12 THE CONTRACTOR SHALL ENSURE THAT WATER PROOFING MATERIALS ARE NOT 7 THE FOLLOWING OTHER ABBREVIATIONS MAY BE APPLICABLE.
DAMAGED DURING BACKFILLING OPERATIONS AND FIXING OF STEEL.
T= TOP, TT = TOP .TOP. FF = FAR FACE
13 THE MAXIMUM PERMISSIBLE TEMPERATURE OF ANY CONCRETE MIX AT TIME OF EF = EACH FACE
TB = TOP BOTTOM B = BOTTOM
PLACEMENT SHALL BE 30 DEGREES CENTIGRADE.
BB = BOTTOM BOTTOM OF = OUTER FACE IF = INNER FACE
14 ALL CONCRETE WORKS (INCLUDING LINTOLS) THAT ARE TO RECEIVE PLASTER NF = NEAR FACE
OR RENDERED ARE TO USE FORM-WORK WITH SHAW-KEYS. BT = BOTTOM TOP EW = EACH WAY
AP = ALTERNATELY PLACE.
AS = ALTERNATELY STAGGERED.
15 ALL EXPOSED CONCRETE WORK TO HAVE 20mm x 20mm CHAMFERS.
Consulting Engineers Notes Developer Project Title Drawing Title Suffix REVISIONS Date
G1. This drawing is to be read in conjunction with relevant Clients,
Designed by: ALEX, O Sheet No:
and other Engineering drawings.
G2. Work to figured dimensions only.
KABANYE ENTERPRISE PROPOSED SCHOOL DEVELOPMENT GENERAL NOTES Checked by: BANYE, U Date: OCT. 2017.
G3. All dimensioins are in millimeters, unless otherwise specified. FLOODGATE STR OLOKONLA AJAH @
G4. Any discrepancies in the drawing should be reported to the engineer. Email: udoka.banye@gmail.com CHEVRON DRIVE LEKKI LAGOS, Approved by: T.O Scale (s): 1: 100
G5. The engineer is not responsible for works not supervised by him. tel: 08038923028 LAGOS STATE. Drawing No.: Rev: