1.All dimensions to be checked on the site.

2.where applicable the contractor is to


check on site size of components to

DOORS AND WINDOWS SCHEDULE manufactured before production.

3.Contractor is responsible for the correct


setting out of the buildings, all external and
internal walls with particular reference to
boundaries , building lines e.t.c.
4. Contractors to verify all levels , heights and
dimensions on site and to check the same
against the drawings before commercement of
Construction.
900 DISCLAIMER
The elements shown on this drawing have been
1500 approved by the client , and he accepts
responsibility for materials , content and
2100

statement

1350
Project:

PROPOSED RESIDENTIAL
750 1200 DEVELOPMENT @
OGWA,UMUEZEALAIJE,OCHII OGWA,

1350
OGWA, MBAITOLI LOCAL
2100

GOVERNMENT AREA ,IMO STATE

Client:
1200

600
Mr. UZUEGBU ISHMAEL
2100

600
UGOCHUKWU

consultants:

900 1500 HAMZ PROJECTS & LOGISTICS LTD.


Architecture,Building / Civil Engineering,Property
Development.
1350

1000

PLOT 127 IKENEGBU EXTENSION


OWERRI,IMO STATE
07037592537
3,3rd Eweka street,
Benin City, Edo State.

designed Henry Ugochukwu


sheet no.
drawn Henry Ugochukwu

checked Ifeanyi Obani

Approved