Accumulated: 8 hours Inspection/Monitoring: Cable pulling at Level 1 from 6
Date: April 23 Paperworks: Manpower Allocation
21 Time In: 6:54 AM
Time Out: 4:04 PM Technical:
Hours Accumulated: 8 hours Inspection/Monitoring: Marking and bracketing for
Motorized Lifter at VIP Area
Date: April 25 Paperworks: Manpower Allocation at Level 5 and 1
22 Time In: 6:39 AM
Time Out: 4:04 PM Technical:
Hours Accumulated: 8 hours Inspection/Monitoring: Tracing of Speaker Cables at
Level 6 (outdoor)
Date: April 26 Paperworks:
23 Time In: 6:47 AM
Time Out: 4:10 PM Technical: Wiring installation at Level 6 (outdoor)
Hours Accumulated: 8 hours Inspection/Monitoring:
Date: April 27 Paperworks: Manpower Allocation for AV System at
24 Time In: 6:50 AM
Time Out: 4:09 PM Level 2
Hours Accumulated: 8 hours Technical: None
Inspection/Monitoring: Manpower Activities at Level 2
IT Room
Date: April 28 Paperworks: Manpower Allocation for AV System at
25 Time In: 7:00 AM
Time Out: 4:16 PM Level 1&2
Hours Accumulated: 8 hours Technical: None
Inspection/Monitoring: Manpower Activities at Level 2
Date: April 29 Paperworks: Inspection of Work Request, Manpower
26 Time In: 7:02 AM
Time Out: 11:42 PM Allocation for AV System
Hours Accumulated: 4 hours Technical: None
Inspection/Monitoring: Checking of cable dropping for
ceiling speakers, homerun of wires, skirting & wall
control panel and Digital Signages, Manpower activities
at Level 2
Date: April 30 Paperworks: Manpower Allocation for AV System
27 Time In: 7:00 AM
Time Out: 4:01 PM Technical: Continuity testing at Level 2 IT room & Level
Hours Accumulated: 8 hours 1 AV room
Inspection/Monitoring: Manpower Activities at Level 2
Date: May 2 Paperworks: Manpower Allocation for AV System
28 Time In: 6:53 AM
Time Out: 4:16 PM Technical: Continuity testing at Lower Ground and
Hours Accumulated: 8 hours Level 1using analog multimeter
Inspection/Monitoring: Manpower Activities at Level 2
Date: May 3 Paperworks: Manpower Allocation for AV System
29 Time In: 6:54 AM
Time Out: 4:23 PM Technical:
Hours Accumulated: 8 hours Inspection/Monitoring: