Ground Fault Protection Relay Contents Dimensional details Drilling plan -

(for Compact CVS MCCBs)


Relay Module GFP11, GFP12, GFP13, GFP14

Commercial Relay
CT type Used with MCCB In In

Reference module type


GFP11

h
GFP11CT13P CT13P CVS100 B/F 3P

g
GFP11
GFP11CT14P CT14P CVS100 B/F 4P

GFP12CT23P CT23P CVS160/250 B/F 3P


GFP12
CT GFP GFP12CT24P CT24P CVS160/250 B/F 4P

GFP13CT33P CT33P CVS400/630 F/N 3P


GFP13
GFP13CT34P CT34P CVS400/630 F/N 4P
This device must be installed by a qualified electrician.
The manufacturer assumes no responsibility of damage for g h
failure to follow the instructions provided. GFP14CT43P CT43P CVS800 F/N 3P

h
GFP14 276 161

g
GFP14CT44P CT44P CVS800 F/N 4P
276 161

421 255

421 255

CVS800 3P + CT43P 70 35 50 30 210 180 445 274 8.0 13.5 40


S1A11735

CVS800 4P + CT44P 70 35 50 30 280 250 445 274 8.0 13.5 40

Mounting of CT on MCCB Schematic Wiring Diagram for 3 Phase 3 Wire and 3 Phase 4 Wire operated GFP Relay Setting of Relay Module - GFP11, GFP12, GFP13, GFP14

Wiring diagram for under voltage release operated GFP Wiring diagram for shunt release operated GFP

1) To change any setting switch `OFF' the MCCB. Remove protective cover
from Relay Module. Replace cover after changing setting.

2) Current Selector Switch Setting:


The setting knob has to be rotated by 2 steps for GFP11 & GFP12 and by
3 steps for GFP13 (The setting will change after the 2nd `click' (GFP11 &
GFP12) and 3rd `click' (GFP13) is heard.
The setting knob of GFP14 is fixed.

Sensitivity and Time Delay Selector Switch Setting:


The setting knob has to be rotated by 2 steps for GFP11, GFP12, GFP13 and
GFP14. (The setting will change after the 2nd `click' is heard.)

3) To test GFP relay press Test Push Button. GFP relay will operate according to
the Time Delay Selection. Keep the Test Push Button pressed till the relay trips
> Supply to Relay unit & Under voltage release shall be taken > Control voltage supply to Relay unit shall be taken from line side (indicated by red lamp).
from supply side of MCCB of MCCB.
> Supply to Shunt release shall be taken from load side of MCCB.
Tightening Torque (Nm)
CT13P 15
CT14P 10
CT23P & CT24P 15
CT33P & CT34P 50 Notes- 1). Connections shown in dotted lines shall be made by customer.
CT43P & CT44P 38
2). HRC fuses are not in SEIPL's scope of supply.