OracleEnterpriseAssetManagementUser'sGuide
Release12.2
Contents Previous Next
PartNumberE4878907
eAMWorkManagement
Thischaptercoversthefollowingtopics:
OvervieweAMWorkManagement
eAMWorkOrders
RoutineWorkOrders
UsingEncumbranceAccountingwithMaintenanceWorkOrders
ExpressWorkOrders
PreventiveMaintenanceWorkOrders
RebuildWorkOrders
EasyWorkOrders
eAMWorkOrderStatuses
DefiningWorkOrderDocuments
eAMOperationsandTasks
DefiningAssetShutdownStatuses
PreparingWorkOrderOperations
ViewingWorkOrderOperations
DefiningInventoryMaterialRequirements
DefiningDirectItemMaterialRequirements
ViewingMaterialRequirements
DefiningResourceRequirements
ViewingResourceRequirements
WorkOrderRelationships
ParentChildRelationship
EndtoStartDependency
CostRelationships
FollowupWorkRelationship
eAMWorkOrderTransactions
OperationCompletion
WorkOrderCompletion
RebuildWorkOrderCompletion
TransactingMaterial
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 1/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
ViewingResourcesTransactions
ClosingWorkOrders
eAMWorkOrderPlanning
UsingtheMaintenanceWorkbench
CapitalizingWorkOrders
OvervieweAMWorkManagement
Theworkorderisthefoundationforallmaintenanceorganizations.Workordersdefinetheresourcesanditemsthatareneededtoconductwork.Theycan
automaticallygeneratethroughtheuseofPreventiveMaintenanceSchedules,theissueofaninventoriedrebuildable,breachofqualityresults,ormanually
generatedasaroutineworkorder.TheseworkordersarethenreviewedandsharedwithOperationstoproduceanestimatedschedule.
OracleEnterpriseAssetManagementintegrateswithOracleQuality.UseQualitycollectionplanstopredefinerequiredfeedbackinformationthatmustbe
enteredintoOracleEnterpriseAssetManagement,uponaworkorder'scompletion.Forexample,datatocollectmayincludeinspectionpointsforasset
numberanddowntimevariables.Ifavarianceisrecordedtothequalityplan,aworkrequestorworkorderiscreated.Youcandefinequalitycollectionplans
directlyontheworkorder,ordefinethemasattributesofanactivitytoultimatelydefaultintofutureworkordersthataregeneratedforspecificassetnumber
andactivitycombinations.
Foreachworkorder,theestimatedcostsaggregate,fromtheassociatedBOMandresources,todevelopacostingprofileforthecurrentworkorder.Youcan
useCostingProfilesforfutureBudgetingandForecasting.
Foreachworkorder,theactualcostsaggregateduringtheworkorder'slifecycle.Thesecostsrollup,basedonthehierarchyofthecurrentworkorder's
associatedassetnumber.Viewtheseactualcostsbyperiodatatransactionleveloratasummarylevel.Costscanrollup,basedonthehierarchyofwork
orders.Youcanviewthecosts(bothactualandestimates)byperiod,atatransactionorsummarylevel.
Thischapterisdividedintothefollowingsections:
eAMWorkOrders
eAMOperationsandTasks
WorkOrderRelationships
eAMWorkOrderTransactions
eAMWorkOrderPlanning
eAMWorkOrders
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 2/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
OracleEnterpriseAssetManagementworkordersarecreatedforassetsandrebuildableinventoryitems.Theyaredefinedmanually,orgenerated
automaticallybasedonascheduledactivity.Ifyouattachanactivitytoamanuallycreatedworkorder(normallytheroleofaPlanner),theworkorderinherits
theactivity'sattributes,suchasthemaintenanceBOM,maintenanceroute(operations),attachments,qualityplans,costinformation,andschedulingrules.
Whenpreplannedworkordersarecreatedforassets,theactivityinformationassociatedwiththeworkorder'scurrentassetnumberautomaticallyattaches
materialandresourcerequirementinformationtotheworkorder.
Youcanprintworkpackets(workorderswithattachments)throughanAutovueserverusingtheEnterpriseAssetManagementorMaintenanceSuperUser
responsibility.
SeeMaintenanceWorkOrderPackagePrintwithAutovueorPrintingWorkPacketsUsingAutovue.
Thissectionincludesthefollowingtopics:
RoutineWorkOrders
UsingEncumbranceAccountingwithMaintenanceWorkOrders
ExpressWorkOrders
PreventiveMaintenanceWorkOrders
RebuildWorkOrders
EasyWorkOrders
eAMWorkOrderStatuses
DefiningWorkOrderDocuments
RoutineWorkOrders
RoutineworkordersarenormallycreatedbyaplannerfromtheMaintenanceWorkbench(See:UsingtheMaintenanceWorkbench),andarealsocreatedusing
amenuoption.Materialandresourceplanning(See:OverviewofPlanningandScheduling)isusedateachstatusoftheroutineworkorder(See:eAMWork
OrderStatuses).
Tomanuallycreateaworkorder
1.NavigatetotheFindWorkOrderswindow(WorkOrders>WorkOrders).
Note:Thisfunctionisavailableforthoseuserswithresponsibilitiesandrolesthatincludefunction,EAM_WO_DETAILS_MODE,withtheirassociated
menu.Otherwise,youcanonlyviewworkorders,andcannotupdateassociatedassethierarchy,workorderhierarchy,material,resource,operation,
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 3/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
cost,collectionplanresults,workrequest,andattachmentinformation.See:ImplementingFunctionSecurity, OracleApplicationsSystemAdministrator's
GuideSecurity .
2.ChooseNew.
WorkOrder
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 4/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Theheaderinformationdisplaysgeneralinformationabouttheassetnumberandthetypeofworkrequired.
3.TheWorkOrdernumberisassigned,butyoucanupdateit.
4.Enteranassetnumberrequiringmaintenance.Theassetgroupdefaults(See:DefiningAssetNumbers).
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 5/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
5.SelectanAssetActivity.Onlyassetactivitiesassociatedwiththisassetnumberareavailable.
Note:Ifthisworkorderwaspreviouslycreated,youcanaddanassetactivity,aslongastheworkorderisatanUnreleasedorDraftstatus,oran
assetactivitywasnotpreviouslydefined.Ifanytasks,material,orresourcerequirementsexist,thesemustbedeletedbeforeaddinganassetactivityto
anexistingworkorder.
Afterselectinganassetactivity,theassociatedmaintenanceBOM(material)(See:SettingUpMaintenanceBillsofMaterial)andmaintenanceroute
(resources),associatedwiththeactivity(See:DefiningMaintenanceRoutes),attachtotheworkorder.Afteranassetactivityissavedtoaworkorder,
youcannolongerchangeordeleteit.
6.EnteraClasscodetorepresentthecharge(expense)accountsassociatedwiththeassetnumber.Thisdefaultsfromtheassetnumber,butyoucan
updateit.
SelectamaintenanceWIPAccountingClassthatcontainsanencumbranceaccountifwanttouseencumbranceaccounting.
7.EntertheStatus.Forexample,Unreleased,Released,OnHold,andDraft.Certaintransactionsupdatethisstatusautomatically,includingWorkOrder
Completion,forexample(See:eAMWorkOrderStatuses).
8.ThePendingcheckboxvaluedetermineswhethertheworkorderhasreachedthestatusaboveorisstillpending,duetoworkflow.Thisvalueissetby
theWorkOrderWorkflowApprovalprocess.Ifthecheckboxisclear,theStatusreflectsthecurrentstate.Ifthecheckboxisselected,theStatus
reflectsadesiredtargetstatethatisnotyetreachedduetopendingactivity,suchasaworkflowapprovalthatisstillinprogress.
9.IfthisisachildworkorderinaworkordernetworkandParentChildispopulatedintheRelationshipTypefield,theparentworkorderispopulatedin
thisfield.
10.TheRelationshipTypefieldindicatesthetypeofRelationshipassociatedwiththeworkorder.ValidrelationshipsareParentChild,EndtoStart
Dependency,Cost,andFollowupWork.Managecomplexmaintenancejobsthroughthesefourtypesofworkorderrelationships.See:WorkOrder
Relationships.
ParentChild:Thisrelationshipenablesanetworkofworkorders,whichincludesonetoplevelworkorderthatdefinesthetimelineofallits
childrenworkorders.Thestartandenddatesofthechildrenworkordersarewithinthestartandenddatesoftheparentworkorder.Achild
workordercanbeparenttoanotherworkorder.Oneparentcanhavemultiplechildren,butonechildcanhaveasingleparent.Therecanbean
infinitenumberofparentchildworkorderlevels,withintheParentChildrelationship.
EndtoStartDependency:Youcancreateworkorderswithschedulingdependencyrelationships(includingchildsiblingworkorders).Forexample,
oneworkorder'sscheduledstartdateisdependentonanotherworkorder'scompletion.Withthisrelationship,thenextworkordercannotstart
untilthepriorworkorderiscompleted.
Cost:Youcanrollthechildworkordercostsintotheparentworkorder,forreportingpurposes.Youcanbasethecostrollup,withinahierarchy,
onschedulingrelationships.Schedulingrelationshipsarenotrequiredtorollupcostswithinahierarchy.Youcancreateacostreportinghierarchy
thatisdifferentfromtheschedulinghierarchy.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 6/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
FollowupWork:YoucancreateaworkorderforthecurrentcapitalassetnumberorRebuildableItem,whileexecutingworkfortheasseton
anotherworkorder.Forexample,asecondproblemwiththeassetisdiscoveredwhileexecutingaworkorder.Afollowupworkorder,associated
withtheoriginalworkorder,iscreatedfortheissue.Thisisindependentofschedulingorcostrelationships.
11.IntheScheduledDatesregion,entertheworkorder'sscheduledStartdateifitisbasedonaforwardschedule.Theschedulingprocessusesthisdate
asastartingpointtocalculatethescheduledenddateanddurationforallocatedresourcesandmaterial.Ifthematerial/resourcesarenotavailableby
thisdate,theschedulingprocessmovesthestartdateforward.
12.EnterascheduledCompletiondateforbackwardscheduling.Thisdateindicatestherequestedendbydateforthework.Theschedulingprocessuses
thisdateasastartingpointtocalculatethescheduledstartdateanddurationforallocatedresourcesandmaterial.Ifthematerialandresourcesare
notavailablebythatdate,theschedulingprocessmovesthestartdatebackwardstoensurecompletionbytherequiredenddate.
Note:Actualdatesareenteredatoperationandworkordercompletion.ScheduleddatesarecalculatedbytheEnterpriseAssetManagementscheduler
ifyouhaveOracleProductionSchedulingenabled(See:OverviewofSettingUp, OracleProductionSchedulingUser'sGuide
).Otherwise,theEAM
schedulercalculatesthedates.
SeeeAMSchedulingformoreinformation.
13.WithintheMaintab,theDepartmentvaluedefaultsfromtheselectedassetnumber.(See:DefiningAssetNumbers).Thisindicatesthepersonsor
departmentresponsibleforthisassetnumber.
Youcanchangethedepartmentattheoperationlevelifnotransactionshavebeenrecordedfortheworkorder.
14.OptionallyselectaPlannerforthisworkorder.
15.OptionallyselectaPriority,suchasHigh,Medium,orLow.
16.OptionallyselectaWorkOrderType.Workordertypesenableyoutodifferentiateworkorders,forexample,Routine,Preventive,Rebuild,Emergency,or
Facilities.Maintenancemanagementcanusethisinformationtosortandmonitorworkactivitiesforreportingandbudgeting.Workordertypesare
referencedintheworkorder.Forinformationonhowtocreatevalidvalueswithintheavailablelistofvalues,See:WorkOrderTypes.
17.TheShutdownTypedefaultsfromtheactivity.Thishelpstheplannergroupworkordersthatmayrequireshutdowns,sothattheyareplannedtogether.
18.IftheFirmcheckboxisselected,planningandschedulingdoesnotautomaticallyadjusttheschedule,regardlessofmaterialorresourceavailability
OverviewofeAMPlanningandScheduling.Thischeckboxdefaultsasselectedorcleared,dependingontheAutoFirmonReleaseandAutoFirmon
Createcheckboxsettings,establishedintheEnterpriseAssetManagementParameterssetupforthecurrentorganization(See:DefiningeAM
Parameters).ThisdefaultsaftertheworkorderisReleased,ifyouselecttheAutoFirmonReleasecheckbox,anddefaultsimmediatelyifyouselected
theAutoFirmonCreatecheckbox.
Ifthecheckboxisselected,theenddateiscalculated,basedontheworkorderduration.Theschedulerautomaticallycalculatesthedurationbasedon
theoperations(resourcedurationsetup)ontheworkorder.YoucanupdatethischeckboxforworkordersatDraft,Released,Unreleased,OnHold,or
Cancelstatuses(See:eAMWorkOrderStatuses).
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 7/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
IftheFirmcheckboxisselected,youcanstillmanuallyreschedulearesourceontheworkorder,therebyupdatingthedatesonitscorresponding
operationandworkorder.
19.OptionallyselecttheNotificationRequiredcheckbox.
20.OptionallyselecttheTagoutRequiredcheckboxtoindicatethattheAreamustbesecuredforoperationsrequiredtoexecutethisworkorder.Tagsare
generallyprintedandplacedonanasset,warningtheplantthatitisshutdownandshouldnotbestarted.Thischeckboxhelpstheplannerisolatethose
jobsthatrequireatagout.
SelectthepaperclipAttachmentsicontoattachrelevanttagoutdocuments.YoucanattachURL,file,ortextattachments.See:DefiningWorkOrder
Documents.
21.ThePlannedcheckboxisselectedifthecurrentworkorderwascreatedfromforecastedworkorders(See:PreventiveMaintenanceWorkOrders).
22.OptionallyselecttheEnableMaterialIssueRequestscheckboxtoenableeAMtomanagematerialavailabilityforthecurrentworkorder.Materialis
physicallyavailabletoaworkorderviathematerialrequestandverificationprocess.ThischeckboxisselectedbydefaultifitisselectedontheeAM
Parameterswindow.
23.TheConstructionEstimatefieldwilldisplayiftheworkorderwascreatedbyusingtheConstructionEstimateWorkbench.Thefieldisdisplayonly.
