WM/4 PRODUCTION CONTROL 2 of 2 (POUCHES / BLISTERS / TUBES)

GENERATED BY PLANNING DAILY PLAN FOR PRODUCTION


UNIT DATE SHIFT M/C LINE GRADE/PRODUCT OPERATOR
TUR / TAL / JEJ 1/2/3
PACK TYPE PACK SIZE CUSTOMER PLAN (Lt / Kg/ Nos) SHIFT PLAN (Lt / Kg/ Nos) BALANCE PLAN (Lt / Kg/ Nos) PLANNING SIGN
PO / BL/ TU
GENERATED BY PRODUCTION BASIC DATA TO BE FILLED BY OPERATOR BEFORE START OF M/C LINE
OPERATOR GRADE/ PRODUCT B.NO. DENSITY/g/cc (if any) TARE WT. ( UNIT PACK/5 POUCHES) IN g

TANK NO. (if any) MRP (UNIT) Rs. VISCOSITY (if any) NOZZLE VISCOSITY (if any) GROSS WT. ( UNIT PACK/5 POUCHES) IN g

MRP (SHIPPER)Rs. IS FLUSHING REQD? IF YES, FLUSHED QTY (Lts) CODING ON UNIT PACK SHIPPER CODING

ON LINE PRODUCTION CONTROL

PARAMETER TO BE CHECKED : CAPPING/ SEAL/ CODING/ CRIMPING / FLAP PASTING/ .(IN CASE OF PROBLEM PUT NOT OK

PARAMETER 1 hr 2hr 3hr 4hr 5hr 6hr 7hr 8hr

FILL WT (g) SAMPLE 1

SAMPLE 2

SAMPLE 3

SAMPLE 4

SAMPLE 5

VISUAL CAPPING

SEALING

CODING

CRIMPING

FLAP PASTING

PRODUCTION SUMMARY

TOTAL PRODUCTION TOTAL REJECTION PACKS

TOTAL GOOD PRODUCTION TOTAL REECTION SEALS / CRIMPINGS

TOTAL GOOD FG SHIPPERS TOTAL REJECTION SHIPPERS

REJECTION ANALYSIS DETAILS

DOWNTIME DETAILS

MACHINE REASON FOR DOWNTIME START TIME END TIME TOTAL DOWNTIME IN HRS

SUMMARY OF PRODUCTIO N DATA

RM / SFG PACKS CAPS LAMINATE SHIPPERS BLISTERS BACKINGS REMARKS

ISSUED/TAKEN

PRODUCED

REJECTED

TOTAL

REMARKS

AUTHORISED BY UNIT HEAD SIGNATUR E& DATE SIGN BY OPERATOR