Sie sind auf Seite 1von 20

Statement of

Qualifications for A/E and Municipal


Administration for CIP Projects
Traffic Engineering September 29, 2017

VISION THAT MOVES YOUR COMMUNITY


VISION THAT MOVES YOUR COMMUNITY

September 29, 2017

Robert Harary
City of Carmel-by-the-Sea
Junipero 2 SE of 4th Avenue
Carmel, CA 93921

Subject: Statement of Qualifications for A/E & Municipal Administration for CIP Projects I
Traffic Engineering Services

Dear Mr. Harary:

TJKM is pleased to submit our Statement of Qualifications to provide On-Call Traffic Engineering Consulting
Services for the City of Carmel-by-the-Sea . TJKM is a traffic engineering and transportation planning firm located
in Pleasanton, San Jose, Santa Rosa, Sacramento, and Fresno. For over 40 years, TJKM has been involved with all
aspects of transportation planning and traffic engineering to improve the quality of life for many communities
within California.

TJKM commits to the City a dedicated, multi-disciplinary staff of seasoned transportation experts who have the
demonstrated capabilities to meet the technical, managerial, and schedule challenges to be encountered with
any transportation-related project. The team offered by TJKM is not only unparalleled in each of these areas, but
has the creativity to develop innovative design approaches to meet any of the City's project goals.

To meet the specific needs of the City of Carmel-by-the-Sea, we are pleased to propose, Mr. Nayan Am in, TE of
TJKM as the Project Manager. He has over 27 years of traffic engineering and transportation planning
experience. He has provided similar services to the Cities of Palo Alto, Seaside, Walnut Creek and Tracy. He will
be supported by a group of talented and experienced leaders in their fields with significant experience in
providing engineering support services for the development of federal, state, and locally funded transportation-
related projects. The Team brings current knowledge and experience to the City and is ready to "hit the ground
running."

Contact & Commitment


As President of the firm, you have my personal assurance that all the resources necessary to address the City of
Carmel-by-the-Sea's needs will be made available and ready to perform, when the opportunity arises.

If you have any questions regarding our qualifications, please do not hesitate to contact us. I can be reached at
408.410.2977 or via email at namin@tjkm.com .

Work will be performed out of our San Jose office located at 2055 Gateway Place, Suite 400, San Jose, CA 95110.

We look forward to hearing from you.

Sincerely,

TJKM Transportation Consultants

Nayan Amin, TE, President/Proposed Project Manager

PLEASANTON + SAN JOSE + SANTA ROSA + SACRAMENTO + FRESNO


Corporate Office: 4305 Hacienda Drive, Suite 550, Pleasanton, CA 94588
Phone: 925.463.0611 Fax: 925.463.3690 www.TJKM.com
DBE #40772 + SBE #38780
________________________________________________________________________________

FORM A GENERAL FIRM INFORMATION

1. Firms Name:
TJKM Transportation Consultants

2. Firms Local
Address: 2055 Gateway Place, Suite 400 San Jose, CA 95110

x
3. Is your local office the Head Office? Yes No x Yes No
Branch Office?
Only Office? x No
Yes
1974
4. Year your firm was established: ______________________

2016
5. Year your local office was established: ________________

6. Primary contacts (Principals) in the local office:


Name Title Telephone E-Mail Address
Number

Nayan Amin President 408.410.2977 namin@tjkm.com

Ruta Jariwala Principal 408.421.0768 rjariwala@tjkm.com

7. List locations of no more than three (3) other offices where work may be performed (if
applicable):
Address Telephone Number # of Personnel
4305 Hacienda Dr. Ste. 550, Pleasanton 925.463.0611 17

8. Total employees presently employed:

12
a) In your local office______ 31
b) In your firm_______

9. Errors and Omissions Insurance

2M
a) Amount your firm presently carries: $_________________ claim
per _________________________

XL Specialty Insurance Company


b) Carriers name and address: ____________________________________________________
________________________________________________________________________________
FORM B TENTATIVE PROJECT TEAM
SERVICE AREA (Select one Service Area from list in SOQ package):

A. Consultants Key Personnel

Please identify your tentative, key Project Team members, their titles/roles and primary duties:

Name Title/Role Primary Duties

Nayan Amin, TE President/Project Manager Project Management

Preliminary Engineering, Traffic


Ruta Jariwala, PE, TE Principal/Task Lead Operations

Chris Kinzel, PE, TE Vice President/Task Lead Speed Surveys, Parking

Atul Patel, TE, PTOE Director/Task Lead Traffic Engineering

Lawrence Liao Director/Task Lead Travel Demand Forecasting

Lin Zhang, PhD, PE, TE, PTOE Senior Project Manager/Task Lead Interagency Coordination

B. Subconsultant and Support Services

Please identify up to four (4) key subconsultants or vendors, contact persons, and services they
would provide in order to support your Project Team.

Firm Name & Location Contact Person Support Services

National Data Surveying Services Laura Norsen Traffic Counts

C. Organizational Chart

Please insert an Organizational Chart of your tentative Project Team on the next page.
Organizational Chart for City of Carmel-by-the Sea
A/E & Municipal Administration for CIP Projects

City of Carmel-by-the-Sea
Project Manager
Legend
* = Task Leaders

Project Manager
Nayan Amin, TE

Traffic Engineering Multimodal Preliminary Parking Studies Speed Surveys


Design Transportation Planning Engineering Chris Kinzel, PE, TE* Chris Kinzel, PE, TE*
Atul Patel, TE, PTOE* Colin Burgett* Ruta Jariwala, PE, TE* Ian Lin, PTP Prashanth Dullu
Rutvij Patel, EIT Janice Spuller Prashanth Dullu
Shruti Shrivastava Shruti Shrivastava
Sandeep Paparaju

Interagency Coordination Pedestrian/ Traffic Safety Travel Demand


Lin Zhang, PhD, PE, TE* Bicycle Studies Committee Support Modeling
Nayan Amin, TE Colin Burgett Janice Spuller* Lawrence Liao*
Prashanth Dullu
Traffic Counts/Studies Shruti Shrivastava
Shruti Shrivastava

Traffic Operations
Ruta Jariwala, PE, TE
Lin Zhang, PhD, PE, TE
Shruti Shrivastava
FORM C RESUMES OF KEY PERSONNEL

1. Name: _Nayan Amin, TE______________________________________________________________

2. Role in this Service Area: _Project Manager_______________________________________________

3. Years of experience Total: _27_______ With current firm: __9_________________ __

4. Education (Degree and Specialization) _MS & BS Civil Engineering__________________________

5. Current Registration/Certification (State & Discipline) CA/Traffic Engineer______________________

6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)

7. Relevant Project Title & Location (City & State): _On-Call Traffic Engineering Services, Palo Alto_____
- Year Completed Professional Services: __Ongoing__________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Project Manager | $1M | Providing on-call services for
projects which include: Staff on-site support for Safe Route to School (SRTS) design and construction inspection
project, Embarcadero Road Redesign to Palo Alto High School, Review of Alma Street Train Preemption Signal
Phasing Alternative, Citywide parking inventory for the residential permit parking program, Alma Street/Loma Verde
Signal Warrant Analysis, On-site support two days a week. __________ __________
- Performed Relevant Project with Current Firm: Yes X No

8. Relevant Project Title & Location (City & State): _On-Call Traffic Engineering, Walnut Creek_______________
- Year Completed Professional Services: _Ongoing___________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Task Lead | $100K | Under this contract TJKM has
provided Traffic Impact Analysis Technical Guidelines; multiple task orders related to preparation of Grant
Application; traffic calming studies, traffic impact fee update; safe routes to school and preparation of Capital
Improvement Project._________________________________________
- Performed Relevant Project with Current Firm: Yes X No

9. Relevant Project Title & Location (City & State): _Seaside 2040 General Plan____________________
- Year Completed Professional Services: _2017______________________________________________
- Year Completed Construction (if applicable): _N/A___________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _QA/QC Manager | $160K | Key components of the
project included: Recommended changes to street standards, Updated goals and policies for vehicles, transit, bicycle
and pedestrian facilities and freight, Complete Streets goals, policies, performance measures, and improvements
(including potential changes to the Citys functional street classifications to account for non-motorized travel),
Comprehensive revisions to the Citys planned bikeway network, Identification of pedestrian priority improvements,
and Performance measures for assessing the transportation impacts of future development, consistent with SB
743.______________________ _____________
- Performed Relevant Project with Current Firm: Yes X No
FORM C RESUMES OF KEY PERSONNEL

1. Name: _Ruta Jariwala, PE, TE______________________________________________________________

2. Role in this Service Area: _Preliminary Engineering Task Lead___________________________________

3. Years of experience Total: _18_______ With current firm: __5_________________ __

4. Education (Degree and Specialization) _MS & BS Civil Engineering__________________________

5. Current Registration/Certification (State & Discipline) CA/Professional Civil & Traffic Engineer______________

6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)

7. Relevant Project Title & Location (City & State): _Neighborhood Traffic Calming Program, Hayward___
- Year Completed Professional Services: __2016__________________________________________
- Year Completed Construction (if applicable): __N/A_________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Project Manager | $208K | Assisting the City of Hayward
to prepare a Citywide Intersection Study to address existing and future congestion and enhance operations for all
modes of transportation throughout the City of Hayward. TJKM conducted a comprehensive outreach approach
geared in part to addressing potential concerns on the part of both the development community and City leaders.
TJKM is examining about 100 intersections and 15 roadway segments for the project. TJKM used land use
information from the General Plan to determine the amount of growth expected, and will conduct a thorough study
of needed roadway improvements, leading to the preparation of the CIP document. As a part of the project, TJKM
will also prepare conceptual layouts for the recommended improvements. __________ __________
- Performed Relevant Project with Current Firm: Yes X No

8. Relevant Project Title & Location (City & State): _Comprehensive Pedestrian & Bicycle Master Plan, Belmont
- Year Completed Professional Services: _2016___________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Task Lead | $67K | Involved in developing a
comprehensive pedestrian and bicycle master plan to encourage people of all ages to bike or walk more. The TJKM
team prepared a thorough review of existing bicycle, pedestrian, and Safe Routes to School planning documents,
conducted peak hour manual counts for pedestrians and bicyclists at key intersections, as well as analyzed
pedestrian and bicycle collisions to offer countermeasures. The team also identified and worked with
representatives from community groups, schools, police and fire departments, coalitions and adjacent agencies to
gain support of the plan and conducted public outreach._________________
- Performed Relevant Project with Current Firm: Yes X No

9. Relevant Project Title & Location (City & State): _On-Call Traffic Engineering Services, San Bruno_____
- Year Completed Professional Services: _Ongoing___________________________________________
- Year Completed Construction (if applicable): _N/A___________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _QA/QC Manager | $150K | Some of the projects
completed under this contract are Engineering and Traffic Surveys, Susan Drive Site Distance Evaluation, San Mateo
Avenue Pedestrian Safety Enhancements, San Bruno Avenue and Second Avenue Intersection Safety Analysis, etc.
After completing a thorough field investigation and collecting necessary data, TJKM engineers analyzed the issues
and made necessary recommendations to resolve issues and improved safety. In addition, in 2016 TJKM was retained
under a separate contract to assist with developing San Brunos first Transportation Impact Fee._________________
- Performed Relevant Project with Current Firm: Yes X No
FORM C RESUMES OF KEY PERSONNEL

1. Name: _Chris Kinzel, PE, TE______________________________________________________________

2. Role in this Service Area: _Parking Studies & Speed Surveys Task Lead____________________________

3. Years of experience Total: _57_______ With current firm: __43________________ __

4. Education (Degree and Specialization) _MS Transportation Engineering | BS Civil Engineering________________

5. Current Registration/Certification (State & Discipline) CA/Professional Civil & Traffic Engineer_______________

6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)

7. Relevant Project Title & Location (City & State): _On-Call Traffic Engineering Services, Orinda_____
- Year Completed Professional Services: __Ongoing__________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Project Manager | $50K | Responsible for overseeing
a variety of traffic engineering services provided to the City, including conducting a field review of centerline striping
for four corridors and recommending modifications, conducting a traffic study near SR 24 and recommending
improvement measures for the corridor. TJKM has also conducted speed surveys on 26 roadway segments and a
focused pedestrian safety study near Glorietta Elementary School, providing recommendations for improvements.
Other tasks include investigating intersection traffic safety conditions to determine if a stop sign is warranted and
conducting a Peer Review of EIR transportation section for a new residential development.____________________
- Performed Relevant Project with Current Firm: Yes X No

8. Relevant Project Title & Location (City & State): _Downtown & Neighborhoods Parking Study, Orinda_______
- Year Completed Professional Services: _Ongoing___________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Project Manager | $51K | Developing a comprehensive
Parking Management Plan that will summarize Orindas current parking challenges, anticipated future demand,
potential near-term and long-term solutions and an action plan. The study will analyze parking needs of all users
including visitors, employees, commuters and residents. It will evaluate impacts of BART commuter parking on
Orinda businesses and residents and develop strategies that will lessen the negative impacts on residential
neighborhoods. The Plan will explore In-Lieu Fees, Shared Parking, Paid Parking, Shuttle to BART station and many
other TDM Strategies. The project involves extensive community outreach and stakeholder
coordination.___________________
- Performed Relevant Project with Current Firm: Yes X No

9. Relevant Project Title & Location (City & State): _On-Call Traffic Engineering Services_____________
- Year Completed Professional Services: _Ongoing ___________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Principal-In-Charge | $600K | responsible for overseeing
the completion of traffic impact analyses for various proposed projects in the City, including a medical center,
Montessori elementary school, and housing developments. Tasks include, but are not limited to, project
management, stakeholder coordination, collecting traffic counts, trip generation and distribution, Level of Service
(LOS) calculations, traffic operations, and intersection configurations. TJKM will coordinate project meetings at
various stages of the project, as needed. ________
- Performed Relevant Project with Current Firm: Yes X No
FORM C RESUMES OF KEY PERSONNEL

1. Name: _Atul Patel, TE, PTOE_____________________________________________________________

2. Role in this Service Area: _Traffic Engineering Design Task Lead_________________________________

3. Years of experience Total: _27_______ With current firm: __5_________________ __

4. Education (Degree and Specialization) _MBA, Technical Management | BS Civil Engineering_________________

5. Current Registration/Certification (State & Discipline) CA/Traffic Engineer, Professional Traffic Operations
Engineer

6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)

7. Relevant Project Title & Location (City & State): _On-Call Transportation Engineering & Planning Services,
Redwood City
- Year Completed Professional Services: __Ongoing__________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Project Manager | $250K | Responsible for preparing
conceptual designs of intersection improvements, numerous reviews of traffic impact studies, provide construction
plan reviews and regional transportation planning support. For two days per week, TJKM provides on-site assistance
with the traffic calming and parking restriction citizen requests, reviewing proposed traffic calming devices,
pedestrian crossing signals, and stop sign installation.____ __________
- Performed Relevant Project with Current Firm: Yes X No

8. Relevant Project Title & Location (City & State): _Safe Routes to School 2015, Sunnyvale_________
- Year Completed Professional Services: _2016___________________________________________
- Year Completed Construction (if applicable): _Ongoing______________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Project Manager | $286K | responsible for designing
the PS&E for Citywide pedestrian improvements at 60 signalized and unsignalized intersections. The improvements
consist of modifications of traffic signal equipment, curb ramp upgrades, signing and striping and pavement marking
improvements. TJKM analyzed over 200 intersections and prepared a Basis of Design Report for the recommended
improvements to move forward into the detailed design phase. TJKM is currently designing the improvements
recommended along with preparing the E76 documentation for NEPA environmental clearance.________________
- Performed Relevant Project with Current Firm: Yes X No

9. Relevant Project Title & Location (City & State): _HSIP Project Signal Modifications at Two Intersections,
Sunnyvale
- Year Completed Professional Services: _2016______________________________________________
- Year Completed Construction (if applicable): _2016_________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Project Manager | $73K |Designed the safety
improvements at the intersections of Mathilda/Maude and Sunnyvale-Saratoga/Fremont intersections. Design of
changeable message signs for northbound and southbound approaches, installation of reflective yellow backplates
and ADA push button upgrades. The project involved HSIP funding and obtaining environmental clearance for each
intersection and coordinating with Caltrans Local Assistance Program for E-76 permit clearance. Also provided
support through the construction bid process and construction. __________
- Performed Relevant Project with Current Firm: Yes X No
FORM C RESUMES OF KEY PERSONNEL

1. Name: _Lawrence Liao______________________________________________________________

2. Role in this Service Area: _Travel Demand Modeling Task Lead_________________________________

3. Years of experience Total: _18_______ With current firm: __3_________________ __

4. Education (Degree and Specialization) _M. Eng. Transportation | MS & BS Industrial Engineering

5. Current Registration/Certification (State & Discipline) Certified Cub Trainer______________________

6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)

7. Relevant Project Title & Location (City & State): _Menlo Park City Model Development_____
- Year Completed Professional Services: __Ongoing__________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Task Lead | $70K | Completed travel forecast to support
traffic analysis as part of project, which entailed updating the Citys last general plan from 1994, to address regional
commuting challenges, improve transit services, and remedy gaps in pedestrian and bicycle networks and
parking._________ __________
- Performed Relevant Project with Current Firm: Yes X No

8. Relevant Project Title & Location (City & State): _On-Call Traffic Engineering, Palo Alto___________________
- Year Completed Professional Services: _Ongoing___________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Task Lead | $1M | Completed travel forecast to support
traffic analysis on projects including Safe Routes to School design and construction, Embarcadero Road redesign to
Palo Alto High School, to suggestion alternatives for the congested corridor review of Alma Street Train Preemption
Signal Phasing Alternative. TJKM also conducted a citywide parking inventory for the residential permit-parking
program and a signal warrant analysis for Alma Street/Loma Verde. __________________________
- Performed Relevant Project with Current Firm: Yes X No

9. Relevant Project Title & Location (City & State): _COMPASS Travel Demand Modeling On-Call Services, Idaho_
- Year Completed Professional Services: _Ongoing___________________________________________
- Year Completed Construction (if applicable): _N/A_____________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Project Manager | $150K | Providing ongoing Cube
Voyager modeling support since 2008. CS has developed models for the Treasure Valley High Capacity Transit Study
Priority Corridor Alternatives Analysis, updated/validated the 2008 peak-hour model, increased the number of
modeled zones, inte-grated Cube Land into COMPASS travel demand model, and enhanced the regions Mode
Choice model to address the Federal Transit Administration (FTA) Technical Guidance.
- Performed Relevant Project with Current Firm: Yes X No
FORM C RESUMES OF KEY PERSONNEL

1. Name: _Lin Zhang, PhD, PE, TE, PTOE____________________________________________________________

2. Role in this Service Area: _Interagency Coordination Task Lead__________________________________

3. Years of experience Total: _15_______ With current firm: __1_________________ __

4. Education (Degree and Specialization) _PhD, MS, & BS, Civil Engineering ________________________

5. Current Registration/Certification (State & Discipline) CA/Professional Civil & Traffic Engineer | Professional
Traffic Operations Engineer_______________________

6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)

7. Relevant Project Title & Location (City & State): _ Project Evaluation for LAVTA/Dublin TPI/NGAOP Project,
Dublin
- Year Completed Professional Services: __Ongoing__________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Project Manager | $60K | Assisting MTC in conducting
a comprehensive evaluation of the LAVTA/Dublin Transit Performance Initiative/Next Generation Arterial
Operations Program project which involves adaptive traffic control system, transit signal priority, bus queue jump,
bicycle detection, and transit real-time passenger information system. The evaluation is comprehensive in its nature,
covering not only travel time, speed and delay, but also other performance measures such as travel time reliability,
vehicle throughput, queue length, fuel consumption and emissions, TSP activations, QJ activations, transit travel
time and reliability, transit schedule adherence, transit ridership, and pedestrian delay. It also includes a thorough
benefit/cost analysis to calculate the B/C ratio, taking into consideration the benefits of the system, initial
investment, staff time spent during deployment/implementation phase, and ongoing system operations and
maintenance costs. The impact on agency resources, such as agency staff resource needs, training, ease of use, and
number of public complaints, will also be evaluated. _________ __________
- Performed Relevant Project with Current Firm: Yes X No

8. Relevant Project Title & Location (City & State): _Citywide Multimodal Improvement Study, Hayward
- Year Completed Professional Services: _Ongoing___________________________________________
- Year Completed Construction (if applicable): _N/A__________________________________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: _Task Lead | $250K | assisting the City of Hayward in
preparing a Citywide Intersection Study to address existing and future congestion and enhance operations for all
modes of transportation throughout the City of Hayward. As a part of the project, a comprehensive outreach was
conducted geared to address potential concerns on both the community and City leaders. Examined about 100
intersections and 15 roadway segments for the project. Used land use information from the General Plan to
determine the amount of growth expected. Currently conducting a thorough study of needed roadway
improvements, leading to the preparation of the CIP document. As a part of the project, we will also prepare
conceptual layouts for the recommended improvements.______________________________________
- Performed Relevant Project with Current Firm: Yes X No
FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS
Project Key Number (1 to 4): 1 X 2 3 4 (Match the bottom of Form E)

1. Title of Example Project: _Seaside 2040 General Plan

2. Project Location (City and State): _Seaside, CA_____________________________________________

3. Year Completed Professional Services: _2017_____________________________________________

4. Year Completed Construction (if applicable): _____________________________________________

5. Project Owners Information:

- Project Owner: __City of Seaside_________________________________________________________

- Point of Contact Name: _Rick Riedl________________________________________________________

- Point of Contact Telephone Number: __831.899.6884________________________________________

- Point of Contact E-Mail Address: __rriedl@ci.seaside.ca.us____________________________________

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
TJKM was responsible for a comprehensive update to Seasides Circulation Element incorporating complete streets
components, multimodal performance metrics, revisions to citywide bikeway network, identification of pedestrian
priority focus areas, and related land use and mobility projects. In addition to updating the Circulation Element,
TJKMs tasks also included travel demand modeling and preparation of the General Plan EIR transportation analysis.

