NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041

AREA TG Operating Instruction For REV 0.00


UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009

A PURPOSE:-
This document is prepared to guide the operating personnel for managing the turbine side drains during a unit startup ,
shutdown & normal operating condition in stage- II of NTPC /TSTPS .

B SCOPE: :-
This shall be applicable to all the 4 units of stage - II , TSTPS ( 4 X 500 MW Units ) .

C INTRODUCTION : -
Drains play an important role in any system charged with steam . This is basically provided to drain out
the condensate before charging steam in a pipeline & subsequently allows sufficient flow in the line for initial warm
up . Also this allows to drain the condensate during cooling of any pipeline .Normally the big headers like MS
/CRH / HRH are provided with drain pots where the condensate is expected to collect & subsequently they are
drained by operation of these drain valves . To avoid human interventions some of the drains depending on their
location & importance severity they are interlocked with certain logics or instruments like level switches & so on .

If the condensate is not properly drained & steam is charged into a line , then it will lead to severe
hammering in the line causing major damages & sometime forced outage of the units due to failure of the
support system . Hence due care is to be taken while operating these drains .

Each Motor Operated drain is provided with a manual isolating valve for isolation of the drain valve
depending on requirement . But in case of MAW 11 drain valve no isolation valve is provided . However a bypass
line with 6-10 mm orifice is provided for continuous bleeding .Some systems are provided with orifice operated
continuous drains for continuous bleeding of steam /condensate .At some places drains are provided with steam drain
traps which should always be kept in service .

D TECHNICAL DATA OF THE SYSTEM


The Following drains are provided in the turbine system of stage - II Units .

Manual Isolation
Down Stream Temp
Sl No Valve Tag Description of Valve Valve Open
Point Provided
provided
ATMOSPHERIC DRAINS
01. MS LINE Drain at TG 0 Mtr Yes No
02. CRH LINE Drain at TG 0 Mtr Yes No
03. HRH LINE Drain at TG 0 Mtr Yes No
04. CRH Drain Before NRV at TG 0 Mtr Yes No
05. LPBP line 1& 2 Drain at TG 0 Mtr Yes No
06. UFT vent line drain at TG 0 Mtr Yes No
IBD TANK ( 02 nos )
07. MS 401 MS line L Drain before MSSV ( Left ) Yes No
08. MS402 MS line R Drain before MSSV ( Right ) Yes No
UNIT FLASH TANK ( 08 nos )
09. BP 101 HPBP Drain ( Left ) Yes No

Sheet 1 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009

10. BP 102 HPBP Drain ( Right ) Yes No


11. MS 419 MS Line Drain Before Strainer Yes No
12. MS 101 MS Strainer Drain ( Left ) Yes Yes
13. MS 102 MS Strainer Drain ( Right ) Yes Yes
14. HRH 101 HRH Strainer Drain ( Left ) Yes Yes
15. HRH 102 HRH Strainer Drain ( Right ) Yes Yes
16. HRH 604 HRH Line Hdr Drain Yes No
STARTUP DRAIN FLASH TANK ( 12 nos )
17. MS 105 MS Strainer Drain ( Left ) Yes Yes
18. MS 106 MS Strainer Drain ( Right ) Yes Yes
19. MS 417 MS Line Drain Before Strainer Yes Yes
20. CRH 101 CRH NRV Drain Yes NO
21. CRH 501 CRH Line Drain Yes NO
22. HRH 105 HRH Strainer Drain ( Left ) Yes Yes
23. HRH 106 HRH Strainer Drain ( Right ) Yes Yes
24. HRH 606 HRH Line Drain Before Strainer Yes NO
25. LP 625 LPBP Line Drain ( Left ) Yes NO
26. LP 624 LPBP Line Drain ( Right ) Yes NO
27. HRH 109 LPBP Warm up Line Drain ( Left ) Yes Yes
28. HRH 110 LPBP Warm up Line Drain ( Right ) Yes Yes
HP DRAIN FLASH TANK ( 13 nos )
29. EX 105 Extraction to HPH 5 A / 5 B Line Drain Yes Yes
30. AS 122 Turbine Gland Steam Seal Drain Yes NO
31. AS 104 Aux. Steam to BFPT A Line Drain Yes NO
32. AS 109 Aux. Steam to BFPT B Line Drain Yes NO
33. CRH 129 CRH to BFPT A DS Line Drain Yes NO
34. CRH 141 CRH to BFPT B DS Line Drain Yes NO
35. CRH 135 Steam to BFPT A Line Drain Yes NO
36. CRH 147 Steam to BFPT B Line Drain Yes NO
37. CRH 109 CRH to DEA Pegging Line Drain Yes NO
38. CRH 116 CRH to BFPT A Line Drain Yes NO
39. CRH 123 CRH to BFPT B Line Drain Yes NO
40. EX 101 Extraction to HPH 6 A Line Drain Yes Yes
41. EX 102 Extraction to HPH 6 B Line Drain Yes Yes
LP DRAIN FLASH TANK ( 07 nos)
42. CRH 153 CRH to DEA Pegging DS of CV Line Drain Yes NO
43. EX 109 Extraction to BFPT A & B Line Drain Yes NO
44. EX 115 Extraction to DEA Line Drain Yes NO
45. EX 110 Extraction to LPH 3 Line Drain Yes NO
46. EX 112 Extraction to LPH 2 Line Drain Yes NO

Sheet 2 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009

47. AS 113 S SCAPH Line Drain Yes NO


48. AS 114 P SCAPH Line Drain Yes NO
TURBINE DRAIN ( FLASH BOX 1 Towards SWYD ) 06 nos
49. MAL 11 Drain Before HPCV - 1 Yes Yes
50. MAL 26 Drain Before IV - 1 Yes Yes
51. MAL 65 Drain Before CRH NRV Yes Yes
52. MAL 31 Drain After IV - 1 Yes Yes
53. MAL 32 Drain After IV - 2 Yes Yes
54. MAL 22 HP Casing Drain Yes Yes
TURBINE DRAIN ( FLASH BOX 2 Towards Boiler ) 08 nos
55. MAL 12 Drain Before HPCV - 2 Yes Yes
56. MAL 27 Drain Before IV - 2 Yes Yes
57. MAL 47 Drain of Extraction Valve A 5 Yes Yes
58. MAL 51 Drain of Extraction Valve A 4.1 Yes Yes
59. MAL 52 Drain of Extraction Valve A 4.2 Yes Yes
60. MAL 54 Drain of Extraction Valve A 3 Yes Yes
61. MAL 81 Gland Steam Header Drain Yes Yes
62. MAL 55 Drain of Extraction Valve A 2 Yes Yes

D OPERATING INSTRUCTIONS :
The following instructions are to be followed during the Unit normal operation , Unit Hot & Cold start-up &
Unit shutdown conditions .

D-1 Normal Operation :-


Always ensure the SLC drain is kept ON .
Check all the Drain MOV ( Motor Operated Valve) are manually tightened and no passing is observed
indicated by high temp at the down stream of the MOV checked either through online measurement or
through Temp Gun at local .
If the temp is maintaining very HI (Suspected Passing) then the manual valve for the MOV can be kept
closed with proper record in the Log Book as well as the information to be made available in soft form .
Necessary WOC to be raised for such drains .

D-2 Unit start-up Operation :-


D-2.1 Hot Start-up
D-2.1.1. The Alternate drains connected to UFT are not to be opened at all such as .
( BP 101 ,BP 102,MS 419,MS 101,MS 102,HRH 101,HRH 102,HRH 604 )
D-2.1.2. Check the following turbine drains are opened as per SLC logic after the Unit Has tripped out .

MAL 11 Drain Before HPCV - 1 MAL 12 Drain Before HPCV - 2


MAL 26 Drain Before IV - 1 MAL 27 Drain Before IV - 2
MAL 65 Drain Before CRH NRV MAL 47 Drain of Extraction Valve A 5
MAL 31 Drain After IV - 1 MAL 51 Drain of Extraction Valve A 4.1

Sheet 3 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009

MAL 32 Drain After IV - 2 MAL 52 Drain of Extraction Valve A 4.2


MAL 54 Drain of Extraction Valve A 3
MAL 55 Drain of Extraction Valve A 2

D-2.1.3. Open MS/HRH Strainers drains to SDFT MS 105/106 & HRH 105/106 ( Operated from BHEL CRT ) immediately
after turbine tip out . On auto these drains open at SGC Shutdown programme at step 53 .
D-2.1.4. Open CRH Hdr Drain CRH 501 to SDFT . This drain actually operates on auto based on the Drain Pot Level
Switch actuation .
D-2.1.5. Ensure all the manual valves ( if anyone was closed ) of drains connected to the SDFT /FB-1& FB -2 / LP & HP FT
are opened as per the list attached as soon the unit has tripped .
D-2.1.6. Now ensure the temperatures are picking up down stream of the drain as soon as soon as steam flow established
( where ever on line measurement provided)
D-2.1.7. Now as the turbine rolling started the MS/HRH Strainers drains MS 105/106 & HRH 105/106 gets closed at step
13 .
D-2.1.8. After Unit is synchronisation & Load pick up is > 100 MW ensure all the following drains are closed on auto
MAL 11 Drain Before HPCV - 1 MAL 12 Drain Before HPCV - 2
MAL 26 Drain Before IV - 1 MAL 27 Drain Before IV - 2
MAL 65 Drain Before CRH NRV
MAL 31 Drain After IV - 1
MAL 32 Drain After IV - 2

D-2.1.9. Ensure the Extraction line drains are closed after the respective Extractions are charged .

MAL 47 Drain of Extraction Valve A 5 MAL 52 Drain of Extraction Valve A 4.2


MAL 51 Drain of Extraction Valve A 4.1 MAL 54 Drain of Extraction Valve A 3
MAL 55 Drain of Extraction Valve A 2

D-2.1.10. Check all the TDBFP drains are closed after TDBFPs are loaded .

D-2.2 Absolute Cold / Warm Start-up .


D-2.2.1. While pulling Vacuum keep the drains connected to vacuum system closed for faster pulling of vacuum . Then
slowly open one by one as per requirement .
D-2.2.2. Never operate both the main & alternate drain valve simultaneously , this will lead to vacuum drop in the system .
D-2.2.3. Ensure the manual valves of following drains connected to the UFT / SDFT /FB-1& FB -2 / LP & HP FT are opened
as per the list attached before charging MS Line .
D-2.2.4. The atmospheric drain s provided in MS /CRH / HRH line are to be kept open ( Crack ) for initial charging MS line
/ HP & LP Bypass system for release of condensate . They are to be closed after ensuring sufficient steam flow .
D-2.2.5. The Alternate drains to UFT are to be kept open initially for better Silica control in the Unit .
D-2.2.6. The Header Drains of MS/CRH/HRH Such as MS 417/419 , HRH 606/604 , CRH 501 are to be kept open till 20 %
steam Flow .
D-2.2.7. The MS/HRH Strainers drains MS 105/106 & HRH 105/106 are to be kept opened till rolling of TG set .
D-2.2.8. Check the following turbine drains are opened as per SLC logic before TG Set Rolling

MAL 11 Drain Before HPCV - 1 MAL 12 Drain Before HPCV - 2


MAL 26 Drain Before IV - 1 MAL 27 Drain Before IV - 2
MAL 65 Drain Before CRH NRV MAL 47 Drain of Extraction Valve A5
MAL 31 Drain After IV - 1 MAL 51 Drain of Extraction Valve A 4.1
MAL 32 Drain After IV - 2 MAL 52 Drain of Extraction Valve A 4.2
MAL-22 HPC drain . MAL 54 Drain of Extraction Valve A3
MAW-11 Seal steam supply drain MAL 55 Drain of Extraction Valve A2

Sheet 4 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009

D-2.2.9. The temp points provided for the major drains are functioning indicated by the rise in temp when ever steam
flows in those drain .
D-2.2.10. For Charging HP/LP Bypass the HPBP Warm up Line Drains

D-2.2.11. Normally the drains are kept closed as soon as sufficient steam flow is established in the system . Such as
Close MS Line drains to IBD ( MS401/402) once the Main MS SV are full open .
Close the CRH hdr atmospheric drain after HP/LP bypass is charged & sufficient steam coming .
Close the MS /HRH Hdr Drains MS 417/419 , HRH 606/604 once HP /LP bypass is charged
D-2.2.12. Check the following turbine drains are opened as per SLC logic after the Unit Has tripped out .

MAL 11 Drain Before HPCV - 1 MAL 12 Drain Before HPCV - 2


MAL 26 Drain Before IV - 1 MAL 27 Drain Before IV - 2
MAL 65 Drain Before CRH NRV MAL 47 Drain of Extraction Valve A5
MAL 31 Drain After IV - 1 MAL 51 Drain of Extraction Valve A 4.1
MAL 32 Drain After IV - 2 MAL 52 Drain of Extraction Valve A 4.2
MAL 54 Drain of Extraction Valve A3
MAL 55 Drain of Extraction Valve A2

D-2.2.13. The MS /HRH strainer drains MS 105/106 & HRH 105/106 are automatically closed once TG set Rolling started at
step 13 .
D-2.2.14. After Unit is synchronisation & Load pick up is > 100 MW ensure all the following drains are closed on auto
MAL 11 Drain Before HPCV - 1 MAL 12 Drain Before HPCV - 2
MAL 26 Drain Before IV - 1 MAL 27 Drain Before IV - 2
MAL 65 Drain Before CRH NRV
MAL 31 Drain After IV - 1
MAL 32 Drain After IV - 2

D-2.2.15. Ensure the Extraction line drains are closed after the respective extractions are charged .

MAL 47 Drain of Extraction Valve A 5 MAL 52 Drain of Extraction Valve A 4.2


MAL 51 Drain of Extraction Valve A 4.1 MAL 54 Drain of Extraction Valve A 3

D-2.2.16. Check all the TDBFP drains are closed after TDBFPs are loaded .

D-2.2.17. Ensure the turbine casing drain MAL22 is closed after HPT casing temp attained > 320 0 C on auto .

D-3 Unit Shutdown Operation :-


When ever the unit goes under shut down , very care full drain operation management is to be followed . Some
times keeping additional drains open may lead to cooling of the turbine components . The situations will be
different with vacuum being maintained or killed .

D-3.1 If Vacuum is maintained .


D-3.1.1. The SLC drain should be kept ON .
D-3.1.2. As soon as the turbine is hand tripped or tipped ensure the following drains are opened on auto .
MAL 11 Drain Before HPCV - 1 MAL 12 Drain Before HPCV - 2
MAL 26 Drain Before IV - 1 MAL 27 Drain Before IV - 2
MAL 65 Drain Before CRH NRV MAL 47 Drain of Extraction Valve A 5
MAL 31 Drain After IV - 1 MAL 51 Drain of Extraction Valve A 4.1
MAL 32 Drain After IV - 2 MAL 52 Drain of Extraction Valve A 4.2

Sheet 5 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009

MAL 54 Drain of Extraction Valve A 3


MAL 55 Drain of Extraction Valve A 2

D-3.1.3. Open MS/HRH Strainers drains to SDFT MS 105/106 & HRH 105/106 ( Operated from BHEL CRT ) immediately
after turbine tip out . On auto these drains open at SGC Shutdown programme at step 53 .
D-3.1.4. Open CRH Hdr Drain CRH 501 to SDFT . This drain actually operates on auto based on the Drain Pot Level
Switch actuation .
D-3.1.5. Ensure all the manual valves ( if anyone was closed ) of drains connected to the SDFT /FB-1& FB -2 / LP & HP FT
are opened as per the list attached as soon the unit has tripped .
D-3.1.6. Now ensure the temperatures are picking up down stream of the drain as soon as soon as steam flow established (
Where ever on line measurement provided)

D-3.1.7. As Boiler is Boxed up by closing the MS stop Valves Ensure the opening of following drains

MS 105 MS Strainer Drain ( Left ) HRH 606 HRH Line Drain Before Strainer
MS 106 MS Strainer Drain ( Right ) LP 625 LPBP Line Drain ( Left )
MS 417 MS Line Drain Before Strainer LP 624 LPBP Line Drain ( Right )
CRH 101 CRH NRV Drain HRH 109 LPBP Warm up Line Drain ( Left )
CRH 501 CRH Line Drain HRH 110 LPBP Warm up Line Drain ( Right )
HRH 105 HRH Strainer Drain ( Left )
HRH 106 HRH Strainer Drain ( Right )

D-3.1.8. Ensure that the HPC drain MAL 22 has opened after HPC temp drops below 300 0 C .
D-3.1.9. Ensure TDBFP drains are opened after TDBFP Tripping .