24.OptionallyenterFailureInformation(See:FailureAnalysisOverview).TheFailureInformationregionappearsifthe FailureCodeRequiredvalueissetto
Yes
,withintheFailureSetdefinition(See:DefiningFailureCodesandSets).
IftheFailureEntryRequiredcheckboxisselected,FailureCodeentryismandatoryduringworkordercompletion.
25.TheMaterialShortageregionenablesyoutoviewmaterialavailability.Thisregionpopulates,afteryouhavesavedtheworkorder.
TheMaterialShortagefielddisplayswhetherthereisashortageofthematerial(atthatmomentintime)thatisneededtocompletetheworkorder's
operations.Thisstatushelpsyoutodeterminewhentostartwork.Forexample,ifthereisamaterialshortage,youtypicallywouldnotstartwork.The
processthatpopulatesthisfieldconsidersbothstockedanddirectitems.Forstockeditems,theWorkOrderMaterialShortageprocessdetermines
whetheralloftheinventoriedmaterialwithintheworkorder'sassociatedBOMisavailabletotransact(ATPisnotconsidered).Fordirectitems,theWork
OrderMaterialShortageprocessdeterminesifallofthedirectitemsthatareincludedwithintheworkorder'sassociatedBOMarereceivedinto
Inventory.Thisprocessshouldbesettoautomaticallyexecuteperiodically,butyoucanexecuteitfromthemenuatanytime.
YoucanchooseCheckShortagetoviewtheshortagedetails.
26.SelecttheActivitytabtoselectalternate,predefinedBOMsandRoutings.See:SettingUpMaintenanceBillsofMaterialandDefiningMaintenance
Routes.
AfterthealternateBOMandRoutingareselected,thesystemusestheassociateditemsandassignstheassociatedresourcesneededtoexecutethe
workorder.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 8/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
27.OptionallyselectanActivityType.Thiscodeindicatesthetypeofmaintenanceforthisactivityandisusedwhendefiningajoborastandardjob,for
example,Inspection,Overhaul,Lubrication,Repair,Servicing,orCleaning.Thisvaluedefaultsfromtheactivity(See:DefiningActivities).
28.OptionallyselectanActivityCausetospecifywhatsituationcausedthisworktogenerate,forexample,Breakdown,Vandalism,NormalWear,or
Settings.Thisvaluedefaultsfromtheactivity.
29.OptionallyselectanActivitySourcetospecifyreasonsthatactivitiesrequireexecution,forexample,WarrantyCompliance,OSHACompliance,orMilitary
SpecificationRequirements.
Thisvaluedefaultsfromtheactivity.
30.OptionallyselecttheProjecttab.ThistabisenabledonlyifProjectManufacturingisinstalledandenabled.
a.OptionallyselectaProject.
b.OptionallyselectaTask.
31.YoucanselecttheRebuildtabifthisworkorderiscreatedforarebuildableitem.See:RebuildWorkOrders.
32.OptionallyselecttheRequesttabtodisplayserviceandworkrequestsassociatedwiththisworkorder.
Youcanaddserviceorworkrequeststoaworkorderbyselectingaservicerequestorrequestnumber,respectively.OnlyworkrequestsatanAwaiting
WorkOrderstatusandMaintenanceTypeservicerequestsatanOpenstatusareavailableforassociation.Youmayassociatemultipleworkrequeststo
asingleworkorder,butonlyoneworkordercanassociatewithaservicerequest.Youcanassociateaservicerequesttomultipleworkorders.Youcan
dissociateaworkrequestfromaworkorder.
Ifyouwanttoviewaworkrequestattachment,highlighttheworkrequestandthenselectView,Attachments.Ifthereareanyattachmentsassociated
withtheworkrequest,youwillbeabletoviewthem.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 9/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Todeleteaworkrequest:
a.Highlighttheworkrequest.
b.ChooseDelete.
33.OptionallyselecttheApprovalHistorytabtoviewtheworkorder'sapprovalhistory.Aworkordermightrequireapprovalsornotificationsatdifferent
stagesofitslifecycle.Forexample,organizationstypicallywantanapprovalprocessinplacebeforeaworkorderisreleased.Workflowautomatesthis
process.YoucaninitiateWorkflowtogeneratenotifications,approvals,transactions,andupdateaworkorderstatus.YoucanenableWorkflowforWork
OrderswithintheeAMParameters(See:DefiningeAMParameters).YoucansetupBusinessEventsandEventSubscriptions(oruseseededeventsand
subscriptions)withinOracleWorkflowtoindicatewhateventstriggerWorkflow.SeededeventsthatyoucanenabletotriggerWorkflowareWorkOrder
creation,WorkOrderreleaseapproval,WorkOrdercompletion,WorkOrderstatuschange,Operationcompletion.See:SettingUpOracleWorkflow,
OracleWorkflowUser'sGuide,SettingUptheBusinessEventSystem, OracleWorkflowUser'sGuide
,andDefiningWorkOrderStatuses).
34.OptionallychooseOperationstopreparenecessaryoperations.Theseoperationsdefaultfromthemaintenanceroute(See:DefiningMaintenance
Routes)associatedwiththecurrentactivity,butyoucanupdateandaddtothem(See:PreparingWorkOrderOperations).
Youcanchangetheoperationsifnotransactionshavebeenrecordedfortheworkorder.
35.OptionallychooseMaterialstovieworadditemsfromtheassociatedassetnumber'sitemslist(See:SettingUpMaintenanceBillsofMaterialand
DefiningMaterialRequirements).FromtheMaterialRequirementswindow,youcanoptionallychooseSelectMaterialstoaddmaterialsfromthisAsset
BOMtothematerialrequirementsforthecurrentworkorder.
36.OptionallychooseResourcestoview,add,orupdatetheresourcesassignedtoeachoperation.See:DefiningResourceRequirements.
Youcanchangetheresourcesforthisworkorderattheoperationlevelifnotransactionshavebeenrecordedfortheworkorder.
37.OptionallychooseRelationshipstomanageworkorderschedulesandviewworkorderdetails.See:WorkOrderRelationships.
38.OptionallychooseAssetRoutetoviewtheassetrouteassociatedwiththecurrentworkorder'sassetgroup.Youmayneedtoperformoneactivityon
multipleassetnumbers.Toeliminatethepossibilityofcreatingmultipleworkordersforthesameactivity,youcandefineassetroutes.See:Defining
AssetRoutes.
YoucanchooseAssetRouteifanassetrouteisassociatedwiththecurrentassetnumber.
39.OptionallychooseCoststoviewthecostsofworkordersfallinginthespecificaccountingperiods,specifiedintheAccountingInformationbyPeriod
region.AccountingPeriodsaredefinedwithinOracleGeneralLedger.See:DefiningPeriodTypes, OracleGeneralLedgerUser'sGuide
andDefining
Calendars, OracleGeneralLedgerUser'sGuide
.
a.Optionallyselectaworkorder,thenchooseValueSummarytoviewasummaryoftheactual,estimated,andvariancecostsforlaborhours,
equipmenthours,andmaterialagainstthecurrentworkorder.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 10/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
ActualCosts:Thisistheaccumulationofallcostsformaterialandresourcetransactionsfortheassetnumber'sassociatedmaintenance
workorders,basedonaspecifiedperiod.
Estimates:ABOM(materialpartslist)androuting(resources)canassociatewithaworkorder.
WhenyouselecttheEstimatestab,theestimatedcostsofallmaterialandresourcesassociatedwithaworkorderappear,enablingyouto
budgetcosts.
Variances:Thedifferencebetweentheactualcostsrecordedandestimatedcosts.
Material:Allmaterialandmaterialoverheadtransactioncosts.
Labor:Allresourceandresourceoverheadtransactioncostsassociatedwithpersonnel.
Equipment:Allmaterialresourceandresourceoverheadtransactioncosts.
b.OptionallychooseDetailstoviewactual,estimated,andvariancecostsforlaborhours,equipmenthours,andmaterialforspecificoperationsof
thecurrentworkorder.
40.Optionallyselectaworkorder,thenchooseValueSummarytoviewasummaryoftheactual,estimated,andvariancecostsforlaborhours,equipment
hours,andmaterialagainstthecurrentworkorder.
41.Saveyourwork.
Aftersavingaworkorder,youcanoptionallyassociateassetattachments:(M)Tools>CopyAssetAttachments.
RelatedTopics
DefiningAssetDocuments
OverviewofeAMCostManagement
FailureAnalysisOverview
UsingEncumbranceAccountingwithMaintenanceWorkOrders
YoumustspecifyanencumbranceaccountfortheWIPAccountingClassusedformaintenance(shopfloor)workorders.
TodefineaWIPAccountingClasstouseencumbranceaccounting
1.NavigatetotheWIPAccountingClasswindow(EnterpriseAssetManagement>WIPAccountingClasses).
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 11/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
2.Definealltherequiredfieldsonthepage.
SeeDefiningWIPAccountingClasses, OracleWorkinProcessUser'sGuide).
3.SelecttheEncumbranceAccountingfield,andentertheencumbranceaccounttobeusedtocapturetheexpenses.
4.Saveyourwork.
ExpressWorkOrders
Youcanusethenewexpressworkorderfeaturetocaptureworkthathasbeencompleted.Thesetypesofworkordersarealsoknownas'emergencywork
orders.'
Youcancreateanewworkorder,chargetimetoitandcompleteitatthesametime.
RelatedTopics
CreatingExpressWorkOrders
PreventiveMaintenanceWorkOrders
OracleEnterpriseAssetManagementenablesyoutogenerateworkordersautomaticallybasedonmeterreadings,runtimeintervals,andcalendardays.
Preventivemaintenanceactivitiesreducetheprobabilityoffailureordegradationoftheassets'physicalconditions.Theseactivitiesareexecutedperiodically,
byusage,orbasedontheconditionofanassetnumber(assetorrebuildableserialnumber).Metersareenteredtomeasureanyassetnumberthatneedsto
bemeasuredandperiodicallyserviced,basedonthemeasurement.Forexample,apipemaystartoutat12millimeters,butwhenitwearstoonlyfour
millimeters,itneedstobereplaced(See:Meters).
Schedulingdefinitionsaredefinedtocreateforecasted,scheduledworkorders,basedonmeterreadings.YoucancreateaPreventiveMaintenancescheduling
definition(See:PreventiveMaintenanceScheduling)foranassetnumberorrebuildableitemandactivitycombination(See:AssociatingAssetNumberswith
Activities),oranassetroute(See:DefiningAssetRoutes).AfteryouhavedefinedPreventiveMaintenanceschedulingdefinitions,thePreventiveMaintenance
schedulerprocessmayexecute.YoucanviewtheseforecastedworkordersusingtheMaintenanceWorkbench(See:UsingtheMaintenanceWorkbench).You
canexecutetheGeneratePreventiveMaintenanceWorkOrdersprocess.Whenthisprocessexecutes,workordersarecreatedwithastatusofUnreleased.
(See:GeneratingWorkOrders).YoucanchoosetheImplementbuttontochangethestatusoftheUnreleasedworkorderstoReleasedworkorders.
ForecastedWorkOrders
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 12/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
RelatedTopics
PreventiveMaintenanceOverview
RebuildWorkOrders
Rebuildworkordersarecreatedaschildworkorders.
Forexample,aworkorderwasissuedfortheinspectionofapump.Duringthepumpinspection,youfoundthatthemotor,oneofthecomponentsofthe
pump,isproblematic.Youhavetwooptions:Youcanrepairandthenreinstallthismotor(rebuildableitem),oryoucanreplacetherebuildableitembyissuing
anewmotorrebuildableitemfrominventory.Ifyouchoosetoperformamaterialissuefrominventory,theoldmotorrebuildableitemattachestothework
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 13/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
order,automaticallycreatingthechild,therebuildworkordernumberassociatedtotheparentworkorder.Inthiscase,theassetnumbergenealogywould
automaticallyupdatetoidentifythisnewitemnumber.See:OverviewofInventoryTransactions, OracleInventoryUser'sGuide
.
Ifyouchoosetorepairandthenreinstalltheproblematicmotorrebuildableitem,youcanmanuallycreatethechildrebuildworkorderfortheoldmotor
(rebuildableitem).
Theinstructionsbelowshowyoutheoptionofcreatingarebuildworkorderwithoutissuinganynewmaterial.Therebuildableitemisreplacedbackintothe
asset(motorplacedbackintothepump,forexample),anddoesnotgotoasubinventorywhentheworkorderiscompleted.Inthiscase,theassetnumber
genealogyisnotupdated.
Tocreaterebuildworkorders
1.NavigatetotheRebuildWorkOrderswindow(WorkOrders>RebuildableWorkOrders).
Note:Thisfunctionisavailableforthoseuserswithresponsibilitiesandrolesthatincludefunction,EAM_WO_DETAILS_MODE,withtheirassociated
menu.Otherwise,youcanonlyviewworkorders,andcannotupdateassociatedassethierarchy,workorderhierarchy,material,resource,operation,
cost,collectionplanresults,workrequest,andattachmentinformation.See:ImplementingFunctionSecurity, OracleApplicationsSystemAdministrator's
GuideSecurity .
2.ChooseNew.
RebuildWorkOrder
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 14/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Theheaderinformationdisplaysgeneralinformationabouttherebuildableitemandthetypeofworkrequired.
3.Aworkordernumberisassigned,butyoucanupdateit.
4.OptionallyenteraDescriptionforthisworkorder,upto240characters.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 15/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
5.OptionallyselectanAssetNumber(serialnumber)fromthelistofvalues(See:DefiningRebuildableItemsandGeneratingSerialNumbers, Oracle
InventoryUser'sGuide
.
6.EnterorselectaRebuildItemrequiringmaintenance.
7.OptionallyselectaRebuildActivity.
OnlyactivitiesassociatedwiththisRebuildableItemareavailable(See:RebuildableItem/ActivityAssociation).Ifanactivitydoesnotexist,youcanadd
operations,andmaterial/resourcerequirementstothisworkordermanually.See:DefiningMaterialRequirements,DefiningResourceRequirements,and
PreparingWorkOrderOperations.Ifanactivitydoesexist,youcanupdatethematerialandresourcesbychoosingtheMaterialsorResourcesbuttons
fromthiswindoworbyutilizingtheMaintenanceWorkbench(See:UsingtheMaintenanceWorkbench).