The Circulation Element update included a greater emphasis on multi-modal transportation, including bicycle, motor
vehicle, pedestrian, and transit circulation. Key components included recommended changes to street standards,
and updated goals and policies for vehicles, transit, bicycle and pedestrian facilities, and freight. Key issues
incorporated into the planning effort included: Complete Streets goals, policies, performance measures, and
improvements (including potential changes to the Citys functional street classifications to account for non-
motorized travel); revisions to the Citys bikeway network map; provision of a pedestrian network map; and
performance measures for assessing the transportation impacts of future development, consistent with SB 743.__

7. Subconsultants from FORM B Involved with this Example Project, if any:

Firm Name Firm Location Support Service


FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS
Project Key Number (1 to 4): 1 2 X 3 4 (Match the bottom of Form E)

1. Title of Example Project: _On-Call Traffic Engineering Services_________________________________

2. Project Location (City and State): _Palo Alto, CA ____________________________________________

3. Year Completed Professional Services: __2013-Ongoing____________________________________

4. Year Completed Construction (if applicable): _____________________________________________

5. Project Owners Information:

- Project Owner: __City of Palo Alto________________________________________________________

- Point of Contact Name: __Joshuah Mello__________________________________________________

- Point of Contact Telephone Number: _650.329.2136_________________________________________

- Point of Contact E-Mail Address: _joshuah.mello@cityofpaloalto.org____________________________

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.): Some of our
projects include:
Middlefield Road North Safety Project Design and Traffic Evaluation Report TJKM prepared design plans for
signage, medians, and striping improvements on the Middlefield Road North Corridor and performed evaluations
over a one-year period to evaluate changes in transportation conditions.
Midtown Parking Layout Reconfiguration TJKM collected data and designed modifications to an existing parking
lot at the corner of Middlefield Road and Colorado Avenue. Tasks included collecting parking lot data and designing
the exiting parking lot to include limited-time parking signs, relocating existing bike racks, and striping.
Staff On-Site Support for SRTS Design & Construction Inspection Project TJKM engineers conducted fieldwork and
designed the PS&E for four elementary schools. In addition, TJKM engineers provided construction support for this
major Safe Routes to School (SRTS) project.
Embarcadero Road Redesign to Palo Alto High School TJKM conducted traffic simulation for several alternatives
and assisted the City in selecting a few Plan Line alternatives.
Review of Alma Street Train Preemption Signal Phasing Alternative TJKM reviewed existing train preemption and
recommended an improved signal-phasing plan.
Residential Permit Parking Inventory TJKM conducted citywide parking inventory for the residential permit-
parking program.
Alma Street/Loma Verde Signal Warrant Analysis TJKM conducted a signal warrant analysis based on Manual on
Uniform Traffic Control Devices (MUTCD) guidelines.
Providing On-Call Traffic Engineering Support For two days per week, TJKM is providing on-site assistance with
the citizen requests related to transportation planning, traffic engineering and traffic operations, parking restriction,
reviewing proposed traffic calming devices, pedestrian crossing signals, and stop sign installations.
FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS
Project Key Number (1 to 4): 1 2 3 X 4 (Match the bottom of Form E)

1. Title of Example Project: _Downtown & Neighborhood Parking Study___________________________

2. Project Location (City and State): _Orinda, CA______________________________________________

3. Year Completed Professional Services: _2016_____________________________________________

4. Year Completed Construction (if applicable): _____________________________________________

5. Project Owners Information:

- Project Owner: __City of Orinda__________________________________________________________

- Point of Contact Name: __Tonya Gilmore__________________________________________________

- Point of Contact Telephone Number: __925.253.4291________________________________________

- Point of Contact E-Mail Address: _tgilmore@cityoforinda.org__________________________________

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
TJKM developed a comprehensive Parking Management Plan that summarizes Orindas current parking challenges,
anticipated future demand, potential near-term and long-term solutions and an action plan. The study analyzed
parking needs of all users including visitors, employees, commuters, and residents. It evaluates impacts of BART
commuter parking on Orinda businesses and residents and develop strategies that will lessen the negative impacts
on residential neighborhoods. The Plan explored In-Lieu Fees, Shared Parking, Paid Parking, Shuttle to BART station
and many other TDM Strategies. The project involved extensive community outreach and stakeholder coordination.
The recommendations were approved by the City Council, now in the implementation phase.

