Contents
What is GOJO BOQ 2013? ............................................................................................................................. 1
Main Features ........................................................................................................................................... 1
Introduction to GOJO BOQ 2013................................................................................................................... 1
Main Windows, Panels and Tool Bars ........................................................................................................... 1
Gojo BOQ Main Window........................................................................................................................... 2
Change my password Dialog ..................................................................................................................... 4
Manage Accounts Window ....................................................................................................................... 4
Add New Account Dialog ...................................................................................................................... 5
Edit Account Dialog ............................................................................................................................... 6
Notifications Window ............................................................................................................................... 7
Project Set up Wizard ............................................................................................................................... 8
Open Project Window ............................................................................................................................. 10
Cost Category Window ........................................................................................................................... 10
Cost Category Material Panel ............................................................................................................. 11
Cost Category Labor Panel .................................................................................................................. 12
Cost Category Machine/Equipment Panel .......................................................................................... 13
Cost Category Overhead and Miscellaneous Panel ............................................................................ 14
Cost Category Profit Panel .................................................................................................................. 15
Type of work Library Window ................................................................................................................. 16
Sub Contract Log Window ...................................................................................................................... 17
Project Window ...................................................................................................................................... 18
How to......................................................................................................................................................... 21
How to Login ........................................................................................................................................... 21
How to Create User accounts ................................................................................................................. 21
How to Delete user accounts .................................................................................................................. 21
How to Change Passwords ...................................................................................................................... 22
How to Create a new Project .................................................................................................................. 22
How to Close Project (Make project no longer editable) ....................................................................... 22
How to create new Project based on a previous project (copy project) ................................................ 22
Main Features
Prepare rates of quantities from bid documents for contractors
1
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
7
6
2
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
Image Description
1. Create new Project: Used to create new Project. Opens Project Setup Wizard Dialog
2. Open and Existing Project: Used to open and edit existing project. Opens Open Project
Window
3. Cost Category: Used to open and edit different Cost categories and items. Opens Cost
Category window.
4. Type of Work Library: Used to open and edit types of work. Opens Types of Works in Library
window
5. Sub Contract Log: Used to see all Sub Contracted Types of works. Opens Sub Contract Log
window
6. Information Area: Shows information about logged in Users and last log in date
7. Notifications: Show number of all new notifications since last log in. Opens Notifications
window
8. Tools: Displays tool menu
1
2
2.1
3
2.2
1. Manage Accounts: Used to create and edit User Accounts. Opens Manage Accounts Window
2. Notifications: Shows submenus regarding Notifications
2.1 All Notifications: Used to see all notifications. Opens Notifications window with all
notifications
2.2 New Notifications: Used to see notifications created since last log in. Opens Notifications
window with recent notifications
3. Change my Password: Used to change the logged in users password. Opens Change My
Password dialog
3
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
4 5
1 2 3 4
5
4
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
1 2
4
3
7
5 6
5
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
3
2
6
4 5
6
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
Notifications Window
2
3
7
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
1
2
6
5
8
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
2 3 4
1. Project types view area: Shows all the inserted project types
2. Back: Used to return to previous Project Wizard Page
3. Add: Used to add new Project Types
4. Remove: Used to remove selected project type
5. Finish: Used to finish project Setup. Opens Project window
9
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
4 6 7
5
10
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
1 4
3 5
1. Material List Area: Shows all Materials in database. When one Item is Selected Material Details
are Shown on Material Detail View Area
2. Material Detail View Area: Shows details of selected material, or is used to insert data when new
material or update buttons are clicked
3. New Material: Used to insert new material to database. Clears Material Detail View Area for
new material Data Insertion
4. Update: used to update the cost or density of the selected Material. Unit cost and Material
Density are highlighted for new data insertion
5. Delete: Used to delete selected Material
11
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
1 3 4
5
1. Labor List Area: Shows all Labor types in database. When one Item is Selected Labor Details are
Shown on Labor Detail View Area
2. Labor Detail View Area: Shows details of selected Labor, or is used to insert data when new
Labor type or update buttons are clicked
3. New Labor Type: Used to insert new Labor type to database. Clears Labor Detail View Area for
new Labor Data Insertion
4. Update: used to update the daily Labor Wage of the selected Labor. Daily Labor Wage is
highlighted for new data insertion
5. Delete: Used to delete selected Labor
12
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
1 3 4
5
1. Machine List Area: Shows all Machine in database. When one Item is Selected Machine Details
are Shown on Machine Detail View Area
2. Machine Detail View Area: Shows details of selected Machine, or is used to insert data when
new Machine or update buttons are clicked
3. New Machine Type: Used to insert new Machine to database. Clears Machine Detail View Area
for new Machine Data Insertion
4. Update: used to update the hourly cost of the selected Machine. Hourly cost is highlighted for
new data insertion
5. Delete: Used to delete selected Machine
13
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
1. Overhead and Miscelaneous Percentage Detail View Area: Shows Overhead and miscellaneous
percentage and last date modified, or is used to insert new percentage when update buttons is
clicked
2. Update: used to update the Overhead and miscellaneous percentage. Overhead and
miscellaneous percentage in decimal is highlighted for new percentage insertion
14
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
1. Profit Percentage Detail View Area: Shows Profit percentage and last date modified, or is used
to insert new percentage when update buttons is clicked
2. Update: used to update the Profit percentage. Profit percentage in decimal is highlighted for
new percentage insertion
15
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
2 4 5 6 7 8
16
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
1. Subcontracted Types of works List View Area: Shows all Subcontracted Types of works
2. Subcontractor Detail Area: Shows Subcontractor Detail of the selected subcontracted type of
work
17
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
Project Window
1. Project Detail View Area: Shows Project Details of the current Project
2. Bill of Quantity Detail View and Work Area: used to show and construct all categories, work
items types of work and subcontracted types of works in a project type
3. Bill of Quantity View Changing Area: used to change pages either between bill of quantity work
area, material list and labor requirement or between different types of projects
18
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
1. Material list based on work items view are: Shows all materials used in the selected Project Type
categorized under their specific work items
19
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
1. Labor Requirements based on work items view area: Shows all Labor types used in the selected
Project Type categorized under their specific work items
20
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
How to
How to Login
Initiate the software.