D-3.2 If Vacuum is Killed .


D-3.2.1. Ensure complete isolation of seal steam supply to turbine gland steam system by closing both HT/LT manual isolation
valves from APRDS at APRDS level . Also the manual isolation valve at 8.5 mtr before seal steam control station
manual valve is closed & the drain to UFT before it is opened .
D-3.2.2. SLC Drain is ON
D-3.2.3. Since MS / HRH Lines are depressurised , keep all the atmospheric drains open .
D-3.2.4. The Following drains to UFT are open
BP 101 HPBP Drain ( Left ) MS 102 MS Strainer Drain ( Right )
BP 102 HPBP Drain ( Right ) HRH 101 HRH Strainer Drain ( Left )
MS Line Drain Before
MS 419 HRH 102 HRH Strainer Drain ( Right )
Strainer
MS 101 MS Strainer Drain ( Left ) HRH 604 HRH Line Hdr Drain
D-3.2.5. Ensure the following turbine drains are open on auto .

MAL 11 Drain Before HPCV - 1 MAL 12 Drain Before HPCV - 2


MAL 26 Drain Before IV - 1 MAL 27 Drain Before IV - 2
MAL 65 Drain Before CRH NRV MAL 47 Drain of Extraction Valve A5
MAL 31 Drain After IV - 1 MAL 51 Drain of Extraction Valve A 4.1
MAL 32 Drain After IV - 2 MAL 52 Drain of Extraction Valve A 4.2
MAL 81 Seal steam Hdr Drain MAL 54 Drain of Extraction Valve A3
MAW 11 Seal steam supply drain MAL 55 Drain of Extraction Valve A2

D-3.2.6. Check HPT casing drain MAL 22 is opened after temp drops < 300 0 C .
D-3.2.7. Ensure all the SDFT / LPFT/ HPFT drains are open

Sheet 6 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG REV 0.00
Operating Instruction For Management of Turbine Drains
UNIT - 3/4/5/6 Date : 25/ 02/2009

SL DRAIN VALVE KKS LOCATI MAN MAN AUTO AUTO PROT PROT
NO. DESCRIPTION CODE ON CLOSE OPEN CLOSE OPEN CLOSE OPEN
DRAIN HP HP OUTER CASING TOP
1 MAL22AA011 0 M TG Y Y HP OUTER CASING TOP >320 DEG .C
CASING <300 DEG .C
AND AND
HP
HP OUTER CASING
HP OUTER CASING BOT >320 DEG .C EVACUATION
BOT<300DEG .C ON
OR OR
HP OUTER CASING TOP
HP OUTER CASING TOP >320 DEG .C
<300DEG .C
OR OR
HP OUTER CASING BOT
HP OUTER CASING BOT >320 DEG .C
<300 DEG .C
AND AND
GEN LOAD > 10 % GEN LOAD <2 %
DRAIN BEFORE
2 MAL11AA011 0 M TG Y Y SGC TURBINE STEP-3
HPCV-1
SGC TURBINE SHUTDOWN
OR
STEP- 55
SGC TURBINE STEP-16
OR
SGC TURBINE STEP -19
DRAIN BEFORE
3 MAL12AA011 0 M TG Y Y SGC TURBINE STEP-3
HPCV-2
SGC TURBINE SHUTDOWN
OR
STEP- 55
SGC TURBINE STEP-16
OR
SGC TURBINE STEP -19
HRH STRAINER
4 LCM20AA202 0 M TG Y Y SGC TURBINE STEP -14 SGC TURBINE STEP- 2 CONDENSER
DRAIN -1(L)
HRH STRAINER VACCUM >0.3
5 LCM20AA203 0 M TG Y Y OR
DRAIN -2( R) KSC
6 MS STRAINER LCM20AA206 0 M TG Y Y SGC TURBINE SHUTDOWN

!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG REV 0.00
Operating Instruction For Management of Turbine Drains
UNIT - 3/4/5/6 Date : 25/ 02/2009