7. Subconsultants from FORM B Involved with this Example Project, if any:

Firm Name Firm Location Support Service


FORM D EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRMS QUALIFICATIONS
Project Key Number (1 to 4): 1 2 3 4 X (Match the bottom of Form E)

1. Title of Example Project: _Comprehensive Pedestrian & Bicycle Master Plan______________________

2. Project Location (City and State): _Belmont, CA_____________________________________________

3. Year Completed Professional Services: _2016_____________________________________________

4. Year Completed Construction (if applicable): _____________________________________________

5. Project Owners Information:

- Project Owner: _City of Belmont______________________________________________

- Point of Contact Name: __Bozhena Palatnik________________________________________________

- Point of Contact Telephone Number: _650.595.7463_________________________________________

- Point of Contact E-Mail Address: _bpalatnik@belmont.gov____________________________________

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
TJKM developed a comprehensive pedestrian and bicycle master plan to encourage people of all ages to bike or walk
more. Currently, Belmont has several bicycle lane segments but does not provide a consistent bike route, and the
provision of continuous sidewalks is limited due to steep terrain, right-of-way-limitations and opposition from
neighborhood groups. TJKM prepared a thorough review of existing bicycle, pedestrian, and Safe Routes to Schools
planning documents, including the Citys Complete Streets Policy.

TJKM conducted public outreach via walking/biking tours, online surveys and advisory committee meetings.

TJKM developed Belmonts first citywide bikeway network map, recommended pedestrian priority segments,
prepared cost estimates and identified a phased list of capital improvement projects.

As part of a separate hiring process, TJKM was recently selected by the City to prepare construction drawings for
Phase I of the Ralston Avenue Corridor bicycle and pedestrian improvements that will provide critical links along and
across the eastern half of the Citys key east/west corridor, including connections between neighborhoods,
downtown and the Belmont Caltrain Station.

7. Subconsultants from FORM B Involved with this Example Project, if any:

Firm Name Firm Location Support Service


FORM E KEY PERSONNEL PARTICIPATION
IN EXAMPLE PROJECTS
Example Projects from FORM
D (Fill in Example Projects
Key section shown below
No. Key Personnel From Role before completing this table.
FORM C Then, place X under project
key numbers below for key
personnels participation in
Example Projects.

1 2 3 4
1. Nayan Amin Project Manager X X X

2. Ruta Jariwala Preliminary Engineering Task Lead X X X

Chris Kinzel Parking Study & Speed Surveys X X


3.
Task Lead

Atul Patel Traffic Engineering Design Task X X


4.
Lead

Lawrence Liao Travel Demand Modeling Task X X


5.
Lead

Lin Zhang Interagency Coordination Task X


6.
Lead

Colin Burgett Multimodal Transportation X X X X


7.
Planning Task Lead

Example Projects Key from FORM D


No. Title of Example Project No. Title of Example Project
1. Seaside 2040 General Plan 3. Downtown & Neighborhood Parking Study, Orinda

2. On-Call Traffic Engineering Services, Palo 4. Comprehensive Pedestrian & Bicycle Master Plan,
Alto Belmont
FORM F APPLICABLE SPECIALIZED EQUIPMENT AND RESOURCES
List specialized and/or unique equipment, vehicles, software, or other resources your firm possesses
that is advantageous or necessary to perform this service and which your firm is willing to commit
locally. Equipment may include, but is not limited to: heavy equipment, special purpose or specially-
equipped vehicles, equipment, specialized computer programs, reference manuals/codes, laboratory
testing equipment, audio visual equipment, tools, supplies, or other relevant resources.

1. Applicable Specialized Equipment


GPS Equipment for travel time runs

2. Applicable Specialized Software Programs


Syncho, SimTraffic, Vissim, HCS, TransCAD, Cube

3. Applicable Reference Manuals, Codes, Data, etc.


ITE Trip Generation Manual, Highway Capacity Manual, AASHTO Green Book, Highway Design Manual, etc.