The software check if the user name and password is correct and log you in
select New
Enter user name, password, Display Name, select role(Administrator or Limited User) and select
OK
The software will display an appropriate message and create the new account.
select Delete
21
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
The software will display an appropriate message and delete the account.
Enter old password, new password, repeat new password and select ok.
The software will show the next page of Project Setup" Wizard
Select Add to add project types, enter project type names, locations and quantity. and select finish
The Software will prepare the "Project" Window for work items to be entered according to project
types
The software will Close the Project and the project will no longer be editable
22
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
The software will copy the Project and open the project window for use
The software will show material list of the selected Project type
The software will show Labor Requirements of the selected Project type
Enter description, Unit, Unit Cost, quantity, select a subcontractor or add new subcontractor and select
OK.
23
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
The software will insert the new subcontracted type of work under the work item
24
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
If specific project types is selected, check on project types you want to export and select whether to
include material list, labor requirements, cost ratio analysis and cost break down.
Select export
If specific project type is selected, check on project types you want to export and select whether to
include material list, labor requirements, cost ratio analysis and cost break down.
Select print
The software will show the "Project Type cost percentages based on cost category " window
25
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
The software will show the "Project Type cost percentages based on work Items " window
How to Calculate unit Costs based on selected cost categories and cost items for
the whole project (Filter out some cost components)
On Project window select settings and select Project settings
To exclude cost categories, check on the cost categories that you want to exclude. Ex. Check on Material
and all material costs will be excluded
To exclude cost items, expand the cost categories by selecting the + sign and check on a cost item that you
want to exclude. Ex. Check on Water and water costs will be excluded
select New
Select materials and select > arrow to add the selected materials to the new type of work
Select labor types and select > arrow to add the selected labor types to the new type of work
Select machines/equipments and select > arrow to add the selected machines/equipments to the new
type of work
Select pre made mixratios and select > arrow to add the selected mixratios to the new type of work
On materials in type of work enter the quantity needed of that material per unit type of work
On labors in type of work enter the utility factor and quantity needed of that labor per unit type of work.
26
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
And enter hours taken for a unit out put per gang
On machines/equipments in type of work enter the machine hour needed of that machine per unit type
of work
On Mixratios in type of work enter the quantity needed of that of that pre made mixratio per unit type of
work
Select save
Select delete
27
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
The software will create new item with corresponding material cost and other necessary information
insert the material name and the corresponding material cost with the necessary information and clicks
on save material
The software will save the material and the material cost with the necessary information
The software will highlight on unit cost and material density of the material
28
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
Select Yes
The software will create new item with corresponding labor type name and cost
insert the labor type name and the corresponding cost and select on save labor type
The software will save the labor type and the cost
29
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
Select Yes
The software will create new item with corresponding machine/equipment name and hourly cost
insert the machine/equipment name and the corresponding cost and select on save machine
30
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
Select Yes
The Software will show the current Overhead and miscellanies percentage and last updated date
31
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
Select update
The Software will show the current profit percentage and last updated date
Select update
select New
The Software will show a page for construction of the new Mix ratios
Enter Mix ratios name, description ,shrinkage, wastage and select type of mix
Select materials and select add to add the selected materials to the new mix ratio
On the add material double click on ratios of the corresponding materials and enter ratios
32
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
Select save
Select Yes
33
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
34
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
Glossary
Project Type: In a specific project (Contract), there may be different types of constructions (Ex. A One
bedroom house, two three bedroom houses and a road that will connect the house to the main road).
A project type is sub project within the parent project(Contract) holding only one the group
construction(Eg. Two three bedroom houses).
Category: is the highest container of work items and types of works with in a specific project type. (Ex.
Super Structure, Sub Structure)
Work Item: is a container below a category that holds types of works and subcontracted types of works.
(Ex. Concrete Work)
Type of Work: is a collection of materials, Labor Types, Machineries, Overhead and miscellaneous cost
and profit cost bound together by a formula that defines the smallest component in a project type. )
Subcontracted Type of work: are types of works that the contractor subcontracts to other companies.
Subcontracted types of works only contain Description, Unit, Unit Price, and Quantity.
Mix Ratio: are systematic calculation of quantities of material based on only ratios and densities of the
component materials.
Notifications: are any significant changes that are stored to inform the administrators
Limited User: is a user with only specific privileges. A limited user cannot see other users projects,
cannot delete anything from library and so on.
35
Continental Management Systems and Software Solutions P.L.C.
Gojo BOQ 2013
Acknowledgements
Main Contributors: Biniyam Girma, Selam Girma, Mulugeta Kebebew, Abel Tadesse, Ermiyas Siyoum,
Thanks to: all the people in continental management systems and software solutions and people that
participated on the development and testing of the project
36