8.EnteraClasscode.
Thisrepresentsthecharge(expense)accountsassociatedwiththeassetnumber.Thisdefaultsfromtheassetnumber(See:DefiningAssetNumbers)
andcanbeupdated.
9.EntertheStatus.Forexample,Unreleased,Released,OnHold,andDraft.Certaintransactionsupdatethisstatusautomatically,includingWorkOrder
Completion,forexample(See:eAMWorkOrderStatuses).
10.ThePendingcheckboxvaluedetermineswhethertheworkorderhasreachedthestatusaboveorisstillpending,duetoworkflow.Ifthecheckboxis
clear,theStatusreflectsthecurrentstate.Ifthecheckboxisselected,theStatusreflectsadesiredtargetstatethatisnotyetreachedduetopending
activity,suchasaworkflowapprovalthatisstillinprogress.
11.IfthisisachildworkorderinaworkordernetworkandParentChildispopulatedintheRelationshipTypefield,theParentworkorderispopulatedin
thisfield.
ThisfieldisalsopopulatedifyouselectedaRebuildSourceworkorder,withintheRebuildtab.
12.TheRelationshipTypefieldindicatesthetypeofRelationshipassociatedwiththeworkorder.
ValidrelationshipsareParentChild,EndtoStartDependency,Cost,andFollowupWork.Managecomplexmaintenancejobsthroughthesefourtypesof
workorderrelationships.See:WorkOrderRelationships.
ParentChild:Thisrelationshipenablesanetworkofworkorders,whichincludesonetoplevelworkorderthatdefinesthetimelineofallitschild
workorders.
Thestartandenddatesofthechildworkordersarewithinthestartandenddatesoftheparentworkorder.Achildworkordercanbeparentto
anotherworkorder.Oneparentcanhavemultiplechildren,butonechildcanhaveasingleparent.
EndtoStartDependency:Youcancreateworkorderswithschedulingdependencyrelationships(includingchildsiblingworkorders).Forexample,
oneworkorder'sscheduledstartdateisdependentonanotherworkorder'scompletion.Withthisrelationship,thenextworkordercannotbe
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 16/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
createduntilthepriorworkorderforthecurrentassetiscompleted.
Cost:Youcanrollthechildworkordercostsintotheparentworkorder,forreportingpurposes.
Youcanbasethecostrollup,withinahierarchy,onschedulingrelationships.Schedulingrelationshipsarenotrequiredtorollupcostswithina
hierarchy.Youcancreateacostreportinghierarchythatisdifferentfromtheschedulinghierarchy.
FollowupWork:YoucancreateaworkorderforthecurrentcapitalassetnumberorRebuildableItem,whileexecutingworkfortheasseton
anotherworkorder.Forexample,asecondproblemwiththeassetisdiscoveredwhileexecutingaworkorder.Afollowupworkorder,associated
withtheoriginalworkorder,iscreatedfortheissue.Thisisindependentofschedulingorcostrelationships.
13.IntheScheduledDatesregion,entertheworkorder'sscheduledStartdateifitisbasedonaforwardschedule.
Theschedulingprocessusesthisdateasastartingpointtocalculatethescheduledenddateanddurationforallocatedresourcesandmaterial.Ifthe
material/resourcesarenotavailablebythisdate,theschedulingprocessmovesthestartdateforward(See:eAMScheduling).
Note:Actualdatesareenteredatoperationandworkordercompletion.ScheduleddatesarecalculatedbytheEnterpriseAssetManagementscheduler
ifyouhaveOracleProductionSchedulingenabled(See:OverviewofSettingUp, OracleProductionSchedulingUser'sGuide
).Otherwise,theEAM
schedulercalculatesthedates.
14.EnterascheduledCompletiondateforbackwardscheduling.Thisdateindicatestherequestedendbydateforthework.
Theschedulingprocessusesthisdateasastartingpointtocalculatethescheduledstartdateanddurationforallocatedresourcesandmaterial.Ifthe
materialandresourcesarenotavailablebythatdate,theschedulingprocessmovesthestartdatebackwardstoensurecompletionbytherequiredend
date(See:eAMScheduling).
Note:Actualdatesareenteredatoperationandworkordercompletion.ScheduleddatesarecalculatedbytheEnterpriseAssetManagementscheduler
ifyouhaveOracleProductionSchedulingenabled(See:OverviewofSettingUp, OracleProductionSchedulingUser'sGuide
).Otherwise,theEAM
schedulercalculatesthedates.
15.WithintheMaintab,theDepartmentdefaultsfromtheselectedassetnumber(See:DefiningAssetNumbers).Thisindicatesthepersonsordepartment
responsibleforthisassetnumber.
16.OptionallyselectaPriority.Forexample,High,Medium,orLow.
17.OptionallyselectaWorkOrderType.Workordertypesenableyoutodifferentiateworkorders,forexample,Routine,Preventive,Emergency,orFacilities.
Maintenancemanagementcanusethisinformationtosortandmonitorworkactivityforreportingandbudgeting.WorkOrderTypesarereferencedin
theworkorder.Forinformationonhowtocreatevalidvalueswithintheavailablelistofvalues,See:WorkOrderTypes.
18.TheShutdownTypedefaultsfromtheRebuildActivity.Thishelpstheplannergroupworkordersthatmayrequireshutdowns,sothattheyareplanned
together.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 17/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
19.IftheFirmcheckboxisselected,planningandschedulingdoesnotadjusttheschedule,regardlessofmaterialorresourceavailability(See:Overviewof
PlanningandScheduling).
Thischeckboxdefaultsasselectedorcleared,dependingontheAutoFirmonReleaseandAutoFirmonCreatecheckboxsettings,establishedinthe
EnterpriseAssetManagementParameterssetupforthecurrentorganization(See:DefiningeAMParameters).Thisdefaultsaftertheworkorderis
Released,ifyouselecttheAutoFirmonReleasecheckbox,anddefaultsimmediatelyifyouselectedtheAutoFirmonCreatecheckbox.
Ifthecheckboxisselected,theenddateiscalculated,basedontheworkorderduration.Theschedulerautomaticallycalculatesthedurationbasedon
theoperations(resourcedurationsetup)ontheworkorder.YoucanupdatethischeckboxforworkordersatDraft,Released,Unreleased,OnHold,or
Cancelstatuses(See:eAMWorkOrderStatuses).
IftheFirmcheckboxisselected,youcanstillmanuallyreschedulearesourceontheworkorder,therebyupdatingthedatesonitscorresponding
operationandworkorder.
20.OptionallyselecttheNotificationRequiredcheckbox.
21.OptionallyselecttheTagoutRequiredcheckboxtoindicatethattheareamustbesecuredforoperationsrequiredtoexecutethisworkorder.
Tagsaregenerallyprintedandplacedonanasset,warningtheplantthatitisshutdownandshouldnotbestarted.Thischeckboxhelpstheplanner
isolatethosejobsthatrequireatagout.
SelectthepaperclipAttachmentsicontoattachrelevanttagoutdocuments.YoucanattachURL,file,ortextattachments.See:DefiningWork
OrderDocuments.
22.ThePlannedcheckboxisselectedifthecurrentworkorderwascreatedfromforecastedworkorders(See:PreventiveMaintenanceWorkOrders).
23.OptionallyselecttheEnableMaterialIssueRequestscheckboxtoenableeAMtomanagematerialavailabilityforthecurrentworkorder.
Materialisphysicallyavailabletoaworkorderviathematerialrequestandverificationprocess.
24.OptionallyenterFailureInformation(See:FailureAnalysisOverview).
TheFailureInformationregionappearsifthe FailureCodeRequiredvalueissettoYes,withintheFailureSetdefinition(See:DefiningFailureCodesand
Sets).
IftheFailureEntryRequiredcheckboxisselected,FailureCodeentryismandatoryduringworkordercompletion.
25.TheMaterialShortageregionenablesyoutoviewmaterialavailability.Thisregionpopulates,afteryouhavesavedtheworkorder.
TheMaterialShortagefielddisplayswhetherthereisashortageofthematerial(atthatmomentintime)thatisneededtocompletetheworkorder's
operations.Thisstatushelpsyoutodeterminewhentostartwork.Forexample,ifthereisamaterialshortage,youtypicallywouldnotstartwork.The
processthatpopulatesthisfieldconsidersbothstockedanddirectitems.Forstockeditems,theWorkOrderMaterialShortageprocessdetermines
whetheralloftheinventoriedmaterialwithintheworkorder'sassociatedBOMisavailabletotransact(ATPisexcluded).Fordirectitems,theworkorder
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 18/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
MaterialShortageprocessdeterminesifallofthedirectitemsthatareincludedwithintheworkorder'sassociatedBOMarereceivedintoInventory.This
processshouldbesettoautomaticallyexecuteperiodically,butyoucanexecuteitfromthemenuatanytime.
YoucanchooseCheckShortagetoviewtheshortagedetails.
26.OptionallyselecttheActivitytabtoselectalternate,predefinedBOMsandRoutings.See:SettingUpMaintenanceBillsofMaterialandDefining
MaintenanceRoutes.
AfterthealternateBOMandRoutingareselected,thesystemusestheassociateditemsandassignstheassociatedresourcesneededtoexecutethe
workorder.
a.OptionallyselectanActivityType.Thiscodeindicatesthetypeofmaintenanceforthisactivityandisusedwhendefiningajoborastandardjob,
forexample,Inspection,Overhaul,Lubrication,Repair,Servicing,orCleaning.Thisvaluedefaultsfromtheactivity(See:DefiningActivities).
b.OptionallyselectanActivityCausetospecifywhatsituationcausedthisworktogenerate,forexample,Breakdown,Vandalism,NormalWear,or
Settings.Thisvaluedefaultsfromtheactivity(See:DefiningActivities).
c.OptionallyselectanActivitySourcetospecifyreasonsactivitiesneedexecution,forexample,WarrantyCompliance,OSHACompliance,orMilitary
SpecificationRequirements.Thisvaluedefaultsfromtheactivity(See:DefiningActivities).
27.OptionallyselecttheProjecttab.ThistabisenabledifProjectManufacturingisinstalledandenabled.
a.OptionallyselectaProject.
b.OptionallyselectaTask.
28.YoucanselecttheRebuildtabtoselecta RebuildSource
workorder.Thisworkorderistheparenttothecurrentchildworkorder.The ChargeAsset
fieldispopulatedwiththeparentworkorder'sassociatedasset.
29.OptionallyselecttheRequesttabtodisplayserviceandworkrequestsassociatedwiththisworkorder.Youcanaddserviceorworkrequeststoawork
orderbyselectingaservicerequestorrequestnumber.WorkrequestsatanAwaitingWorkOrderstatusandMaintenanceTypeservicerequestsare
availableforassociation.Youmayassociatemultipleworkrequeststoasingleworkorder,butoneworkordercanassociatewithaservicerequest.You
canassociateaservicerequesttomultipleworkorders.Youcandissociateaworkrequestfromaworkorder.
a.HighlighttheWorkRequest.
b.ChooseDelete.
30.OptionallyselecttheApprovalHistorytabtoviewtheworkorder'sapprovalhistory.Aworkordermightrequireapprovalsornotificationsatdifferent
stagesofitslifecycle.Forexample,organizationstypicallywantanapprovalprocessinplacebeforeaworkorderisreleased.Workflowautomatesthis
process.YoucaninitiateWorkflowtogeneratenotifications,approvals,transactions,andupdateaworkorderstatus.YoucanenabletheWorkflowfor
WorkOrdersoptionwithintheeAMParameters(See:DefiningeAMParameters).YoucansetupBusinessEventsandEventSubscriptions(oruse
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 19/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
seededeventsandsubscriptions)withinOracleWorkflowtoindicatewhateventstriggerWorkflow.Seededeventsthatyoucanenabletotrigger
Workfloware:WorkOrdercreation,WorkOrderreleaseapproval,WorkOrdercompletion,WorkOrderstatuschange,Operationcompletion.See:Setting
UpOracleWorkflow, OracleWorkflowUser'sGuide
,SettingUptheBusinessEventSystem, OracleWorkflowUser'sGuide
,andDefiningWorkOrder
Statuses).
31.OptionallychooseOperationstopreparenecessaryoperations.Theseoperationsdefaultfromthemaintenanceroute(See:DefiningMaintenance
Routes)associatedwiththecurrentactivity,butyoucanaddorupdatethem(See:PreparingWorkOrderOperations).
32.OptionallychooseMaterialstoview,add,orupdatetheassociatedassetnumber'sitemslist(See:SettingUpMaintenanceBillsofMaterialandDefining
MaterialRequirements).FromtheMaterialRequirementswindow,youcanoptionallychooseSelectMaterialstoaddMaterialsfromtheAssetBOMtothe
materialrequirementsforthecurrentworkorder.
33.OptionallychooseResourcestoview,add,orupdatetheresourcesassignedtoeachoperation.See:DefiningResourceRequirements.
34.OptionallychooseRelationshipstomanageworkorderschedulesandviewworkorderdetails.ThisbuttonisenabledifaRelationshipTypewas
previouslyselected.See:WorkOrderRelationships
35.OptionallychooseAssetRoutetoviewtheassetrouteassociatedwiththeassetgroupforthecurrentworkorder.Youmightneedtoperformone
activityonmultipleassetnumbers.Toeliminatethepossibilityofcreatingmultipleworkordersforthesameactivity,youcandefineassetroutes.See:
DefiningAssetRoutes.
YoucanchooseAssetRouteifanassetrouteisassociatedwiththecurrentassetnumber.
36.OptionallychooseCoststoviewthecostsofworkordersfallinginthespecificaccountingperiods,specifiedintheAccountingInformationbyPeriod
region.AccountingPeriodsaredefinedwithinOracleGeneralLedger.See:DefiningPeriodTypes, OracleGeneralLedgerUser'sGuide
andDefining
Calendars, OracleGeneralLedgerUser'sGuide
.
a.Optionallyselectaworkorder,thenchooseValueSummarytoviewasummaryoftheactual,estimated,andvariancecostsforlaborhours,
equipmenthours,andmaterialagainstthecurrentworkorder.
