Sie sind auf Seite 1von 121

TABLE OF CONTENTS

M3 PURCHASING TRAINING MANUAL M3 PURCHASING TRAINING MANUAL

NAME:......................................................................

CONTACTS:

IT HELPDESK for all technical issues


ServiceDesk@aggreko.biz

Jagoda Dordevic for all Training assistance

Email - Jagoda.Dordevic@aggreko.com.au

Phone - 03 9586 5152

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 1


TABLE OF CONTENTS
M3 PURCHASING TRAINING MANUAL

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 2


TABLE OF CONTENTS
M3 PURCHASING TRAINING MANUAL

TABLE OF CONTENTS
TABLE OF CONTENTS ......................................................................................................................................... 3

M3 SETTINGS & INFOR SMART OFFICE SETTINGS ......................................................................................... 5


How to Log into M3 ............................................................................................................................................... 6
How to Add Widgets.............................................................................................................................................. 7
How to Remove a Widget ..................................................................................................................................... 9
How to Set Favourites in the Navigator Widget .................................................................................................. 10
How to Create M3 Output as a Favourite ........................................................................................................... 12
How to Open a M3 Program ............................................................................................................................... 14
How to Manage M3 Programs in ISO ................................................................................................................. 16
Managing Panel Sequence ................................................................................................................................. 18
How to Use the Quick Note Widget .................................................................................................................... 20
How to Export to Excel ........................................................................................................................................ 21
How to Log Out/Shutdown M3 ............................................................................................................................ 23

CREATE PURCHASE ORDERS (PO) ................................................................................................................. 25


PPS200 Panel Settings ....................................................................................................................................... 26
How to Create a PO for XX Items ....................................................................................................................... 28
How to Create a PO for Stocked Items ............................................................................................................... 36
How to Create a PO through SO ........................................................................................................................ 43
How to Release XHire POs ................................................................................................................................ 51
How to Release Multiple Planned PO's to Form One PO ................................................................................... 64
How to Set a PO Line To Not Include GST Charges .......................................................................................... 65
How to Amend the Addresses on a PO .............................................................................................................. 67
How to Print a PO after it is Approved ................................................................................................................ 68
How to Reprint a PO ........................................................................................................................................... 70
How to Copy a PO .............................................................................................................................................. 72
How to Copy a PO Line ...................................................................................................................................... 74

PURCHASE ORDER AMENDMENTS ................................................................................................................. 77


How to Amend a PO ........................................................................................................................................... 78
How to Cancel a PO............................................................................................................................................ 81
How to Delete a PO Line .................................................................................................................................... 85
How to Process PO Line Flag Complete to an Entire PO................................................................................... 87
How to Process PO Line Flag Complete to a PO Line ....................................................................................... 91

RECEIPTING PURCHASE ORDERS .................................................................................................................. 95


How to Receive a PO .......................................................................................................................................... 96
How to Receive XHire PO'S................................................................................................................................ 98
How to Un-Receive a PO .................................................................................................................................. 102

APPROVE PURCHASE ORDERS ..................................................................................................................... 107


M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 3
TABLE OF CONTENTS
M3 PURCHASING TRAINING MANUAL

How to Approve a Purchase Order ................................................................................................................... 108


How to Approve a PO Amendment that was Raised by Another User ............................................................. 113

MISCELLANEOUS ............................................................................................................................................. 115


How to Review a PO in PPS200 ....................................................................................................................... 116
How to Check if Supplier's Invoice has been Paid and Reprint Invoice ........................................................... 118
How to Check what Invoice a PO Line has been Matched to ........................................................................... 120

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 4


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

M3 SETTINGS & INFOR SMART OFFICE SETTINGS


1 6
2
6
3

7
5

1 Title Bar - The area located at the very top of the Infor Smart Office desktop

2 Taskbar - The area in which the open M3 programs will be displayed when they are not activated.

3 Canvas - The area located in the centre of the desktop, this is a free non-magnetic space that allows you
to drag and drop applications (i.e. widgets, shortcuts) anywhere

4 Widgets

a. Profile Information Information relating to Environment & Division you are in will be displayed.

b. QuickNote - Data from programs can be dragged/pasted to later be dragged/copied to M3


programs.

c. Navigator - This widget allows you to open M3 programs and holds


o Function tab - includes all available M3 programs

o Favourite's tab - M3 Programs can be set as favourites and are held here

o Recent tab - the 10 most recent programs that have been opened are held here

5 Magnetic Area - The left and right-hand side of the desktop that allows widgets to automatically snap into
vertical alignment and can be accessed at any time. This includes when M3 programs are maximised.
Shortcuts created cannot be placed in these areas

6 Open M3 programs

a. The top right Start field

b. The Bar in the "Navigator' Widget field

7 M3 Programs Open M3 Programs appear here


M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 5
M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

HOW TO LOG INTO M3

1 From Citrix screen click on [M3]

2 From Citrix screen click on [M3 Live]

The Lawson Smart Office window opens


3 Key in your Citrix password in the
[Password] field and select the right
arrow

NOTE: Alternatively to Log On you can also


press Enter from the keyboard

Lawson Smart Office opens

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 6


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

HOW TO ADD WIDGETS


Depending on what has been predefined as the set up the following Widgets should be set

1 From LSO click on [Show]

The Show options appear


2 Select [Widget Library]

NOTE: You can also access the Widget


Library by right clicking in the canvas

The Widget Library screen opens


3 Double click on the [Navigator] widget

NOTE: You can also select the widget and


drag it into the canvas where you want it to be
or highlight the widget and click on Add to
Canvas

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 7


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

The widget will appear in your canvas


4 From here you can move it to a spot where
you want it to be.

5 Any widgets that are moved into the


magnetic areas allow you to easily access
them when you are in a M3 program.