4. Other Applicable Resources


FORM G HOURLY RATE SHEET

Fully Burdened Hourly Rates


No. Key Personnel from FORM C Role
2017 2018 2019
1. Nayan Amin Project Manager
$220 $227 $233

2. Ruta Jariwala Preliminary


$220 $227 $233
Engineering Task
Lead
3. Chris Kinzel Parking Study &
$220 $227 $233
Speed Surveys
Task Lead
4. Atul Patel Traffic
$200 $206 $212
Engineering
Design Task Lead
5. Lawrence Liao Travel Demand
$200 $206 $212
Modeling Task
Lead
6. Lin Zhang Interagency
$190 $196 $202
Coordination Task
Lead
7. Colin Burgett Multimodal
$190 $196 $202
Transportation
Planning Task
Lead
Fully Burdened Hourly Rates
No. Other Staff Role
(or Classifications) 2017 2018 2019
11. Project Manager
$160 $165 $170
12. Assistant Transportation
$115 $118 $122
Engineer
13. Assistant Transportation Planner
$105 $108 $111
14. Technical Staff II
$85 $88 $90

Does your firms fully burdened hourly rates include the following?
Software Yes X No Vehicles Yes X No
Phone/Cell Yes X No Printing Yes X No
Mileage Yes No X Postage/Courier Yes No X

Please initial here to acknowledge that markups for subconsultants and other direct costs shall not
exceed 10.0% __NA________
FORM H ADDITIONAL INFORMATION
Provide any additional information that would further clarify your interest, expertise, similar
experience, and/or capabilities relevant to this Service Area.

It is our understanding that the City of Carmel-by-the-Sea is seeking on-call professional support and expertise in
Traffic Engineering services to complete a variety of projects. The on-call contract is intended to provide a flexible
and effective way to respond to recurring service needs for multi-dimensional tasks covering a range of traffic
engineering services.
TJKM Transportation Consultants founded in 1974, is a traffic engineering and transportation planning, firm that
services Northern and Central California. TJKM currently has a staff of 30 employees with offices in Pleasanton, San
Jose, Fresno, Sacramento, and Santa Rosa. For over 40 years, more than 3,500 satisfied clients have entrusted
TJKM with their critical work. We serve a full-range of clients, including municipalities, congestion management
agencies, metropolitan planning organizations, transportation agencies, private developers, other consulting firms,
and attorneys.
TJKM has played an important role in the completion of numerous on-call contracts. Over the years, we have
gained invaluable insight and experience in managing individual assignments and the overall contract effectively.
With this knowledge, TJKM will ensure that our service to the City will be timely, cost-effective, and of the highest
quality, as we serve as an extension of City staff. A major goal for each assignment, will be to complete all phases
within the agreed upon budget and schedule. Mr. Amin and the rest of the TJKM Team have proven their ability to
adhere to contract agreements in numerous transportation projects.
As a full-service, multi-disciplinary organization, the TJKM Team offers expertise in the following areas:

Transportation Planning Traffic Studies


Traffic Engineering Design Roadway Improvements
Traffic Operations On-Street & Off-Street Parking
Corridor Studies Travel Demand Forecasting
Traffic Analysis Development & Site Plan Review
Traffic Calming Transit Priority & Bus Rapid Transit
Traffic Signals Transit Modeling & Simulation Travel Demand
Traffic Signal Timing & Coordination Modeling & Forecasting
Parking Studies Construction Support Services
Multimodal Studies Educational Material
Transportation Management Design Criteria, Schematic Design & Alternatives
Environmental Impact Studies Project Phasing, Scheduling, & Estimating
Intelligent Transportation Systems (ITS) Topographic Surveys
Incident Management Government Agency Review & Coordination
Communication Systems Feasibility Studies
Traffic Modeling Programming & Grant Application
Traffic Simulation Noise Analysis
Pedestrian & Bicycle Access & Safety Plan, Specifications, & Estimate (PS&E) Preparation
Traffic Safety Systems Public & Staff Meeting Facilitation

Signature of Authorized Representative: __________________________________


Printed Name: _Nayan Amin__________________________________________________________
Title of Signer: _President____________________________________________________________
Date Signed: _September 28, 2017_____________________________________________________
Corporate Office
4305 Hacienda Drive, Suite 550, Pleasanton, CA 94588
Phone: (925) 463-0611
www.TJKM.com

Das könnte Ihnen auch gefallen