MaintenanceWorkOrderValueSummary
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 20/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
ActualCosts:Thisistheaccumulationofallcostsformaterialandresourcetransactionsfortheassetnumber'sassociatedmaintenance
workorders,basedonaspecifiedperiod.
Estimates:ABOM(materialpartslist)androuting(resources)canassociatewithaworkorder.
WhenyouselecttheEstimatestab,theestimatedcostsofallmaterialandresourcesassociatedwithaworkorderappear,enablingyouto
budgetcosts.
Variances:Thedifferencebetweentheactualcostsrecordedandestimatedcosts.
Material:Allmaterialandmaterialoverheadtransactioncosts.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 21/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Labor:Allresourceandresourceoverheadtransactioncostsassociatedwithpersonnel.
Equipment:Allmaterialresourceandresourceoverheadtransactioncosts.
b.OptionallychooseDetailstoviewactual,estimated,andvariancecostsforlaborhours,equipmenthours,andmaterialforspecificoperationsof
thecurrentworkorder.
37.Saveyourwork.
Aftersavingaworkorder,youcanoptionallyassociateassetattachments:(M)Tools>CopyAssetAttachments
Note:Arequirementforrebuildworkordersthatarecreatedautomaticallyviaamaterialtransactionisthatthecompletionsubinventorymustbean
expensesubinventory(See:SubinventoryGeneralLedgerAccountFields, OracleInventoryUser'sGuide
andWorkOrderCompletion).
Note:Arebuildworkorder'sowningdepartmentdefaultsfromtheowningdepartmentofitsparentworkorder.Thisisviewablewhenyouselectthe
Maintab.
RelatedTopics
DefiningAssetDocuments
OverviewofeAMCostManagement
FailureAnalysisOverview
EasyWorkOrders
Easyworkordersareunplannedworkorders,andenableyoutoavoidoperationandresourceplanning.Anactivitydoesnotdefaultintotheworkorder,based
ontheassetnumberandactivityassociationaswithplannedworkorders,however,youcanaddanactivitytoaneasyworkorder.Theseworkordersare
onlycreatedinMaintenanceUser.Workorderscanbecreatedatanystatus,suchasReleased(See:eAMWorkOrderStatuses),enablingyoutoexecutethe
workorderbyrequestingmaterialandcharginglabor.
eAMWorkOrderStatuses
AnEnterpriseAssetManagementworkordermayprogressthroughseveralstatuses,throughoutitslifecycleduration.Thediagrambelowillustrateshow
EnterpriseAssetManagementworkordersmightstartataDraftstatus,thenmovetoReleased,Complete,andfinallyClosed.Thesestatusescanvary,
dependingonthetypeofworkorderthatiscreated.Forexample,expressworkordersarecreatedinaReleasedstatus,bypassingtheDraftstatus.
eAMWorkOrderLifecycle
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 22/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Status Description
Draft InfiniteresourcecapacityschedulingofworkordersataDraftstatusmaytakeplace.Youcannotchargelabor,orrequestmaterialforworkordersatthisstatus.
Released AfteraworkorderisReleased,youcanexecuteaworkorder.Youcanchargelabor,requestmaterial,andschedulingforthisworkordertakesplace(See:eAM
Scheduling)tocreatethescheduledstartorenddate.YoucanreleaseaworkorderfromtheWorkOrderswindow(See:RoutineWorkOrders),andtheMaintenance
Workbench(See:UsingtheMaintenanceWorkbench).
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 23/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Ifyoucreateaworkorderwithafuturedateandthenreleaseit,thereleasedateisthesystemdate.Ifyoucreateaworkorderwithadateinthepastandthen
releaseit,thereleasedateisthescheduledstartdate,sinceyoucanposttransactionsduringanytimeafterthescheduledstartdate(evenifitisinpast).Therelease
datehasadirectrelationshipwithcosting,andtransactionsforaworkordercannotbepostedbeforeitsreleasedate.Thereleasedatemightappeardifferentfrom
thestartdate,becauseoftimezoneconversions.
Unreleased YoucanmoveanEnterpriseAssetManagementworkorderinDraftorReleasedstatustoUnreleased.Schedulingcantakeplacefortheseworkorders(See:eAM
Scheduling)butyoucannotchargelabororrequestmaterial.AnUnreleasedworkordercannotbechangedtoaDraftstatus.
Pending IftheSchedulerisenabled,theworkorderstatuschangestoPendingScheduling,ifastatusofReleasedischosen.AftertheSchedulerprocessfinishesrunning,the
Scheduling statuschangesbacktoReleased.
Complete ACompletestatusforanEnterpriseAssetManagementworkorderdoesnotrequireanycompletedoperations.Whenaworkorderiscompleted,youcanstillcharge
labor,receivedirectitems,issueremainingmaterialallocationsand/ordeleteremainingmaterialallocations.Demandwillremainforunissuedmaterialsunlessthese
aredeleted.YoucanuncompleteaworkorderthistransitionsittoaReleasedstatus.Uncompletionisperformedwithintheworkordercomplete/uncompletepages
intheMaintenanceSuperUserresponsibility(SeeWorkOrderCompletion.Youcancloseanduncompleteworkorderswiththisstatus.
Complete ACompleteNoChargesstatusforanEnterpriseAssetManagementworkorderdoesnotrequireanycompletedoperations.Youcannotchargelaboratthisstatus
No norissuematerials.Remainingmaterialallocationswillbeautomaticallydeleted.Validationofopenpurchasingrequirementswilloccurduringworkorderupdateto
Charges 'completenocharges'status.
Youcannotupdateassociatedassethierarchy,workorderhierarchy,material,resource,operation,cost,collectionplanresults,workrequest,andattachment
informationonaworkorderthatisataCompleteNoChargesstatus.WorkordersinthisstatuscanbeclosedandcanbeupdatedtoaCompletestatus.Applicable
workordersinthisstatusareeligibleforWorkOrderBillingandWorkOrderCapitalization.
Closed YoucannotchargeanyaccountsafteranEnterpriseAssetManagementworkorderisclosed.Youcancloseanduncompleteworkorderswiththisstatus.Ifawork
orderwasataCompletestatusatthetimeofclosingit,youcanuncompletetheworkordertobringitbacktoaCompletestatus.Forallotherstatusesduringwork
orderclosing,theworkorderistransitionedtosamestatusithadwhileclosing.See:ClosingWorkOrders.
Youcannotupdateassociatedassethierarchy,workorderhierarchy,material,resource,operation,cost,collectionplanresults,workrequest,andattachment
informationonaworkorderthatisataClosedstatus.
OnHold EnterpriseAssetManagementworkordersatReleasedandUnreleasedstatusescanbeputonhold.Youcannotchargelabororrequestmaterialforaworkorderat
thisstatus.
Cancel YoucancancelanEnterpriseAssetManagementworkorderatanystatusinitslifecycle.
Youcannotupdateassociatedassethierarchy,workorderhierarchy,material,resource,operation,cost,collectionplanresults,workrequest,andattachment
informationonaworkorderthatisataCancelstatus.
DefiningWorkOrderDocuments
Youcanattachexistingdocumentstoaworkorder,andcreatetexttoassociatewithaworkorder.Youcanattachtextandfiles,suchasspreadsheets,
graphics,andOLEobjects.
Todefineworkorderdocuments
1.NavigatetotheEAMWorkOrderDocumentswindow.
EAMWorkOrderDocuments
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 24/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
2.SelectaDataType.
RelatedTopics
WorkingWithAttachments, OracleApplicationsUser'sGuide
eAMOperationsandTasks
Operationsonaworkorderaretheinstructionsortaskstoperformarepair.Theseoperationsareassignedresources,forexample,tradespeople,outside
serviceproviders,andequipment.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 25/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Thissectionincludesthefollowingtopics:
DefiningAssetShutdownStatuses
PreparingWorkOrderOperations
ViewingWorkOrderOperations
DefiningInventoryMaterialRequirements
DefiningDirectItemMaterialRequirements
ViewingMaterialRequirements
DefiningResourceRequirements
ViewingResourceRequirements
DefiningAssetShutdownStatuses
Shutdownofanassetissometimesnecessarytoperformamaintenanceactivity.Youcancreatenewshutdowninformationassociatedwithanasset,orview
existingshutdownhistoryinformationalreadyrecordedtoanasset.Shutdowninformationconsistsofstartandenddates,workordernumbersrequiring
maintenanceontheasset,andspecificoperationsequences.Whilecompletingaworkordertoitsoperations,youcanviewassetshutdowninformationinthe
AssetStatuswindow.
AllshutdowninformationenteredwithintheAssetStatuswindowisforinformationpurposesonly.
Toviewanddefineshutdowninformationforanasset
1.NavigatetotheAssetStatuswindow.
2.SelectanAssetNumber,andclicktheFindbutton.
AllshutdowninformationforthecurrentassetappearsintheShutdownDetailsregion.
3.SelectaStartdatetoaddnewshutdowninformationforthecurrentasset.
4.SelectanEndDate.
5.Optionallyassociatetheshutdowninformationtoaspecificworkorderrequiringmaintenanceonthecurrentasset.
Onlyworkorderscreatedforthecurrentassetareavailable.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 26/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
AssetStatus
6.Optionallyassociateshutdowninformationtotheoperationlevelofaworkorderbychoosingaspecificoperationsequence.
7.Optionallyenterashutdowndescription.
8.Saveyourwork.
PreparingWorkOrderOperations
Operations(alsoknownastasks)aretheinstructionstoperformmaintenanceactivities.Eachoperationisassignedtoadepartment(See:Defining
DepartmentsandResources),associatedwithassignedresources(tradespeople,outsideserviceproviders,andequipment).Whenyoucreateaworkorder
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 27/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
foranassetnumber,youcanattachtheassetnumber'sassociatedactivitiesandrelatedmaintenanceroutetoworkorder.(See:DefiningMaintenance
Routes)andBOM.Themaintenancerouteiscomprisedofoperationsnecessarytocompletetheactivity.Youcanviewandupdatetheseoperationsfromthe
workorder.
Toprepareoperations
1.NavigatetotheSelectworkorderwindow(workorderDetails>Operations).
Note:Thisfunctionisavailableforthoseuserswithresponsibilitiesandrolesthatincludefunction,EAM_WO_DETAILS_MODE,withtheirassociated
menu.Otherwise,youcanonlyviewworkorders,andcannotupdateassociatedassethierarchy,workorderhierarchy,material,resource,operation,
cost,collectionplanresults,workrequest,andattachmentinformation.See:ImplementingFunctionSecurity, OracleApplicationsSystemAdministrator's
GuideSecurity .
2.Selectaworkorder.
3.ClicktheContinuebutton.
Operationscanbescheduledtoruninparallel,sequence,orthroughdependentsteps.Inthescreenshotbelow,forexample,Operation20isdependent
onOperation10,sincethereisalineconnectingtheoperationsOperation20cannotbeperformeduntilOperation10iscomplete.Operations30and40
runinparalleltoeachother.Operation40isindependentitcanbeperformedatanytime.
Operations
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 28/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
4.ChoosetheOperationicon,thenclicktheheadertodisplaytheNewOperationwindow.
a.Optionallyenterorupdateanoperationsequence,orletitgenerateforyou,accordingtoyourprofilesetup(See:ItemandOperationSequence,
OracleBillsofMaterialUser'sGuide
).Operationsaregenerallyassignedinincrementsoften,enablingyoutoinsertadditionalsteps.
b.OptionallyenteraDescriptionforthisoperation.
c.Optionallytocopyorreferencestandardoperationsintoarouting,selectanOperationCode.Ifyouuseastandardoperationcode,theoperation
Oracle
informationforthatcodeiscopiedintothecurrentoperation.Youcanthenupdatethatinformation(See:CreatingaStandardOperation,
BillsofMaterialUser'sGuide
).
d.SelectanAssignedDepartment.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 29/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Theassigneddepartmentidentifiestheroleresponsibleforperformingthetask.
e.SelectascheduledStartDateforthisoperationtobaseonaforwardschedule.
TheEnterpriseAssetManagementschedulingprocessusesthescheduledstartdateasastartingpointtocalculatethedurationoftheoperation,
basedontheresourcesandmaterial.Ifthematerialandresourcesarenotavailablebythisdate,theschedulingprocessmovesthestartdateof
theworkorderforward.Theplanningprocessusesthescheduledstartdatetorecommendcreationofpurchaseordersforthematerial(See:
OverviewofPlanningandScheduling).
f.SelectascheduledCompletiondateforthisoperationtobaseonabackwardschedule.
TheEnterpriseAssetManagementschedulingprocessusesthescheduledenddateasastartingpointtocalculatethedurationoftheoperation,
basedontheresourcesandmaterial.Ifthematerialandresourcesarenotavailablebythisdate,theschedulingprocessmovesthecompletion
dateoftheworkorderbackward.Theplanningprocessusesthescheduledcompletiondatetorecommendcreationofpurchaseordersforthe
material(See:OverviewofPlanningandScheduling).
Note:Actualdatesareenteredatoperationandworkordercompletion.ScheduleddatesarecalculatedbytheEnterpriseAssetManagement
schedulerifyouhaveOracleProductionSchedulingenabled(See:OverviewofSettingUp, OracleProductionSchedulingUser'sGuide
).Otherwise,
theWIPschedulercalculatesthedates.
g.OptionallyselectaShutdownTypetohelptheplannergroupworkordersthatmayrequireshutdowns.
Whentheworkordersaregrouped,theyareplannedtogether.
h.ClicktheOKbuttontoreturntotheOperationswindow.
Theoperationsenteredinthepreviouswindowappearatthebottomofthiswindow.Scrollovertothefarrightfield.
TheDurationidentifiesthedurationoftheoperationandismeasuredinhours.Youcanmanuallyenterthis,orletitcalculateasthedifference
betweentheestimatedStartDateandestimatedEndDate.
5.Afterallnecessaryoperationsareentered,youcancreatedependenciesasnecessary.
OptionallychoosetheConnecticontoconnectdependentoperations.Afterchosen,youcandrawalinebetweendependentoperations.