6 Your M3 is set up

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 8


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

HOW TO REMOVE A WIDGET

1 All Widgets have the [X] option which allows


you to remove the widget. Click on the [X] for
one of the widgets
Eg, Quikic Note Widget

The widget will no longer appear

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 9


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

HOW TO SET FAVOURITES IN THE NAVIGATOR WIDGET

1 From and opened M3 program right click on


it from the [Task Bar]

The following options open


2 Select [Add to Favourites] then
[Favourites List]

The program will appear in the Favourites


list from the Navigator Widget

3 The favourite can be renamed by right


clicking on the name in the [Navigator]
widget and selecting [Change]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 10


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

The Infor Smart Office window opens


4 In the [Name] field change the name to what
you want and click on [Ok]

The screen returns to the ISO window


5 The name is updated

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 11


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

HOW TO CREATE M3 OUTPUT AS A FAVOURITE

1 From the [Navigator] widget click on the


[Favourites] tab

2 Right click in the blank area inside the


[Favourites] tab

The following options open


3 Click on [New Favourite]

The Create New Favourite window


opens

4 Complete the following


[Name] - Key in the name, eg M3
Output

[Link] - Key in the following link


\\gla1fs01\homedirs\youruserid\
movexoutput\

Your user id - replace this with


your computer user name

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 12


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

The following should appear


5 Click on [Ok]

The Favourite created will appear in the


favourite list

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 13


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

HOW TO OPEN A M3 PROGRAM


There are 4 ways M3 programs can be opened

USING THE START FIELD FROM THE TITLE BAR

1 Key in the program name in the [Start] field


from the title bar located in the top right hand
corner of the screen and press enter
Eg STS100

NOTE: This field can also be accessed by


using [CTRL+R] from the keyboard

The program opens

USING THE NAVIGATOR WIDGET

1 Key in the program name in the white field


below the [Navigator] name and press
[Enter] from the keyboard
Eg PPS200

The program opens

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 14


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

USING THE FAVOURITES SECTION WITHITN THE NAVIGATOR WIDGET

1 From the [Navigator Widget] select


[Favourites] tab then double click on the
program to opens
Eg Service Order. Open (SOS100)

The program opens

USING THE RECENT SECTION FROM THE NAVIGATOR WIDGET

1 From the [Navigator] widget select the


[Recent] tab then double click on the
program to open
Eg Service Order. Open (SOS100)

The program opens

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 15


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

HOW TO MANAGE M3 PROGRAMS IN ISO


There are 3 Ways to access programs when you have multiple open

USING THE TASK BAR

1 To move from one program to the next you


can select the program from the task bar

This will bring the program to the front in your


canvas

SELECTING IT FROM THE CANVAS AREA

1 From the canvas click on


the program using your
mouse

This will bring that program to the front

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 16


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

USING THE FIND WINDOW STANDARD OPTION

1 Click on the [Find Window] icon

The open programs will appear in the


standard option on your screen

2 Click on the program you need

NOTE: You can also use [CTRL+TAB] to toggle


between the programs

The screen returns to


the main ISO window

3 The program selected will


appear at the front

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 17


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

MANAGING PANEL SEQUENCE


The Panel Sequence can be managed through
F13 Settings - For permanent changes

Direct Change - For non-permanent changes

F13 SETTINGS

1 From an open program select [Actions]

The following appears


2 Select [F13 Settings]

The window opens


3 Make the necessary changes
Opening Panel - Select A or B

Panel Sequence

Then click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 18


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

The screen returns to the program


4 The changes made will be applied

DIRECT CHANGE

1 From an open program right click in the Panel


Sequence are and select [Direct Change]

NOTE: CTRL+D can also be used from the


keyboard which will open Direct Change

The following appears


2 Key in the desired sequence and press
[Enter] from the keyboard
Eg, 1

The new panel sequence


will be displayed
When you exit the
program and reopen it
the panel sequence
will revert back to its
original settings

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 19


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

HOW TO USE THE QUICK NOTE WIDGET

1 When you are in a M3 Program you


have the ability to drag or paste
information that you may want to use
in another program into the Quick
Note Widget.
Eg From PPS200, PO
Number, click on the PO
number and then drag it into
the Quicknote widget

The information will appear in the


Quick note Widget

2 From another program you can then


drag the information from the Quick
Note widget into the appropriate field
Eg From PPS300 drag the PO
Number into the PO Number
Field

The information will appear in the


field

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 20


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

HOW TO EXPORT TO EXCEL

1 From the M3 Program highlight a


record/s from the list and click on
[Tools]

The following options open


2 Select [Export to Excel] then [Use
Source Format]

The Select Date Format window


opens

3 Select the date format and click on


[Ok]

The Export to Excel window opens


4 Select the appropriate option
[Export currently selected
rows] for only the rows you
had selected to be put into
Excel

[Export all rows] for all rows


to be exported, which is capped
at 9999 rows

5 Then click on [Export]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 21


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

The export will begin and once


completed Excel will open

6 The rows you had selected or export


option selected will appear

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 22


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

HOW TO LOG OUT/SHUTDOWN M3

1 Prior to logging out ensure no program is


open in the [Task Bar].

2 Right Click in the Task Bar and select [Close


All]

All open programs will be closed


3 Click on [Shutdown] from the Title Bar

NOTE: you also have the option to Log Off by


selecting the drop down arrow next to Shut
Down

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 23


M3 SETTINGS & INFOR SMART OFFICE SETTINGS
M3 PURCHASING TRAINING MANUAL

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 24


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

CREATE PURCHASE ORDERS (PO)

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 25


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

PPS200 PANEL SETTINGS


Prior to creating a Purchase Order the below F13 Settings should be set. This process only needs to be
completed when you first begin using M3

1 In the [Start Bar] key in [PPS200] and press


[Enter]

The PPS200/A panel opens


2 Click on [Actions]

The following options appear


3 Click on [Settings F13]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 26


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS200/P panel opens


4 Ensure the settings are set to
[Opening panel] - A - Entry

[Panel Sequence] - EG13

[Max no. records:] - 1000

Then press [Enter]

The screen returns to PPS200 the settings


are saved

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 27


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO CREATE A PO FOR XX ITEMS

1 In the [Start Bar] key in [PPS200] and


press [Enter]

The PPS200/A panel opens

2 Complete the following


[Warehouse] key in the warehouse
number for the depot requiring the
order

[Supplier] key in the supplier


number (if unknown press [F4] from
the keyboard to search

[Request dely dt] key in the date or


select it from the calendar of when the
items will be delivered or service
conducted
NOTE: Panel Sequence ensure this is set to
[Order type] key in the appropriate EG13. This can be permanently amended through
F13 Settings from the Actions drop down.
order type

The following should appear

3 From the toolbar click on [Create]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 28


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS200/E panel opens

4 Complete the following


[Buyer] key in the M3 id of the
person who raised the PO with the
Supplier

[Requisition by] leave this as your


ID

[Your ref 1] can be used to key in


information which allows you to
distinguish POs from the PPS200/B1
panel when searching.