SL DRAIN VALVE KKS LOCATI MAN MAN AUTO AUTO PROT PROT
NO. DESCRIPTION CODE ON CLOSE OPEN CLOSE OPEN CLOSE OPEN
DRAIN -1(L) STEP -53
MS STRAINER
7 LCM20AA207 0 M TG Y Y
DRAIN -2( R)
DRAIN BEFORE
8 MAL26AA011 0 M TG Y Y DT(IV1 -CRH) >50 DEG .K DT(IV1 -CRH) <20 DEG .K
IV-1
DRAIN BEFORE
9 MAL27AA011 0 M TG Y Y AND AND
IV-2
DRAIN AFTER IV-
10 MAL31AA011 0 M TG Y Y T BEHIND ICV-2 >300 DEG.C T BEHIND ICV-2 <270 DEG.C
1
DRAIN AFTER IV-
11 MAL32AA011 0 M TG Y Y OR OR
2
DT(IV1 -CRH) >50 DEG .K DT(IV1 -CRH) <20 DEG .K
OR OR
T BEHIND ICV-2 >300 DEG.C T BEHIND ICV-2 <270 DEG.C
AND AND
IPCV-2 NOT CLOSED IPCV-2 CLOSED
& &
IPCV-1 NOT CLOSED IPCV -1 CLOSED
GLAND STEAM GLAND STEAM TEM -1<120
12 MAL81AA011 0 M TG Y Y GLAND STEAM TEM -1 >150 DEG.C
DRAIN DEG.C
AND OR
GLAND STEAM TEM -2<120
GLAND STEAM TEM -2 >150 DEG.C
DEG.C
DRAIN
13 EXTRACTION V/V MAL47AA011 0 M TG Y Y EXTRACTION V/V A-5 > 15% EXTRACTION V/V A-5 < 5%
A-5
AND OR
GEN LOAD >10% GEN LOAD <2%
DRAIN
14 EXTRACTION V/V MAL51AA011 0 M TG Y Y EXTRACTION V/V A-4.1 > 15% EXTRACTION V/V A-4.1 <5%
A-4.1
AND OR
DP EXTRACTIONV/V A-4.1 >300mmwc DP EXTRACTIONV/V A-4.1

"
!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG REV 0.00
Operating Instruction For Management of Turbine Drains
UNIT - 3/4/5/6 Date : 25/ 02/2009

SL DRAIN VALVE KKS LOCATI MAN MAN AUTO AUTO PROT PROT
NO. DESCRIPTION CODE ON CLOSE OPEN CLOSE OPEN CLOSE OPEN
<100mmwc
DRAIN
15 EXTRACTION V/V MAL52AA011 0 M TG Y Y EXTRACTION V/V A-4.2 > 15% EXTRACTION V/V A-4.2 <5%
A-4.2
AND OR
DP EXTRACTIONV/V A-4.2
DP EXTRACTIONV/V A-4.2 >300mmwc
<100mmwc
DRAIN
16 EXTRACTION V/V MAL54AA011 0 M TG Y Y EXTRACTION V/V A-3 > 15% EXTRACTION V/V A-3 < 5%
A-3
AND OR
GEN LOAD >10% GEN LOAD <2%
DRAIN
17 EXTRACTION V/V MAL55AA011 0 M TG Y Y EXTRACTION V/V A-2 > 15% EXTRACTION V/V A-2 < 5%
A-2
AND OR
GEN LOAD >10% GEN LOAD <2%
WARMING UP GLAND STEAM TEM BEFV/V GLAND STEAM TEM
18 MAW11AA011 0 M TG Y Y
DRAIN >270(DEG.C) BEFV/V<250(DEG.C)
DRAIN BEF CRH
19 MAL65AA011 0 M TG Y Y CRH NRV >100% CRH NRV 0%
NRV
AND OR
GEN LOAD >10% CRH NRV <100%
OR
GEN LOAD <2%

#
!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009

Interlocks for valves connected to Flash tanks

Sl Protection
Valve Tag Description of Valve Auto open Auto close
No open
IBD TANK ( 02 nos )
MS line L Drain before MSSV ( OPEN Command from
01. MS 401
Left ) GC
CLOSE Command from GC NIL
MS line R Drain before MSSV ( OPEN Command from
02. MS402
Right ) GC
CLOSE Command from GC NIL