Youmightneedtomoveoperationsaround.OptionallychoosetheDragicontomoveanoperation.
6.OptionallychooseDependenciestosetdependenciesbetweenoperations.
Forexample,Operation30isdependentonOperation10completing.
DependentOperations
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 30/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
7.OptionallychooseMaterialstovieworupdatetheassociateditemslistforthecurrentoperation(See:SettingUpMaintenanceBillsofMaterialand
DefiningInventoryMaterialRequirements).
MaterialRequirements
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 31/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
8.OptionallychooseResourcestovieworupdatetheresourcesassignedtothecurrentoperation.
Resources
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 32/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
IfyouselecttheSchedulingtab,foreachresourceoperation,youcanchooseifitisincludedinscheduling.
Youcanscheduleattheresourcelevelwithinanoperation.See:DefiningResourceRequirements.
SelectYesorNofromtheScheduledlistofvalues.
Note:Youcanviewworkorderoperationsinaviewonlymode.See:ViewingWorkOrderOperations.
ViewingWorkOrderOperations
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 33/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Youcanviewtheoperationsrequiredtoperformarepair.Theseoperationsareassignedresources(tradespeople,outsideserviceproviders,andequipment),
aswellasmaterial.TheViewOperationswindowdoesnotenableyoutoupdatetheoperations.Forinstructionsonupdatingoperations,See:PreparingWork
OrderOperations.
Toviewoperations
1.NavigatetotheViewOperationswindow.
a.WithintheSelectWorkOrderwindow,selectaworkorder.
b.ChooseContinue.
2.ChooseDependenciestoviewoperationdependencyinformation.
3.ChooseMaterialstoviewmaterialrequirements.See:DefiningMaterialRequirements.
4.ChooseResourcestoviewresourceassignment.See:DefiningResourceRequirements.
RelatedTopics
PreparingWorkOrderOperations
DefiningInventoryMaterialRequirements
Whenenteringaworkorderforanassetnumber,theactivityassociatedtotheassetnumberattachestherequiredmaterialandresourcestocompleteits
operations.However,youcanupdate,add,view,anddeletematerialrequirementsforaspecificworkorder.
YoucanalsospecifyasourcesubinventoryandsourcelocatorattheBOMlevelortheworkordermaterialrequirementlevel.IftheAutoRequestMaterial
optionisselectedattheBOMlevel,materialallocationwillbeinitiatedwhentheworkorderisreleased,andthesourcesubinventoryandsourcelocatorvalues
youenterwilloverridethesevaluesintheInventorysourcingrules.IftheAutoRequestMaterialoptionisnotselected,youcanspecifyasourcesubinventory
andsourcelocatorforyourmaterialwhenyouperformamaterialrequestoraOneStepMaterialIssue.
Todefineworkordermaterialrequirements
1.NavigatetotheSelectWorkOrderpage(WorkOrderDetails>MaterialRequirements).
Note:Thisfunctionisavailableforthoseuserswithresponsibilitiesandrolesthatincludefunction,EAM_WO_DETAILS_MODE,withtheirassociated
menu.Otherwise,youcanonlyviewworkorders,andcannotupdateassociatedassethierarchy,workorderhierarchy,material,resource,operation,
cost,collectionplanresults,workrequest,andattachmentinformation.See:ImplementingFunctionSecurity, OracleApplicationsSystemAdministrator's
GuideSecurity .
2.Selectaworkorder.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 34/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
3.ClicktheContinuebutton.
MaterialRequirements
4.Optionally,withintheInventoryItemsregion,youcanvieworupdatetheitemlistassociatedwiththeassetnumber.(See:SettingUpAssetBillsof
Material)byplacingyourcursorintheMaterialfieldorbychoosingSelectMaterials.WhenyouchooseSelectMaterials,thecurrentassetnumbers
associatedAssetBillofMaterialitemsareavailabletobeaddedtotherequiredmaterialforthecurrentworkorder.
SelectMaterials
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 35/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
5.OptionallyselecttheMaintabtochangeoperationsequenceandthedaterequired.
Note:IfyouareaccessingtheSelectMaterialspageviatheOperationspage,youcannotchangeoperationinformation.IfyouareaccessingtheSelect
MaterialspageusingtheWorkOrderpage,youcanchangeoperationinformation.
6.OptionallyselecttheQuantitiestabtoupdatethequantitiesRequired.
7.OptionallyselecttheSupplytabtoselectasupplyType.YoucanoptionallyspecifyavaluefortheSourceSubinventoryandSourceLocatorfields.
Supply
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 36/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
8.OptionallyselecttheCommenttabtoenterinformationforthecurrentMaterial.
9.OptionallychoosetheATPtabtodefineavailabletopromiseinformationforthecurrentmaterial.IfyouselecttheATPAllowedcheckbox,availableto
promiseinformationcanbecalculatedforthecurrentmaterial.
10.OptionallychooseCheckATPtocheckavailabletopromiseinformationfortheselectedmaterial.
ATPResults
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 37/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
11.OptionallychooseDirectItemtocreaterequisitionsfordirectitems,andaddthemtoyouritemslist.OracleSelfServicePurchasingdefaultstheWork
OrderNumberandOperationNumber,aswellastheclasscodeinformationforcorrectexpensing.DirectItemsareonetime,noninventorieditemsthat
arepurchaseddirectlyfromthesupplier.AfteryouchooseDirectItem,thecurrentWorkOrderandoperationreferencevaluesarepassedtothe
requisitioncreated.IftheWorkOrderisprojectrelated,theprojectandtaskinformationiscapturedinthepurchaserequisition(See:OverviewofDirect
ItemProcurementforeAMWorkOrders).YoucanexitSelfServicePurchasingandreturntotheMaterialRequirementspagebychoosingReturnTo
Portal.
UponreinquiryofthisWorkOrder,theDirectItemsregionreflectsanyrequisitionandpurchaseorderdetails.
Note:YoumusthaveOracleSelfServicePurchasinginstalledforthisfunctionality.YoucanpurchasedirectitemsfromaRequisitionorPurchaseOrder
pageifyouhaveOraclePurchasinginstalled(See:EnteringPurchaseOrdersforDirectItems).
Note:YoucanprocuredirectitemstoWorkOrdersatReleasedstatuses.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 38/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
12.ChooseCopytoAssettodynamicallyupdatetheBOMassociatedtotheassetgroupwithanyitemslistchanges(See:SettingUpAssetBillsofMaterial).
13.Saveyourwork.
Note:YoucanviewWorkOrdermaterialrequirementsinaviewonlymode.See:ViewingMaterialRequirements.
RelatedTopics
ViewingATPInformation, OracleInventoryUser'sGuide
DefiningDirectItemMaterialRequirements
Directitemsrepresentitemswithinfrequentuseorcriticalitytheyarenotincludedintheinternalcatalogasstockeditems.Theseitemsareconsideredas
"oneoff",boughtdirectlyfromavendorforaspecificworkorderandoperation.Theseitemsaredelivereddirectlytotheshopfloorformaintenancework
orderexecution.
Tosetupnonstockdirectitems,accesstheMasterItemwindowwithinOracleInventory,andsetuptheitemwiththeStockablecheckboxcleared.See:
DefiningItems, OracleInventoryUser'sGuide
.DescriptionbaseddirectitemsarenotsetupwithinOracleInventory.
Youcanaddnonstockbaseddirectitemstoasset,maintenance,andrebuildableBOMs.Youcanaddnonstockanddescriptionbaseddirectitemsdirectlyto
thematerialrequirementsforanexistingworkorder.
IfdirectitemsexistonanactivityBOM,theyappearasdefaultmaterialrequirementswhencreatingaworkorderforthatactivity.However,youcanadd
additionaldirectitemmaterialrequirementstoanexistingworkorder.
SettingUpAssetBillsofMaterial
SettingUpMaintenanceBillsofMaterial
DefiningRebuildableBillsofMaterial
Toadddirectitemmaterialrequirements
1.NavigatetotheSelectWorkOrderwindow.
2.Chooseaworkorder.
3.ChooseContinue.
MaterialRequirements
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 39/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
4.WithintheCreateDirectItemsregion,selectanOperation.
5.SelectanItemType.
DescriptionBasedItem:ThisdirectitemtypeisnotstoredinOracleInventory.
NonStockItem:ThisdirectitemtypeisstoredinOracleInventory.ItsMasterItemrecord'sStockablecheckboxiscleared.
6.IfyouselectedaNonStockItemType,selectanItem.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 40/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
ThisfieldisdisabledifaDescriptionBasedItemTypewaspreviouslyselected.
7.EnteraDescription,ifyoupreviouslyselectedaDescriptionBasedItemType.
8.SelectaUOM.IfyoupreviouslyselectedaNonStockItemType,thisvaluedefaultsfromtheMasterItem.
9.SelectaPurchasingCategory.See:SettingUpPurchaseOrderCategoryAssociationsforDirectItems.
10.EnteraNeedByDatethesystemdatedefaults.
11.Clickthehorizontalscrollbar.
12.Selectorenteravalueforthefollowingfields:
SupplierContact
SupplierSite
ContactPhone
13.Saveyourwork.
ViewingMaterialRequirements
Whenyouenteraworkorderforanassetnumber,theactivityassociatedwiththeworkorderattachestherequiredmaterial(See:SettingUpMaintenance
BillsofMaterial)andresourcestocompleteitsoperations.Youcanviewmaterialrequirementsforaspecificworkorder.
Toviewworkordermaterialrequirements
1.NavigatetotheViewMaterialRequirementswindow.
a.FromtheSelectWorkOrderwindow,selectaworkorder.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 41/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
b.ClicktheContinuebutton.
ViewMaterialRequirements
2.IntheInventoryItemsregion,youcanviewinventorieditemsonthisworkorder'srequireditems.
Youcanviewthembywarehouse,andatthesubinventorylevel.
a.IntheMaintab,youcanviewoperationsequenceandtheDateRequired.
b.IntheQuantitiestab,youcanviewthequantitiesRequired.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 42/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
c.IntheSupplytab,youcanviewsupplyTypeinformation,suchasmaterial,subinventoryandsourcelocator,ifapplicable.
Supply
d.IntheCommenttab,youcanviewcommentinformation.
e.IntheATPtab,youcanviewdefinedavailabletopromiseinformation.
RelatedTopics
DefiningMaterialRequirements
DefiningSubinventories, OracleInventoryUser'sGuide
DefiningResourceRequirements
Youcanview,update,add,ordeleteresourcerequirementsforaworkorder.Resourcesareusedtoperformataskforamaintenanceoperation.Aresource
isaperson,pieceofequipment,orcontractorserviceusedtoperformanoperation.Aresourceandusagerateforallscheduledactivitiesisrequiredina
routing.
Contractorservicesaredefinedasworkservicesprovidedbyanorganizationorpersonwhoisnotanemployeeofyourcompany.Contractorsarepaidfor
theirwork,basedonanagreeduponcontractoragreement.Forexample,withinmaintenanceworkenvironments,itisoftenimportanttoincludelandscaping
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 43/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
serviceswithinaworkorder.Itisalsoimportanttorelatethepurchasingtransactions,suchastherequisitionandpurchaseordertotheworkorder.Inorder
forthistoexecute,theappropriatestepsarecompletedinPurchasingandEnterpriseAssetManagement.
Whendefiningdepartments,availableresourcesareassignedineachdepartmentandtheshiftsthateachresourceisavailable.Foreachoperationdefined,
youspecifyadepartmentandlistofresourcesandusages.Anoperationcanuseanyresourcethatisavailableinthedepartment,butnotallresourcesare
assignedtothedepartment.Anoperationcanuseresourcesthatareownedorborrowedfromotherdepartments.(See:DefiningDepartmentsand
Resources).
Todefineresourcerequirements
1.NavigatetotheSelectWorkOrderwindow(WorkOrderDetails>ResourceRequirements).
Note:Thisfunctionisavailableforthoseuserswithresponsibilitiesandrolesthatincludefunction,EAM_WO_DETAILS_MODE,withtheirassociated
menu.Otherwise,youcanonlyviewworkorders,andcannotupdateassociatedassethierarchy,workorderhierarchy,material,resource,operation,
cost,collectionplanresults,workrequest,andattachmentinformation.See:ImplementingFunctionSecurity, OracleApplicationsSystemAdministrator's
GuideSecurity .
2.ChooseaWorkOrder.
3.ChooseContinue.
TheresourcesthatappearonthefollowingResourceswindowareassignedtothedepartment,andassignedtothecurrentoperationoftherouting.
See:DefiningDepartmentsandResources.
Resources
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 44/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
4.SelectanOperation.Onlyvalidoperations,associatedwiththerouting,areavailable.See:PreparingWorkOrderOperations.
Note:IfyouaccesstheResourceswindowviatheOperationswindow,youcannotchangeoperationinformation.IfyouaccesstheResourceswindow
viatheWorkOrderwindow,youcanchangeoperationinformation.
5.EnteraResourceSequence.Youcanhavemultipleresourcesforanoperation.
6.SelectaResource.
7.IntheMaintab,theUOMdefaultsbasedontheResourcedefinition.See:DefiningDepartmentsandResources.YoucanupdatethisiftheBOM:Update
ResourceUOMprofileoptionissettoYes.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 45/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
TheUOMrequiresatimebasedmeasure,forthisWorkOrdertoschedule.Itmustbethesameasthesitelevelprofileoption,BOM:HourUOM.See:
BillsofMaterialProfileOptions, OracleBillsofMaterialUser'sGuide
.
OracleBillsofMaterial
8.SelectaBasistochargeandscheduletheresource.ThisdefaultsbasedontheResourcedefinition.See:DefiningaResource,
User'sGuide
.
Item:Chargeandscheduletheresourcewheretheresourceusagequantityistheamountrequiredperassemblyunityoumake.
Lot:Chargeandscheduletheresourcewheretheresourceusagequantityistheamountrequiredperjoborschedule.
IfyouselectLot,theBasiswillbebasedontheresourceitemwhentheworkorderiscreated.
9.EntertheUsageRateorAmountValuefortheresource.Youcanpostusagetimeforpersons,equipment,andmiscellaneousmaterial.