The following should appear

5 Click on [Next]

The PPS200/G panel opens

6 Click on [Next] if the Addresses do not


need to be amended

NOTE: To change the Addresses refer to How


to Amend Delivery Address on a PO

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 29


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS201/B1 panel opens

7 Complete the following


[Item number] key in the item to be
ordered

[Order qty] key in the quantity

[Purch price] only key this in for


items entered beginning with XX

[Req dt] if this item will be delivered


on different date than the header date
this can be amended here

NOTE: Ensure the [Sorting order] is set to [4 = PO


line] and the panel sequence is [BEI]. The panel
sequence can be permanently amended through
[F13 Settings]

The following should appear

8 Click on [Next]

The PPS201/E panel opens

9 Complete the following


[Our ref no] key in the supplier
quote number if supplied and select
option [3-Qutations no] from the drop
down box next to this field

[Ref order no] if the PO is related to


an agreement or a service order this
MUST be keyed in here

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 30


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The following should appear

10 Click on [Next]

The PPS201/I panel opens


11 Complete the following
[Suppl item no] for XX items
entered if there is a Supplier item
number this can be entered here

[PO item name] for XX items


entered key in a brief description of
what the line is for
NOTE: For Transport POs the following will apply
[PO item descr] if further
PO item name DEL A350230 Bob the
information needs to be entered use
Builder
this field
PO item descr DEL XAVN016
Melbourne. (the XAVN016 will be the
fleet number)

The following should appear

12 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 31


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The Accounting Entry box opens


13 Complete the following
[Bus.Cen] field - This will default to
the warehouse selected for the PO.
Amend if another area will be paying
for the PO
NOTE: Ac Rule
[Dept] field - select the appropriate
R-DEL Rechargeable Delivery
department
R-COL Rechargeable Return
[Cont/Cap] ensure the
agreement/service order number N-DEL Non rechargeable Delivery
entered in the [Ref order no] field N-COL Non rechargeable Return
appears here, if not key this in

[Ac Rule], this only needs to be NOTE: Under NO circumstances is [Cancel] or


[Close] to be used, this will ensure the accounting
amended for transport items entered entries appear for Finance.

14 Then click [OK].


The screen returns to the PPS201/B1
panel

15 The line added will appear in the grid. If


there are more lines to add repeat steps 7
to 14.

16 Once all lines are added to the PO click on


[X Close]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 32


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS205/E panel opens

17 Complete the following


[Highest Status] field if 15/15
(Ready for Printing) appears, in the
[Prf] field key in [1] and then press
[Next]

[Highest Status] field if 12/12


(approval required ) appears this
means that the PO has exceeded your
PO limit and requires a manager to
approve it,

o leave the [Prf] field at [0]

o [Remark] if needed you can


enter information here that the
manager will see when they
review the PO

o [Resp] key in the M3 id of the


manager that will be approving
the PO

Then click on [Next]

The screen returns to the PPS200/A


panel

18 The PO is created Ready for Printing. To


Print the PO copy the PO number and click
on [Actions]

NOTE: if the PO needs to be approved by your


manager you will not be able to complete these
next steps until it has been approved and the
status moves from 12 to 15.

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 33


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The following options appear

19 Click on [Purchase Order Documents F14]

The PPS600/E panel opens

20 Paste or key in the PO number in the [PO


no] field in the bottom left of the screen
and then click on [Next]

NOTE: Ensure the PO number is entered


before clicking next as if not you will be
printing all POs at a status 15. You are also
able to key in multiple PO numbers before
clicking next in the extra white fields

The PPS600/F panel opens

21 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 34


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The MNS212/B1 panel opens

22 Click on [Confirm Output]

The system requires a series of files to be


generated, you will need to click on
[Confirm Output] four times

NOTE: If you do not need a hardcopy to print


for the PO you are able to delete the [PRT] file
line that appears, ensure you delete this line
for all 4 screens that appear.

The Lawson Smart Office box appears

23 Click on [Ok]. The document will print to


the printer and your output file.

24 Click on [X Close] to go back to PPS200/A


panel

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 35


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO CREATE A PO FOR STOCKED ITEMS

1 In the [Start Bar] key in [PPS200] and press


[Enter]

The PPS200/A panel opens

2 Complete the following


[Warehouse] key in the warehouse
number for the depot requiring the
order

[Supplier] key in the supplier


number (if unknown press [F4] from
the keyboard to search

[Request dely dt] key in the date or


select it from the calendar of when the
items will be delivered or service
conducted
NOTE: Panel Sequence ensure this is set to
[Order type] key in the appropriate EG13. This can be permanently amended through
F13 Settings from the Actions drop down.
order type

The following should appear

3 From the toolbar click on [Create]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 36


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS200/E panel opens

4 Complete the following


[Buyer] key in the M3 id of
the person who raised the PO
with the Supplier

[Requisition by] leave this


as your ID

[Your ref 1] can be used to


key in information which allows
you to distinguish POs from
the PPS200/B1 panel when
searching.

The following should appear

5 Click on [Next]

The PPS200/G panel opens

6 Click on [Next] if the Addresses do


not need to be amended

NOTE: To change the Addresses refer


to How to Amend Delivery Address on
a PO

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 37


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS201/B1 panel opens

7 Complete the following


[Item number] key in the
item to be ordered

[Order qty] key in the


quantity

[Req dt] if this item will be


delivered on different date than
the header date this can be
amended here

NOTE: Ensure the [Sorting order] is set to [4 = PO line]


and the panel sequence is [BEI]. The panel sequence can
be permanently amended through [F13 Settings]

The following
should appear

8 Click on [Next]

The PPS201/E panel opens

9 Complete the following


[Our ref no] key in the
supplier quote number if
supplied and select option [3-
Qutations no] from the drop
down box next to this field

Confirm or amend as required


the quantity, delivery date or
purchase price.

Then click on [Next]

NOTE: The F11 Accounting Entry Box


can be opened from this panel, prior to
selecting Next from the keyboard press
[F11] and it will open

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 38


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS201/I panel opens


10 No information is required to be
amended here, click on [Next]

The screen returns to the


PPS201/B1 panel

11 The line added will appear in the


grid. If there are more lines to add
repeat steps 7 to 14.

12 Once all lines are added to the PO


click on [X Close]

NOTE: To access the F11 Accounting


Entry for stocked items from the Lines
double click on the item, then in the next
screen press [F11] from the keyboard].
ONLY the Business Centre and
Cont/Cap should be amended

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 39


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS205/E panel opens

13 Complete the following


[Highest Status] field if 15/15
(Ready for Printing) appears, in the
[Prf] field key in [1] and then press
[Next]

[Highest Status] field if 12/12


(approval required ) appears this
means that the PO has exceeded your
PO limit and requires a manager to
approve it,

o leave the [Prf] field at [0]

o [Remark] if needed you can


enter information here that the
manager will see when they
review the PO

o [Resp] key in the M3 id of the


manager that will be approving
the PO

Then click on [Next]

The screen returns to the PPS200/A


panel

14 The PO is created Ready for Printing. To


Print the PO copy the PO number and click
on [Actions]

NOTE: if the PO needs to be approved by your


manager you will not be able to complete these
next steps until it has been approved and the
status moves from 12 to 15.