UNIT FLASH TANK ( 08 nos


)
03. BP 101 HPBP Drain ( Left ) NIL BLI>10% NIL
04. BP 102 HPBP Drain ( Right ) NIL BLI>10% NIL
05. MS 419 MS Line Drain Before Strainer NIL NIL NIL
DRAIN TO SDFT
06. MS 101 MS Strainer Drain ( Left )
CLOSE
DRAIN TO SDFT OPEN NIL
DRAIN TO SDFT
07. MS 102 MS Strainer Drain ( Right )
CLOSE
DRAIN TO SDFT OPEN NIL
DRAIN TO SDFT
08. HRH 101 HRH Strainer Drain ( Left )
CLOSE
DRAIN TO SDFT OPEN NIL
DRAIN TO SDFT
09. HRH 102 HRH Strainer Drain ( Right )
CLOSE
DRAIN TO SDFT OPEN NIL
10. HRH 604 HRH Line Hdr Drain NIL NIL NIL
STARTUP DRAIN FLASH TANK
11. ( 12 nos )
SGC TG STEP-2 OR
12. MS 105 MS Strainer Drain ( Left )
SGC TG S/D STEP-53
SGC TG STEP-14 NIL
SGC TG STEP-2 OR
13. MS 106 MS Strainer Drain ( Right )
SGC TG S/D STEP-53
SGC TG STEP-14 NIL
14. MS 417 MS Line Drain Before Strainer NIL NIL NIL
15. CRH 101 CRH NRV Drain NIL NIL NIL
COMMAND FROM GC COMMAND FROM GC
CRH DRAIN
OR OR
16. CRH 501 CRH Line Drain
CRH DRAIN POT LEVEL CRH DRAIN POT LEVEL
POT LEVEL
VERY HIGH
HIGH NOT HIGH
SGC TG STEP-2 OR
17. HRH 105 HRH Strainer Drain ( Left )
SGC TG S/D STEP-53
SGC TG STEP-14 NIL
SGC TG STEP-2 OR
18. HRH 106 HRH Strainer Drain ( Right )
SGC TG S/D STEP-53
SGC TG STEP-14 NIL
OPEN COMMAND CLOSE COMMAND FROM
19. HRH 606 HRH Line Drain Before Strainer
FROM GC GC
NIL

20. LP 625 LPBP Line Drain ( Left ) NIL NIL NIL

21. LP 624 LPBP Line Drain ( Right ) NIL NIL NIL

22. HRH 109 LPBP Warm up Line Drain ( Left ) NIL BLI>10% NIL

$
!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009

Sl Protection
Valve Tag Description of Valve Auto open Auto close
No open

23. HRH 110 LPBP Warm up Line Drain ( Right ) NIL BLI>10% NIL

HP DRAIN FLASH TANK ( 13


nos )
CLOSE COMMAND FROM
OPEN COMMAND
SCM-A
FROM SCM-A OR
OR HPH-
HPH-5A/5B EXT. VALVE
Extraction to HPH 5 A / 5 B Line HPH-5A/5B EXT. VALVE 5A/5B/6A
24. EX 105
Drain
CLOSED
OPEN LVL VERY
OR
OR HIGH
OPEN COMMMMAND
CLOSE COMMMMAND
FROM SCM-B
FROM SCM-
SEAL STEAM INLET SEAL STEAM INLET
25. AS 122 Turbine Gland Steam Seal Drain
TEMP<250 DEG.C TEMP>270 DEG.C
NIL
OPEN COMMAND
FROM SCM
OR SUCTION FLOW>30%
Aux. Steam to BFPT A Line
26. AS 104
Drain
BFP-A TRIPPED AND NIL
OR AUX STM TEMP>280DEG.C
BFP-A WORKING &AUX
STM TEMP<250DEG.C
OPEN COMMAND
FROM SCM
OR
SUCTION FLOW>30%
Aux. Steam to BFPT B Line BFP-B TRIPPED
27. AS 109
Drain OR
AND NIL
AUX STM TEMP>280DEG.C
BFP-B WORKING &
AUX STM
TEMP<250DEG.C
OPEN COMMAND
FROM SCM
SUCT FLOW>30%
OR
AND (ACV>2%OR WARMUP
28. CRH 129 CRH to BFPT A DS Line Drain BFP-A TRIPPED
VALVE OPEN)
NIL
OR
(ACV<2% AND AUX
W/U VALVE OPEN)
OPEN COMMAND
FROM SCM
SUCT FLOW>30%
OR
AND (ACV>2%OR WARMUP
29. CRH 141 CRH to BFPT B DS Line Drain BFP-B TRIPPED
VALVE OPEN)
NIL
OR
(ACV<2% AND AUX
W/U VALVE OPEN)
OPEN COMMAND CLOSE COMMAND FROM
FROM SCM SCM
30. CRH 135 Steam to BFPT A Line Drain
OR AND
NIL
BFP-A TRIPPED SUCT. FLOW>30%