10.SelecttheQuantitiestab.YoucanviewtheRequiredquantityofthisresourcetouse.ThisinformationdefaultsfromtheUsageRate/Amount
information.YoucanalsoviewtheAppliedamountorrateoftheresourcealreadyused.TheOpenamountorrateidentifiestheamountoftheresource
lefttouse(thedifferencebetweentheRequiredandApplied).
11.SelecttheSchedulingtab.Thisinformationdefaultsfromthecurrentoperation'ssetup.See:PreparingWorkOrderOperations.
SelectYesintheScheduledfieldtoindicatethatthisresourcecanbescheduled.
12.SelecttheCostingtab.Youcanviewandupdatethisresource'scostinginformation.
a.SelectaChargeType.
Manual:Youcanmanuallyenterthecost.
POreceipt:Thecostdefaultsasthecostonthepurchaseorderreceipt.
b.TheDepartmentdefaultsastheareathecurrentresourceisassignedto.See:DefiningDepartmentsandResources.
13.OptionallychooseInstancestovieworupdatealistofspecificpeopleorequipmentassignedtothisresource.ThePersontabdisplayspersonsgrouped
inspecificroles.TheEquipmenttabdisplayssimilartypesofequipmentgroupedbyresource.Youcandefinespecificmachinestoanyofyourmachine
typeresourcesandyoucandefinespecificpersonstoanyofyourlabortyperesources.Whenaresourcehasinstancesdefined,youcanviewthe
resourceloadandcapacityintheSchedulerWorkbench(See:UsingtheSchedulerWorkbench).
Forexample,youcandefineallmachinesbelongingtotheresource,GRINDERS.Anindividualgrindermachinecanthenbeaspecificresource
requirementandscheduled,andcanhaveitsownuniquecapacitydefinition.
Thisinformationdefaultsfromyourcurrentresourcedefinition.Youcanaddpersons(includingcontingentworkers)andequipmentthatareassociated
withthecurrentresource.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 46/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
See:DefiningaResource, OracleBillsofMaterialUser'sGuide.
14.Saveyourwork.
RelatedTopics
DefiningaResource, OracleBillsofMaterialUser'sGuide
ViewingResourceRequirements
Youcanviewresourcerequirementsforaworkorder.Resourcesdefinethetimeanassemblyspendsatanoperationandthecostyouincurfortheoperation.
Aresourceisaperson,pieceofequipment,orcontractorserviceusedtoperformanoperation.Aresourceandusagerateforallscheduledactivitiesare
requiredinarouting.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 47/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Toviewresourcerequirements
1.NavigatetotheViewResourceRequirementswindow.
2.FromtheSelectWorkOrderwindow,selectaworkorder.
3.ChooseContinue.
ViewResourceRequirements
4.Viewthelistofoperationsandtheirresourcesassociatedtothecurrentworkorder.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 48/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
RelatedTopics
PreparingWorkOrderOperations
DefiningDepartmentsandResources
DefiningResourceRequirements
DefiningaResource, OracleBillsofMaterialUser'sGuide
WorkOrderRelationships
Workorderrelationshipsenableyoutomanageanetworkofrelatedworkorders,enablingyoutomanagecomplexprojects,suchasplannedorfacility
shutdowns.Thedifferentrelationshipsprovideseparateschedulingrulesthatareusedtomanagelargeprojects.AGanttchartenablesyoutomanagework
bydisplayingworkorderschedulesandasummaryofworkorderdetails.TheGanttChart'sdraganddropfunctionalityenablesyoutomanagescheduleswith
ease.
Thissectionincludesthefollowingtopics:
WorkOrderRelationshipDefinition
ParentChildRelationship
EndtoStartDependency
CostRelationship
FollowupWorkRelationship
WorkOrderRelationshipDefinition
Workordersfordifferentassetsmayassociatetoeachotherinahierarchy.ValidrelationshipsareParentChild,EndtoStartDependency,Cost,andFollowup
Work.Managecomplexmaintenancejobsthroughthesefourtypesofworkorderrelationships.See:RoutineWorkOrders.AGanttchartenablesyouto
manageworkbydisplayingworkorderschedulesandasummaryofworkorderdetails.TheGanttChart'sdraganddropfunctionalityenablesyoutomanage
scheduleswithease.
ParentChildRelationship
TheParentChildRelationshipenablesanetworkofworkorders,whichincludesonetoplevelworkorderthatdefinesthetimelineofallitschildworkorders.
Thestartandenddatesofthechildworkordersarewithinthestartandenddatesoftheparentworkorder.Theparentworkorderdatesarescheduled,
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 49/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
whileitschildworkordersautomaticallyschedule,aswell.Achildworkordercanbeaparenttoanotherworkorder.Oneparentcanhavemultiplechildren,
butonechildcanhaveonlyasingleparent.Youcanhaveaninfinitenumberofparentchildworkorderlevels.
Tocreateparentworkorders
1.NavigatetotheWorkOrderspage(MaintenanceSuperUser:WorkOrderstab).
2.Queryaworkorder(See:ViewingWorkOrders).
3.ClicktheworkorderandselecttheWorkRelationshipssubtab.Thispagegraphicallydisplaystheworkorder'sschedule.Thetabenablesyoutoview
theschedulingrelationshipsfortheworkorderinagraphicalformatandliststheworkorder'spossiblerelationships.
WorkRelationships
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 50/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
4.Selecttheworkorderforwhichyouwanttodefineachildworkorder,andclickUpdateWorkHierarchy.
UsetheUpdateWorkHierarchypagetoaddachildworkorder.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 51/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
5.IntheSelectWorkOrderfield,dependingonyourrequirement,selecttocreateanewchildworkorderoraddanexistingworkorderasachild.
6.Enterdetailsofthenewchildorderyouwanttocreate,oraddtheexistingworkorderthatyouareaddingasachild.
7.ClicktheApplybutton.
Aconfirmationmessagedisplaysthattheworkorderhasbeenaddedasaschedulingchild.
EndtoStartDependency
Youcancreateworkorderswithschedulingdependencyrelationships(includingchildsiblingworkorders).Forexample,oneworkorder'sscheduledstartdate
isdependentonanotherworkorder'scompletion.Withthisrelationship,thenextworkordercannotstartuntilthepriorworkorderiscompleted.Notethatto
createanendtostartdependencybetweentwoworkorders,theyshouldbesiblingssharingacommonparent.
TocreateEndtoStartdependencies:
1.NavigatetotheWorkOrderspage(MaintenanceSuperUser>WorkOrders).
2.Queryaworkorder.(See:ViewingWorkOrders).
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 52/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
3.ClicktheworkorderandselecttheWorkRelationshipssubtab.
4.SelectaworkorderandintheSelectWorkOrderfield,andchoosetheoptiontoUpdateDependencies.
5.IntheWorkOrderDependenciespage,clicktheAddDependenciesbutton.
SelectaworkorderintheDependentWorkOrderfield.IntheDependencyTypefield,selectPriororNext.
6.ClicktheApplybutton.
CostRelationships
Youcanoptionallyrollachildworkorder'scostsintotheparentworkorderforreportingpurposes.Youcanperformcostrollupsonadhocworkorders
becausethecostrollupisindependentofschedulingrelationships.Youcanbasethecostrollup,withinahierarchy,onschedulingrelationships,aswell.
Schedulingrelationshipsarenotrequiredtorollupcostswithinahierarchy.Youmaycreateacostreportinghierarchythatisdifferentthanthescheduling
hierarchy.
Tocreateworkordercostingrelationships:
1.NavigatetotheWorkOrderspage(MaintenanceSuperUser>WorkOrders).
2.Queryaworkorder(See:ViewingWorkOrders).
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 53/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
3.ClicktheworkorderandselecttheWorkRelationshipssubtab.
4.Toviewthecostrollupofachildworkorder,clickViewCosts.
5.ClicktheUpdateAlternateCostHierarchytocreateacostreportinghierarchy.Youcancreatenewworkordersoraddexistingworkorders.
Alternatively,toestablishacostreportinghierarchybyimportingtheparentchildworkorderhierarchy,clicktheImportWorkHierarchybutton.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 54/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
6.Aconfirmationmessagedisplaysandtheworkorderisaddedasacostchild.
FollowupWorkRelationship
YoucancreateaworkorderforacapitalAssetNumberorRebuildableItem,whileexecutingworkfortheassetonanotherworkorder.Forexample,asecond
problemwithanassetisdiscoveredwhileexecutingaworkorder.Afollowupworkorder,associatedwiththeoriginalworkorder,iscreatedfortheissue.This
isindependentofschedulingorcostrelationships.
Tocreateandviewfollowupworkorders:
1.NavigatetotheWorkOrderstab(MaintenanceSuperUser>WorkOrders).
2.Queryaworkorder(See:ViewingWorkOrders).
3.SelectViewFollowupWorkOrdersfromtheSelectWorkOrderlistofvalues.
4.ChooseGo.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 55/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
5.SelectavalueintheSelectWorkOrderfieldlistofvaluestocreateafollowupworkorder.
6.ClickGo.
7.UsetheCreateFollowUpWorkOrderpagetoenterdetailsofthefollowupworkorderthatyouarecreating.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 56/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
8.ClickApply.
Aconfirmationmessagedisplaysthatafollowupworkorderhasbeencreated.
RelatedTopics
eAMScheduling
eAMWorkOrderTransactions
TherearetwotypesofEnterpriseAssetManagementworkordertransactions:materialandresource.Amaterialtransactionisusedwhenyouissuematerial
frominventorytoaworkorder.Aresourcetransactionisusedwhenyouchargeresources(forexamplelabor,orequipment)toaworkorder.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 57/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Thissectionincludesthefollowingtopics:
OperationCompletion
WorkOrderCompletion
RebuildWorkOrderCompletion
TransactingMaterial
ViewingResourceTransactions
ClosingWorkOrders
OperationCompletion
Operationsaretheinstructionsortaskstoperformarepair.Everyoperationisassignedtoadepartment(See:DefiningDepartmentsandResources),
associatedwithassignedresources(tradespeople,contractorservices,andequipment).WhenyouenteraWorkOrderforanAssetNumber,theAsset
Number'sassociatedactivity(See:AssociatingAssetNumberswithActivities)attachestotheworkorder,deliveringitsrelatedmaintenanceroute(See:
DefiningMaintenanceRoutes)andBOM.Themaintenancerouteiscomprisedofoperationsnecessarytocompletetheactivity.YoucanCompleteand
Uncompleteoperations.Afteranoperationiscomplete,youcanperformanOperationUncompletion.Ifanoperationisdependentuponanotheroperation,you
cannotuncompletethatoperation'sdependencyifthecurrentoperationiscomplete.Forexample,operation20isdependentonoperation10completing.You
cannotuncompleteoperation10afteroperation20hasbeencompleted.
YoucancompleteoruncompleteanoperationusingtheMaintenanceSuperUserresponsibility.
Tocompleteanoperation
1.NavigatetotheMaintenanceSuperUserresponsibility.
2.SelecttheWorkOrdertab.
3.Queryworkordersandselectaworkorderfromthelist.
4.SelectanOperationandchooseComplete/Uncomplete.Thisistheoperationyouwishtocomplete.
Operations
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 58/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
5.EntertheActualStartDateandTimeoftransactionthesystemdateappearsasdefaultvalues.
6.EnterActualDuration(hours)information.
7.TheActualEndDatedefaultsasthecurrentsystemdate.Youcannotchangethisvalue.
8.OptionallyenteraReconciliationCode.
Thisisadescriptionofwhyyouarecompletingthisoperation.Forexample,OperationCompletedorOperationPartiallyCompleted.
9.ClicktheApplybutton.
Touncompleteanoperation
1.NavigatetoMaintenanceSuperUserresponsibility.
2.SelecttheWorkOrdertab.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 59/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
3.Queryworkordersandselectaworkorderfromthelist.
4.SelectanOperationandchooseComplete/Uncomplete.Iftheoperationwaspreviouslycompleted,thenyoucanUncompletetheoperation.
5.ClicktheApplybuttontouncompletetheoperation.
RelatedTopics
PreparingWorkOrderOperations
DefiningMaintenanceRoutes
OperationCompletionMoves, OracleWorkinProcessUser'sGuide
WorkOrderCompletion
OracleeAMworkordersarecreatedagainstassets.Theyaredefinedmanually,orgeneratedautomaticallybasedonascheduledactivity.Ifyouattacha
manuallycreatedworkordertoanactivity(normallytheroleofaplanner),theworkorderinheritstheactivity'sattributes,suchastheassetBOM,assetroute
(operations),attachments,qualityplans,costinformation,andschedulingrules.
Theoperationswithinaworkorderdonotneedtobecompletetocompleteaworkorder.However,thedateyoucompleteaworkordermustbegreaterthan
(later)orequaltotheenddateoftheoperationthathasthelatestenddate.Likewise,thedateyoustartaworkordermustbeearlierthanorequaltothe
startdateoftheoperationwiththeearlieststartdate.YoucanuncompleteaComplete,CompleteNoCharges,Cancelled,PendingCloseorFailedClose
workorder.IfyouuncompleteaworkorderwithastatusofCompleteorCompleteNoCharges,transitionstoaCompletestatusforallotherstatuses,the
workordertransitionstothestatusithadwhenclosed.See:eAMWorkOrderStatuses).
Forplannedworkorders,thedefaultworkordercompletiondatevalueisthescheduledcompletiondate.
However,theprofileoption,EAM:ActualWorkCompletionDatePreference,canbesettousethesystemdateasthedefaultworkordercompletiondate.See
EAMProfileOptionsinthe OracleEnterpriseAssetManagementImplementationGuide.
Plannersorcrewsupervisorscancompleteoruncompleteworkorders,usingtheMaintenanceWorkbench(UsingtheMaintenanceWorkbench),fromthe
EnterpriseAssetManagementresponsibility,orbyaccessingtheWorkOrderCompletionmenuoption.Aftercompletingaworkorder,thecompletion
transactionrecordiscreatedwithanelectronicsignature(UserName).Duringcompletion,arecordiscreatedwiththissignatureforanymandatorycollection
planresultsormandatorymeterreadings.