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 40


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The following options appear

15 Click on [Purchase Order Documents F14]

The PPS600/E panel opens

16 Paste or key in the PO number in the [PO


no] field in the bottom left of the screen
and then click on [Next]

NOTE: Ensure the PO number is entered


before clicking next as if not you will be
printing all POs at a status 15. You are also
able to key in multiple PO numbers before
clicking next in the extra white fields

The PPS600/F panel opens

17 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 41


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The MNS212/B1 panel opens

18 Click on [Confirm Output]

The system requires a series of files to be


generated, you will need to click on
[Confirm Output] four times

NOTE: If you do not need a hardcopy to print


for the PO you are able to delete the [PRT] file
line that appears, ensure you delete this line
for all 4 screens that appear.

The Lawson Smart Office box appears

19 Click on [Ok]. The document will print to


the printer and your output file.

20 Click on [X Close] to go back to PPS200/A


panel

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 42


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO CREATE A PO THROUGH SO

1 In the [Start Bar] key in [SOS660] and


press [Enter]

The SOS660/B1 panel opens


2 Key in the service order number in the
[SO no] field and press enter

The system retrieves the service order


3 Highlight the Service Order and click on
[Related]

NOTE: You can highlight the Service Order


and from the keyboard press CTRL+13

The following options appear


4 Click on [Order lines CTRL+13]

The SOS120/B1 panel opens


5 Complete the following
[Ltp] select option 2

[Item ID] key in the item number

[Order qty] key in the quantity

[Tech] key in the tech number

[Pln start date] - key in the date


the item is required

[Supplier] key in the Supplier


Code
NOTE: Ensure the Panel Sequence is EF and the
[Sales price] key in the price
Sorting Order is 1-Name

The following should appear


6 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 43


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The SOS120/E2 panel opens


7 Complete the following
[Cost price] key in the cost
price, this will generally be the
same price as the sales price

[Name] if the XX code was used


a description of the items will need
to be keyed in

Then click on [Next]

The Lawson Smart Office box opens


8 Click on [Ok]

The screen returns to the


SOS120/E2 panel

9 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 44


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The screen returns to the


SOS120/B1 panel

10 The item will appear in the grid with a


status [22]. If there are more lines to
add complete steps 5 to 9. Once all
lines added click on [X Close]

NOTE: When the items are delivered


and the PO is received the status for
this line will update to 44

The screen returns to the


SOS660/B1 panel

11 A Planned PO has now been


generated that needs to be
progressed. In the [Start Bar] key in
[PPS170] then press [Enter]

The PPS170/B panel opens


12 Key in the Service Order number in
the [Ref order] field and press
[Enter]

NOTE: Ensure the Sorting Order is set


to [2-Reference Order] and the View is
set to [REF/BUYER-Ref Cat fo]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 45


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The system will retrieve all Planned


POs for your division

13 Double click on the planned po for the


Service Order to release.

The PPS171/E panel opens


14 Click on [Actions] drop down box
If there are multiple Planned
PO's for the same Supplier that
need to be combined DO NOT
complete this step and go to
Step 16

The following appears


15 Click on [Generate Purchase Order
Number]

The PO number is generated


16 Complete the following
[Supplier no] confirm the correct Supplier
appears, amend if incorrect

[Order type] key in 021

[Buyer] key in the M3 user id of the


person that placed the order

[Planned dely dt] confirm/amend the


correct delivery date

[Purchase price] confirm/amend the price

[Our ref no] If a quote has been supplied


this can be entered here.

o Select [3] from the drop down box and


key in the quote number if supplied,
M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 46
CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The following should appear


17 Click on [Next]

The Lawson Smart Office box opens


18 Click on [Ok]

The screen returns to the PPS171/E


panel

19 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 47


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS171/F panel opens


20 Complete the following if needed
[PO item name] Where an
XX code was used key in the
item name

[PO item descr] For XX


codes if more information
needs to be added key this in
here

[Your ref:] Key in reference


for the PO, eg SO number,
parts

[Requisition by] leave this


as your M3 ID

The following should appear


21 Click on [Next]

The screen returns to the PPS170/B


panel

22 Ensure there is nothing in the [Msg]


field, highlight the line and click on
[Related]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 48


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The following options appear


23 Click on [Release Line CTRL + 11]

The system will release the planned


PO and the status moves to 60 -
Released

24 Click on [Actions] drop down box

The following options appear


25 Click on [Create Purchase Order
Selection F14]

The PPS913/E panel opens


26 Key in the M3 id of the person set as the
buyer in the [Buyer] field under the [From]
and [To]. Then click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 49


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The Lawson Smart Office box opens


27 Click on [Ok]

The screen returns to PPS170/B panel


28 The PO is released and will appear in
PPS200

NOTE: the planned po still appears, press [F5


Refresh] on the keyboard and this will clear

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 50


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO RELEASE XHIRE POS

Once the agreement is created, the planned


PO that is generated needs to be released

1 In the [Start bar] key in [PPS1710] and


press [Enter]

The PPS170/B panel opens


2 Complete the following
[Sorting order] - set to 2-Reference
Order

[View] - set to REF/BUYER-Ref Cat


for Buyer

Delete the information that appears in


the grid

Press [Enter]

The following should appear


3 Key in the agreement number in the [Ref
order] field and press [Enter]

The Planned PO is retrieved


4 Double click on the Planned PO to release.

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 51


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS171/E panel opens


5 Click on [Actions] drop down box

The following appears


6 Click on [Generate Purchase Order
Number]

The PO number is generated, copy the PO


number

7 Complete the following


[Supplier no] confirm the correct
Supplier appears, amend if incorrect

[Buyer] key in the M3 user id of the


person that placed the order

[Planned dely dt] confirm/amend


the correct delivery date

[Purchase price] confirm/amend


the price

[Discount 1/2/3:] - key in 100 in the


first field

[Our ref no] If a quote has been


supplied this can be entered here.

o Select [3] from the drop down box


and key in the quote number if
supplied,

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 52


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The
following
should
appear

8 Click on [Next]

The screen returns to the PPS171/F panel


opens

9 Complete the following


[Your ref:] Key in reference for the
PO, eg Agreement number, Xhire,
Customer

[Requisition by] leave this as your


M3 ID

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 53


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The
following
should
appear

10 Click on [Next]

The screen returns to the PPS170/B panel


11 Ensure there is nothing in the [Msg] field,
highlight the line and click on [Related]

NOTE: If an area has not been completed a


message will appear in the Msg field which will
need to be actioned prior to releasing the
Planned PO

The following options appear


12 Click on [Release Line CTRL + 11]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 54


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The system will release the planned PO and


the status moves to 60 - Released

13 Click on [Actions] drop down box

The following options appear


14 Click on [Create Purchase Order Selection
F14]

The PPS913/E panel opens


15 Key in the movex id of the person set as the
buyer in the [Buyer] field under the [From]
and [To]. Then click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 55