!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009

Sl Protection
Valve Tag Description of Valve Auto open Auto close
No open
OPEN COMMAND CLOSE COMMAND FROM
FROM SCM SCM
31. CRH 147 Steam to BFPT B Line Drain
OR AND
NIL
BFP-B TRIPPED SUCT. FLOW>30%
32. CRH 109 CRH to DEA Pegging Line Drain NIL NIL NIL
OPEN COMMAND
FROM SCM
OR
BFPT-A TIPPED CRH TEMP>290 DEG.C
OR AND
33. CRH 116 CRH to BFPT A Line Drain
BFP-A WORKING &CRH AUX STM BLOCK VALVE
NIL
TEM<250 DEG.C OPEN
OR
CRH BLOK VALVE
CLOSE
OPEN COMMAND
FROM SCM
OR
BFPT-B TIPPED CRH TEMP>290 DEG.C
OR AND
34. CRH 123 CRH to BFPT B Line Drain
BFP-B WORKING &CRH AUX STM BLOCK VALVE
NIL
TEM<250 DEG.C OPEN
OR
CRH BLOK VALVE
CLOSE
HPH
OPEN COMMAND 5A/5B/6A
CLOSE COMMAND FROM
FROM SCM LVL VERY
SCM
35. EX 101 Extraction to HPH 6 A Line Drain OR
AND
HIGH
HPH-6A EXT. VALVE OR
HPH-6A EXT VALVE OPEN
CLOSED TURBINE
TRIPPED
HPH
OPEN COMMAND 5A/5B/6B
CLOSE COMMAND FROM
FROM SCM LVL VERY
SCM
36. EX 102 Extraction to HPH 6 B Line Drain OR
AND
HIGH
HPH-6B EXT. VALVE OR
HPH-6B EXT VALVE OPEN
CLOSED TURBINE
TRIPPED
LP DRAIN FLASH TANK ( 07
nos)
CRH to DEA Pegging DS of CV
37. CRH 153
Line Drain
NIL NIL NIL

%
!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009

Sl Protection
Valve Tag Description of Valve Auto open Auto close
No open
OPEN COMMAND
FROM BFP-A SCM
BFP-A SUCT FLOW >30%
OR
&STM PRESS>3.5KSC
OPEN COMMAND
Extraction to BFPT A & B Line AND
38. EX 109
Drain
FROM BFP-B SCM
BFP-B SUCT FLOW >30%
NIL
OR
&STM PRESS>3.5KSC
BFP-A/B NOT
WORKING

39. EX 115 Extraction to DEA Line Drain NIL NIL NIL


LPH-3 LVL
OPEN COMMAND CLOSE COMMAND FROM
VERY HIGH
FROM SCM SCM
40. EX 110 Extraction to LPH 3 Line Drain
OR OR
OR
TURBINE
EX-3 CLOSED EX-3 OPENED
TRIPPED
LPH-2 LVL
OPEN COMMAND CLOSE COMMAND FROM
VERY HIGH
FROM SCM SCM
41. EX 112 Extraction to LPH 2 Line Drain
OR OR
OR
TURBINE
EX-2 CLOSED EX-2 OPENED
TRIPPED
42. AS 113 S SCAPH Line Drain NIL NIL NIL
43. AS 114 P SCAPH Line Drain NIL NIL NIL