Tocompleteaworkorder
1.NavigatetotheWorkOrderCompletionwindow(MaintenanceSuperUserorMaintenanceUserWorkbench:WorkOrderstaborEnterpriseAsset
Management:WorkOrderPlanning>MaintenanceWorkbench).
2.Selectaworkorder.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 60/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
3.SelecttheCompleteWorkOrdervalueintheSelectWorkOrderdropdown.
4.OptionallyenteraReconciliationCode.
Thisisasimpledescriptionofwhyyouarecompletingthisworkorder.Forexample,WorkOrderCompletedorWorkOrderPartiallyCompleted.
5.OptionallyenterActualDuration(hours)information.
Youmustentertwovalueswithinthisregion:ActualDurationandActualStartDateandTime.Thevaluethatyoudonotenterisautomatically
calculated.
ActualDurationidentifiesthetotalelapsedtimeoftheworkorder.ItisautomaticallycalculatedasthedifferencebetweentheScheduledStartDateand
ScheduledEndDate.
6.TheMetersregionenablesyoutoenterreadingsformetersassociatedwiththisAssetNumber.Readingsformetersdefinedasmandatorymustbe
entered.Youcanoptionallyenternonmandatoryreadings.
Atworkordercompletion,meterreadingsaremandatoryforworkordersgeneratedbythePreventiveMaintenanceschedulingengine.Afteraworkorder
iscompleted,meterreadingsarerequiredforallruntimeintervalmetersassociatedwiththeAssetNumberinthePreventiveMaintenancescheduling
definition.See:PreventiveMaintenanceScheduling.IfthereisameterassociatedwiththisAssetNumber,youarepromptedtoenteraCurrentReading
oraReadingChange.IfyouenteraCurrentReading,theReadingChangedefaults.IfyouenteraReadingChange,theCurrentReadingdefaults.See:
EnteringMeterReadings.
SelecttheResetcheckboxtoindicateifyouwouldliketoResettheCurrentReadingtozero.
7.OracleQualitycollectionplansassociatedwiththecurrentworkorder'sassetnumberandrequiringcompletionappearintheQualityPlansregion.When
thecollectionplanwascreated,itwasspecifiedifthecollectionplanrequiredcompletion.Also,duringtheEnterpriseAssetManagementcollectionplan
creationprocess,triggersmighthavebeenspecifiedtomakeonlycertainassetseligibleforthecollectionplan.See:QualitySetup.
RequiredfieldsaredependentontheCollectionPlan'scollectionelementspecifications.See:QualitySetup.
8.ChooseApplytosaveyourwork.
Touncompleteaworkorder
1.NavigatetotheWorkOrderCompletionwindow.
2.Selectacompletedworkorder.
3.SelecttheCompleteWorkOrdervalueintheSelectWorkOrderdropdowntouncompletethisworkorder.
4.OptionallyenteraReconciliationCode.Thisisasimpledescriptionofwhyyouareuncompletingthisworkorder.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 61/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
5.OptionallyenteranActualDurationorActualStartDateandTime.ActualDurationidentifiesthetotalelapsedtimeoftheworkorder.Itisautomatically
calculatedasthedifferencebetweentheEstimatedStartDateandEstimatedEndDate.Changingthetimesanddurationaffectsresourceusagefor
employeesandequipment.
6.ChooseApplytosaveyourwork.
RelatedTopics
EnteringMeterReadings
RebuildWorkOrderCompletion
Therearetwowaystocreaterebuildworkorders.Inthescenariothatanewrebuildableitemisissuedfrominventorytobeplacedintotheasset,arebuild
workordercreatesfortherebuildableitemthatwastakenoutwithaneedforrepair,giventherequiredinformationwasenteredintothematerialtransaction
(See:TransactingMaterial).Thischildworkorderoftheparentworkordercancomplete,independentoftheparentworkorder.However,iftherebuildable
itemneedingrepairisremovedfromtheasset,repaired,thenreinstalled,thatmanuallycreatedchild,rebuildworkordermustfirstbecompletedbeforethe
parentworkordercancomplete.Inthisscenario,firstcompleteallrebuildorchildworkorders(See:RebuildWorkOrders)beforeyoucancompleteaparent
workorder(See:WorkOrderCompletion).Theoperationswithinaworkorderdonotneedtobecompleteinordertocompleteaworkorder.However,the
dateyoucompleteaworkordermustbegreaterthan(later)orequaltotheenddateoftheoperationthathasthelatestenddate.Likewise,thedateyou
startaworkordermustbeearlierthanorequaltothestartdateoftheoperationwiththeearlieststartdate.Youcanuncompleteaworkorderafteritis
completed,transcendingittoaReleasedstatus(See:eAMWorkOrderStatuses).
PlannersorCrewSupervisorscancompleteoruncompleteworkordersusingtheMaintenanceworkbench(See:UsingtheMaintenanceWorkbench),orby
accessingtheRebuildableWorkOrderCompletionmenuoption.Aftercompletingaworkorder,thecompletiontransactionrecordiscreatedwithyour
electronicsignature(UserName).Arecordiscreatedwiththissignature,duringcompletion,foranymandatorycollectionplanresultsormandatorymeter
readings,aswell.
Tocompletearebuildworkorder
1.NavigatetotheRebuildCompletionwindow(MaintenanceSuperUserorMaintenanceUserWorkbench:WorkOrderstab,orEnterpriseAsset
Management:WorkOrderPlanning>MaintenanceWorkbench).
2.Queryandselectarebuildworkorder.
3.SelecttheCompleteWorkOrderintheSelectWorkOrderdropdown.
RebuildWorkOrderCompletion
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 62/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 63/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
4.Selectarebuildworkorder.
Onlyrebuildworkordersareavailable.
5.OptionallyenteraReconciliationCode.
Thisisadescriptionofwhyyouarecompletingthisworkorder.Forexample,WorkOrderCompletedorWorkOrderPartiallyCompleted.
6.EnteranactualDurationandActualStartDateandTime.
ActualDurationidentifiesthetotalelapsedtimeoftheworkorder.ItautomaticallycalculatesasthedifferencebetweentheScheduledStartDateand
ScheduledEndDate.Changingthetimesanddurationaffectsresourceusageforemployeesandequipment.
7.IftherebuildworkorderisgeneratedfromamaterialissueorisastandalonerebuildworkorderforaRebuildableItem'sserialnumberthatresidesout
ofinventory,thenentertheCompletionLocationinformation.
a.EntertheCompletionSubinventory.Forrebuildworkordersthatarecreatedfromamaterialtransaction,thismustbeanexpensesubinventory.
b.Iftherebuildableitemislocatorcontrolled,enteraCompletionLocator.See:InventoryAttributeGroup, OracleInventoryUser'sGuide.
c.Iftherebuildableitemislotcontrolled,enteraCompletionLot.See:InventoryAttributeGroup,OracleInventoryUser'sGuide.
8.ChooseApplytosaveyourwork.
Touncompletearebuildworkorder
1.NavigatetotheRebuildCompletionwindow.
2.Selectacompletedrebuildworkorder.
3.SelecttheCompleteWorkOrderfromtheSelectWorkOrderdropdowntouncompletetheworkorder.
4.OptionallyenteraReconciliationCode.
Thisisadescriptionofwhyyouareuncompletingthisworkorder.
5.ChooseApplytosaveyourwork.
RelatedTopics
DefiningSubinventories, OracleInventoryUser'sGuide
TransactingMaterial
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 64/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Youmightneedtoissuearebuildableitemorassetfrominventorytoamaintenanceworkorder.Forexample,aworkorderwasissuedfortheinspectionofa
pump.Duringthepumpinspection,youfoundthatthemotor,oneofthecomponentsofthepump,isproblematic.Youcanreplacetherebuildableitemby
issuinganewmotorrebuildableitemfrominventory.Ifyouchoosetoperformamaterialissuefrominventory,theoldmotorrebuildableitemattachestothe
workorder,automaticallycreatingthechild,rebuildworkordernumberassociatedtotheparentworkorder.Inthiscase,theAssetNumbergenealogy
automaticallyupdatestoidentifythisnewitemnumber.See:OverviewofInventoryTransactions, OracleInventoryUser'sGuide
.
YoucanexecuteamaterialissuetransactionfromtheStorestabpage,withinMaintenanceSuperUser(See:Stores).
RelatedTopics
IssuingandReturningSpecificComponents, OracleWorkinProcessUser'sGuide
ViewingResourcesTransactions
Resourcetransactionsdefinethetimeanassemblyspendsatanoperationandthecostyouincurforanoperation.Therearetwotypesofresources:person
andmachine.Youcantransactbothpersonandmachineresources.Aresourceisanemployee,pieceofequipment,orcontractorservice,usedtoperforman
operation.Youcanchargeresourcestoaspecificworkorder.Youcanviewalltransactionsthathavechargedagainstaspecificresource.
Toviewcompletedresourcetransactions
1.NavigatetotheFindResourceTransactionswindow.
Youcannarrowyourselectionoftransactionsbyanyfieldwithinthiswindow.Forexample,youcanviewallresourcetransactioninformationcharged
duringaspecificperiod,orviewalltransactioninformationtranspiredforaspecificworkordernumber.
TheconcurrentprocesswillalsoconsidertheOTLdatesforthetimeentriesiftheyfallwithinclosedaccountingperiods.
2.ChooseFind.
ViewResourceTransactions
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 65/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
3.SelecttheJoborScheduleHeadertabtoviewresourcetransactioninformationspecifictoaworkorder.
4.SelecttheOperation,Quantitiestabtoviewresourcetransactioninformationspecifictoaworkorderoperation.
5.SelecttheResourceInformationtoviewresourcetransactioninformationspecifictoaresource.
ClosingWorkOrders
YoucancloseamaintenanceworkorderifithasastatusofCancelled,Complete,CompleteNoCharges,PendingClose,orFailedClose.(See:eAMWork
OrderStatuses).Youcancloseoneormanyworkordersatonce.Afteraworkorderoraperiodisclosed,costvariancesarepostedtotheasset'sWIP
accountingclasscodeaccounts,iftheworkorderisassociatedwithanassetroute.VariancesarepostedtotheWIPaccountforeveryassetwithintheasset
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 66/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
routewhentheworkorderisreleased.Theseaccountsarecharged,evenifoneormoreassetsontheassetroutemovebetweenorganizationsbeforethe
workorderisclosed.
Note:IfyouwanttoupdatethequalityresultsforaworkorderwithastatusofClosed,youmustunclosetheworkorder.
IfaworkorderwasataCompletestatusatthetimeofclosingit,youcanunclosetheworkordertotransitionittoaCompletestatus.Forallotherstatuses
duringtheclosingofaworkorder,unclosingtheworkordertransitionstosamestatusithadwhenclosed.
Tocloseaworkorder
1.NavigatetotheFindWorkOrderswindow(EnterpriseAssetManagement>WorkOrders>CloseWorkOrders).
2.Selectaworkorder.Youcanoptionallyenterotherdataselectioninformation.
3.ChooseFind,andtheCloseWorkOrderpageappears.
CloseWorkOrder
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 67/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
4.FromtheToolsmenu,selectCloseWorkOrders.
TheCloseEAMWorkOrderswindowappears.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 68/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
5.SelectaReportType.
Yourselectiondeterminesthetypeofinformationpresentedonthereportthatisproducedbytheconcurrentprocess(CloseDiscreteJobs)closingthe
workorder.Thereportpresentsprojectinformation,workordersclosed,statusinformation,andquantityinformation.
6.SelectanActualCloseDate.
Thisdatemustbegreaterthanorequaltothesystemdate.
7.SelectaSubmissionDate.
Thisdatemustbegreaterthanorequaltothesystemdate.
8.ChooseOK.
Touncloseaworkorder
1.NavigatetotheFindWorkOrderswindow.
2.Selectaclosedworkorder.
Youcanoptionallyenterotherdataselectioninformation.
3.ClicktheFindbutton.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 69/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
TheCloseWorkOrderwindowappears.
4.FromtheToolsmenu,selectUncloseWorkOrders.
5.Saveyourwork.
Toclosearebuildworkorder
1.NavigatetotheFindRebuildWorkOrderswindow.
2.Selectaworkorder.
Onlyrebuildworkordersareavailable.
3.ChooseFind.TheCloseRebuildWorkOrderwindowappears.
4.FromtheToolsmenu,selectCloseRebuildWorkOrders.
TheCloseEAMWorkOrderswindowappears.
5.IntheReportTyperegion,selectareporttype.Yourselectiondeterminesthetypeofinformationpresentedonthereportthatisproducedbythe
concurrentprocess(CloseDiscreteJobs)closingtheworkorder.Thereportpresentsprojectinformation,theworkordersclosed,statusinformation,as
wellasquantityinformation.
6.SelectanActualCloseDate.Thisdatemustbegreaterthanorequaltothesystemdate.
7.SelectaSubmissionDate.Thisdatemustbegreaterthanorequaltothesystemdate.
8.ChooseOK.
9.Selectaclosedrebuildworkorderfromthelistofvalues.
10.ClicktheFindbutton.
TheCloseRebuildWorkOrderwindowappears.
11.FromtheToolsmenu,selectUncloseRebuildJobs.
12.Saveyourwork.
RelatedTopics
ClosingDiscreteJobsUsingSubmitRequests, OracleWorkinProcessUser'sGuide
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 70/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
eAMWorkOrderPlanning
Aplannerperformsseveralfunctions,includingpurchasingrequiredmaterialforworkorders,approvingworkrequests,creatingworkorders,releasingwork
orders,andcompletingworkorders.Thissectionincludesthefollowingtopics:
UsingtheMaintenanceWorkbench
UsingtheMaintenanceWorkbench
UsingtheMaintenanceWorkbench,aplannercanmassreleaseandmasscompleteworkorders.YoucansettheEAM:MassCompleteworkordersatsystem
dateprofileoptiontoperformamasscompletionforworkorderswithpastandfuturescheduledcompletiondates,withadefaultvalueoftheSystemDate
usingtheMaintenanceWorkbench.SeeProfileOptions, OracleEnterpriseAssetManagementImplementationGuide.