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The Infor Smart Office box opens


16 Click on [Ok]

The screen returns to PPS170/B panel


17 The PO is released and will appear in
PPS200

NOTE: the planned po still appears, press [F5


Refresh] on the keyboard and this will clear

Xhire PO's require to be paid using the


XXINV code

18 In the [Start Bar] key in [PPS200] and press


[Enter]

The PPS200/A panel opens


19 Complete the following
[Panel sequence] - set to EG13

[PO number] - Key in the PO number


and press [F4]

NOTE: if the program doesnt open in the


PPS200/A panel go to Actions and F13
settings, change the opening panel to A

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 56


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The system retrieves


the PO

20 Double click on the PO

The PPS200/E panel opens


21 Edit any information as required and then
click on [Next]

The PPS200/G panel opens


22 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 57


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS201/B1 panel opens


23 Complete the following
[Sorting order] - set to 4-PO line

[Panel sequence] - set to EI, amend


through Actions and F13 settings

[Item number] - key in

o XXINV-POW - for power products

o XXINV-TC - for temperature


control

o XXINV-MC - for moisture control

o XXINV-OFA - for air products

o XXINV-OTHER - for all other


xhires

[Order qty] - key in 1

[Purch price] - key in the amount to


be invoiced

[Req del dt] - key in the date of when


the Supplier will invoice the item

The following
should appear

24 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 58


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS201/E panel


opens

25 In the [Ref order no]


field key in the
agreement number and
click on [Next]

The PPS201/I panel


opens

26 In the [PO item name] field


key in the description about
the invoice
EG - NOV Invoice -
350kVA Generator

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 59


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The following should


appear

27 Click on [Next]

The screen returns to the


PPS201/B1 panel

28 The item is added to the grid,


click on [X Close]

NOTE: If the item will be xhired


for longer periods further XXINV
lines will need to be added to be
used to the pay the subsequent
invoices sent by the Supplier

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 60


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS205/E panel opens


29 If
The [Highest status] is 12 the PO will
need to be approved prior to being
printed

o In the [Resp] field key in the


Movex id of the person that will
be approving the PO and click on
[Next]

The [Highest status] is 15, click on


[X Close]

The screen returns to the PPS200/B1 panel


30 To print the PO if the status is 15 take note of
the PO number, highlight the PO and click on
[Actions] drop down

The following options appear


31 Select [Purchase Order Documents F14]

The PPS600/E panel opens


32 Key in the PO number in the [PO number]
field and click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 61


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS600/F panel opens


33 Click on [Next]

The MNS212/B1 panel opens


34 Click on [Confirm Output]
The system requires a series of files to be
generated, you will need to click on
[Confirm Output] four times

NOTE: If you do not need a hardcopy to print


for the PO you are able to delete the [PRT] file
line that appears, ensure you delete this line
for all 4 screens that appear.

The Infor Smart Office box appears


35 Click on [Ok]. The document will print to the
printer and your output file.

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 62


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The screen returns to the PPS600/E panel


36 Click on [X Close] to go back to PPS200/A
panel

The screen returns to the PPS200/B1 panel


37 The status of the PO will move to 20 -
Documents printed

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 63


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO RELEASE MULTIPLE PLANNED PO'S TO FORM ONE PO


Where multiple planned po's appear for the same supplier these can be released to form 1 PO, rather than
multiple. Follow the same steps as completed for releasing a Planned PO for each of the PO's however
Do not click on [Generate Purchase Order Number]

Stop at the point of selecting [Related] drop down box and selecting [Release
Line] and follow the below steps

1 From PPS170 highlight all the planned po's


that need to be combined into one and click
on [Related] drop down box and click on
[Release Line CTRL + 11]

The status changes to 60 - released


2 Highlight all the planned po lines again and
click on [Actions] drop down and click on
[Create Purchase Order Selection]

The PPS913/E panel opens


3 Key in the movex id of the person set as the
buyer in the [Buyer] field under the [From]
and [To]. Then click on [Next]

The Lawson Smart Office box opens


4 Click on [Ok]

The screen returns to PPS170/B panel


5 The PO is released and will appear in
PPS200

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 64


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO SET A PO LINE TO NOT INCLUDE GST CHARGES

From the PPS201/B1 panel, prior to entering


in the item to be ordered

1 In the [Panel Sequence] add the [F] panel


by right clicking in the panel sequence, select
[Direct Change] and add the F panel

The following should appear


2 Key in the item information to be ordered and
click on [Next]

The PPS201/E panel opens


3 Complete the necessary information then
click on [Next]

The PPS201/I panel opens


4 Complete the necessary information then
click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 65


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS201/F panel opens


5 In the [VAT code] field key in [99] - Exempt

The following should appear


6 Click on [Next]

The F11 Accounting Entry screen opens


7 Complete the PO as normal

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 66


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO AMEND THE ADDRESSES ON A PO

1 From the PPS200/G panel tick the [Chg adr]


box against the address you wish to change
and press [Enter]

This will open up the field to be able to


amend

2 Key in the new address details and press


[Enter]

The PPS201/B1 panel opens


3 The address is amended, complete the PO
as normal

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 67


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO PRINT A PO AFTER IT IS APPROVED


Where a PO was at status 12 and required approval by a manager, once this has been approved the status will
move to 15.

The PO can then be printed and sent to the Supplier

1 In the [Start Bar] key in [PPS600] and press


[Enter]

The PPS600/E panel opens


2 Complete the following areas
[Lowest / Highest status] 15 15
and 85 to 85

[PO no] in the fields at the bottom


key in the PO number, you can enter
up to 9 POs

The PPS600/F panel opens


3 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 68


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The MNS212/B1 panel opens


4 Click on [Confirm Output]

The system requires a series of files to be


generated, you will need to click on
[Confirm Output] four times

NOTE: If you do not need a hardcopy to print


for the PO you are able to delete the [PRT] file
line that appears, ensure you delete this line
for all 4 screens that appear.

The Infor Smart Office box appears


5 Click on [Ok]. The document will print to the
printer and your output file.

The screen returns to the PPS600/E panel


6 Click on [X Close]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 69


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO REPRINT A PO
PO's can ONLY be reprinted where the status is greater than 12 and less than 99

1 In the [Start Bar] key in [PPS600] and


press [Enter]

The PPS600/E panel opens


2 Complete the following areas
[Lowest / Highest status] 15 15
and 85 to 85

[Copy] tick the box

[PO no] in the fields at the bottom


key in the PO number, you can enter
up to 9 POs

The following should appear


3 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 70


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS600/F panel opens


4 Click on [Next]

The MNS212/B1 panel opens


5 Click on [Confirm Output]

The system requires a series of files to be


generated, you will need to click on
[Confirm Output] four times

NOTE: If you do not need a hardcopy to


print for the PO you are able to delete
the [PRT] file line that appears, ensure
you delete this line for all 4 screens
that appear.