Youcannotcompletemassworkordersthathavemandatorymeterreadingsandmandatoryqualityplansassociatedwithaworkorder(See:WorkOrder
Completion).Aplannercanalsoprocuredirectitems(See:OverviewofDirectItemProcurementforeAMWorkOrders)forworkorders,withouthavingto
leavetheMaintenanceWorkbench.Youcangenerateworkordersfromsuggestedworkorders,manageworkorderrequiredmaterial,resources,andupdate
workorderoperationsasnecessary.
Youcanforecastmultipleassetsatonce.Youcanselectmultipleassetstoforecast,andthenexecutetheforecast.Afterexecution,youcancreateawork
order,associatetheworkorderwithaprojectandtaskforcapitalexpenditures,andassociatetheworkorderwithaparentworkorder.Thisisusefulfor
shutdowns.Whenanorganizationknowsthattheywillbeshuttingdownaportionoftheirplantorfacility,theycanaddthepreventivemaintenancework
orderstotheshutdownandusingOracleProjects,capitalizethecostsintofixedassets.
TousetheMaintenanceWorkbench
1.NavigatetotheMaintenanceWorkbenchpage(EnterpriseAssetManagement>WorkOrderPlanning>MaintenanceWorkbench).
2.Youcannarrowyourdataselectionusinganyofthefieldsavailable.Forexample:
AssetOwningDepartment:Usethisfieldtofilterresultsbasedonforecasts.
OwningDepartment:Usethisfieldtofilterresultsbasedonworkorders.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 71/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
3.ChooseLaunch.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 72/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
MaintenanceWorkbench
4.OptionallyintheMaintenanceWorkbenchpane,selecttheResults(Capital)tab,Results(RebuildableInventory)tab,ortheForecastWorktab.
SelectingtheResults(Capital)tabdisplaysassetnumberinformation(See:DefiningAssetNumbers)inatreestructureformat.Ifyouexpandthe
Results(Capital)branch,thetreedetailsassetnumberinformationintothreelowerbranches,includingAllAssets,AssetsWithWork,andRoutes.
AllAssets:Allassets,associatedwiththedataselectionenteredinStep2,appearundertheexpandedAllAssetsbranch.
AssetsWithWork:Allassetswithworkorders(See:eAMWorkOrders),associatedwiththedataselectionenteredinStep2,appearunderthe
expandedAssetsWithWorkbranch.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 73/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Routes:Allassetswithanassociatedassetroute(See:DefiningAssetRoutes),associatedwiththedataselectionenteredinStep2,appear
undertheexpandedRoutesbranch.
SelectingtheResults(RebuildableInventory)tabdisplaysrebuildableiteminformation(See:DefiningRebuildableItems)inatreestructureformat.If
youexpandtheResults(RebuildableInventory)branch,thetreedetailsrebuildableiteminformationintothreelowerbranches,includingAllRebuildables,
RebuildableswithWorkOrders,andInstanceNumbers.
AllRebuildables:Allrebuildables,associatedwitharebuildworkorder,appear.
RebuildableswithWorkOrders:Allrebuildableitemswithworkorders(See:eAMWorkOrders),associatedwiththedataselectionenteredinStep
2,appear.
InstanceNumbers:AllInstanceNumbersappear.
SelectingtheForecastWorktabdisplaystheForecastWorkOrderswindow,associatedwithassetnumberinformationintheMaintenanceWorkbench
pane.Youcanforecastand/orimplementformultipleassetsatonce.IfyouexpandtheForecastWorkbranch,thetreedetailsassetnumber
informationintothreelowerbranches,includingAllAssets,AssetsWithWork,andRoutes.
AllAssets:Allassets,associatedwiththedataselectionenteredinStep2,appearundertheexpandedAllAssetsbranch.
AssetsWithWork:Allassetswithworkorders(See:eAMWorkOrders),associatedwiththedataselectionenteredinStep2,appearunderthe
expandedAssetsWithWorkbranch.
Routes:Allassetswithanassociatedassetroute(See:DefiningAssetRoutes),associatedwiththedataselectionenteredinStep2,appear
undertheexpandedRoutesbranch.
ForecastedWorkOrders
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 74/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
a.EnteraCutoffDatetoindicatehowfaroutyouwouldliketheworkorderstobecreatedfromthesuggesteddates.
TheHorizondefaultsasthedifferencebetweentheStartDateandCutoffDate.
b.OptionallyselectaSetName.
IfaSetName(See:DefiningSetNames)isentered,theSimulateandRunbuttonsareenabled.IfyouselectSimulate,thenyoucannot
implementworkorders.IfRunisselected,youcanimplementworkordersonlyforforecastedsuggestionsfromdefault.TheDefaultcheckboxis
selectedinthePreventiveMaintenance(PM)Scheduledefinition.See:EnteringPreventiveMaintenanceScheduleDefinitions)PMSchedulesinthe
currentPMSetdefaultPMSchedulesarechosenfromthatPMsetforworkordergeneration.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 75/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
c.OptionallyselecttheIncludeRunToFailurecheckboxtoindicatethattheschedulingprocessshouldincludesuggestedworkordersforRunTo
Lifeassetnumberandactivityassociations.
Ifthischeckboxiscleared,manualworkorderscanbecreated.RunToLifeitemsaretypicallyitemsthatcostmoretomaintainthantheitem
itself.FormoreinformationonRunToLifeitems,See:PreventiveMaintenanceScheduling.
d.ChooseRuntogenerateworkordersuggestionsforthespecifieddateperiod.
TheExpectedStartDateiscalculatedifyouareusingbackwardscheduling,andtheExpectedEndDateiscalculatedifyouareusingforward
scheduling(See:InformationontheReschedulingPointregioninPreventiveMaintenanceScheduling).
e.OptionallychooseImplementtoreleasetheselected(indicatedbythecheckboxontheleftsideofthewindow)forecastedworkorders.
TheworkordersarecreatedatthestatusspecifiedinthePreventiveMaintenanceScheduledefinition.(See:eAMWorkOrderStatusesand
PreventiveMaintenanceScheduling).
Note:YoucanForecastWorkforassets,butnotrebuildableitems.
5.IfyouselectedtheResults(Capital)orResults(RebuildableInventory)tab,youcanoptionally,chooseOperationstoviewthetasksassociatedwitha
specificworkorder.
Youcanviewandupdatethematerialandresourcesassociatedwithaspecificoperation(See:eAMOperationsandTasks).
6.OptionallychooseMaterialstoviewandupdatethematerialrequirementsassociatedwithaselectedworkorder(See:DefiningaMaterialRequirements
PlanName).
a.Optionallyyoucanvieworupdatethecurrentworkorder'sassociatedassetnumber'sitemslistbychoosingSelectMaterials.Thecurrentasset
number'sassociatedAssetBOMitemsareavailabletoaddtotherequiredmaterial.See:SettingUpAssetBillsofMaterial.
b.OptionallychooseDirectItemtoselectdirectitemsfromsuppliercatalogs,createrequisitions,andaddthemtoyouritemslist.
DirectItemsareonetimenoninventorieditemsthatarepurchaseddirectlyfromasupplier.OracleSelfServicePurchasingdefaultstheworkorder
numberandoperationnumber,aswellastheclasscodeinformationforcorrectexpensing.AfteryouchooseDirectItem,thecurrentworkorder
andoperationreferencevaluesarepassedtotherequisitioncreatedusingSelfServicePurchasing.Iftheworkorderisprojectrelated,thenthe
projectandtaskinformationiscapturedinthepurchaserequisition(See:OverviewofDirectItemProcurementforeAMWorkOrders).Youcanexit
SelfServicePurchasingandreturntotheMaintenanceWorkbenchbyselectingReturnToPortal.
Note:Uponreinquiryofthisworkorder,theDirectItemsregionreflectsanyRequisitionandPurchaseOrderdetails.
Note:YoumusthaveOracleSelfServicePurchasinginstalledforthisfunctionality.YoucanpurchasedirectitemsfromaRequisitionorPurchase
OrderwindowifyouhaveOraclePurchasinginstalled(See:EnteringPurchaseOrdersforDirectItems).
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 76/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
c.ChooseCopytoAssettodynamicallyupdatetheBOMassociatedtotheassetgroupwithanyitemslistchanges(See:SettingUpAssetBillsof
Material).
7.OptionallychooseResourcestoview,update,add,ordeleteresourcerequirementsforaselectedworkorder(See:DefiningResourceRequirements).
OptionallychooseInstancestovieworupdatealistofspecificpeopleorequipmentassignedtothisresource.ThePersontabdisplayspersons
groupedinspecificroles.TheEquipmenttabdisplayssimilartypesofequipmentgroupedbyresource.Youcandefinespecificmachinestoanyof
yourmachinetyperesourcesandyoucandefinespecificemployeestoanyofyourlabortyperesources.Whenaresourcehasinstancesdefined,
youcanviewtheresourcecapacityandloadintheSchedulingWorkbench(See:UsingtheSchedulerWorkbench).
Forexample,youcandefineallmachinesbelongingtotheresource,GRINDERS.Anindividualgrindermachinecanthenbeaspecificresource
requirementandscheduled,andcanhaveauniquecapacitydefinition.
Thisinformationdefaultsfromyourcurrentresourcedefinition.Youcanonlyaddpersonsandequipmentthatareassociatedwiththecurrent
resource.
8.OptionallyselecttheCompletebuttontocompleteaselectedworkorder(See:WorkOrderCompletion).
9.OptionallyselecttheOpenbuttontoopentheworkorderdetailsofaspecifiedworkorderSee:eAMWorkOrders).
10.OptionallyselecttheRequestsbuttontoviewallopenserviceandworkrequestsforthecurrentassetnumber.
Note:Youcanviewworkrequestsforassets,butnotrebuildablespares.TheResults(Capital)tabmustbeselectedtoviewworkrequests.
11.OptionallyselecttheMassReleasebuttontoreleasemultipleworkordersatonce.WorkordersatthestatusspecifiedinthePreventiveMaintenance
Scheduledefinitionappear.See:PreventiveMaintenanceScheduling.
MassRelease
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 77/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Selectthecheckboxesnexttotheworkorderstorelease,thenchooseRelease.Becauseyoucannotcompletemassworkordersthathavemandatory
meterreadingsandmandatoryqualityplansassociated,youcannotreleasetheworkorderiftheseconditionsexist.
12.OptionallychooseMassCompletetocompletemultipleworkordersatonce(See:WorkOrderCompletionandeAMWorkOrderStatuses).Choose
Completetocompleteallworkordersselected.
MassComplete
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 78/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
13.Saveyourwork.
RelatedTopics
DefiningaResource, OracleBillsofMaterialUser'sGuide
CapitalizingWorkOrders
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 79/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Youcancapitalizepartorallofthecostsincurred,whilemaintaininganasset.Theasset'sbookvalueandusefullifeincrementwiththeadditionalvalue,
withinOracleFixedAssets.Accountantsanalyzethemaintenancecosthistorytodecidewhichcoststocapitalize.Youcanidentifytheworkordersthat
increaseanasset'svalue.Youcancapitalizeonlythecostsofworkordersatthe CompleteNoCharges Closed
or statuses.
Whendefiningamaintainedassetnumber,youcanoptionallyenterFixedAssetinformationtoassociateaFixedAssetCategoryandFixedAssetnumberwith
themaintainedassetnumber,ifOracleFixedAssetsisinstalled.See:DefiningAssetNumbers.
Tocapitalizeworkordercosts
1.NavigatetotheFindWorkOrderswindow(BillingandCapitalization>WorkOrderCapitalization).
2.Queryoneormoreworkorderstocapitalize.
a.Youcannarrowyoursearchcriteria,usingthefieldsatthetopofthewindow.
Forexample,youcanenteraspecificworkorder,assetnumber,orspecifyifyouwanttodisplayonlyworkordersataClosedstatus.
b.OptionallychooseCleartoresetthesearchcriteriatothedefaultsearchcriteria(allfieldsareclearedandtheClosedandCompleteNoCharges
Statuscheckboxesareselected).
c.ChooseFind.TheWorkOrdersregiondisplaysqueriedworkorders,dependentonyoursearchcriteria.
3.Selectaworkorder.
YoucansearchusinganumberofsearchparameterssuchasWorkOrderandconstructionEstimateNumber.Ifyousearchbyestimatenumber,the
valuesavailableforselectionareonlytheconstructionestimatesthathaveworkorderscreatedforthem.
FindWorkOrders
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 80/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
4.ClicktheCapitalizeWorkOrderbutton.
Thisbuttonisenabledforonlythoseworkordersthathaveamountsavailabletocapitalize.
WorkOrderCapitalization
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 81/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
5.EnteraCapitalization%.
ThecostsassociatedwiththeselecteditemsandresourceswithintheCapitalizationregionarecapitalizedbythispercentage.
6.AfterselectingitemsorresourcestocapitalizewithintheCapitalizationregion,chooseCalculateAmountstoviewtheprojectedamounttocapitalize,
basedonwhatyouhadenteredwithintheCapitalization%field.
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 82/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Theasset'sbookvalueandusefullifewillincrementwiththisadditionalvaluewithinFixedAssets.
7.OptionallychangethedefaultedOffsetAccount.Capitalizedmaintenancecostsarecreditedtotheirassociatedmaintenanceexpenseaccounts,while
thisOffsetAccountisdebitedbythesameamountwithinFixedAssets.
Maintenanceexpensesthatarecapitalizedareconsideredcapitalassetvalueandnotmaintenanceexpenses,withintheGeneralLedger.
8.TheCommentfieldcontainstheworkordernumber,Asset,andAssetDescription,concatenatedtogether.
9.ChooseInitiateCapitalizationtoexecuteaconcurrentprocessthatcapitalizesthecurrentworkorder'smaintainedasset'sassociatedFixedAsset
withthecalculatedamounts.
10.OptionallychooseViewPastDetailstoviewallpastcapitalizationtransactionsforthemaintainedasset'sassociatedFixedAsset.
ViewPastDetails
11.ClicktheClosebutton.
12.Closethewindows.
Contents|Previous|TopofPage|Next
https://docs.oracle.com/cd/E26401_01/doc.122/e48789/T259967T259972.htm#worelation 83/84
22/10/2017 OracleEnterpriseAssetManagementUser'sGuide
Copyright2001,2017,Oracleand/oritsaffiliates.Allrightsreserved.