The Lawson Smart Office box appears


6 Click on [Ok]. The document will print to
the printer and your output file.

7 Click on [X Close] to go back to PPS200/A


panel

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 71


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO COPY A PO
This function can also be used where a PO was raised for the wrong Supplier or Order Type, you are able to
copy the original PO and create a new one that contains the correct Supplier and or Order type.

1 From the PPS200/B1 panel right click on the


PO to be copied

The following information appears


2 Click on [Copy]

The PPS200/C panel opens


3 Amend the information needed and then click
on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 72


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS200/E panel opens


4 The new PO is generated. Continue as
normal

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 73


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

HOW TO COPY A PO LINE

1 From the PPS201/B1 panel right click on


the PO Line to be copied.

NOTE: Depending on the line that is copied


take note of the next available Line Number

The following opens


2 Select [Copy]

The PPS201/C panel opens


3 Key in the next available Line Number in
the [PO line] field and click on [Next] or
press [Enter]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 74


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

The PPS201/I panel opens


4 The line is copied, amend the information
as required

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 75


CREATE PURCHASE ORDERS (PO)
M3 PURCHASING TRAINING MANUAL

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 76


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

PURCHASE ORDER AMENDMENTS

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 77


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

HOW TO AMEND A PO
PO's can only be amended where they are below status 35. If the PO is at status 75 - Received the PO will need
to be un-received first.

1 In the [Start Bar] key in [PPS200] and press


[Enter]

The PPS200/A panel opens


2 In the [PO number] field press [F4]

The PPS200/B1 panel opens


3 Ensure the [Lowest status] fields are set to
00 - 99.

4 Key in the PO number to be amended in the


[PO no] field and press [Enter]

NOTE: There are other options to use to search


for PO's if you do not have the PO Number this
can be selected from the Sorting Order drop down
box

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 78


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The system will retrieve the information


5 Double click on the PO

The PPS200/E panel opens


6 Amend the information as required then
press [Next]

The PPS200/G panel opens


7 Amend the information as required then
press [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 79


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The PPS201/B1 panel opens


8 From here you can
Add a line to the PO - follow the same
steps used when creating a PO

Amend the lines of the PO by double


clicking on the line

Once all amendments are made click


on [X Close]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 80


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

HOW TO CANCEL A PO
PO's can only be cancelled if they are below status 20 and have NEVER been received then un-received. Prior
to completing the below steps ensure you have the correct PO as once the PO's is cancelled it CANNOT be
reinstated

1 In the [Start Bar] key in [PPS200] and press


[Enter]

The PPS200/A panel opens


2 In the [PO number] field press [F4]

The PPS200/B1 panel opens


3 Ensure the [Lowest status] fields are set to
00 - 99.

4 Key in the PO number to be amended in the


[PO no] field and press [Enter]

NOTE: There are other options to use to search


for PO's if you do not have the PO Number this
can be selected from the Sorting Order drop down
box

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 81


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The system retrieves the PO


5 Double click on the PO

The PPS200/E panel opens


6 In the [Your ref 1] field key in the reason for
the deletion of the PO and then click on
[Next]

The PPS200/G panel opens


7 The information entered will be saved/ click
on [Previous]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 82


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The screen returns to the PPS200/E panel


8 Click on [Previous]

The screen returns to the PPS200/B1 panel


9 Highlight the PO and click on [X - Delete]

The Lawson Smart Office box opens


10 Click on [Ok] to begin the process of
cancelling the PO

The PPS200/D panel opens


11 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 83


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The screen returns to the PPS200/B1 panel


12 The status of the PO changes to 99-99 -
Cancelled/PO Closed

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 84


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

HOW TO DELETE A PO LINE


The below process can ONLY be used if the PO Line is below status 20, and has NEVER been received then
un-received. Prior to completing the below steps ensure you have the correct PO Line as once it is deleted it will
be no longer appear on the PO and CANNOT be reinstated

1 In the [Start Bar] key in [PPS200] and press


[Enter]

The PPS200/A panel opens


2 In the [PO number] field press [F4]

The PPS200/B1 panel opens


3 Ensure the [Lowest status] fields are set to
00 - 99.

4 Key in the PO number to be amended in the


[PO no] field and press [Enter]

NOTE: There are other options to use to search


for PO's if you do not have the PO Number this
can be selected from the Sorting Order drop down
box

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 85


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The system retrieves the PO


5 Highlight the PO and click on [Related]

6 Alternatively you can highlight the PO then


from the keyboard press [CTRL+11] then
proceed to step 8

The following options appear


7 Click on [Lines CTRL+11]

The PPS201/B1 panel opens


8 Highlight the line to be deleted and click on
[X - Delete]

The Lawson Smart Office box opens


9 Click on [Ok] to begin the process of
deletion

The PPS200/D panel opens


10 Click on [Next]

The screen returns to the PPS201/B1 panel


11 The PO Line is removed from the PO

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 86


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

HOW TO PROCESS PO LINE FLAG COMPLETE TO AN ENTIRE PO


This process is used where a PO needs to be cancelled that has been received then un-received

Prior to completing the PO Line Flag Complete Steps 1 to 9 MUST be completed if the PO is linked to an
Agreement or a Service Order to remove the link.

Otherwise begin at Step 10

1 From the PPS200/B1 panel highlight the PO


and click on [Related]

2 Alternatively you can highlight the PO then


from the keyboard press [CTRL+11] then
proceed to step 4

The following options appear


3 Click on [Lines CTRL+11]

The PPS201/B1 panel opens


4 Double click on the PO Line

The PPS201/E panel opens


5 Delete any information recorded in the 3 white
fields next to [Ref order no] field. Then click
on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 87


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

Even through the reference has been deleted


this message will appear

6 Click on [Ok]

The screen returns to the PPS201/E panel


7 Click on [Next]

The PPS201/I panel opens


8 Click on [Next]

The screen returns to the PPS201/B1 panel


9 Follow steps 4 to 8 for any remaining lines
then click on [X Close]

The PO is now ready to be PO Flag


Complete

10 In the [Start Bar] key in [PPS350] and press


[Enter]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 88


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The PPS350/A panel opens


11 Key in the PO Number in the [PO no] field
and press [Enter]

The PPS350/E panel opens


12 Click on [Next] to begin the process

The Lawson Smart Office box opens


13 Click on [Ok]

The screen returns to the PPS350/E panel


14 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 89


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The screen returns to the PPS350/A panel


15 The PO has been closed and will move to
status 99

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 90


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

HOW TO PROCESS PO LINE FLAG COMPLETE TO A PO LINE


This process is used where a PO Line needs to be cancelled that has been received then un-received

Prior to completing the PO Line Flag Complete Steps 1 to 9 MUST be completed if the PO is linked to an
Agreement or a Service Order to remove the link.

Otherwise begin at Step 10

1 From the PPS200/B1 panel highlight the PO


and click on [Related]

2 Alternatively you can highlight the PO then


from the keyboard press [CTRL+11] then
proceed to step 4

The following options appear


3 Click on [Lines CTRL+11]

The PPS201/B1 panel opens


4 Double click on the PO Line

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 91


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The PPS201/E panel opens


5 Delete any information recorded in the 3 white
fields next to [Ref order no] field. Then click
on [Next]

Even through the reference has been deleted


this message will appear

6 Click on [Ok]

The screen returns to the PPS201/E panel


7 Click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 92


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The PPS201/I panel opens


8 Click on [Next]

The screen returns to the PPS201/B1 panel


9 Click on [X Close]

The PO is now ready to be PO Flag


Complete

10 In the [Start Bar] key in [PPS350] and press


[Enter]

The PPS350/A panel opens


11 Complete the following
Key in the PO Number in the [PO no]
field

Key in the Line Number in the [PO


line] field

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 93


PURCHASE ORDER AMENDMENTS
M3 PURCHASING TRAINING MANUAL

The following should appear


12 Click on [Next]

The PPS350/E panel opens


13 Click on [Next] to begin the process

The screen returns to the PPS350/A panel


14 The PO Line has been closed and will move
to status 99

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 94


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

RECEIPTING PURCHASE ORDERS

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 95


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

HOW TO RECEIVE A PO
Prior to Receiving in the PO ensure the pricing has been checked in PPS200.

1 In the [Start Bar] key in [PPS300] and press


[Enter]

The PPS300/A panel opens


2 Complete the following
[Warehouse] - key in the warehouse
of the PO to be received. Alternatively
this can be deleted from here

[PO number] - key in the PO number


in the first white field

The following should appear


3 Press [Enter]

NOTE: If only a specific line of the PO is being


received this can be keyed into the white field
next to the PO number and then press [Enter]

The PPS300/B1 panel opens


4 The lines of the PO that require to
be received will be displayed.
Complete the following
[Recved qty] - key in the
quantity delivered. The
[Remain] field will display
the total quantity waiting to
be received

[Location] - confirm or
amend the location for
parts. Generally all XX
codes are set to default to
NONSTOCK location

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 96


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The following should


appear

5 Click on [Actions] drop


down

The following appears


6 Select [Confirm Update F14]

The system processed the receipt


7 All lines that are received in full will disappear
from the grid. To receive in another PO key in
the PO number in the [PO number] field and
press [Enter]. Then follow steps 4 to 6.

8 Once completed click on [X Close]

The MNS212/B1 panel opens


9 Click on [Confirm output]

10 The program closes

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 97


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

HOW TO RECEIVE XHIRE PO'S


To Receive XHire PO's for Lot Controlled Items (Fleet items) the below process is to be used

1 In the [Start Bar] key in [PPS300] and press


[Enter]

The PPS300/A panel opens


2 Complete the following
[Warehouse] - Delete the warehouse

[PO number] - key in the PO number


in the first white field

The following should appear


3 Press [Enter]

The PPS300/B1 panel opens LINE TYPE 7

4 The lines of the PO that require to


be received will be displayed.
Double click on the XH line item

NOTE: the XXINV lines are only to


be received prior to the supplier
invoicing us for the goods and the
pricing has been confirmed

LINE TYPE 8

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 98


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The PPS300/E panel opens LINE TYPE 7

5 Complete the following for both


Line Type 7 & or 8 PO's
[Received qty] - key in the
quantity

[Lot number] - key in the


Supplier's fleet number

[Location] - this is to be
left as to what is defaulted

o Line type 7 the


location will default to
XHIRE

o Line type 8 the LINE TYPE 8


location will default to
the customer number

NOTE: The Lot Number will only be


open for editing for serialised type
products, cable, duct and hose are
generally not lot controlled and this
will not be required to be completed.

Completing the Lot Number to the


Suppliers serialisation system will
allow for easier allocation if multiple
items of the same fleet are hired.

Also when the items are to be


returned easy identification of what
was sent on what agreement will
assist.

If the Supplier does not have


serialisation keying in the
agreement number instead will also
be useful

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 99


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The following should appear LINE TYPE 7

6 Click on [Next]

LINE TYPE 8

The Infor Smart Office box opens


7 Click on [Ok]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 100


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The screen returns to the


PPS300/B1 panel

8 The system processed the receipt,


the line received will disappear from
the grid if received in full. Click on [X
Close]

The MNS212/B1 panel opens


9 Click on [Confirm output]

10 The program closes

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 101


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

HOW TO UN-RECEIVE A PO
PO's can ONLY be un-received when they are at a status 75 (lines received)

1 In the [Start Bar] key in [PPS200] and


press [Enter]

The PPS200/B1 panel opens


2 Key in the PO number in the [PO no] field
and press [Enter]

The system retrieves the PO


3 Highlight the PO and click on [Related]
drop down

NOTE: Alternatively highlight the PO and


from the keyboard use CTRL+11, then go to
step 5

The following options appear


4 Select [Lines CTRL+11]

The PPS201/B1 panel opens


5 Highlight the line to un-receive
and click on [Related] drop down

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 102


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The following options appear


6 Select [Purchase Order Transactions
CTRL+11]

The PPS330/B1 panel opens


7 The line will appear as the first line
in the grid. Highlight the line and
click on [Delete]

The Infor Smart Office box opens


8 Click on [Ok]

NOTE: If the message appears that "Internal


Account Entries Exist", this means that the
PO Line cannot be un-received until the
following day

The PPS330/D panel opens


9 Click on [Next] to proceed

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 103


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The screen returns to the


PPS330/B1 panel

10 The receipt has been deleted, the


status of the PO line will move from
status 75 back to 20 or 15. Click on
[X Close]

The MNS212/B1 panel opens


11 Click on [Confirm output] for the [Printer
file] CAMNGPPF to be processed

The next Printer File to be processed will


appear

12 Click on [Confirm output] to process the


GLS041PF file

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 104


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The screen returns to the


PPS201/B1 panel

13 The status of the line will reflect


the un-receipt processed. Click
on [X Close]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 105


RECEIPTING PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 106


APPROVE PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

APPROVE PURCHASE ORDERS

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 107


APPROVE PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

HOW TO APPROVE A PURCHASE ORDER

1 In the [Start Bar] bar key in [PPS205]


and press [Enter]

The PPS205/B1 panel opens


2 In the white field above the [Sts] field
key in [10] and press [Enter]

NOTE: Status 10 will show all PO's


awaiting to be approved

The system will retrieve the PO's that


have been assigned to you to be
approved

3 Highlight the PO and then click on


[Related] drop down

The following options appear


4 Select [Purchase Order CTRL+11]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 108


APPROVE PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The Infor Smart Office box opens


5 Click on [Ok]

NOTE: to reduce the record search for


purchase order in PPS200 program it has
been configured so that it only searches
are smaller record in order the results to
display quickly

The PPS200/B1 panel opens


6 The PO and its status will be
displayed double click on the PO
appearing as the most recent line in
the grid
The status of the PO will either
display

o 12/12 - All line(s) require


approval

o 12/15 or 12/75 - some


line(s) are to be approved

NOTE: Ensure the settings are as follows


[Lowest status] 00 99

Panel Sequence 1F

View 1 = PO no

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 109


APPROVE PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The PPS201/B1 panel opens


7 Review the following lines that are at
status 12
The items being ordered, the
cost etc

Once reviewed click on [X


Close]

NOTE: Ensure the [Sorting Order] is set


to 4-PO Line.

If you do not wish to approve at this


point click on [Previous] to return to the
PPS200/B1 panel.

To view further information for the line


highlight the line and click on [Display]

The PPS200/F panel opens


8 In the [Signature] field key in you
approval code and click on [Next]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 110


APPROVE PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The screen returns to the PPS200/B1


panel

9 The PO has been approved and the


status changes from 12 to 15. Click
on [X Close]

The screen returns to the PPS205/B1


panel

10 Double click on the PO that has been


approved to set it to Approved status

The PPS205/E panel opens


11 In the [Prf] field key in [1]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 111


APPROVE PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The following should appear


12 Click on [Next]

The screen returns to the PPS205/B1


panel

13 The status of the PO will change to


90. Follow the above steps for
subsequent PO's

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 112


APPROVE PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

HOW TO APPROVE A PO AMENDMENT THAT WAS RAISED BY ANOTHER USER


When amending a PO that is within your PO Limit that is created by another user the PO will move to a status
12 and require re-approval from the F panel. The below process can ONLY be completed if the entire PO is
within your PO Limit

1 From PPS200/B1 locate the PO that


is at status 12. Then right click in the
panel sequence area

The following will appear


2 Click on [Direct Change]

The following will appear


3 Delete the panels that are in this field
and key in [F]

The following should appear


4 Press [Enter] from the keyboard

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 113


APPROVE PURCHASE ORDERS
M3 PURCHASING TRAINING MANUAL

The panel sequence is amended


5 Double click on the PO to re-approve

The PPS200/F panel opens


6 In the [Signature] field key in your 3
digit authorisation code and click on
[Next]

The screen returns to the PPS200/B


panel

7 The status of the PO will move to 15


or 20 depending on what it was prior
to the amendments being made

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 114


MISCELLANEOUS
M3 PURCHASING TRAINING MANUAL

MISCELLANEOUS

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 115


MISCELLANEOUS
M3 PURCHASING TRAINING MANUAL

HOW TO REVIEW A PO IN PPS200

1 In the [Start Bar] key in [PPS200] and press


[Enter]

The PPS200/B1 panel opens


2 Ensure the [Lowest status] fields are set to
00 - 99.
Key in the PO number in the [PO no]
field and press [Enter]

NOTE: There are other options to use to search


for PO's if you do not have the PO Number this
can be selected from the Sorting Order drop down
box

The system will retrieve the information


3 Highlight the PO and click [Display]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 116


MISCELLANEOUS
M3 PURCHASING TRAINING MANUAL

The PPS200/E panel opens


4 The header information of the PO is
displayed click on [Next]

The PPS200/G panel opens


5 The Address information of the PO is
displayed click on [Next]

The PPS201/B1 panel opens


6 The Lines of the PO are
displayed. From here
The Status of the PO Lines
will be displayed in the
[Lst] column.

To view further information


and/or PO Description
highlight the PO line and
click on [Display]

o The PPS201/E panel


opens, click on [Next]
to proceed to the
PPS201/Ipanel

To exit click on [X Close]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 117


MISCELLANEOUS
M3 PURCHASING TRAINING MANUAL

HOW TO CHECK IF SUPPLIER'S INVOICE HAS BEEN PAID AND REPRINT INVOICE
The following process can be used
To search if a Supplier's Invoice has been processed to a PO

Check what invoice a PO has been paid to

Divisions that have Basware will only be able to print the Invoice

1 In the [Start Bar] key in [APS200] and


press [Enter]

The APS200/B1 panel opens


2 Complete the following
[Payee] - key in the
Supplier M3 Number

[Supplier] - key in the


Supplier M3 Number

[Select] - is set to 3-All


invoices

[Supplier invoice no] -


key in the Supplier's
invoice number

Press [Enter]

The system will retrieve the information


3 If the Invoice has been entered through
the system it will be shown
[Invoice amt] - display total
amount of the PO

[Outstanding] - display how


much of the Invoice is left to be
paid

[Purchase order] - display the


PO the invoice was matched/paid
against

To print the Invoice highlight the


invoice and click on [Display]

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 118


MISCELLANEOUS
M3 PURCHASING TRAINING MANUAL

The APS201/E panel opens


4 If the invoice has been scanned
through Basware the [Document]
button will appear.
Click on [Document]

The Basware Image Viewer


window opens

5 Complete the following


[Select view] - click on [All
pages]

Right click on the image and


select [Print]

This will print to your printer

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 119


MISCELLANEOUS
M3 PURCHASING TRAINING MANUAL

HOW TO CHECK WHAT INVOICE A PO LINE HAS BEEN MATCHED TO


The below process can ONLY be used when the status of the PO line is 85 - Matched to an Invoice

1 In the [Start Bar] key in [PPS200] and


press [Enter]

The PPS200/B1 panel opens


2 Key in the PO number in the [PO no] field
and press [Enter]

The system retrieves the PO


3 Highlight the PO and click on
[Related] drop down

NOTE: Alternatively highlight the PO


and from the keyboard use CTRL+11,
then go to step 5

The following options appear


4 Select [Lines CTRL+11]

The PPS201/B1 panel opens


5 Highlight the line to review and click
on [Related] drop down

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 120


MISCELLANEOUS
M3 PURCHASING TRAINING MANUAL

The following options appear


6 Select [Invoice Transactions CTRL+13]

The PPS330/B1 panel opens


7 The Invoice information will be
displayed. From here you can go to
APS200 to check if the Invoice has
been paid.

M3 PURCHASING TRAINING MANUAL V1.1 27/03/15 121

Das könnte Ihnen auch gefallen